4 GEW (INDIA) PRIVATE LIMITED
Non Conformance Report
7 | Process Q
‘Cause of NOR
Buppter [16 [comataint [1 | internat va
| Processibepi Production o7/t272019 [ Norioot
Cent L&T, MHPS ean ee
jt Frame Assembly GAP No. GAP/GHATAMPURISECONDARY
STRUCTURE/O1, R-00 Did. 23.02.17
Drawing No. & | 3873-110-FO1,Rev-0 &
3873-510-F01,Rev-0
DUT 101083873110F01 &
Mark / DU No. | p44 101083873510F01
TI Non-conformity | F) Maior miner
1 Observation
In Frame Assly. welded mark
nos. 28 & 29 orientation not
found as per drawing no.
3873-110-FO1,Rev-0 & 3873-
510-F01,Rev-0.
Qty-01 set each.
Be
[Root Cate Hinvestigation Analysis:
Drawing interpretation not done property.
4
Pon )B-
ay
Proper training is gi
ned production supervisor regardi
1.) These mark nos. 28 & 29 need to cut first with suitable means grindingifiame cutting.
2.) After cutting weld edge preparation should be checked.
3.) Get the inspection clearance of these mark nos. at tack condition
4.) Use WPS no. GEW-WPS-FCAW.-008 for welding.
A val
8 Sion | TEE
loypla
MONITORING
Follow-up Remarks:
Action Taken _[_] Partial Action
O
No Action:
Reet hie on per The proprsat- (wor
Checlead 4 tburd OK,
Form No: GEW-GEN-09| 00