MUHAMMAD ZIKRIL HAFIZ B MOHD MAIZAM

PERSONAL DATA

IC No. : 940905-14-6849 Gender : Male

Passport No. : A34949581 Marital : Married


Status
PCN No. : 329032
Present : Welding/NDT/Piping Inspector
Date of Birth : 05 September 1994 Designation
Age : 25 years old Email : zick5994@gmail.com
Languages : Malay & English Citizen : Malaysian
Mobile No. : +60145328940
TECHNICAL EXPERIENCE

4 years of experience in the application and exercise of Welding Inspection and Non Destructive
Testing methods in engineering industries, refineries, process plant, fabrication yard and general
oil and gas industries. Experience making for any NDT methods and reporting.

ACADEMICS
September 2019 Attended Classes for API 571 Certification Course.

August 2019 Attended Training for Abseiling Rope Access (IRATA)

October 2017 Attended Classes for Magentic Particle Testing by PCN at Ruane
Tati Kemaman

September 2017 Attended Basic Offshore Safety Induction and Emergency


Training(BOSIET)conducted by OPITO

February 2016 Attended Confined Space and Standby Person (AESP) training
conducted by NIOSH.

Aug 2015 – Nov 2015 Attend Course Certification Organized by INSEP for Dye-Penetrant
Inspection and Welding Inspection

May 2015 – May 2015 Certificate of Ultrasonic Testing for Engineering Non-Destructive
Testing in full categories
(3.1- Plate, 3.2- Pipe, 3.7-T-Joint, 3.8-Nozzle and 3.9- Node)
April 2015 Attended Oil and Gas Passport (OGSP) training conducted by
NIOSH.

July 2012 – July 2015 Diploma in Engineering of Non-Destructive Testing


Terengganu Advance Technical Institute (TATI) University
CGPA: 3.37

CAREER AIM

I am seeking a professional position that will allow me to further my experience and skills, and
allow me scope for forward movement. Keep up-to-date with changes in technology through
continuing education and training
QUALIFICATION

• IRATA Abseiler Level 1


• PCN Welding Inspection 3.1/Level 2
• PCN Ultrasonic Testing (3.1, 3.2, 3.7, 3.8 & 3.9)
• PCN Magnetic Particle Testing
• PCN Dye Penetrant Testing
• A valid BOSIET
• A valid NIOSH

WORKING EXPERIENCE
CAKERAWALA CARIGALI HESS OPERATING COMPANY PLATFORM (CKP),
THAILAND
• 7 November 2019 – 19 November 2019 (13 Days)
• Applus Velosi Piping & NDT Inspector.
• Performing Close Visual Inspection and Ultrasonic Thickness Measurement on Piping.
o ASME B31.3
o API 570
o API 571

CAKERAWALA CARIGALI HESS OPERATING COMPANY PLATFORM (CKP),


THAILAND
• 2 October 2019 – 24 October 2019 (23 Days)
• Applus Velosi Piping & NDT Inspector.
• Performing Close Visual Inspection and Ultrasonic Thickness Measurement on Piping.
o ASME B31.3
o API 570
o API 571

SAFE EURUS FLOATING HOTEL RIG, MAURITIUS


• 30 July 2019 – 25 August 2019 (27 Days)
• Axess Offshore NDT Inspector
• Performing Thickness Measurement for All Pressure Vessel Inside The rig.
• Assisting Calibration and Pressure Test for Pressure Safety Valve & Pressure Reduce
Valve for All Instrument and Pressure Vessel.
o ASME VIII
o API 510

PETRONAS GAS BERHAD, KERTEH


• 4 July 2019 – 20 July 2019 (16 Days)
• Danamin Malaysia SB Ultrasonic Testing Flaw Detector Inspector
• Shutdown for GPP4 plant.
o Refer to ASME B31.3
o ASME VIII
o API 510

FLOATING STORAGE OFFSHORE (FSO) SEPAT, PCSB


• 15 May 2019 – 1 June 2019 (18 Days)
• Energy Workforce Piping Inspector cum Rope Access (IRATA)
• Close Visual Inspection for Piping Campaign
o Refer to ASME B31.3
o API 570
o API 574

DULANG B, PETRONAS CARIGALI SENDIRIAN BERHAD


• 16 April 2019 – 27 April 2019 (12 Days)
• Technofibre UT Inspector cum QC Inspector
• UT Flaw Detector Scan for Lifeboat Davit Legs Structure
o Refer to AWS

WEST DESARU MOBILISATION OFFSHORE PROCESS UNIT (MOPU), PETROFAC


• 12 March 2019 – 27 March 2019 (27 Days)
• Reliacraft UT Inspector cum Rope Access (IRATA)
• UT-A Scan for Non-Intrusive Pressure Vessel & Heat Exchanger.
o Refer to ASME

FLOATING PRODUCTION STORAGE OFFSHORE (FPSO CENDOR), PETROFAC


• 14 January 2019 – 28 January 2019 (15 Days)
• Reliacraft Welding Inspector cum Rope Access (IRATA)
• Performing Close Visual Inspection for Utilities & Instrument Piping.
o Refer to ASME B31.3.

WEST DESARU MOBILISATION OFFSHORE PROCESS UNIT (MOPU), PETROFAC


• 12 December 2018 – 31 December 2018 (20 Days)
• Reliacraft Welding Inspector cum Rope Access (IRATA)
• Performing Close Visual Inspection for Topside Structural and Crane.
o Refer to AWS.

