Inspection and - Testing - Plan - CP08 On 26-Oct-2019
Inspection and - Testing - Plan - CP08 On 26-Oct-2019
Date/Ngày: 11-Jan-20 For related information see the Sheet-" Note-Ghi chú"
Main item
Hạng mục chính
No Date Time Rev. Location Status Status of material, working drawing Person Incharge Note Status of inspection work
Ngày Thời gian P.bản Địa điểm Tình trạng Tình trạngvật liệu, bản vẽ thi công Ghi chú
ITR number Work item
Hạng mục
Pre-concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp PIC: Mr. Bao
2 19-Apr-19 9:00 AM 1 00002-19 Track concrete structure Track 17 (T17-295 to 17-318) (Building No.6)
and track level check) thuận Mr. David
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp PIC: Mr. Lien
7 26-Apr-19 2:00 PM 1 00007-19 Track concrete structure Track T17 (T17-110 to T17-206) (Building No.6)
and track level check) thuận
Accepted chấp
8 26-Apr-19 2:00 PM 00008-19 Track concrete structure Adjusting track 17 Track T17 (T17-110 to T17-206) (Building No.6)
thuận
Accepted chấp
11 3-May-19 2:00 PM 1 00011-19 Track concrete structure Adjusting track 16 Track T16(T16-147 to T16-246) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
12 3-May-19 2:00 PM 1 00012-19 Track concrete structure Track T16(T16-147 to T16-246) (Building No.6)
and track level check) thuận
Accepted chấp
13 4-May-19 9:00 AM 1 00013-19 Track concrete structure Concrete Pouring Track T16(T16-147 to T16-246) (Building No.6)
thuận
Accepted chấp Colas person in-charge
14 6-May-19 9:00 AM 1 00014-19 Rail system 3 Checking as-built data report for Viaduct Station 1 to Station 2,( meeting point station 1)
thuận Mr. Aurelien : 0986. 148880
Accepted chấp Colas person in-charge
15 7-May-19 9:00 AM 1 00015-19 Rail system 3 Checking as-built data report for Viaduct Station 3 to Station 4, meeting point station 3
thuận Mr. Aurelien : 0986. 148880
Accepted chấp
16 7-May-19 2:00 PM 1 00016-19 Track concrete structure Adjusting track 16 Track T16(T16-32.995 to T16-133.729) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
17 7-May-19 2:00 PM 1 00017-19 Track concrete structure Track T16(T16-32.995 to T16-133.729) (Building No.6)
and track level check) thuận
Accepted chấp
18 8-May-19 9:00 AM 1 00018-19 Track concrete structure Concrete Pouring Track T16(T16-32.995 to T16-133.729) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
20 10-May-19 2:00 PM 1 00020-19 Track concrete structure Track T15(T15-238 to T15-337) (Building No.6)
and track level check) thuận
Accepted chấp
21 10-May-19 2:00 PM 1 00021-19 Track concrete structure Adjusting track 15 Track T15(T15-238 to T15-337) (Building No.6)
thuận
Track 1 (KP 10335.102 to KP 10385.102) Accepted chấp
22 10-May-19 9:00 AM 1 00022-19 Track concrete structure Adjusting track 1
(P35 to P37 Right side) thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1 (KP 10335.102 to KP 10385.102) Accepted chấp
23 10-May-19 9:00 AM 1 00023-19 Track concrete structure
and track level check) (P35 to P37 Right side) thuận
Accepted chấp
28 14-May-19 9:00 AM 2 00028-19 Track concrete structure Concrete Pouring Track T15(T15-123 to T15-224) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1 (KP 10-610.102 to KP 10-660.102) Accepted chấp
30 15-May-19 2:00 PM 1 00030-19 Track concrete structure
and track level check) (P46 to P48 ) thuận
Accepted chấp
32 15-May-19 9:00 AM 1 00032-19 Rail system 3 Re survey of piled slabs track 2 and 24 (depot) Depot area
thuận
Accepted chấp
33 15-May-19 2:00 PM 1 00033-19 Rail system 3 Check Traversing between ST6 and ST7 Station 6 to Staion 7
thuận
35 16-May-19 8:30 AM 1 00035-19 Track concrete structure Adjusting track 18 Track T18(T18-722.995 to T18-821.251) (Building No.6) Postponed hoãn
36 16-May-19 10:00 AM 1 00036-19 Track concrete structure Concrete Pouring Track T18(T18-722.995 to T18-821.251) (Building No.6) Postponed hoãn
Accepted chấp
37 17-May-19 8:30 AM 2 00034-19 Track concrete structure Adjusting track 18 in building N06 depot Track T18(T18-722.995 to T18-821.251) (Building No.6)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
38 17-May-19 8:30 AM 2 00035-19 Track concrete structure Track T18(T18-722.995 to T18-821.251) (Building No.6)
and track level check) thuậnchấp
Accepted
39 17-May-19 9:00 AM 2 00036-19 Track concrete structure Concrete Pouring Track T18(T18-722.995 to T18-821.251) (Building No.6)
Track 1 (KP 10-660.102 to KP 10-710.102) thuậnchấp
Accepted
40 18-May-19 3 :00 PM 1 00037-19 Track concrete structure Adjusting track 1 viaduct
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P48 to1 P50
Track (KP Right side) to KP 10-710.102)
10-660.102 thuậnchấp
Accepted
41 18-May-19 3:00 PM 1 00038-19 Track concrete structure
and track level check) (P48 to1 P50
Track (KP Right side) to KP 10-710.102)
10-660.102 thuậnchấp
Accepted
42 18-May-19 11:00 PM 1 00039-19 Track concrete structure Concrete Pouring
(P48 to P50 Right side) thuậnchấp
Accepted
43 20-May-19 9:00 AM 1 00040-19 Track concrete structure Adjusting track 18 in building N06 depot Track T18(T18-608.207 to T18-708.956) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
44 20-May-19 8:30 AM 1 00041-19 Track concrete structure Track T18(T18-608.207 to T18-708.956) (Building No.6)
and track level check) thuận
Accepted chấp
45 20-May-19 9:30 AM 1 00042-19 Track concrete structure Concrete Pouring Track T18(T18-608.207 to T18-708.956) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1 (KP 10-710.102 to KP 10-760.102)
47 21-May-19 4:00 PM 1 00044-19 Track concrete structure Postponed hoãn
and track level check) (P50 to P52 Right side)
Accepted chấp
49 22-May-19 8:30 AM 1 00046-19 Track concrete structure Adjusting track 19 Track 19 (T19-145.800 to T19-244.102)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
50 22-May-19 8:00 AM 1 00047-19 Track concrete structure Track 19 (T19-145.800 to T19-244.102)
and track level check) thuận
Accepted chấp
51 22-May-19 9:30 AM 1 00048-19 Track concrete structure Concrete Pouring Track 19 (T19-145.800 to T19-244.102)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1 (KP 10-710.102 to KP 10-760.102) Accepted chấp
53 22-May-19 3:00 PM 2 00044-19 Track concrete structure
and track level check) (P50 to P52 Right side) thuận
Accepted chấp
55 24-May-19 9:00 AM 1 00049-19 Track concrete structure Adjusting track 19 Track 19 (T19-45.311 to T19-131.762) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
56 24-May-19 9:00 AM 1 00050-19 Track concrete structure Track 19 (T19-45.311 to T19-131.762) (Building No.6)
and track level check) thuận
Accepted chấp
57 24-May-19 10:30 AM 1 00051-19 Track concrete structure Concrete Pouring Track 19 (T19-45.311 to T19-131.762) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1 (KP 10-760.102 to KP 10-835.102) Accepted chấp
58 25-May-19 3:00 PM 1 00052-19 Track concrete structure
and track level check) (P52 to P55 Right side) thuận
Track 1 (KP 10-760.102 to KP 10-835.102) Accepted chấp
59 25-May-19 2:00 PM 1 00053-19 Track concrete structure Adjusting track 1
(P52 to P55 Right side) thuận
Track 1 (KP 10-760.102 to KP 10-835.102)
60 25-May-19 10:30 PM 1 00054-19 Track concrete structure Concrete Pouring Postponed hoãn
(P52 to P55 Right side)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
61 27-May-19 8:30 AM 1 00055-19 Track concrete structure Track 12 (T12-35 to T12-137) (Building No.6)
and track level check) thuậnchấp
Accepted
62 27-May-19 8:30 AM 1 00056-19 Track concrete structure Adjusting track 1 Track 12 (T12-35 to T12-137) (Building No.6)
thuậnchấp
Accepted
63 27-May-19 10:30 AM 1 00057-19 Track concrete structure Concrete Pouring Track 12 (T12-35 to T12-137) (Building No.6)
Track 1 (KP 10-760.102 to KP 10-835.102) thuậnchấp
Accepted
64 28-May-19 10:30 PM 2 00054-19 Track concrete structure Concrete Pouring
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P52 to P55 Right side) thuậnchấp
Accepted
65 29-May-19 8:30 AM 1 00058-19 Track concrete structure Track 10 (T10-113.394 to T10-214.183) (Building No.6)
and track level check) thuậnchấp
Accepted
66 29-May-19 8:30 AM 1 00059-19 Track concrete structure Adjusting track 1 Track 10 (T10-113.394 to T10-214.183) (Building No.6)
thuận
67 29-May-19 10:30 AM 1 00060-19 Track concrete structure Concrete Pouring Track 10 (T10-113.394 to T10-214.183) (Building No.6) Postponed hoãn Postponed by our self(colas)
Accepted chấp
68 30-May-19 10:30 AM 2 00060-19 Track concrete structure Concrete Pouring Track 10 (T10-113.394 to T10-214.183) (Building No.6)
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1 (KP 10-835.102 to KP 10-910.102) Accepted chấp
69 30-May-19 3:00 PM 1 00061-19 Track concrete structure
and track level check) (P55 to P58 Right side) thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
107 15-Jun-19 9:00 AM 1 00098-19 Track concrete structure Track 9 (T9-207.865 to T9-306.090) (Building No.6)
and track level check) thuận
Accepted chấp
108 15-Jun-19 10:00 AM 1 00099-19 Track concrete structure Concrete Pouring Track 9 (T9-207.865 to T9-306.090) (Building No.6)
Track 2(KP10-885.102 to KP11-010.120). thuậnchấp
Accepted
109 15-Jun-19 4:00 PM 1 00100-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P57 to2(KP10-885.102
Track P62) to KP11-010.120). thuậnchấp
Accepted
110 15-Jun-19 4:00 PM 1 00101-19 Track concrete structure Track
and track level check) (P57 to15
Track (T15-224 to T15-338)
P62)
2(KP10-885.102 (Building No.6)
to KP11-010.120). thuậnchấp
Accepted
111 15-Jun-19 10:00 PM 1 00102-19 Track concrete structure Concrete Pouring Track
Track 16P62)
(T16-133.729 to T16-146)(Building No.6)
(P57 to15 (T15-224 to T15-338) (Building No.6) thuậnchấp
Accepted
112 17-Jun-19 9:00 AM 1 00103-19 Track concrete structure Adjusting track 15, track 16, track 17, track 18, track 19 Track
Track 17
Track 16 (T17-206
15 (T15-224 to
to T17-220)(Building
(T16-133.729T15-338) (BuildingNo.6)
to T16-146)(Building No.6)
No.6)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
113 17-Jun-19 9:00 AM 1 00104-19 Track concrete structure Track 16
Track
Track 18 (T16-133.729
17 (T18-708.956to
(T17-206 toT18-722.995)(Building
to T17-220)(Building No.6)
T16-146)(Building No.6)
No.6)
and track level check) Track 1719 (T17-206
(T19-131.762 toT18-722.995)(Building
T19-145.800)(Building No.6) thuậnchấp
Accepted
114 17-Jun-19 10:00 AM 1 00105-19 Track concrete structure Concrete Pouring Track
Track 18 (T18-708.956to
to T17-220)(Building No.6) No.6)
Track 18219(KP10-804.214
(T19-131.762 totoT18-722.995)(Building
KP10-885.102).
T19-145.800)(Building No.6) thuậnchấp
Accepted
115 18-Jun-19 4:00 PM 1 00106-19 Track concrete structure Adjusting track 2 Track (T18-708.956to No.6)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P53 to219P57)
Track (KP10-804.214 to KP10-885.102).
