17.PAT.A105 Rev.G PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES:

NO ETIC
'W

H
° 15

GN
RT
S 62

MA

MAKKAH

LEGEND:

1070

STAIR ( 03) STAIR ( 02)


FR - 044 FR - 021

RAC SERVER
MEP
ELEV.=400

ROOM
W=3860
H=1300

FR - 059
FR - 022
MEP
FR - 036
ELEC.
FR -
ELEV ELEV DN ELEC
NO. (01) NO. (02) FR - 043 DN
1321

STAIR ( 04) CORRIDOR FHC


FR - 073 FR - 047 EXISTING WALL TO BE RETAIN,PAINTED
FINISHED AND NEW DOORS TO INSTALLED CORRIDOR
ELEV.=400
W=4000

FR - 035
H=1300
4410

REFERENCE DRAWINGS:
WAITING
LOUNGE
FR - 058 MEP
FR - 050

FHC JANITOR
DN STAIR ( 05) KITCHEN FR - 028
2200

UP FR - 074 FR - 038
STORAGE
FR - 042
CONTROL ROOM
CUSTOMS FR - 048 TOILET
3325 F-TOILET
OFFICES FR - 034 ABLUTION
FR - 061 FR - 029
SHOWERS
FR - 070
FR - 026

SERVER
JANITOR FR - 051
FR - 062
LOCKERS
FR - 033

JANITOR
OPEN BELOW
CORRIDOR CORRIDOR
FR - 063 CAFE PRAYER HALL
RAMP FR - 049 CORRIDOR FR - 023
UP FR - 039 FR - 025
FR - 041

OFFICE
REST ROOM
FR - 071
M-TOILET FR - 032
FR - 064

RAC OFFICE
FR - 069
LOBBY
ADDITIONAL
OFFICES
KEY PLAN

N
OFFICE

ETIC
H
GN
FR - 065

RT
FR - 052

MA
NO
FR - 051A

COMM.
FR - 067
LAND SIDE
FHC

ELEC.
CORRIDOR
FR - 066
FR - 30
CORRIDOR
CORRIDOR FR - 053
FR - 060
P1

RSAF AIR SIDE


LOBBY PTB
FR - 056
FR - 55A
MEZZANINNE PASA OFFICE AL-ATHEER
FR - 057 FR - 054 PASA OFFICES PASA OFFICES OFFICES
FR - 040 FR - 031 FR - 024

OFFICE OFFICE
G REVISED AS PER COMMENTS 13.03.19 EAM EPC HH
FR - 072 FR - 068
RSAF MGN RLB MVL
F REVISED AS PER COMMENTS 06.09.18
FR - 055
E ISSUED FOR APPROVAL 29.08.18 MGN RLB MVL

D ISSUED FOR APPROVAL 14.07.18 MGN RLB MVL


576

C REVISED AS PER COMMENTS 05.07.18 MGN RLB MVL

H=2400 H=2400 H=2400 H=2400 H=2400 H=2400 H=2400 B GENERAL UPDATE 22.05.18 MGN RLB MVL
W=10800 W=10800 W=10800 W=10800 W=10800 W=10800 W=10800 revision revision description (see flags) date drawn checked review
575 11400 600 600 ELEV.=1000 600 600 ELEV.=1000 600 600 ELEV.=1000 600 600 ELEV.=1000 600 600 ELEV.=1000 600 600 ELEV.=1000 600 600 ELEV.=1000 600 600
drawing revision history

PrivatAir
SAUDIARABIA

Consultant:

project:
RENOVATION OF PRIVATE AVIATION TERMINAL
KING KHALID INTERNATIONAL AIRPORT, RIYADH
ISSUED FOR subject:
FIRST FLOOR
APPROVAL PARTIAL PLAN
(1 OF 2)
drawing number: revision:

17.PAT.A105 G
scale: drawn: checked: reviewed:
@A0 1:100 MGN RLB MVL
drawing status: date: 04/14/18
ISSUED FOR APPROVAL sign:
copyrights reserved
FILENAME

You might also like