EVERSENDAI FABRICATION YARD, RAWANG


• December 2017 – 1 October 2018 (9 Months)
• Energy Workforce NDT Multitech Inspector.
o Supervise and monitoring NDT Inspection for several projects: KL118 Tower
Project by PNB Merdeka Venture under contractor Samsung C&T.
▪ Refer to BS EN Standards
o Jimah East Power Sdn Bhd by Hyundai
▪ Refer to BS EN Standards
o Melaka Refinery Diesel Euro 5 by Hyundai
▪ Refer to BS EN Standards
o New State Court by Samsung C&T
▪ Refer to AWS Standards
o Mixed Development Lot91 Sapura by Samsung C&T
▪ Refer to BS EN Standards.

KNM FABRICATION YARD, MELAKA


• November 2017 – December 2017 (2 Months)
• Energy Workforce NDT Inspector
• Assistant PAUT for project 117 Stainless Steel Vessel
o Refer ASME V for procedure and ASME VIII for the acceptance & rejection
criteria.

UIE SOLUTION (M) SDN BHD, KUANTAN


• Sept – November 2017 (3 Months)
• Technical Assistant for RBI Inspector
• Liase with Head of Technical, RBI Engineer, Corrosion Engineer and Inspection Engineer
on project commissioning.
• Assisting in the completion of Risk Based Inspection report.
• Analyse UT and visual report documentation.
• Transfer markup of Process & Instrumentation Design of offshore piping system.
• Project Involved:
i. BDO Re-assessment (BASF Petronas Chemicals Sdn Bhd, Gebemg)
ii. RBI Piping Inspection (Petronas Carigali Sdn Bhd PMO, Kerteh)

PETRONAS CHEMICAL BERHAD, KERTEH


• July – August 2017 (2 Months)
• Danamin Multi NDT Inspector
• Operated and Scanning All The Pipes, Structure and Equipment To Check The Thickness
of A Material Using Ultrasonic Testing Thickness Gauging or C-Scan.
o Refer ASME V for procedure and ASME VIII for the acceptance & rejection
criteria.

DIALOG RAPID FABRICATOR YARD, PENGERANG


• August 2016 – June 2017 (11 Months)
• Energy Workforce Welding Supervisor
• Supervise Visual Inspection and monitoring NDT Inspection for Pressure Vessel and Bullet
Tanks.
• Perform Visual Inspection, Ultrasonic Testing Flaw Detector & Magnetic Particle Testing
for Pressure Vessel and Bullet Tanks.
o Refer to PD500 for procedure and acceptance & rejection criteria.

PETRONAS GAS BERHAD, KERTEH


• May – August 2016 (4 Months)
• Danamin Multi NDT Inspector
• Gas Processing Kerteh (GPK) at GPP1 & GPP2.
• Operated and Inspect The Equipment Using Ultrasonic Testing Flaw Detector, Dye
Penetrant Testing or Magnetic Particle Testing.
o Refer ASME V for procedure and ASME VIII for the acceptance & rejection
criteria.
o Refer ASME B31.3 for process piping.

PETRONAS CHEMICALS BASF BERHAD, GEBENG


• March – April 2016 (2 Months)
• Danamin Multi NDT Inspector
• Petronas Chemical BASF for Turnaround Projects in this two plant:
o MAN & BDO plant.
• Operated and inspect the equipment using dye penetrant testing or magnetic particle
testing.
o Refer ASME V for procedure and ASME VIII for the acceptance & rejection
criteria.

PETRONAS GAS BERHAD, KERTEH


• January – February 2016 (2 Months)
• Danamin Multi NDT Inspector
• NDT Inspector at Petronas Gas Berhad Komplek A (GPP3) for Turnaround Project.
• Operated and Scanning All The Pipes, Structure And Equipment To Check The Thickness
of A Material Using Ultrasonic Testing Thickness Gauging or C-Scan.
o Refer ASME V
o ASME VIII

UTILITIES KERTEH
• December 2015 – January 2016 (2 Months)
• Danamin Multi NDT Inspector
• Operated and Inspect All The Specimen Using Several Technique of Non-Destructive
Testing but Mostly Used Is Dye Penetrant & Magnetic Particle Inspection.
o Refer ASME V
o ASME VIII

PETRONAS GAS BERHAD, KERTEH


• October – December 2015 (3 Months)
• Danamin Multi NDT Inspector.
• Petronas Gas Berhad Komplek A (GPP2) Maintenance Projects.
• Operated and Scanning All The Pipes, Structure And Equipment to Check The Thickness
of A Material Using Ultrasonic Testing Thickness Gauging and C-Scan. Perform Dye
Penetrant or Magnetic Particle Inspection to Check The Surface Defect By 3mm Depth and
Below.
o Refer ASME V
o ASME VIII

PETRONAS GAS BERHAD, KERTEH


• February – May 2015 (4 Months)
• Danamin Multi NDT Inspector
• NDT Technician at Petronas Gas Berhad Komplek A (GPP1) for maintenance project.
• Operated and scanning all the pipes, structure and equipment to check the thickness of a
material using ultrasonic testing thickness gauging and c-scan.
o Refer ASME V
o ASME VIII

MALAYSIAN MARINE AND HEAVY ENGINEERING PASIR GUDANG, JOHOR.


• October – December 2014 (3 Months)
• Freelance at MMHE as Multi NDT Inspector
• Operated and inspect the all the specimen using several techniques such as dye penetrant
testing, ultrasonic testing and positive material identification (PMI).