Professional Documents
Culture Documents
Part e
Part e
(2 X 660 MW)
TECHNICAL SPECIFICATION
FOR
WATER SYSTEM PACKAGE
SECTION - VI
PART – E
(TENDER DRAWINGS)
CONSULTANT
NTPC Limited
(A Government of India Enterprise)
(2 X 660 MW)
TECHNICAL SPECIFICATION
FOR
WATER SYSTEM PACKAGE
SECTION - VI
PART – E
(TENDER DRAWINGS)
CONSULTANT
NTPC Limited
(A Government of India Enterprise)
(This document is meant for the exclusive purpose of bidding against this Package and shall not be
transferred, reproduced or otherwise used for purposes other than that for which it is specifically issued).
CLAUSE NO.
LIST OF TENDER DRAWINGS
Option-2
3. 9915-373-POM-A-002B Rev. A P&I Diagram FOR RO Plant (2 Sheets)
C&I
Layouts
Plant Utility
S. No. DRAWING NUMBER TITLE
11. 9915-999-POM-A-046 Layout of Fire hydrant and spray mains
12. 9915-999-POM-A-047 Schematic Drawing of Compressed Air System
13. 9915-373-POM-A-048 P&I diagram of HVW/MVW spray system
14. 9915-373-POM-A-049 P&I diagram of fire water pump house.
15. 9915-373-POM-A-050 P&I diagram of fire water booster pump house
16. 9915-373-POM-A-051 Miscellaneous Details of Fire Detection System
17. 9915-373-POM-A-052 Fixing Details of Wall Mounted Axial Fans
18. General Layout Plan Coal, Limestone & Gypsum Handling
9915-372-POM-A-001
Plant
ELECTRICAL
S. No. DRAWING NUMBER TITLE
19. ------999-POE-J-002 Single Line Diagram – Water System
C&I
S. No. DRAWING NUMBER TITLE
20. 0000-999-POI-A-001, Distributed Digital Control, Monitoring and Information
Sh. 2 of 2 System (DDCMIS) configuration diagram
21. 0000-999-POI-A-019A, Instrumentation cabling diagram Grounding Scheme For
Sh.1 of 2 Cabinets/ Panels/ Power Supply
22. 0000-999-POI-A-019A, Instrumentation cabling diagram Grounding Scheme For
Sh. 2 of 2 Cabinets/ Panels/ Power Supply
23. 0000-999-POI-A-019B Scheme for 24V DC Power Supply System
24. 0000-999-POI-A-019C, Scheme for Uninterrupted Power Supply System-
Sh.1 of 2 Configuration-A
25. 0000-999-POI-A-019C, Scheme for Uninterrupted Power Supply System-
Sh. 2 of 2 Configuration-B
26. 0000-999-POI-A-022 Instrument Installation Diagrams
To
0000-999-POI-A-034
27. 0000-405-POI-A-035 Instrument Source Connection details
(sheet 1 to 14)
KHURJA SUPER THERMAL POWER PROJECT TECHNICAL SPECIFICATIONS
LIST OF TENDER PAGE
(2X660 MW) SECTION – VI, PART-E
DRAWINGS 2 OF 3
WATER SYSTEM PACKAGE BID DOC NO: THDC/RKSH/CC-9915-373
CLAUSE NO.
LIST OF TENDER DRAWINGS
NOTES
P2a
P2b
P2c
LEGEND
(P7a)
(P7b)
(P3a)
(T2a) (T2b) H1
(E1a) (P3b)
H2
(P7c)
(E1b)
(R8)
(T8a) (T8b)
(E2a)
(E2b)
(P10a)
(P5a)
H1
(P10b)
(P5b) H2
(T7)
(P4a)
(P4b)
(P7a)
(P10b)
(P7b)
(P7c)
(T2a) (T2b)
LEGEND
B2a B2b
LEGEND NOTE :
P
M RAW
SU WATER PUMPS
ER
AT
W
AW
/R
R
O
VI WATER SYSTEM
E R
S
RE
PACKAGE CHP
RAW WATER
EVAP. LOSS/D.L RO REJECT TP-40
AUX. COOLING
TP-9
CHEMICAL
EFFULENT FROM SG TO WS
CHP
SLUDGE(WTP)
CHP
INSTRUMENT AIR TO WS
SERVICE AIR TO WS
SERVICE WATER
BOILER FILLING / FGD
APH WASH
HVAC MAKE UP
NORMAL DM MAKEUP
WS
CW.BLOWDOWN
POTABLE WATER
SERVICE WATER
HVAC
WS
FIRE
TO FIRE WATER
WATER
TANKS SYSTEM
TP-37
TP-27
TP-31
TP-32
TP-13
TP-14
TP-15
TP-16
TP-17
TP-28
WS
TP-18
TP1
TP20 50 TP-A EMERGENCY MAKE UP
TP-24
TP-23
TP-22
TP-21
TP-20
TP-19
TP2 TP21 - TP-A TO SG
TP40 TITLE
- A
PLANT WATER SCHEME & TP DETAILS
1. LOCATION SHALL BE READ IN CONJUCTION WITH PIPE & TRESTLE LAYOUT (9915-999-POM-A-006) WS SG TG MH PIPING WS PU GH
REV.NO. DESCRIPTION SCALE DRG NO.