(T19-131.762 to T19-145.800)(Building No.6) thuậnchấp
Accepted
116 18-Jun-19 4:00 PM 1 00107-19 Track concrete structure
and track level check) (P53 to2 P57)
Track (KP10-804.214 to KP10-885.102). thuậnchấp
Accepted
117 18-Jun-19 10:00 PM 1 00108-19 Track concrete structure Concrete Pouring
(P53 to P57) thuậnchấp
Accepted
118 19-Jun-19 9:00 AM 1 00109-19 Track concrete structure Adjusting track 8 Track 8(T8-155.008 to T8-253.261)(Building No.6)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
119 19-Jun-19 9:00 AM 1 00110-19 Track concrete structure Track 8(T8-155.008 to T8-253.261)(Building No.6)
and track level check) thuậnchấp
Accepted
120 19-Jun-19 10:00 AM 1 00111-19 Track concrete structure Concrete Pouring Track 8(T8-155.008 to T8-253.261)(Building No.6)
Track 2 (KP10-720.303 to KP10-804.244). thuậnchấp
Accepted
121 19-Jun-19 4:00 PM 1 00112-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P50 to2 P53)
Track (KP10-720.303 to KP10-804.244). thuậnchấp
Accepted
122 19-Jun-19 4:00 PM 1 00113-19 Track concrete structure
and track level check) (P50 to2 P53)
Track (KP10-720.303 to KP10-804.244). thuậnchấp
Accepted
123 19-Jun-19 10:00 PM 1 00114-19 Track concrete structure Concrete Pouring
(P50 to2 P53)
Track (KP10-645.314to KP10-720.303). thuậnchấp
Accepted
124 20-Jun-19 4:00 PM 1 00115-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P47 to2 P51)
Track (KP10-645.314to KP10-720.303). thuậnchấp
Accepted
125 20-Jun-19 4:00 PM 1 00116-19 Track concrete structure
and track level check) (P47 to2 P51)
Track (KP10-645.314to KP10-720.303). thuậnchấp
Accepted
126 20-Jun-19 10:00 PM 1 00117-19 Track concrete structure Concrete Pouring
(P47 to2 P51)
Track (KP10-589.950 to KP10-645.314). thuậnchấp
Accepted
127 21-Jun-19 4:00 PM 1 00118-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P43to2P47)
Track (KP10-589.950 to KP10-645.314). thuậnchấp
Accepted
128 21-Jun-19 4:00 PM 1 00119-19 Track concrete structure
and track level check) (P43to92P47)
Track
Track (KP10-589.950
(T9-193.827 to KP10-645.314).
to T9-207.865). thuậnchấp
Accepted
129 21-Jun-19 10:00 PM 1 00120-19 Track concrete structure Concrete Pouring
(P43to910
Track
Track P47)
(T10-214.183
(T9-193.827 to T10-228.225).
to T9-207.865). thuậnchấp
Accepted
130 22-Jun-19 9:00 AM 1 00121-19 Track concrete structure Adjusting track 9, track 10, track 11, track 12
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 10
Track 11 (T11-129.779
(T10-214.183 to
to T11-143.820).
T10-228.225). thuậnchấp
Accepted
131 22-Jun-19 9:00 AM 1 00122-19 Track concrete structure Track 11 12 (T11-129.779
(T12-137 to T12-150.799).
and track level check) Track to T11-143.820). thuận
Track 912(T9-193.827
Track (T12-137 toto
T12-150.799).
T9-207.865).
Track 10 (T10-214.183 to T10-228.225).
132 22-Jun-19 10:00 AM 1 00123-19 Track concrete structure Concrete Pouring Postponed hoãn
Track 11 (T11-129.779 to T11-143.820).
Track 12 (T12-137 to T12-150.799).
Track 2 (KP10-535.102 to KP10-589.950). Accepted chấp
133 22-Jun-19 4:00 PM 1 00124-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P41to2P44)
Track (KP10-535.102 to KP10-589.950). thuậnchấp
Accepted
134 22-Jun-19 4:00 PM 1 00125-19 Track concrete structure
and track level check) (P41to92P44)
Track
Track (KP10-535.102
(T9-193.827 to KP10-589.950).
to T9-207.865). thuậnchấp
Accepted
135 22-Jun-19 10:00 PM 1 00126-19 Track concrete structure Concrete Pouring
(P41to10
Track P44)
(T10-214.183 to T10-228.225). thuậnchấp
Accepted
136 24-Jun-19 10:00 AM 2 00123-19 Track concrete structure Concrete Pouring
Track 211(KP10-435.102
Track (T11-129.779 totoT11-143.820).
KP10-535.102). thuậnchấp
Accepted
137 25-Jun-19 4:00 PM 1 00127-19 Track concrete structure Adjusting track 2 Track 12 (T12-137 to T12-150.799).
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P39 to P41)
Track 2 (KP10-435.102 to KP10-535.102). thuậnchấp
Accepted
138 25-Jun-19 4:00 PM 1 00128-19 Track concrete structure
and track level check) (P39 to2 P41)
Track (KP10-435.102 to KP10-535.102). thuậnchấp
Accepted
139 25-Jun-19 10:00 PM 1 00129-19 Track concrete structure Concrete Pouring
(P39 to2 P41)
Track (KP10-335.102 to KP10-435.102). thuậnchấp
Accepted
140 26-Jun-19 4:00 PM 1 00130-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P35 to2 P39)
Track (KP10-335.102 to KP10-435.102). thuậnchấp
Accepted
141 26-Jun-19 4:00 PM 1 00131-19 Track concrete structure
and track level check) (P35 to2 P39)
Track (KP10-335.102 to KP10-435.102). thuậnchấp
Accepted
142 26-Jun-19 10:00 PM 1 00132-19 Track concrete structure Concrete Pouring
(P35 to13P39)
Track (T13-259.2 toT13-382). thuận
143 27-Jun-19 4:00 PM 1 00133-19 Track concrete structure Adjusting track 13 Postponed hoãn
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building 6)
Track 13 (T13-259.2 toT13-382).
144 27-Jun-19 4:00 PM 1 00134-19 Track concrete structure Postponed hoãn
and track level check) (Building
Track 6)
1 (KP10-385.102 to KP10-460.102). Accepted chấp
145 28-Jun-19 4:00 PM 1 00135-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P37 to1 P40)
Track (KP10-385.102 to KP10-460.102). thuậnchấp
Accepted
146 28-Jun-19 4:00 PM 1 00136-19 Track concrete structure
and track level check) (P37 to1 P40)
Track (KP10-385.102 to KP10-460.102). thuậnchấp
Accepted
147 28-Jun-19 10:00 PM 1 00137-19 Track concrete structure Concrete Pouring
(P37 to13P40)
Track (T13-259.2 toT13-382). thuậnchấp
Accepted
148 28-Jun-19 8:30 AM 2 00133-19 Track concrete structure Adjusting track 13
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building
Track 6)
13 (T13-259.2 toT13-382). thuậnchấp
Accepted
149 28-Jun-19 8:30 AM 2 00134-19 Track concrete structure
and track level check) (Building
Track 6)
13 (T13-259.2 toT13-382). thuậnchấp
Accepted
150 28-Jun-19 9:30 AM 1 00138-19 Track concrete structure Concrete Pouring
(Building 6) thuận
Track 19
- Weld Number 0001 & 0002 (CH: 194.369) Accepted chấp
151 28-Jun-19 9:00 AM 1 00139-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds - Weld Number 0003 & 0004 (CH: 219.669). thuận
- Weld Number 0005 & 0006 (CH: 169.669).
- Weld Number 0007 & 0008 (CH:95.269).
- Weld Number 0009 & 0010 (CH: 70.569).
(Building No.6)
Checked by Mr Bao- Inspector of PIC
Track 18
- Weld Number 0011 & 0012 (CH: 647.765). Accepted chấp
152 28-Jun-19 10:00 AM 1 00140-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds
- Weld Number 0013 & 0014 (CH:672.465). thuận
- Weld Number 0015 & 0016 (CH: 746.865).
- Weld Number 0017 & 0018 (CH: 771.565).
- Weld Number 0019 & 0020 (CH: 796.265).
(Building No.6)
Checked by Mr Bao- Inspector of PIC
Track 1 (KP10-460.102 to KP10-535.102). Accepted chấp
153 29-Jun-19 4:00 PM 1 00141-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P40 to1 P43)
Track (KP10-460.102 to KP10-535.102). thuậnchấp
Accepted
154 29-Jun-19 4:00 PM 1 00142-19 Track concrete structure
and track level check) (P40 to1 P43)
Track (KP10-460.102 to KP10-535.102). thuậnchấp
Accepted
155 29-Jun-19 10:00 PM 1 00143-19 Track concrete structure Concrete Pouring
(P40 to1 P43)
Track (KP10-535.102 to KP10-610.102). thuậnchấp
Accepted
156 1-Jul-19 4:00 PM 1 00144-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P43
Trackto1 P46) (KP10-535.102 to KP10-610.102). thuậnchấp
Accepted
157 1-Jul-19 4:00 PM 1 00145-19 Track concrete structure
and track level check) (P43 to1 P46)
Track (KP10-535.102 to KP10-610.102). thuậnchấp
Accepted
158 1-Jul-19 10:00 PM 1 00146-19 Track concrete structure Concrete Pouring Track
(P43 to17
Track 14P46)
(T14-147 toT13-246.670). thuận
159 1-Jul-19 4:00 PM 1 00147-19 Track concrete structure Adjusting track 14 - Weld16
Track Number 0021 & 0022 (CH: 293.447) Postponed hoãn
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building 6)
160 1-Jul-19 4:00 PM 1 00148-19 Track concrete structure --Track Weld14
Weld (T14-147
Number
Number toT13-246.670).
0023
0031 & 0032
& 0024 (CH:
(CH: 72.537)
268.822). Postponed hoãn
and track level check) (Building
--Track Weld14
Weld 6)
(T14-147
Number
Number toT14-246.670).
0025
0033 & 0034
& 0026 (CH:
(CH: 97.237).
244.019). Accepted chấp
161 2-Jul-19 8:30 AM 2 00147-19 Track concrete structure Adjusting track 14
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building
--Track
Weld14
Weld 6)
Number 0027
(T14-147
Number 0035 & 0036
& 0028 (CH:
(CH:169.647).
toT14-246.670).
171.637). thuậnchấp
Accepted
162 2-Jul-19 8:30 AM 2 00148-19 Track concrete structure
and track level check) --(Building
Weld
Weld Number
6)
Number 0029
0037 & 0038
& 0030 (CH:196.337).
(CH: 144.947).
Track 14 (T14-147 toT14-246.670). thuậnchấp
Accepted
163 2-Jul-19 9:30 AM 1 00149-19 Track concrete structure Concrete Pouring -(Building No.6)
Weld Number 0029 & 0040 (CH: 221.037).
(Building 6) thuậnchấp
Accepted
164 2-Jul-19 3:00 PM 1 00150-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds (Building No.6) thuậnchấp
Accepted
165 2-Jul-19 3:00 PM 1 00151-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds
Track 1(KP11-327.502 to KP11-400.872) thuậnchấp
Accepted
166 3-Jul-19 4:00 PM 1 00152-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P78-P81)
Track 1(KP11-327.502 to KP11-400.872) thuậnchấp
Accepted
167 3-Jul-19 4:00 PM 1 00153-19 Track concrete structure
and track level check) ( P78-P81) thuận
Track 1(KP11-327.502 to KP11-400.872) Accepted chấp
168 3-Jul-19 10:00 PM 1 00154-19 Track concrete structure Concrete Pouring
( P78-P81)
Track 13 (T13-168.85 to T13-275.950) thuậnchấp
Accepted
169 4-Jul-19 8:30 AM 1 00155-19 Track concrete structure Adjusting track 1 Track 15 6)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building thuậnchấp
170 4-Jul-19 8:30 AM 1 00156-19 Track concrete structure -Track
Track
13
Weld11 (T13-168.85
Number 0041 &to0042
T13-275.950)
(CH: 311.686) Accepted
and track level check) (Building 6) thuậnchấp
171 4-Jul-19 9:30 AM 1 00157-19 Track concrete structure Concrete Pouring --Track Weld13
Weld (T13-168.85
Number
Number 0051 &to0052
0043 & T13-275.950)
0044 (CH: 217.089)
(CH: 286.986). Accepted
(Building
--Track Weld 6)
Weld1(Number
KP11-400.872
Number 0045 &
0053 to KP11-450.872)
& 0054
0046 (CH: 192.389).
(CH: 262.286). thuậnchấp
Accepted
172 4-Jul-19 4:00 PM 1 00158-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( Weld
--TrackP81-P83)
Weld Number
1(Number 0047 &
KP11-400.872
0055 & 0056
0048 (CH:187.886).
to KP11-450.872)
(CH: 167.689). thuậnchấp
Accepted
173 4-Jul-19 4:00 PM 1 00159-19 Track concrete structure
and track level check) --Track
Weld
( Weld Number
P81-P83)
1(Number 0049 &
0057
KP11-400.872& 0058
0050 (CH: 163.186).
(CH:93.289).
to KP11-450.872) thuậnchấp
Accepted
174 4-Jul-19 10:00 PM 1 00160-19 Track concrete structure Concrete Pouring -(Building No.6)0059 & 0060 (CH: 68.589).
