Joint Welding Date 03-09-2019
Joint Welding Date 03-09-2019
ROOF TUBE
No Weld Name No Stamp Date Weld
1 DAYAT/BASORI 151/81 9/3/2019
2 DEHARMAN/AGUS 74/124 9/3/2019
3 SUYONO/PRIO N 197/195 9/3/2019
4 NURAINI/IMRON 231/232 9/3/2019
FIT-UP
No Weld Name No Stamp Date Weld
1 SISWANTO 9/3/2019
2 MAMAN 9/3/2019
3 AA SUMINTA/DEDE 100/99 9/3/2019
4 ARIEF 79 9/3/2019
5 SELAMET B 128 9/3/2019
6 DENI 226 9/3/2019
7 NUROHIM 230 9/3/2019
8 MURDIYANTO 126 9/3/2019
(KUO-213-955 FW1)
No Joint Total
135/136/137 3
TOTAL 3
KUO-214-078 FW1)
No Joint Total
54/55/56 3
TOTAL 3
(KUO-214-076 FW1)
No Joint Total
13 sd 28/32 sd 40 25
TOTAL 25
R INLET (FW1)
No Joint Total
AB:96/97/98/99/100/101/102/103 16
B:110 sd 117 8
C:190 sd 196. D:190 sd 193. E:189 sd 193 16
B: 39/40/44/45/46/47/48/49 8
B:127 sd 134 8
A:215 sd 218. B:214 sd 217 8
CD:5 sd 9 10
A:248/249/250/251. B:248/249/250/251 8
A:226/227/228/229. B:226/227/228/229 8
TOTAL 90
F TUBE
No Joint Total
231 sd 240/248 11
203/204 2
31 sd 41 11
74 sd 84 11
TOTAL 35
PASS (KUO-212-146)
No Joint Total
FW 03 1
TOTAL 1
28-08-2019 157
T-UP
Description Total
PSH HEADER INLET FW1 24
PSH HEADER INLET FW1 12
PSH HEADER INLET FW1 25
PSH HEADER INLET FW1 30
ROOF 14
SIRCULATION 4
SIRCULATION 8
SIRCULATION
28-08-2019 117