2. PIPING SHALL BE TERMINATED AT SUITABLE ELEVATION. REV
DATE DRAWN DESIGN REVIEWED BY APPRVD BY
9915-999-POM-A-037 C
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
LOCAL F.F.L
LOCAL F.G.L
INLET CHAMBER
A A
SECTION A-A
FLOCCULATION FLOCCULATION
TANK (TYP) TANK (TYP)
B B
PUMPS C
L 4M
TREADED WATER TANK / CMB & PUMP HOUSE
PUMPS LC 4M LOCAL F.F.L
LOCAL F.G.L
LOCAL F.F.L
LOCAL F.G.L
SECTION D-D
SECTION B-B
TDS
SECTION-I
WATER SUMP
SERVICE
D
D
SERVICE WATER PUMPS
SECTION-II
X X
9915-373-POM-A-005
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P& ID LEGEND
SDI ANALYZER
AE-SDI
A4 NTS
9999-136-POI-G-001
1
SH. 1 OF 1
110°
HOPPER LINE(PHASE-II)
CSR 720m (DS TO SRJ) LINE NO.1
CSR 733m (FM TO FM) LINE NO.2
LINE NO.3
CSR 819m (FM TO FM) LINE NO.4
LINE NO.5
CSR 735m (FM TO FM) LINE NO.6
LINE NO.7
CSR 1024m (FM TO FM) LINE NO.8
CSR 959m (FM TO SRJ) LINE NO.9
CHP PH
PH-1
TP
SPACE FOR FGD SPACE FOR FGD
FURTHER ROUTING 3 NOS. CABLE TRAY
BY CHP VENDOR
(OWNERS) (600 WIDE)
PUMP HOUSE
CHP WATER
TP TP TP TP
MILL CONVEYOR MILL
GTU
GTU
REJECT REJECT
SILO GALLERY SILO
GTU(TYP) GTU(TYP) GTU(TYP) GTU(TYP)
6 NOS. CABLE TRAY
(600 WIDE)
6 NOS. CABLE TRAY 3 NOS. CABLE TRAY
(OWNERS) (600 WIDE) (OWNERS) (600 WIDE)
OWNERS(600 WIDE)
6 NOS. CABLE TRAY
GRID JUCTION POINT
GREEN BELT
GREEN BELT (A JV OF GOVT. OF INDIA & GOVT. OF UP)
GREEN BELT
(2X660 MW PRESENT PROPOSAL + 1X660 MW FUTURE PROVISION )
PIPE & CABLE TRESTLE LAYOUT
9915-999-POM-F-006
ALIGNMENT OF NH-91
PROPOSED DIVERTED
NTPC Limited
Y -91
EXISTING NATIONAL HIGHWA
WIND ROSE
110°
NER
OW
RL(+)194.00M
DER
BID
RL(+)195.33M
RL(+)187.88M
DUSHEHRA
VILLAGE
SCHOOL
TOP LEVEL OF EMBANKMENT=RL(+)195.08M
BED LEVEL OF RESERVOIR=RL(+)187.88M
DUSHHERI
RAW WATER RESEVIOR-2
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
N
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
21
ROW
ROW ROW
MAX. WATER LEVEL=RL(+)193.08M
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
MIN. WATER LEVEL=RL(+)188.38M
ROW
AI
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW
ROW ROW ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
(DEAD STORAGE)
ROW ROW
DR
ROW
ROW ROW ROW
ROW
ROW
ROW ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW
H
ROW ROW
ROW ROW ROW ROW
ROW
ROW ROW
ROW ROW ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW ROW
ROW
ROW
ROW ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW ROW
ROW
ROW ROW ROW
ROW
ROW ROW
ROW
ROW
ROW ROW ROW
ROW
ROW
ROW ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW
ROW ROW
R350.000m
L608.989m
ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW
ROW
ROW ROW
IG
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
W ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
AL
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
DRAIN
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ED
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
TO KHURJA
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
RT
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
TELEPHONE
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
VE
ROW
ROW
ROW
ROW
IGARH
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
DI
ROW
ROW
ROW
ROW
ROW
ROW
ROW
TOWER
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
22
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
NG AL
ROW
ROW
ROW
ROW
59
ROW
ROW
ROW
ROW
PUMP HOUSE
ROW
RAW WATER
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
EXISTI
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
21
ROW
ROW
ROW
ROW
ROW
ROW
ROW