( Weld Number
P81-P83) thuậnchấp
Accepted
175 5-Jul-19 11:00 AM 1 00161-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds (Building No.6) Checked by Mr Bao- Inspector of PIC
thuậnchấp
Accepted
176 5-Jul-19 11:00 AM 1 00162-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds Checked by Mr Bao- Inspector of PIC
Track 1( KP11-450.872 to KP11-525.872) thuậnchấp
Accepted
177 5-Jul-19 4:00 PM 1 00163-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Track P83-P86)
1( KP11-450.872 to KP11-525.872) thuậnchấp
Accepted
178 5-Jul-19 4:00 PM 1 00164-19 Track concrete structure
and track level check) ( P83-P86)
Track 1( KP11-450.872 to KP11-525.872) thuậnchấp
Accepted
179 5-Jul-19 10:00 PM 1 00165-19 Track concrete structure Concrete Pouring
( P83-P86)
Track 14 (T14-30 to T14-143.360) thuậnchấp
Accepted
180 6-Jul-19 8:30 AM 1 00166-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building
Track 6)
14 (T14-30 to T14-143.360) thuậnchấp
Accepted
181 6-Jul-19 8:30 AM 1 00167-19 Track concrete structure
and track level check) (Building
Track 6)
14 (T14-30 to T14-143.360) thuậnchấp
Accepted
182 6-Jul-19 9:30 AM 1 00168-19 Track concrete structure Concrete Pouring
(Building
Track 6)
1( KP11-525.872 to KP11-600.872) thuậnchấp
Accepted
183 6-Jul-19 4:00 PM 1 00169-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Track P86-P89)
1( KP11-525.872 to KP11-600.872) thuậnchấp
Accepted
184 6-Jul-19 4:00 PM 1 00170-19 Track concrete structure
and track level check) ( P86-P89)
Track 1( KP11-525.872 to KP11-600.872) thuậnchấp
Accepted
185 6-Jul-19 10:00 PM 1 00171-19 Track concrete structure Concrete Pouring
( P86-P89)
Track 1( KP11-600.872 to KP11-725.872) thuận
186 8-Jul-19 4:00 PM 1 00172-19 Track concrete structure Adjusting track 1 Postponed hoãn
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P89-P94)
Track 1( KP11-600.872 to KP11-725.872)
187 8-Jul-19 4:00 PM 1 00173-19 Track concrete structure Postponed hoãn
and track level check) ( P89-P94)
Track 1( KP11-600.872 to KP11-725.872)
188 8-Jul-19 10:00 PM 1 00174-19 Track concrete structure Concrete Pouring Postponed hoãn
( P89-P94)
Track 1( KP11-600.872 to KP11-725.872) Accepted chấp
189 9-Jul-19 4:00 PM 2 00172-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P89-P94)
Track 1( KP11-600.872 to KP11-725.872) thuậnchấp
Accepted
190 9-Jul-19 4:00 PM 2 00173-19 Track concrete structure
and track level check) ( P89-P94)
Track 1( KP11-600.872 to KP11-725.872) thuậnchấp
Accepted
191 9-Jul-19 10:00 PM 2 00174-19 Track concrete structure Concrete Pouring
( P89-P94)
Track 8 (T14-40 to T14-155.008) thuậnchấp
Accepted
192 9-Jul-19 8:30 AM 1 00175-19 Track concrete structure Adjusting track 8 Track 12 6)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Building thuậnchấp
193 9-Jul-19 8:30 AM 1 00176-19 Track concrete structure -Track
Track
8Number
Weld10 (T14-400061
to T14-155.008)
& 0062 (CH: 224.065) Accepted
and track level check) (Building 6) thuậnchấp
194 9-Jul-19 9:30 AM 1 00177-19 Track concrete structure Concrete Pouring --Track Weld8Number
Weld (T14-40
Number to T14-155.008)
0063
0071 & 0072
& 0064 (CH:
(CH: 301.491)
199.365). Accepted
(Building
--Track Weld 6)
Weld1(Number
KP11-725.872
Number 0065 &
0073 to KP11-850.872)
& 0074
0066 (CH: 174.665).
(CH:276.791). thuậnchấp
Accepted
195 10-Jul-19 4:00 PM 1 00178-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( Weld
--TrackP94-P99)
Weld Number
1(Number 0067 &
KP11-725.872
0075 & 0076
0068 (CH:100.265).
to KP11-850.872)
(CH: 252.091). thuậnchấp
Accepted
196 10-Jul-19 4:00 PM 1 00179-19 Track concrete structure
and track level check) --Track
Weld
( Weld Number
P94-P99)
1(Number 0069 &
0077
KP11-725.872& 0078
0070 (CH: 75.565).
(CH:177.691).
to KP11-850.872) thuậnchấp
Accepted
197 10-Jul-19 10:00 PM 1 00180-19 Track concrete structure Concrete Pouring -(Building No.6)0079 & 0080 (CH: 152.991).
( Weld Number
P94-P99) thuậnchấp
Accepted
198 11-Jul-19 10:00 AM 1 00181-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds (Building No.6) Checked by Mr Bao- Inspector of PIC
thuậnchấp
Accepted
199 11-Jul-19 10:00 AM 1 00182-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds Checked by Mr Bao- Inspector of PIC
Track 1( KP11-850.872 to KP11-950.872) thuậnchấp
Accepted
200 11-Jul-19 4:00 PM 1 00183-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Track
P99-P103)
1( KP11-850.872 to KP11-950.872) thuậnchấp
Accepted
201 11-Jul-19 4:00 PM 1 00184-19 Track concrete structure
and track level check) ( P99-P103)
Track 1( KP11-850.872 to KP11-950.872) thuậnchấp
Accepted
202 11-Jul-19 10:00 PM 1 00185-19 Track concrete structure Concrete Pouring
( P99-P103)
Track 1( KP11-950.872 to KP12-050.872) thuậnchấp
Accepted
203 12-Jul-19 4:00 PM 1 00186-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P103-P107)
Track 1( KP11-950.872 to KP12-050.872) thuậnchấp
Accepted
204 12-Jul-19 4:00 PM 1 00187-19 Track concrete structure
and track level check) ( P103-P107)
Track 1( KP11-950.872 to KP12-050.872) thuậnchấp
Accepted
205 12-Jul-19 10:00 PM 1 00188-19 Track concrete structure Concrete Pouring
( P103-P107) thuận
206 12-Jul-19 9:30 AM 1 00189-19 Rail welding Ultrasonic Testing for Aluminothermic Welds Rejected bị từ chối
Track 18 and track 19 (20 welds)
Track 1( KP12-050.872to KP12-150.872) Accepted chấp
207 13-Jul-19 4:00 PM 1 00190-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P107-P111)
Track 1( KP12-050.872to KP12-150.872) thuậnchấp
Accepted
208 13-Jul-19 4:00 PM 1 00191-19 Track concrete structure
and track level check) ( P107-P111)
Track 1( KP12-050.872to KP12-150.872) thuậnchấp
Accepted
209 13-Jul-19 10:00 PM 1 00192-19 Track concrete structure Concrete Pouring
(Track
P107-P111)
1( KP12-150.872to KP12-271.372) thuậnchấp
Accepted
210 15-Jul-19 4:00 PM 1 00193-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P111-P116)
Track 1( KP12-150.872to KP12-271.372) thuậnchấp
Accepted
211 15-Jul-19 4:00 PM 1 00194-19 Track concrete structure
and track level check) ( P111-P116)
Track 1( KP12-150.872to KP12-271.372) thuậnchấp
Accepted
212 15-Jul-19 10:00 PM 1 00195-19 Track concrete structure Concrete Pouring
( P111-P116) thuận
Accepted chấp
213 16-Jul-19 8:00 AM 1 00196-19 Track concrete structure Adjusting track 18 Track 18
Track 09 (T8 - 075.408 to T8 - 146.008) thuận
- Weld13
Track Number 0081 & 0082 (CH: 281.133)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment -- Weld Number 0083
0091 & 0084 Accepted chấp
214 16-Jul-19 8:00 AM 1 00197-19 Track concrete structure Track Weld18Number & to
(T8 - 075.408 T8 -(CH:
0092 (CH: 256.433).
356.914)
146.008) Accepted by Mr Sao
and track level check) -- Weld Number 0093
Weld Number 0085 &
& 0094
0086 (CH:332.214).
(CH: 231.733). thuận
-- Weld Weld Number
Number 0095
0087 &
& 0096
0088 (CH:
(CH:157.333).
307.514). Accepted chấp
215 16-Jul-19 8:30 AM 1 00198-19 Track concrete structure Concrete Pouring --Track Weld18
Weld Number 0089 &
& to
(T8 - 075.408
Number 0097 0090 (CH: 132.633).
T8 -(CH:233.114).
0098 146.008)
thuận
Accepted by Mr Sao
-(Building No.6)0099 & 0100 (CH: 208.414).
Weld Number Accepted chấp
216 16-Jul-19 9:30 AM 1 00199-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds (Building No.6) Checked by Mr Sao- Inspector of PIC Accepted by Mr Sao
thuậnchấp
Accepted
217 16-Jul-19 9:30 AM 1 00200-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds Checked by Mr Sao- Inspector of PIC Accepted by Mr Sao
Track 1( KP12-271.372 to KP12-346.372) thuậnchấp
Accepted
218 16-Jul-19 4:00 PM 1 00201-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track ( P115-P119) 1( KP12-271.372 to KP12-346.372) thuậnchấp
Accepted
219 16-Jul-19 4:00 PM 1 00202-19 Track concrete structure Accepted by Mr Hieu
and track level check) ( P115-P119)
Track
Track 1( KP12-346.372
1( KP12-271.372 toto KP12-396.372)
KP12-346.372) thuậnchấp
Accepted
220 16-Jul-19 10:00 PM 1 00203-19 Track concrete structure Concrete Pouring Accepted by Mr Hieu
Adjusting track 1 (( P119-P121)
Track P115-P119)
1( KP12-346.372 to KP12-396.372) thuậnchấp
Accepted
221 17-Jul-19 4:00 PM 1 00204-19 Track concrete structure
Adjusting track 2Inspection (Formwork, Track Jigs installation, Track aligment Track
Pre- Concreting ( P119-P121)
Track 2(
1( KP12-346.372
KP12-346.372 toto KP12-396.372)
KP12-396.372) thuậnchấp
Accepted
222 17-Jul-19 4:00 PM 1 00205-19 Track concrete structure ( P119-P121)
P119-P121) Accepted by Mr Hieu
and track level check) (Track 2( KP12-346.372 to KP12-396.372) thuậnchấp
Accepted
223 17-Jul-19 10:00 PM 1 00206-19 Track concrete structure Concrete Pouring ( P119-P121) Accepted by Mr Hieu
Track 2( KP12-346.372 to KP12-396.372) thuậnchấp
Accepted
224 18-Jul-19 4:00 PM 1 00207-19 Track concrete structure Adjusting track 2 Track 2( KP12-246.372 to KP12-346.372) ( P115-P119)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment ( P119-P121) thuậnchấp
Accepted
225 18-Jul-19 4:00 PM 1 00208-19 Track concrete structure Track 2( KP12-246.372 to KP12-346.372) ( P115-P119) Accepted by Mr Hieu
and track level check) thuậnchấp
Accepted
226 18-Jul-19 10:00 PM 1 00209-19 Track concrete structure Concrete Pouring Track 2( KP12-246.372 to KP12-346.372) ( P115-P119) Accepted by Mr Hieu
thuậnchấp
Accepted
227 18-Jul-19 8:30 AM 1 00210-19 Track concrete structure Adjusting track18 Track 18 14 (T8 - 146.008 to T8 - 207.345)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
228 18-Jul-19 8:30 AM 1 00211-19 Track concrete structure - Weld18
Track Number
08 0101 & to
(T8 - 146.008 0102
T8 -(CH: 221.832)
207.345) Accepted by Mr Sao
and track level check) thuậnchấp
Accepted
229 18-Jul-19 9:0 AM 1 00212-19 Track concrete structure Concrete Pouring --TrackWeld18
Weld Number
Number 0103 &
0111 & to
(T8 - 146.008 0104
0102 -(CH:
T8 (CH: 197.132).
226.279)
207.345) Accepted by Mr Sao
thuậnchấp
Accepted
230 19-Jul-19 4:00 PM 1 00213-19 Track concrete structure Adjusting track 2 --Track
Weld2(Number
Weld Number 0105 &
0113
KP12-144.976& 0114
0106 (CH: 203.579).
(CH: 172.432).
to KP12-246.372) ( P110-P115)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment -- Weld Weld Number
Number 0115
0107 &
& 0116
0108 (CH:
(CH:98.032).
