Generic Project SW Test Kernel

Draft proposition for


Arguments for the In order to fully benefit from new test systems (TestBox/ITB V2/, etc) is also neede
introduction of the Test will provide, for the DUT, a predictable behaviour even in early stages of SW devel
Kernel run full tests on the HW and communication platform. It will also aloud the decuplin
activities, resulting in a high time economy. A lot of money, development time and
a standardized test kernel in early stages of development (PDV/DV...) in tandem w
greately ease the test reuse and test standatization.

Description Modular test kernel has a generic and a project related parts. Higly modular can b
and HW platforms. Has a standardized communication interface, a system interfac
interface. Modules for board interface can be easely developed and integrated into
SW interfaces.

Development steps ● Define general kernel functionalities


(WPs)
● Define the modular archietecture and interface standard
● Define and develop communication interface
● Define the modular structure of the kernel
● Define and develop standar kernel modules
● Define and develop multi-kernek synchronization and communication for multi-mic
● Define and develop the kernel security interface
● Define and implement kernel validation checklist and installation/configuration proc
● Disseminate information, documentation. Organize trainings.
● Set-up the test kernel Continental internal standard

Estimated Project ● HC: 2 developers, 1 archietect, 1 PM


Expenses and Duration
● Time: 1 year (2020)
● Additional costs (excluding HC) for licences, HW, development tools: 120 KEUR

Benefits ● Test time reduction and HW/SW blockages reduced by more than 60%
● Test cost reduction by more than 25%
● Increase Test reuse by more than 60%
● Reduce HW development time, in preDV and DV phases by more than 30%
● Reduce R&D costs by 25%
est Kernel
Draft proposition for generic projects 2020 12.06.2019
x/ITB V2/, etc) is also needed a SW test & debug kernel that
in early stages of SW development. The kernel will aloud to
will also aloud the decupling of SW and HW development
ney, development time and men-hours can be saved by using
ent (PDV/DV...) in tandem with a test automation device. It will

d parts. Higly modular can be adapted to various requirements


interface, a system interface and a modular onboard modules
veloped and integrated into kernel by the use of standardized

ommunication for multi-microcontrollers boards

stallation/configuration procedure
nings.

opment tools: 120 KEUR

more than 60%

es by more than 30%

You might also like