Project: ETAP Page: 1

12.6.0H
Location: Date: 23-11-2019
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: LAB1_PROTECTION1___REPORT Config.: Normal

Sequence-of-Operation Event Summary Report

Symmetrical 3-Phase Fault between Bus4 and Lump1. Adjacent to Bus4.

Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition


8.5 M1 4.686 1.0 8.5
26.2 M3 4.527 10.0 26.2 Phase
26.2 M4 4.527 10.0 26.2 Phase
21418 M2 0.159 14453 21418 Phase
28163 M5 4.527 18541 28163 Phase