178.879). thuậnchấp
Accepted
231 19-Jul-19 4:00 PM 1 00214-19 Track concrete structure Track 2( KP12-144.976 to KP12-246.372)
(CH: 73.332).( P110-P115) Accepted by Mr Hieu
and track level check) -- Weld
Weld Number
Number 0109 &
0117 & 0118
0110 (CH:104.479). thuậnchấp
Accepted
232 19-Jul-19 10:00 PM 1 00215-19 Track concrete structure Concrete Pouring Track
Weld2(Number
-(BuildingKP12-144.976 to KP12-246.372)
No.6)0119 & 0120 (CH: 79.779).( P110-P115) Accepted by Mr Hieu
thuậnchấp
Accepted
233 19-Jul-19 9:30 AM 1 00216-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds (Building No.6) Checked by Mr Sao- Inspector of PIC Accepted by Mr Sao
thuậnchấp
Accepted
234 19-Jul-19 9:30 AM 1 00217-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds Checked by Mr Sao- Inspector of PIC Accepted by Mr Sao
thuậnchấp
Accepted
235 20-Jul-19 4:00 PM 1 00218-19 Track concrete structure Adjusting track 2 Track 2( KP12-039.628 to KP12-144.976 ( P106-P110)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
236 20-Jul-19 4:00 PM 1 00219-19 Track concrete structure Track 2( KP12-039.628 to KP12-144.976 ( P106-P110) Accepted by Mr Hieu
and track level check) thuậnchấp
Accepted
237 20-Jul-19 10:00 PM 1 00220-19 Track concrete structure Concrete Pouring Track 2( KP12-039.628 to KP12-144.976 ( P106-P110) Accepted by Mr Hieu
thuậnchấp
Accepted
238 22-Jul-19 4:00 PM 1 00221-19 Track concrete structure Adjusting track 2 Track 2( Kp11+925.872 to Kp12-039.628) ( P102-P106)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
239 22-Jul-19 4:00 PM 1 00222-19 Track concrete structure Track 2( Kp11+925.872 to Kp12-039.628) ( P102-P106) Accepted by Mr Hieu
and track level check) thuậnchấp
Accepted
240 22-Jul-19 10:00 PM 1 00223-19 Track concrete structure Concrete Pouring Track 2( Kp11+925.872 to Kp12-039.628) ( P102-P106) Accepted by Mr Hieu
thuận
Accepted chấp
241 22-Jul-19 8:30 AM 1 00224-19 Track concrete structure Adjusting track 18 Track 18( T18-287.466 to T18-418.299) Accepted by Mr Sao
thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp
242 22-Jul-19 8:30 AM 1 00225-19 Track concrete structure Track 18( T18-287.466 to T18-418.299) Accepted by Mr Sao
and track level check) thuận
Accepted chấp
243 22-Jul-19 9:00 AM 1 00226-19 Track concrete structure Concrete Pouring Track 18( T18-287.466 to T18-418.299) Accepted by Mr Sao
thuận
Track 2 (Kp11+825.872 to Kp12-925.872) Accepted chấp
244 23-Jul-19 4:00 PM 1 00227-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P102-P98)
Track 2 (Kp11+825.872 to Kp12-925.872) thuậnchấp
Accepted
245 23-Jul-19 4:00 PM 1 00228-19 Track concrete structure Accepted by Mr Hieu
and track level check) (P102-P98)
Track 2 (Kp11+825.872 to Kp12-925.872) thuậnchấp
Accepted
246 23-Jul-19 10:00 PM 1 00229-19 Track concrete structure Concrete Pouring Accepted by Mr Hieu
(P102-P98)
Track 02 (KP11+725.872 to KP11+825.872) thuậnchấp
Accepted
247 24-Jul-19 4:00 PM 1 00230-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P94-P98)
Track 02 (KP11+725.872 to KP11+825.872) thuậnchấp
Accepted
248 24-Jul-19 4:00 PM 1 00231-19 Track concrete structure Accepted by Mr Hieu
and track level check) (P94-P98)
Track 02 (KP11+725.872 to KP11+825.872) thuậnchấp
Accepted
249 24-Jul-19 10:00 PM 1 00232-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P94-P98) thuận
Track 08
- Weld Number 0121 & 0122 (CH: 129.179)
- Weld Number 0122 & 0123 (CH: 154.179).
- Weld Number 0123 & 0124 (CH: 154.179).
Track 9
- Weld Number 0124 & 0125 (CH:182.033).
- Weld Number 0125 & 0126 (CH: 182.033).
- Weld Number 0126 & 0127 (CH: 207.033).
- Weld Number 0127 & 0128 (CH: 207.033).
Track 10
- Weld Number 0128 & 0129 (CH: 202.391).
- Weld Number 0129 & 0130 (CH: 202.391). Accepted chấp
250 24-Jul-19 9:30 AM 1 00233-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds Accepted by Mr Sao
- Weld Number 0130 & 0131 (CH: 227.391). thuận
- Weld Number 0131 & 0132 (CH: 227.391).
- Weld Number 0132 & 0133 (CH: 117.989).
Track 11
- Weld Number 0133 & 0134 (CH: 117.989).
- Weld Number 0134& 0135 (CH: 79.779).
- Weld Number 0135 & 0136 (CH: 142.989).
Track 12
- Weld Number 0136 & 0137 (CH: 142.989).
- Weld Number 0137 & 0138 (CH: 124.965).
- Weld Number 0138 & 0139 (CH: 149.965).
- Weld Number 0139 & 0140 (CH:149.965).
(Building No.6)
Track 02 (KP11+625.872 to KP11+725.872) Accepted chấp
251 25-Jul-19 4:00 PM 1 00234-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P90-P94)
Track 02 (KP11+625.872 to KP11+725.872) thuậnchấp
Accepted
252 25-Jul-19 4:00 PM 1 00235-19 Track concrete structure Accepted by Mr Hieu
and track level check) (P90-P94)
Track 02 (KP11+625.872 to KP11+725.872) thuậnchấp
Accepted
253 25-Jul-19 10:00 PM 1 00236-19 Track concrete structure Concrete Pouring Accepted by Mr Hieu
(P90-P94)
Track 02 (KP11+525.872 to KP11+625.872) thuậnchấp
Accepted
254 26-Jul-19 4:00 PM 1 00237-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P86-P90)
Track 02 (KP11+525.872 to KP11+625.872) thuậnchấp
Accepted
255 26-Jul-19 4:00 PM 1 00238-19 Track concrete structure Accepted by Mr Hieu
and track level check) (P86-P90)
Track 02 (KP11+525.872 to KP11+625.872) thuậnchấp
Accepted
256 26-Jul-19 10:00 PM 1 00239-19 Track concrete structure Concrete Pouring Accepted by Mr Hieu
(P86-P90)
Track 02 (KP11+425.872 to KP11+525.872) thuậnchấp
Accepted
257 27-Jul-19 4:00 PM 1 00240-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P82-P86)
Track 02 (KP11+425.872 to KP11+525.872) thuậnchấp
Accepted
258 27-Jul-19 4:00 PM 1 00241-19 Track concrete structure Accepted by Mr Hieu
and track level check) (P82-P86)
Track 02 (KP11+425.872 to KP11+525.872) thuậnchấp
Accepted
259 27-Jul-19 10:00 PM 1 00242-19 Track concrete structure Concrete Pouring Accepted by Mr Hieu
(P82-P86)
Track 06 (T6-85.290 toT6-210.560 ) thuậnchấp
Accepted
260 27-Jul-19 8:30 AM 1 00243-19 Track concrete structure Adjusting track 6 Accepted by Mr Sao
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Depot)
Track 06 (T6-85.290 toT6-210.560 ) thuậnchấp
Accepted
261 27-Jul-19 8:30 AM 1 00244-19 Track concrete structure Accepted by Mr Sao
and track level check) (Depot)
Track 06 (T6-85.290 toT6-210.560 ) thuậnchấp
Accepted
262 27-Jul-19 9:00 AM 1 00245-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(Depot)
Track 02 (KP11+327.502 to KP11+425.872) thuậnchấp
Accepted
263 29-Jul-19 4:00 PM 1 00246-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P78-P82)
Track 02 (KP11+327.502 to KP11+425.872) thuậnchấp
Accepted
264 29-Jul-19 4:00 PM 1 00247-19 Track concrete structure Accepted by Mr Hieu
and track level check) (P78-P82)
Track 02 (KP11+327.502 to KP11+425.872) thuậnchấp
Accepted
265 29-Jul-19 10:00 PM 1 00248-19 Track concrete structure Concrete Pouring Track 23 (T23-243.096 to T23-285.036 ) Accepted by Mr Hieu
(P78-P82) thuậnchấp
Accepted
266 30-Jul-19 8:30 AM 1 00249-19 Track concrete structure Adjusting track 23 Track 23
Track 23 (T23-243.096
(T23-150.340to
toT23-182.420
T23-285.036))
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
267 30-Jul-19 8:30 AM 1 00250-19 Track concrete structure (Depot)
Track
Track 23 (T23-243.096
23 (T23-150.340to
toT23-182.420
T23-285.036)) Accepted by Mr Sao
and track level check) thuậnchấp
Accepted
268 30-Jul-19 9:00 AM 1 00251-19 Track concrete structure Concrete Pouring (Depot)
Track 23 (T23-150.340to T23-182.420 ) Accepted by Mr Sao
thuận
(Depot)
Track 13
- Weld Number 0141 & 0141(CH:257.814)
- Weld Number 0143 & 0144(CH: 282.814).
Track 14
- Weld Number 0145 & 0146 (CH:122.732).
- Weld Number 0147 & 0148(CH: 147.732).
Track 15
Accepted chấp
269 31-Jul-19 9:00 AM 1 00252-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds - Weld Number 0149 & 0150 (CH: 212.586). Accepted by Mr Sao
thuận
- Weld Number 0151 & 0152 (CH: 237.586).
Track 16
- Weld Number 0153 & 0154 (CH:121.937).
- Weld Number 0155& 0156 (CH: 146.947).
Track 17
- Weld Number 0157 & 0158 (CH:194.347).
- Weld Number 0159& 0160 (CH: 219.347).
Track 18
- Weld Number 0161& 0162 (CH:697.165).
- Weld Number 0163& 0164(CH: 722.165).
Track 19
- Weld Number 0165& 0166 (CH:119.969).
- Weld Number 0167& 0168(CH: 144.969).
