PROJECT MANAGEMENT
constructing the whole plant area and all equipment in each process as well as the
I. PRELIMENARIES
Four numbers of stages will be set for the smooth construction flow of the
plant. These stages are the conceptualization, feasibility study, design basis and
design.
A. Planning Stage
presented before preceding the project. This stage serves as the information or
prepared. It is also identifying the process and preliminary cost estimation which
has a basis of a real cost of the project. At this stage, the analysis of the project is
to determine if the plant has the ability to complete a project successfully, taking
equipment that will be used and the plant that will be constructed. The plant would
be located where the minimum cost of the production and distribution is obtained.
With this, the plant will set its building on Makati, Manila. The properties will be
purchased upon getting hold of the capital funds from bank loan and investors.
The initial stage to make a design layout of the project is the detailed
construction plan. Capital cost estimation for the proposed plant will be made and
criteria that must be considered are the specification of the product, annual
operating factor, material and energy balance of the plant, equipment summary
specification, etc. In the basic design of the project, some of the factors which must
having civil works, mechanical works, electrical works, automotive control the
A complete plant layout will be prepared and blueprints and instructions for
made for the fabrication of special equipment and specifications will be prepared
for purchasing standard type of materials and equipment. The company will select
Availability, quality, quantity and cost are the main factors to be considered.
Ensure that each of equipment will operate at its best condition during the
production. Raw materials will be bought and properly stored while the machineries
and equipment are being installed. Two years will be allocated to completely
The process will be verified ensuring that all the subsystems including
requirements. In this stage, the safety of running the plant processes and
operations must be practiced. During the trial run, the plant will be tested to its
regarding the processes or the product quality will be done to avoid any
unexpected accidents before and during the official start of the plant operation.
D. Operation Stage
The plant will start its normal operation after the, planning, compliance to all
the government and company requirements and specification, and ensuring the
safety of its processes and quality of its product. This stage contains the production
In order to operate the plant safely and maintain specific conditions such as
temperature and pressure, the plant must be properly controlled. The control of the
process was broken down into three stages; sulfur oxide, nitrogen monoxide
oxidation, and absorption. The diagrams for these three control schemes can be
found in the appendix. The flow rates are controlled by a three-way valve and flow-
indicator-controllers.
RISK MANAGEMENT
Managing what might cause harm to people and decide whether you are
taking reasonable steps to prevent that harm. These are the ways to assess
the risk on the waste of Oxobiodegradable Polyethylene manufacturing
plant:
Put signage in every part of the plant. Wearing proper Personal Protective
the workers on evaluating the risk found in the plant and thinking for the
Recording the findings of the risk and hazards that can affect the plant
GANTT CHART
Project Schedule
YEAR
N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P T V C
Plan
ning
Feas
ibility
Stud
y
Stag
e
Basi
s of
Desi
gn
Pha
se
Desi
gn
Layo
ut
Stag
e
Com
plete
Desi
gn
Stag
e