SLOPE 1:2 SLOPE 1:2

L.H.S A1 L.H.S A2

R.H.S A1 R.H.S A2

SLOPE 1:2 SLOPE 1:2

NOTES:-
1. All Dimension are tentative detail Dimension
shall be followed as Per separate detail drawing
provided.
2. Soil property shall followed as
Per design .
TYPICAL LEVELLING PAD DETAIL 3. Batter of panel shall be 40 mm in 1m (2.3°).
4. Filter media shall be provided from ground
/service level.
5. Construction methodology components can be
varies at the time of detailed designing.

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL (ERECTION) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH)
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked A.K
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 01/09 00

EPDM PAD

LAP JOINT DETAIL


3 LOOP CONNECTOR

STEEL CLAMP

INSTALLATION OF GEOGRID & GEOCOMPOSITE

EPDM BEARING PAD DETAIL

INSTALLATION OF GEOGRID EPDM PAD

TYPICAL PLAN

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL (ERECTION ) 19/11/2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH) A.K
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
KHAND, GOMTI NAGAR, LUCKNOW- 226010 9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR 00
description info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 02/09
PANEL INSTALLATION SEQUENCE:-

PANEL PLACEMENT FOR INITIAL COURSE

40

HARD WOOD WEDGE

PANELS INSTALLATION WOODEN CLAMP

WOODEN CLAMP WITH TIE ROD

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL (ERECTION) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH)
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked A.K
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 03/09 00
LEVELING PAD

ERECTION OF PANELS:-

LEVELING PAD PANEL ALIGNMENT

COMPACTION OF SOIL WITHIN COMPACTION OF SOIL BEYOND


2.0M WIDE ZONE FROM PANEL 2.0M WIDE ZONE FROM PANEL

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
DEVELOPMENT OF PURVANCHAL
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION
EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
(ERECTION) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD.
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH)
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked A.K
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 04/09 00
DRAINAGE GALLERY

BACK FILL MATERIAL:-

FILTER MEDIA/DRAINAGE

BACKFILL

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL (ERECTION) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH)
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked A.K
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 05/09 00
CORNER PANEL DETAIL

CORNER PANEL

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING
PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
(ERECTION) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH)
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked A.K
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 06/09 00
RS WALL MATERIAL:-

CASTING MATERIAL:-

1. MATERIAL :-

2. CONNECTION :-

3. PANEL MOULD :-

EPDM PAD

EPDM PAD & GEOGRID PANEL MOULD

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL
( CASTING ) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH) A.K
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 07/09 00
CASTING :-

DE MOULDING :-

FIXING OF SHUTTERS PANEL LIFTING :-


POURING OF CONCRETE

PANEL LIFTING

USE OF FOUR SLING IS MANDATORY TO AVOID DIAGONAL CRACKING


LIFTING OF PANEL

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL
( CASTING ) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH) A.K
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 08/09 00
FACING ELEMENT:-

STACKING:-

PLACING OF MOULD FACING PANEL

STACKING

TYPICAL STACK ELEVATION

Authority: EPC Contractor: Design Consultant: Authority Engineer: Proof Consultant: Project: Drawn F.S Title: Date:
UTTAR PRADESH EXPRESSWAY INDUSTRIAL GR INFRA PROJECTS LTD. GR INFRA PROJECTS LTD. EGIS INDIA CONSULTING SABZ INFRA SOLUTION DEVELOPMENT OF PURVANCHAL
( CASTING ) 19.11.2019
DEVELOPMENT AUTHORITY 2ND FLOOR NOVUS TOWER 2ND FLOOR NOVUS TOWER ENGINEERS PRIVATE PVT. LTD. EXPRESSWAY (PACKAFE-IV) FROM SIDHI Designed A.K
PLOT 18, SECTOR - 18, PLOT 18, SECTOR - 18, LIMITED L-15 PRATAP NAGAR NEW GANESHPUR (DIST. SULTANPUR) TO
(GOVERNMENT OF UTTAR PRADESH) A.K
DELHI- 110007 Mobile:- SANSAR (DIST. SULTANPUR) KM 121+600 Checked
2ND FLOOR, PARYATAN BHAWAN, C - 18, VIPIN GURUGRAM, HARYANA-122015 GURUGRAM, HARYANA-122015 Scale: Drg. No: UPEIDA/GR/EICEPL/SISPL Rev:
9212222997 e-mail: TO KM 164+300 IN THE STATE OF UTTAR
description KHAND, GOMTI NAGAR, LUCKNOW- 226010
info@sispl.com PRADESH ON EPC BASIS. Approved AZ AS SHOWING Sheet No: 09/09 00