Track 01 (KP12+501.372 to KP12+632.022)
270 1-Aug-19 4:00 PM 1 00253-19 Track concrete structure Adjusting track 1 Postponed hoãn 3rd Typhon , It was rain whole day
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P128-P134)
Track 01 (KP12+501.372 to KP12+632.022)
271 1-Aug-19 4:00 PM 1 00254-19 Track concrete structure Postponed hoãn
and track level check) (P128-P134)
Track 01 (KP12+501.372 to KP12+632.022)
272 1-Aug-19 10:00 PM 1 00255-19 Track concrete structure Concrete Pouring Postponed hoãn
(P128-P134)
Track 01 (KP12+501.372 to KP12+632.022) Accepted chấp
273 2-Aug-19 4:00 PM 2 00253-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P128-P134)
Track 01 (KP12+501.372 to KP12+632.022) thuậnchấp
Accepted
274 2-Aug-19 4:00 PM 2 00254-19 Track concrete structure Accepted by Mr Sao
and track level check) (P128-P134)
Track 01 (KP12+501.372 to KP12+632.022) thuậnchấp
Accepted
275 2-Aug-19 10:00 PM 2 00255-19 Track concrete structure Concrete Pouring Accepted by Mr Khoi
(P128-P134)
Track 01 (KP12+632.022 to KP 12+757.022) thuận
276 3-Aug-19 4:00 PM 1 00256-19 Track concrete structure Adjusting track 1 Postponed hoãn
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P134-P138)
Track 01 (KP12+632.022 to KP 12+757.022)
277 3-Aug-19 4:00 PM 1 00257-19 Track concrete structure Postponed hoãn
and track level check) (P134-P138)
Track 01 (KP12+632.022 to KP 12+757.022)
278 3-Aug-19 10:00 PM 1 00258-19 Track concrete structure Concrete Pouring Postponed hoãn
(P134-P138)
Track 01 (KP12+632.022 to KP 12+757.022) Accepted chấp
279 5-Aug-19 4:00 PM 2 00255-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P134-P138)
Track 01 (KP12+632.022 to KP 12+757.022) thuậnchấp
Accepted
280 5-Aug-19 4:00 PM 2 00256-19 Track concrete structure Accepted by Mr Sao
and track level check) (P134-P138)
Track 01 (KP12+632.022 to KP 12+757.022) thuậnchấp
Accepted
281 5-Aug-19 10:00 PM 2 00257-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P134-P138)
Track 01 (KP12+757.022 to KP 12+877.022) thuậnchấp
Accepted
282 6-Aug-19 4:00 PM 1 00258-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P138-P143)
Track 01 (KP12+757.022 to KP 12+877.022) thuậnchấp
Accepted
283 6-Aug-19 4:00 PM 1 00259-19 Track concrete structure Accepted by Mr Sao
and track level check) (P138-P143)
Track 01 (KP12+757.022 to KP 12+877.022) thuậnchấp
Accepted
284 6-Aug-19 10:00 PM 1 00260-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P138-P143)
Track 01 (KP12+877.022 to KP 12+977.022) thuậnchấp
Accepted
285 7-Aug-19 4:00 PM 1 00261-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P143-P147)
Track 01 (KP12+877.022 to KP 12+977.022) thuậnchấp
Accepted
286 7-Aug-19 4:00 PM 1 00262-19 Track concrete structure Accepted by Mr Sao
and track level check) (P143-P147)
Track 01 (KP12+877.022 to KP 12+977.022) thuậnchấp
Accepted
287 7-Aug-19 10:00 PM 1 00263-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P143-P147)
Track 01 (KP12+977.022 to KP 13+069.172) thuậnchấp
Accepted
288 8-Aug-19 4:00 PM 1 00264-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P147-P149)
Track 01 (KP12+977.022 to KP 13+069.172) thuậnchấp
Accepted
289 8-Aug-19 4:00 PM 1 00265-19 Track concrete structure Accepted by Mr Sao
and track level check) (P147-P149)
Track 01 (KP12+977.022 to KP 13+069.172) thuậnchấp
Accepted
290 8-Aug-19 10:00 PM 1 00266-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P147-P149)
Track 23 (T23-285.036 to T23 - 397.256) thuậnchấp
Accepted
291 8-Aug-19 8:30 AM 1 00267-19 Track concrete structure Adjusting track 23
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 23 (T23-285.036 to T23 - 397.256) thuậnchấp
Accepted
292 8-Aug-19 8:30 AM 1 00268-19 Track concrete structure
and track level check) Track 23 (T23-285.036 to T23 - 397.256) thuậnchấp
Accepted
293 8-Aug-19 9:00 AM 1 00269-19 Track concrete structure Concrete Pouring
thuận
Track 01 (KP12+977.022 to KP 13+027.022)
Adjusting track 2 (P149-P151) Accepted chấp
294 9-Aug-19 4:00 PM 1 00270-19 Track concrete structure
Adjusting track 1 Track 02 (KP 13+002.022 to KP 13+069.172) thuận
Track 01 (KP12+977.022 to KP 13+027.022)
(P148-P151)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P149-P151)
Track 01 (KP12+977.022 to KP 13+027.022) Accepted chấp
295 9-Aug-19 4:00 PM 1 00271-19 Track concrete structure Accepted by Mr Sao
and track level check) Track 02 (KP 13+002.022 to KP 13+069.172)
(P149-P151) thuậnchấp
Accepted
296 9-Aug-19 10:00 PM 1 00272-19 Track concrete structure Concrete Pouring (P148-P151) Accepted by Mr Sao
Track 02 (KP 13+002.022 to KP 13+069.172) thuận
Track 02 (KP12+877.022 to KP13+002.022)
(P148-P151) Accepted chấp
297 10-Aug-19 4:00 PM 1 00273-19 Track concrete structure Adjusting track 2
(P143-P148) thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP12+877.022 to KP13+002.022) Accepted chấp
298 10-Aug-19 4:00 PM 1 00274-19 Track concrete structure Accepted by Mr Sao
and track level check) (P143-P148) thuận
Track 02 (KP12+877.022 to KP13+002.022) Accepted chấp
299 10-Aug-19 10:00 PM 1 00275-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P143-P148) thuận
Track 02 (KP12+757.022 to KP12+877.022) Accepted chấp
300 12-Aug-19 4:00 PM 1 00276-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P138-P143)
Track 02 (KP12+757.022 to KP12+877.022) thuậnchấp
Accepted
301 12-Aug-19 4:00 PM 1 00277-19 Track concrete structure Accepted by Mr Sao
and track level check) (P138-P143)
Track 02 (KP12+757.022 to KP12+877.022) thuậnchấp
Accepted
302 12-Aug-19 10:00 PM 1 00278-19 Track concrete structure Concrete Pouring Accepted by Mr Sao
(P138-P143)
Track 02 (KP12+652.022 to KP12+757.022) thuậnchấp
Accepted
303 13-Aug-19 4:00 PM 1 00279-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P134-P138)
Track 02 (KP12+652.022 to KP12+757.022) thuậnchấp
Accepted
304 13-Aug-19 4:00 PM 1 00280-19 Track concrete structure
and track level check) (P134-P138)
Track 02 (KP12+652.022 to KP12+757.022) thuậnchấp
Accepted
305 13-Aug-19 10:00 PM 1 00281-19 Track concrete structure Concrete Pouring
(P134-P138)
Track 02 (KP12+501.372 to KP12+652.022) thuậnchấp
Accepted
306 14-Aug-19 4:00 PM 1 00282-19 Track concrete structure Adjusting track 2
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P128-P134)
Track 02 (KP12+501.372 to KP12+652.022) thuậnchấp
Accepted
307 14-Aug-19 4:00 PM 1 00283-19 Track concrete structure
and track level check) (P128-P134)
Track 02 (KP12+501.372 to KP12+652.022) thuậnchấp
Accepted
308 14-Aug-19 10:00 PM 1 00284-19 Track concrete structure Concrete Pouring
(P128-P134) thuậnchấp
Accepted
309 15-Aug-19 8:30 AM 1 00285-19 Track concrete structure Adjusting track 6 Track 06 (T6 - 46 to T6 - 85) and (T6 - 210 to T6 - 244)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted
310 15-Aug-19 8:30 AM 1 00286-19 Track concrete structure Track 06 (T6 - 46 to T6 - 85) and (T6 - 210 to T6 - 244)
and track level check) thuậnchấp
Accepted
311 15-Aug-19 9:00 AM 1 00287-19 Track concrete structure Concrete Pouring Track 06 (T6 - 46 to T6 - 85) and (T6 - 210 to T6 - 244)
Track 01 (KP13+332.492 to KP13+407.492) thuậnchấp
Accepted
312 16-Aug-19 4:00 PM 1 00288-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P162-P165)(Station
Track 4 to Station
01 (KP13+332.492 5)
to KP13+407.492) thuậnchấp
Accepted
313 16-Aug-19 4:00 PM 1 00289-19 Track concrete structure
and track level check) (P162-P165)(Station
Track 4 to Station
01 (KP13+332.492 5)
to KP13+407.492) thuậnchấp
Accepted
314 16-Aug-19 10:00 PM 1 00290-19 Track concrete structure Concrete Pouring
(P162-P165)(Station
Track 4 to Station
01 (KP13+407.492 5)
to KP13+507.492) thuậnchấp
Accepted
315 17-Aug-19 4:00 PM 1 00291-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P165-P169)(Station
Track 4 to Station
01 (KP13+407.492 5)
to KP13+507.492) thuậnchấp
Accepted
316 17-Aug-19 4:00 PM 1 00292-19 Track concrete structure
and track level check) (P165-P169)(Station
Track 4 to Station
01 (KP13+407.492 5)
to KP13+507.492) thuậnchấp
Accepted
317 17-Aug-19 10:00 PM 1 00293-19 Track concrete structure Concrete Pouring
(P165-P169)(Station
Track 4 to Station
01 (KP13+507.492 5)
to KP13+632.492) thuậnchấp
Accepted
318 19-Aug-19 4:00 PM 1 00294-19 Track concrete structure Adjusting track 1
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P169-P174)(Station 4 to Station 5)
Track 01 (KP13+507.492 to KP13+632.492) thuậnchấp
Accepted
319 19-Aug-19 4:00 PM 1 00295-19 Track concrete structure Accepted by Mr Tuong
and track level check) (P169-P174)(Station
Track 4 to Station
01 (KP13+507.492 5)
to KP13+632.492) thuậnchấp
Accepted Input material had taken sample and test at sourse and frequency
320 19-Aug-19 10:00 PM 1 00296-19 Track concrete structure Concrete Pouring Accepted by Mr Tuong
-(P169-P174)(Station 4 to Station 5)
Building No.6 - depot thuậnchấp
Accepted test follow ITP of track concrete and winess by PIC
321 19-Aug-19 Power rail Installation power rail in building No.6 and S1 to S2 Design drawing for track concrete S4 to S5 is under review by
- S1 to01
Track S2(KP13+632.492
- Viaduct to KP13+757.492) thuậnchấp
Accepted
322 20-Aug-19 4:00 PM 1 00297-19 Track concrete structure Adjusting track 1 PIC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P174-P179)(Station
Track 4 to Station
01 (KP13+632.492 5)
to KP13+757.492) thuậnchấp
Accepted
323 20-Aug-19 4:00 PM 1 00298-19 Track concrete structure Accepted by Mr Tuong
and track level check) (P174-P179)(Station
Track 4 to Station
01 (KP13+632.492 5)
to KP13+757.492) thuậnchấp
Accepted
324 20-Aug-19 10:00 PM 1 00299-19 Track concrete structure Concrete Pouring Installation Design drawing from S1 to S2 has been SONO Accepted by Mr Tuong
(P174-P179)(Station 4 to Station 5)
- Building No.6 - depot thuậnchấp
Accepted
325 20-Aug-19 Power rail Installation power rail in building No.6 and S1 to S2 version 2C
- S1 to S2 - Viaduct thuận
Accepted chấp Input material had taken sample and test at sourse and frequency
326 20-Aug-19 Whole day 1 Track concrete structure Rectify shear connector at track 23, track 18 Depot area Material will be apply fortrack
rectify starter and
bar has beenbySONO
thuận test follow ITP of concrete winess PIC
Method
Designstatement for track
drawing for rectify work isS4
concrete under
to S5review by review
is under PIC by
Track 01 (KP13+757.492 to KP13+857.492) Accepted chấp
327 21-Aug-19 4:00 PM 1 00300-19 Track concrete structure Adjusting track 1 PIC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P179-P183)
Track (Station 4 to to
01 (KP13+757.492 Station 5)
KP13+857.492) thuậnchấp
Accepted Input material had taken sample and test at sourse and frequency
328 21-Aug-19 4:00 PM 1 00301-19 Track concrete structure Accepted by Mr Tuong
and track level check) (P179-P183)
Track (Station 4 to to
01 (KP13+757.492 Station 5)
KP13+857.492) thuậnchấp
Accepted test follow ITP of track concrete and winess by PIC
329 21-Aug-19 10:00 PM 1 00302-19 Track concrete structure Concrete Pouring Design drawing for track concrete S4 to S5 is under review by Accepted by Mr Tuong
(P179-P183) (Station 4 to to
Track 01 (KP13+757.492 Station 5)
KP13+967.292) thuận
Accepted chấp Input material had taken sample and test at sourse and frequency
330 22-Aug-19 4:00 PM 1 00303-19 Track concrete structure Adjusting track 1 PIC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P183-P188)
Track (Station 4 to to
01 (KP13+757.492 Station 5)
KP13+967.292) thuậnchấp test follow ITP of track concrete and winess by PIC
Accepted
331 22-Aug-19 4:00 PM 1 00304-19 Track concrete structure Accepted by Mr Tuong
and track level check) (P183-P188)
Track (Station 4 to to
01 (KP13+757.492 Station 5)
KP13+967.292) thuậnchấp Design drawing for track concrete S4 to S5
Accepted
332 22-Aug-19 10:00 PM 1 00305-19 Track concrete structure Concrete Pouring Accepted by Mr Tuong
(P183-P188)
Track (Station 4 to to
01 (KP13+967.492 Station 5)
KP14+063.492) thuậnchấp CSL-IMP-GCS-STO-L20-80566-B-1A
Accepted
333 23-Aug-19 4:00 PM 1 00306-19 Track concrete structure Adjusting track 1 is under
Design reviewfor
drawing bytrack
PIC concrete at depot
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P188-P192)
Track (Station 4 to to
01 (KP13+967.492 Station 5)
KP14+063.492) thuậnchấp
Accepted
334 23-Aug-19 4:00 PM 1 00307-19 Track concrete structure CSL-IMP-GCS-STO-D00-80573-B-3A NOWC Accepted by Mr Tuong
and track level check) (P188-P192)
Track (Station 4 to to
01 (KP13+967.492 Station 5)
KP14+063.492) thuậnchấp CSL-IMP-GCS-STO-D00-80573-B-4B
Accepted
335 23-Aug-19 10:00 PM 1 00308-19 Track concrete structure Concrete Pouring Accepted by Mr Tuong
(P188-P192) (Station 4 to Station 5) thuận is under review by PIC
336 23-Aug-19 8:30 AM 1 00309-19 Track concrete structure Adjusting track 23 Track 23 (T23 - 49.409 to T23 - 150.340) Rejected bị từ chối METHOD STATEMENT FOR STARTER BAR SEALING ON
PILED SLABS IN DEPOT:REJECT
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment
337 23-Aug-19 8:30 AM 1 00310-19 Track concrete structure Track 23 (T23 - 49.409 to T23 - 150.340) Rejected bị từ chối
and track level check) Input material had taken sample and test at sourse and frequency
338 23-Aug-19 9:00 AM 1 00311-19 Track concrete structure Concrete Pouring Track 23 (T23 - 49.409 to T23 - 150.340) Rejected bị từ chối test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S4 to S5
Track 01 (KP14+063.492 to KP14+163.492) Accepted chấp Design drawing for track concrete at depot
CSL-IMP-GCS-STO-L20-80566-B-1A
339 24-Aug-19 4:00 PM 1 00312-19 Track concrete structure Adjusting track 1
(P192-P196) (Station 4 to Station 5) thuận CSL-IMP-GCS-STO-D00-80573-B-3
is under review by PIC A NOWC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 01 (KP14+063.492 to KP14+163.492) Accepted chấp CSL-IMP-GCS-STO-D00-80573-B-4B
340 24-Aug-19 4:00 PM 1 00313-19 Track concrete structure Accepted by Mr Tuong
and track level check) (P192-P196) (Station 4 to to
Track 01 (KP14+063.492 Station 5)
KP14+163.492) thuậnchấp
Accepted is under review by PIC
341 24-Aug-19 10:00 PM 1 00314-19 Track concrete structure Concrete Pouring METHOD STATEMENT FOR STARTER BAR SEALING ON Accepted by Mr Tuong
(P192-P196) (Station 4 to Station 5) thuậnchấp
Accepted
342 24-Aug-19 8:30 AM 2 00309-19 Track concrete structure Adjusting track 23 Track 23 (T23 - 49.409 to T23 - 150.340) Input
PILEDmaterial
SLABShadIN taken sample and test at sourse and frequency
DEPOT:REJECT
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted test follow ITP of track concrete and winess by PIC
343 24-Aug-19 8:30 AM 2 00310-19 Track concrete structure Track 23 (T23 - 49.409 to T23 - 150.340) Accepted by Mr Sao
and track level check) thuậnchấp
Accepted Design drawing for track concrete S4 to S5
344 24-Aug-19 9:00 AM 2 00311-19 Track concrete structure Concrete Pouring Track 23 (T23 - 49.409 to T23 - 150.340) CSL-IMP-GCS-STO-L20-80566-B-1A Accepted by Mr Sao
Track 01 (KP14+163.492 to KP14+288.492) thuậnchấp
Accepted
345 26-Aug-19 4:00 PM 1 00315-19 Track concrete structure Adjusting track 1 is under review by PIC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P196-P201)
Track (Station 4 to to
01 (KP14+163.492 Station 5)
KP14+288.492) thuậnchấp
Accepted Laboratory Proposal: LABORATORY-04:
346 26-Aug-19 4:00 PM 1 00316-19 Track concrete structure Input material had taken sample and test atTien Thanh
sourse and Center for
frequency Accepted by Mr Sao
and track level check) (P196-P201)
Track 01
Venue: (Station
(KP14+163.492
Tien Thanh 4 to to
Station
Laboratory 5)
KP14+288.492) thuậnchấp
Accepted Experiment on Materials
test follow ITP (TTCEM
of track concrete andofwiness
TTDJSC) - LAS-XD 1733
by PIC
347 26-Aug-19 10:00 PM 1 00317-19 Track concrete structure Concrete Pouring CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected Accepted by Mr Sao
(P196-P201)
T2 (Station
tower, Thang Long4Victory
to Station 5)
apartment, Nam An Khanh thuậnchấp
Accepted Design drawing for track concrete S4 to S5
348 26-Aug-19 10:00 AM 1 Rail welding Visit to Ultrasonic Testing Laboratory – Tien Thanh. Track 01 (KP14+288.492 to KP14+352.652) and Track 02 CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
CSL-IMP-GCS-STO-L20-80566-B-1A
urban area, thuậnchấp
Accepted
349 27-Aug-19 4:00 PM 1 00318-19 Track concrete structure Adjusting track 1 & track 2 (KP14+288.492
Track district,toHanoi.
KP14+352.652)
01 (KP14+288.492
Hoai Duc to KP14+352.652) and Track 02 Input material
is under hadbytaken
review PICsample and test at sourse and frequency
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment thuậnchấp
Accepted test follow ITP of track concrete and winess by PIC
350 27-Aug-19 4:00 PM 1 00319-19 Track concrete structure (P201-P204)
(KP14+288.492
Track (Station 4 to to
Station
to KP14+352.652)
01 (KP14+288.492 5)
KP14+352.652) and Track 02 Accepted by Mr Sao
and track level check) thuậnchấp
Accepted Design drawing for track concrete S4 to S5
351 27-Aug-19 10:00 PM 1 00320-19 Track concrete structure Concrete Pouring (P201-P204) (Station
(KP14+288.492 4 to Station 5)
to KP14+352.652) Design drawing for track concrete at depot Accepted by Mr Sao
Track 02 (KP(Station
14 + 182.355 to KP 5)
14 + 288.492) thuậnchấp
Accepted CSL-IMP-GCS-STO-L20-80566-B-1A
352 28-Aug-19 4:00 PM 1 00321-19 Track concrete structure Adjusting track 2 (P201-P204) 4 to Station CSL-IMP-GCS-STO-D00-80573-B-3A
is SONO NOWC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (P196+18.86
Track 02 (KP m14-+P201) (Station
182.355 to KP4 14
to Station 5)
+ 288.492) thuậnchấp
Accepted CSL-IMP-GCS-STO-D00-80573-B-4B
353 28-Aug-19 4:00 PM 1 00322-19 Track concrete structure Accepted by Mr Sao
and track level check) (P196+18.86
Track 02 (KP m14-+P201) (Station
182.355 to KP4 14
to Station 5)
+ 288.492) thuậnchấp
Accepted is under review by PIC
354 28-Aug-19 10:00 PM 1 00323-19 Track concrete structure Concrete Pouring METHOD STATEMENT FOR STARTER BAR SEALING ON Accepted by Mr Sao
(P196+18.86
Track m - P201)to(Station
18 (T18+49.449 4 to Station
T18+075.403) and 5)
Track 22 thuậnchấp
Accepted
355 28-Aug-19 4:00 PM 1 00324-19 Track concrete structure Adjusting track 18 & track 22 PILED SLABS IN DEPOT:REJECT
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (T22+53.027
Track to T22+133.860)
18 (T18+49.449 to T18+075.403) and Track 22 thuậnchấp
Accepted
356 28-Aug-19 4:00 PM 1 00325-19 Track concrete structure Accepted by Mr Bao
and track level check) (T22+53.027
Track to T22+133.860)
18 (T18+49.449 to T18+075.403) and Track 22 thuậnchấp
Accepted
357 28-Aug-19 10:00 PM 1 00326-19 Track concrete structure Concrete Pouring Input material had taken sample and test at sourse and frequency Accepted by Mr Bao
(T22+53.027 to T22+133.860) thuận
test follow ITP of track concrete and winess by PIC
Track 02 (KP14+077.051 to KP14+182.355 ) (P192 +13.6 Accepted chấp
358 29-Aug-19 4:00 PM 1 00327-19 Track concrete structure Adjusting track 2 Design drawing for track concrete S4 to S5
m to P196+18.86m) (Station 4 to Station 5) thuận CSL-IMP-GCS-STO-L20-80566-B-1A
is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP14+077.051 to KP14+182.355 ) (P192 +13.6 Accepted chấp
359 29-Aug-19 4:00 PM 1 00328-19 Track concrete structure Accepted by Mr Sao
and track level check) m to P196+18.86m) (Station 4 to Station 5) thuận
Input material had taken sample and test at sourse and frequency
Track 02 (KP14+077.051 to KP14+182.355 ) (P192 +13.6 Accepted chấp test follow ITP of track concrete and winess by PIC
360 29-Aug-19 10:00 PM 1 00329-19 Track concrete structure Concrete Pouring Design drawing for track concrete S4 to S5 Accepted by Mr Sao
m to P196+18.86m) (Station 4 to Station 5) thuận
Track 02 (KP13+924.892 to KP14+077.051) (P186 to CSL-IMP-GCS-STO-L20-80566-B-1A
361 30-Aug-19 4:00 PM 1 00330-19 Track concrete structure Adjusting track 2 Postponed hoãn Input material had taken sample and test at sourse and frequency
is SONO
P192 +13.6
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track m ) (Station 4 to
02 (KP13+924.892 to KP14+077.051)
Station 5) (P186 to test follow ITP of track concrete and winess by PIC
362 30-Aug-19 4:00 PM 1 00331-19 Track concrete structure Postponed hoãn
and track level check) P192 +13.6
Track m ) (Station 4 to
02 (KP13+924.892 to KP14+077.051)
Station 5) (P186 to Design drawing for track concrete S4 to S5
363 30-Aug-19 10:00 PM 1 00332-19 Track concrete structure Concrete Pouring Postponed hoãn CSL-IMP-GCS-STO-L20-80566-B-1A
P192 +13.6
Track m ) (Station 4 to
02 (KP13+924.892 to KP14+077.051)
Station 5) (P186 to
364 31-Aug-19 4:00 PM 1 00330-19 Track concrete structure Adjusting track 2 Postponed hoãn is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment P192
Track +13.6 m ) (Station 4 to
02 (KP13+924.892 to KP14+077.051)
Station 5) (P186 to
365 31-Aug-19 4:00 PM 1 00331-19 Track concrete structure Postponed hoãn Input material had taken sample and test at sourse and frequency
and track level check) P192 +13.6
Track m ) (Station 4 to
02 (KP13+924.892 to KP14+077.051)
Station 5) (P186 to
366 31-Aug-19 10:00 PM 1 00332-19 Track concrete structure Concrete Pouring Postponed hoãn test follow ITP of track concrete and winess by PIC
P192 +13.6 m ) (Station 4 to Station 5) Design drawing for track concrete S4 to S5
Track 02 (KP13+924.892 to KP14+077.051) (P186 to Accepted chấp CSL-IMP-GCS-STO-L20-80566-B-1A
367 3-Sep-19 4:00 PM 1 00330-19 Track concrete structure Adjusting track 2
P192 +13.6 m ) (Station 4 to Station 5) thuận is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track
"Track02
19(KP13+924.892 to KP14+077.051) (P186 to Accepted chấp
368 3-Sep-19 4:00 PM 1 00331-19 Track concrete structure
and track level check) P192
- Weld+13.6 m ) 0001
Number (Station 4 to Station
& 0002 5)
(CH: 194.369) thuận
- Weld Number 0003 & 0004 (CH: 219.669).
Track 02 (KP13+924.892 to KP14+077.051) (P186 to Accepted chấp
369 3-Sep-19 10:00 PM 1 00332-19 Track concrete structure Concrete Pouring - Weld Number 0005 & 0006 (CH: 169.669).
P192 +13.6 m ) (Station 4 to Station 5) thuận Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
Input material had taken sample and test at sourse and frequency
Accepted chấp Experiment
test on Materials
follow ITP (TTCEM
of track concrete andofwiness
TTDJSC) - LAS-XD 1733
by PIC
370 3-Sep-19 09:00 AM 1 00333-19 Rail welding Ultrasonic Testing for Aluminothermic Welds (Building No.6)
thuận CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Design drawing for track concrete S4 to S5
Track 02 (KP 13+801.492 to KP13+924.892 ) (P181 to Accepted chấp CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
371 4-Sep-19 4:00 PM 1 00334-19 Track concrete structure Adjusting track 2 CSL-IMP-GCS-STO-L20-80566-B-1A
P186) (Station 4 to Station 5) thuận is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP 13+801.492 to KP13+924.892 ) (P181 to Accepted chấp
372 4-Sep-19 4:00 PM 1 00335-19 Track concrete structure
and track level check) P186) (Station 4 to Station 5) thuận
Track 02 (KP 13+801.492 to KP13+924.892 ) (P181 to Accepted chấp
373 4-Sep-19 10:00 PM 1 00336-19 Track concrete structure Concrete Pouring
P186) (Station 4 to Station 5) thuận
(Building No.6) Input material had taken sample and test at sourse and frequency
test follow ITP of track concrete and winess by PIC
Track 02 (KP13+707.492 to KP 13+807.492) (P177 to Accepted chấp Design drawing for track concrete S4 to S5
375 5-Sep-19 4:00 PM 1 00338-19 Track concrete structure Adjusting track 2 CSL-IMP-GCS-STO-L20-80566-B-1A
P181+6m) (Station 4 to Station 5) thuận
is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP13+707.492 to KP 13+807.492) (P177 to Accepted chấp
376 5-Sep-19 4:00 PM 1 00339-19 Track concrete structure
and track level check) P181+6m) (Station 4 to Station 5) thuận
382 6-Sep-19 9:30 AM 1 00345-19 Rail welding Inspection for weld Geometrical Checks of the Flash Butt Welding all FBW on Track 1 – Station 1 to 2 Postponed hoãn
"Track 18
- Weld Number 0017 & 0018 (CH: 771.565).
383 6-Sep-19 9:30 AM 1 00346-19 Rail welding Inspection for Geometrical Checks for the ATW -Section (200 – 207)
Weld Number 0019on
&Track
0020 1(CH:
– Station 1 to 2.
796.265). Postponed hoãn
- Weld Number 0161 & 0162 (CH: 697.165).
Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
- Weld Number 0163 & 0164 (CH: 722.165) .
Accepted chấp Input material
Experiment onhad taken sample
Materials (TTCEM andoftest at sourse
TTDJSC) and frequency
- LAS-XD 1733
383 6-Sep-19 09:30 AM 1 00347-19 Rail welding Ultrasonic Testing for Aluminothermic Welds (Building No.6) test follow ITP of track concrete and winess by PIC
CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
thuận
Track 02 (KP13+592.536 to KP 13+707.492) Accepted chấp Design drawing for track concrete S4 to S5 Reviewing by PIC
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under
384 6-Sep-19 4:00 PM 1 00348-19 Track concrete structure Adjusting track 2 CSL-IMP-GCS-STO-L20-80566-B-1A
(P172+10.044m to P177) (Station 4 to Station 5) thuận
is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP13+592.536 to KP 13+707.492) Accepted chấp
385 6-Sep-19 4:00 PM 1 00349-19 Track concrete structure
and track level check) (P172+10.044m to P177) (Station 4 to Station 5) thuận
Input material had taken sample and test at sourse and frequency
Track 02 (KP13+592.536 to KP 13+707.492) Accepted chấp test follow
Input ITPhad
material of track
takenconcrete and test
sample and winess by PICand frequency
at sourse
386 6-Sep-19 10:00 PM 1 00350-19 Track concrete structure Concrete Pouring Design drawing
(P172+10.044m to P177) (Station 4 to Station 5) thuận test follow ITP offortrack
trackconcrete
concreteand
S4winess
to S5 by PIC
Zone 1 (P35 to P71): Track 1( Km 10+335.102 to Km CSL-IMP-GCS-STO-L20-80566-B-1A
Design drawing for track concrete S4 to S5
387 6-Sep-19 4:00 PM 1 00351-19 Track concrete structure Post-Concreting Inspection (Visual checking follow checklist ) 11+222.502)
Zone & P71):
1 (P35 to TrackTrack
2 ( Km
1(10+335.102 to to Km
Km 10+335.102 Postponed hoãn is SONO
CSL-IMP-GCS-STO-L20-80566-B-1A
388 6-Sep-19 4:00 PM 1 00352-19 Track concrete structure Post-Concreting Inspection ( Plinth/slab geometry check ) Km11+222.502)
11+222.502) & Track 2 ( Km 10+335.102 to Postponed hoãn is SONO
Visit to Hanitel Group Factory for checking column track & Anchors bolts – H Venue: Hanitel Group Factory-Son Tay
Km11+222.502) Accepted chấp Input material had taken sample and test at sourse and frequency
389 6-Sep-19 09:00 AM 1 00353-19 Rail system 3 Following
test follow Drawing
ITP of trackNo:concrete
CSL-IMP-GCS-STO-D08-70564-B
and winess by PIC
Steel Structure district, Hanoi. thuận
Track 02 (KP13+482.492 to KP 13+592.536) (P168 to Accepted chấp Design drawing for track concrete S4 to S5
384 7-Sep-19 4:00 PM 1 00354-19 Track concrete structure Adjusting track 2 CSL-IMP-GCS-STO-L20-80566-B-1A
P172+10.044m) (Station 4 to Station 5) thuận
is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP13+482.492 to KP 13+592.536) (P168 to Accepted chấp
385 7-Sep-19 4:00 PM 1 00355-19 Track concrete structure
and track level check) P172+10.044m) (Station 4 to Station 5) thuận Input material had taken sample and test at sourse and frequency
"Track 17
- Weld Number 0026 (CH: 244.019). test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S4 to S5
386 7-Sep-19 10:00 PM 1 00356-19 Track concrete structure Concrete Pouring -Track Weld02 (KP13+482.492
Number 0027 & 0028to KP 13+592.536)
(CH: 169.647). (P168 to Accepted chấp
CSL-IMP-GCS-STO-L20-80566-B-1A
-P172+10.044m)
"Track Weld Number
16
(Station 4 to Station
0029&0030 5)
(CH: 144.947). thuận
is SONO and CSL-IMP-GCS-STO-L20-80566-B-1B-Under
Track
-"Track Weld02
-Weld 17(KP13+332.492
Number
Number 0157&
0035 to KP
&0158
0036 13+482.492)
(CH:
(CH: 194.347). (P162 to
171.637). Accepted chấp
387 9-Sep-19 4:00 PM 1 00357-19 Track concrete structure Adjusting track 2 reviewing
P168)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment --Track
- Weld Weld
Weld02(Station
Number 40159
to Station
0021
(KP13+332.492
Number
Number &
0037&0038 to5)KP
& 0160
0022 (CH:
(CH:
(CH: 293.447).
13+482.492)
196.337). (P162 to
219.347). thuậnchấp
Accepted
388 9-Sep-19 4:00 PM 1 00358-19 Track concrete structure -Track Weld Number
and track level check) P168)
"Track
- Weld (Station
0216 40023
(KP13+332.492
Number 0039 & 0024
to Station
&0040 (CH:
to5)KP 268.822).
13+482.492)
(CH: 262.286). (P162 to thuậnchấp
Accepted
389 9-Sep-19 10:00 PM 1 00359-19 Track concrete structure Concrete Pouring Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
---P168)
Weld(Station
Weld
Weld Number40153
Number
Number 0025
0031&0032
to Station
& 0154 (CH:
5)(CH: 244.019).
(CH:72.537).
187.886). thuậnchấp
Accepted ExperimentProposal:
Laboratory on Materials (TTCEM of TTDJSC)
LABORATORY-04: - LAS-XD
Tien Thanh 1733
Center for
390 9-Sep-19 09:30 AM 1 00360-19 Rail welding Ultrasonic Testing for Aluminothermic Welds -- Weld .(Building
Number No.6)
0033 & 0034 (CH:
Weld Number 0155&0156 (CH: 163.186). 97.237). CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
thuậnchấp
Accepted Experiment on Materials (TTCEM of TTDJSC) - LAS-XD 1733
391 10-Sep-19 09:30 AM 1 00361-19 Rail welding Ultrasonic Testing for Aluminothermic Welds .(Building No.6) Laboratory Proposal: LABORATORY-04:
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under TienReviewing
Thanh Center for
by PIC
thuậnchấp
Accepted CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Experiment on Materials
392 11-Sep-19 09:30 AM 1 00362-19 Rail welding Ultrasonic Testing for Aluminothermic Welds .(Building No.6) Design drawing for track (TTCEM
concrete atofdepot
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under
TTDJSC) - LAS-XD 1733
Reviewing by PIC
thuận CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
CSL-IMP-GCS-STO-D00-80573-B-3 A NOWC
Track 05(T5-18.27 to T5-50.320)&Track 07 (T7-18.242 to CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
393 11-Sep-19 8:30 AM 1 00363-19 Track concrete structure Adjusting track 05&07 Postponed hoãn CSL-IMP-GCS-STO-D00-80573-B-4B
T7 - 67.388) is under review by PIC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 05(T5-18.27 to T5-50.320)&Track 07 (T7-18.242 to
394 11-Sep-19 8:30 AM 1 00364-19 Track concrete structure Postponed hoãn METHOD STATEMENT FOR STARTER BAR SEALING ON
and track level check) T7 - 67.388)
Track 05(T5-18.27 to T5-50.320)&Track 07 (T7-18.242 to Design drawing for track concrete at depot
395 11-Sep-19 9:00 AM 1 00365-19 Track concrete structure Concrete Pouring Postponed hoãn PILED SLABS IN DEPOT:REJECT
T7 - 67.388) CSL-IMP-GCS-STO-D00-80573-B-3 A NOWC
Track 05(T5-18.27 to T5-50.320)&Track 07 (T7-18.242 to Accepted chấp Input material had taken sample and test at sourse and frequency QC incharge: Mr Anh 0947290472 SE
396 12-Sep-19 8:30 AM 2 00363-19 Track concrete structure Adjusting track 05&07 CSL-IMP-GCS-STO-D00-80573-B-4B Mr Viet
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment T7 - 67.388)
Track 05(T5-18.27 to T5-50.320)&Track 07 (T7-18.242 to thuậnchấp
Accepted test followreview
is under ITP ofby
track
PICconcrete and winess by PIC Mr Tu:0386108273
397 12-Sep-19 8:30 AM 2 00364-19 Track concrete structure
and track level check) T7 - 67.388)
Track 05(T5-18.27 to T5-50.320)&Track 07 (T7-18.242 to thuậnchấp
Accepted Design
METHOD drawing for track concrete
STATEMENT S5 to S6BAR SEALING ON
FOR STARTER
398 12-Sep-19 9:00 AM 2 00365-19 Track concrete structure Concrete Pouring CSL-IMP-GCS-STO-L20-80567-B-1A
PILED SLABS IN DEPOT:REJECT
T7 - 67.388)
Track 01 (KP14+457.652 to KP 14+554.932) (P211 to thuậnchấp
Accepted
399 12-Sep-19 4:00 PM 1 00366-19 Track concrete structure Adjusting track 1 Input material had taken sample and test at sourse and frequency
is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track COTP215) (Station 5 to Station
01 (KP14+457.652 to KP 6)
14+554.932) (P211 to thuậnchấp
Accepted test follow ITP of track concrete and winess by PIC
400 12-Sep-19 4:00 PM 1 00367-19 Track concrete structure
and track level check) COTP215)
Track (Station 5 to Station
01 (KP14+457.652 to KP 6)
14+554.932) (P211 to thuậnchấp
Accepted Design drawing for track concrete S5 to S6
401 12-Sep-19 10:00 PM 1 00368-19 Track concrete structure Concrete Pouring CSL-IMP-GCS-STO-L20-80567-B-1A
COTP215)
Track (Station 5 to Station
02 (KP14+457.652 to KP 6)
14+554.932) (P211 to thuậnchấp
Accepted
402 13-Sep-19 4:00 PM 1 00369-19 Track concrete structure Adjusting track 2 is SONO QC incharge: Mr Phuc 0935517681
COTP215)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 (KP14+457.652 (Station 5 to Station
to KP 6)
14+554.932) (P211 to thuậnchấp
Accepted SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
403 13-Sep-19 4:00 PM 1 00370-19 Track concrete structure 0913391325 Mr Sao
and track level check) COTP215)
Track (Station 5 to Station
02 (KP14+457.652 to KP 6)
14+554.932) (P211 to thuậnchấp
Accepted
404 13-Sep-19 10:00 PM 1 00371-19 Track concrete structure Concrete Pouring Company Surveyor: Mr Aurelien 0986148880
COTP215)Name: HaiPhong
(Station Inhouse
5 to Station 6) Industrial Structure thuậnchấp
Accepted
405 13-Sep-19 9:00AM 1 HEIGHT ADJUSTABLE SHIM Visit Iniss factory for testing material for Shim plate in PO CP08-0179 Supplier JSC.
thuận
No.43-45 An Dong, An Duong, Hai Phong.
Re- issue
Section (200 – 207) on Track 1 – Station 2 to 1. Weld
number 200&201 (CH:10.381) Weld number
Follow ITP FOR ALUMINOTHERMIC WELDING – MAIN
202(CH10.393) Weld number Accepted chấp
407 14-Sep-19 9:30 AM 1 00346-19 Rail welding Inspection for Geometrical Checks for the ATW LINE (Elevated & underground) & DEPOT drawing CSL-IMP- QC incharge: Mr Kien 0982756102 Mr Viet
203(CH:10.531) Weld number thuận PPG-STO-L00-00003-E-3B is SONO
204&205(CH:10.550) Weld number
206&207(CH:11.050)
Re- issue
Section (200 – 207) on Track 1 – Station 2 to 1. Weld Follow ITP FOR ALUMINOTHERMIC WELDING – MAIN
415 16-Sep-19 09:30 AM 1 00379-19 Rail welding Geometrical Check after final grinding of ATW number 200&201 (CH:10.381) Weld number Rejected bị từ chối LINE (Elevated & underground) & DEPOT drawing CSL-IMP- Mr Joydeep:
202(CH10.393) Weld number PPG-STO-L00-00003-E-3B is SONO
203(CH:10.531) Weld number
204&205(CH:10.550) Weld number
206&207(CH:11.050)
"Track 1
Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
- Weld Number 0013 &0017 (CH: 10.356). Accepted chấp Experiment on Materials (TTCEM of TTDJSC) - LAS-XD 1733
416 16-Sep-19 09:00 AM 1 00380-19 Rail welding Ultrasonic Testing for Aluminothermic Welds &FBW - Weld Number 0200& 0201 (CH: 10.381 ). CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Mr Joydeep: Mr Viet
thuận
- Weld Number 0202 (CH: 10.393). CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
- Weld Number 0030 &0036 (CH: 10.407).
- Weld Number 0031& 0037 (CH: 10.431) -
Weld 1Number Input material had taken sample and test at sourse and frequency QC incharge: Mr Phuc 0935517681 , SE
Zone (P35 to0032&0038
P71): Track 1( (CH:
Km10.456).
10+335.102 to Km
"Track 1 Accepted chấp test follow ITP of track concrete and winess by PIC Track:
QC Duệ 0965730358;
incharge: Mr Phuc 0935517681 Civil
SE Mr Viet
417 16-Sep-19 10:00 AM 2 00351-19 Track concrete structure Post-Concreting Inspection (Visual checking follow checklist ) 11+222.502) & P71):
TrackTrack
2 ( Km 10+335.102 to Gửi lại cho hôm 6.sep.2019
-Zone Weld1 Number
(P35 to 0033 &00391( Km (CH:10+335.102
10.482). to Km thuậnchấp
Accepted Design drawing for track concrete S5 to S6 Engineer
Track: Mr0965730358;
Duệ Luân: 0913391325 ChipCivil
418 16-Sep-19 10:00 AM 2 00352-19 Track concrete structure Post-Concreting Inspection ( Plinth/slab geometry check ) Km11+222.502)
-11+222.502)
Track Weld01 Number& Track 20040
( KP 140034&
( Km 10+335.102
+ 888.932 + (CH:
KP 14+10.506 to).
988.932) (P229 thuậnchấp
Accepted CSL-IMP-GCS-STO-L20-80567-B-1A Surveyor:
QC MrLuân:
incharge:
Engineer Mr Aurelien
Mr Phuc 0986148880
0935517681,Mr
0913391325 Kien
Chip
Mr Viet Gửi lại cho hôm 6.sep.2019
419 17-Sep-19 4:00 PM 1 00381-19 Track concrete structure Adjusting track 1 Km11+222.502)
- Weld Number 0203&0041 (CH: 10.531). is SONO 0982756102
Surveyor: Mr Aurelien 0986148880
to
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment "Track P233)1 (Station 5+ to Station 6) thuậnchấp
420 17-Sep-19 4:00 PM 1 00382-19 Track concrete structure -Track Weld01 ( KP 140205
Number 888.932
&0204+ (CH:
KP 14+ 988.932)
10.550). (P229 Accepted SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
and track level check) toWeld P233) (Station 5+ to Station 0913391325
421 17-Sep-19 10:00 PM 1 00383-19 Track concrete structure Concrete Pouring --Track Weld Number
01
Number 0007
( KP 140001& 0051+6)
&0057
888.932 (CH:
KP
(CH: 10.725).
14+ 988.932)
10.575) (P229
- thuậnchấp
Accepted Design drawing for track concrete at depot
Surveyor: Mr Aurelien 0986148880
-Weld
toWeld Number 0008& 0058(CH:(CH: 10.750 CSL-IMP-GCS-STO-D00-80573-B-3 A NOWC
Track P233) (Station
03(T3-16.51
Number 5 to
to T3-84.747)&Track
0002&0052Station 6) 04).(T4-119.145
10.600). - Weld thuậnchấp
Accepted QC incharge: Mr Phuc 0935517681 SE
422 17-Sep-19 8:30 AM 1 00384-19 Track concrete structure Adjusting track 03&04 CSL-IMP-GCS-STO-D00-80573-B-4B Mr Viet
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment -Numberto
Track Weld Number 0009&0059
T4 -03(T3-16.51
157.14)
0003&0053 (CH: 10.775).
(CH: 10.625).
to T3-84.747)&Track 04 (T4-119.145 thuậnchấp
Accepted is under
Input review
material hadbytaken
PICsample and test at sourse and frequency
Mr Tu:0386108273
423 17-Sep-19 8:30 AM 1 00385-19 Track concrete structure --toWeld Number
and track level check) TrackWeld 157.14) 0042
Number 0004
T4 -03(T3-16.51 to
&0069
&0054 (CH:
(CH: 10.825).
10.650).
T3-84.747)&Track 04 (T4-119.145 thuậnchấp
Accepted METHOD
test STATEMENT
follow ITP of track FOR STARTER
concrete and winessBAR SEALING
by Thanh
PIC ON
424 17-Sep-19 9:00 AM 1 00386-19 Track concrete structure Concrete Pouring - Weld
Weld Number
Number 0005&
0043& 0055
0070 (CH:(CH:10.675)
10.850) Laboratory Proposal: LABORATORY-04: Tien Center for
-to T4 - Number
157.14) 0044&0071 - thuậnchấp PILED drawing
Design SLABS IN
forDEPOT:REJECT
track (TTCEM
concrete S5
- Weld (CH: 10.875). Accepted Experiment on Materials of to S6
TTDJSC) - LAS-XD 1733
425 17-Sep-19 09:30 AM 1 00387-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW Weld Number 0006&0056 (CH: 10.700). CSL-IMP-GCS-STO-L20-80567-B-1A
CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Mr
QC Joydeep:
incharge: Mr Phuc 0935517681,Mr Kien Mr Viet
Track
- Weld01Number
( KP 14 0045&0072
+ 988.932 + KP 15+10.900).
(CH: 088.932) (P233 thuậnchấp
Accepted
426 18-Sep-19 4:00 PM 1 00388-19 Track concrete structure Adjusting track 1 is SONO
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC 0982756102
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment -Track toWeldP237)
01 (Station
Number 5+ to
( KP 140046 Station+6)
&0073
988.932 (CH:
KP 15+10.925).
088.932) (P233 thuậnchấp
Accepted SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
427 18-Sep-19 4:00 PM 1 00389-19 Track concrete structure -Track
and track level check) toWeld
P237)Number
01 ( KP 140047&
(Station 5+ to 0074+6)
Station
988.932 (CH:
KP 15+10.950)
088.932) (P233 thuậnchấp
Accepted 0913391325
428 18-Sep-19 10:00 PM 1 00390-19 Track concrete structure Concrete Pouring Laboratory Proposal: LABORATORY-04: Tien Thanh Center for Surveyor: Mr Aurelien 0986148880
to- Weld
P237)Number
(Station0048&0075
5 to Station 6)(CH: 10.975). thuậnchấp
Accepted Experiment on Materials (TTCEM of TTDJSC) - LAS-XD 1733
429 18-Sep-19 08:30 1 00391-19 Rail welding Ultrasonic Testing for Aluminothermic Welds &FBW - Weld Number 0049&0076 (CH: 11.000). CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Mr Joydeep: Mr Viet
thuận
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
Follow ITP FOR ALUMINOTHERMIC WELDING – MAIN
Accepted chấp
430 18-Sep-19 02:30 PM 1 00392-19 Rail welding Inspection for Geometrical Checks for the ATW LINE (Elevated & underground) & DEPOT drawing CSL-IMP- Mr Joydeep:
thuận PPG-STO-L00-00003-E-3B is SONO
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
438 20-Sep-19 4:00 PM 1 00400-19 Track concrete structure "Track02
Track 1 (KP15+063.932 to KP 15+163.932) (P236 to 0913391325
and track level check) thuận Input material had taken sample and test at sourse and frequency
-3RT240)
Weld Number 0050
(Station 5 to&0077
Station 6)(CH: 11.025).
- Weld Number 0207& 0208 (CH: 11.050 ). test follow ITP of track concrete and winess by PIC
- Weld Number 0060&0078 (CH: 11.075). Design drawing for track concrete S5 to S6
Accepted chấp
439 20-Sep-19 10:00 PM 1 00401-19 Track concrete structure Concrete Pouring -Track
Weld02 (KP15+063.932
Number 0061 &0079 to KP(CH:
15+163.932)
11.100). (P236 to CSL-IMP-GCS-STO-L20-80567-B-1A
thuận is SONO
-3RT240) (Station
Weld Number 5 to Station
0062& 0080 6)(CH: 11.125) Laboratory Proposal: LABORATORY-04: Tien Thanh Center for Surveyor: Mr Aurelien 0986148880
Accepted chấp Design
Experiment drawing
on Materials for track
(TTCEM ofconcrete
TTDJSC)S5 to S6
- LAS-XD 1733
440 20-Sep-19 08:30 1 00398-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW - Weld
track 02Number 0063&0081 (CH: 11.150).
(KP14+963.932 CSL-IMP-GCS-STO-L20-80567-B-1B
CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Mr Joydeep:
QC incharge: Mr Phuc 0935517681,Mr Kien
thuậnchấp
Accepted
441 21-Sep-19 4:00 PM 1 00402-19 Track concrete structure Adjusting Track 2 to-KP
trackWeld Number 0064&0082
0215+063.932)
(KP14+963.932(P232 to P236) (CH: 11.175).
(Station 5 to Station 6) is under review
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC 0982756102
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment - Weld Number 0065 &0083 (CH: 11.200). thuậnchấp
Accepted SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
442 21-Sep-19 4:00 PM 1 00403-19 Track concrete structure to KP0215+063.932)
track (P232 to P236) (Station 5 to Station 6)
and track level check) ''Track 2(KP14+963.932 thuậnchấp
Accepted 0913391325
443 21-Sep-19 10:00 PM 1 00404-19 Track concrete structure Concrete Pouring to KP 15+063.932) (P232 to P236) (Station 5 to Station 6) Surveyor: Mr Aurelien 0986148880
- Weld
track 02 (T02-43.159 toNumber 0622&0632
T02-116.300 ) (CH: thuậnchấp
Accepted
444 21-Sep-19 8:30 AM 1 00405-19 Track concrete structure Adjusting track 02 11.172).
(Depot)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment track 02 (T02-43.159 to T02-116.300 ) thuậnchấp
Accepted
445 21-Sep-19 8:30 AM 1 00406-19 Track concrete structure - Weld Number 0623 &0633 (CH: 11.197).
and track level check) (Depot)
track 02 (T02-43.159 to T02-116.300 ) thuậnchấp
Accepted
446 21-Sep-19 9:00 AM 1 00407-19 Track concrete structure Concrete Pouring
(Depot) thuận
"Track 2
- Weld Number 0621 &0631 (CH: 11.147).
- Weld Number 0620& 0630 (CH: 11.122 ).
- Weld Number 0619&0629 (CH: 11.097).
- Weld Number 0618 & 0627 (CH: 11.072). Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
- Weld Number 0209& 0208 (CH: 11.047). Accepted chấp Experiment on Materials (TTCEM of TTDJSC) - LAS-XD 1733
447 21-Sep-19 8:30 AM 1 00408-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Mr Joydeep:
- Weld Number 0599& 0608 (CH: 11.022). thuận
- Weld Number 0598& 0607 (CH: 10.997). CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
- Weld Number 0597& 0606 (CH: 10.972).
- Weld Number 0596& 0605 (CH: 10.947).
- Weld Number 0595& 0604 (CH: 10.922). Input material had taken sample and test at sourse and frequency
- Weld Number 0594& 0603 (CH: 10.987). test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S5 to S6
CSL-IMP-GCS-STO-L20-80567-B-1A
is SONO
Track 02 (KP14+838.932 to KP 14+963.932) (P227 to Accepted chấp Design drawing for track concrete S5 to S6
448 23-Sep-19 4:00 PM 1 00409-19 Track concrete structure Adjusting track 2 CSL-IMP-GCS-STO-L20-80567-B-1B QC incharge: Mr Phuc 0935517681,Mr Kien
P232) (Station 5 to Station 6) thuận
Track 6 (Depot) is under review 0982756102
- Weld Number 0190 & 0191
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment -Track Weld02Number 0192& 0192
(KP14+838.932 to KP 14+963.932) (P227 to Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
449 23-Sep-19 4:00 PM 1 00410-19 Track concrete structure -P232) Weld(Station
Number50194 & 1956) 0913391325
and track level check) to Station thuận
- Weld Number 096 & 0197
-Track Weld18Number
(Depot)0198& 0199 Input material had taken sample and test at sourse and frequency
450 23-Sep-19 10:00 PM 1 00411-19 Track concrete structure Concrete Pouring -Track Weld02 (KP14+838.932
Number 0224
0169 & 0225to KP 14+963.932) (P227 to
0170 Accepted chấp test follow ITP of track concrete and winess by PIC
-"Track
P232) 2
Weld(Station
Number 50226
to Station
0171 & 0227
01726) thuận Design drawing for track concrete S1 to S2
-Station
- Weld Weld Number 0593 Surveyor: Mr Aurelien 0986148880 Mr Sao
Number 0228
0173
1 to Station 2 &0602
& 0229 (CH: Track
174to P71):
(P35 10.873).
1( Km CSL-IMP-GCS-STO-L20-80563-B-2C
MATERIAL
451 23-Sep-19 2:00 PM 1 00412-19 Track concrete structure Final Plinth for Post-Concreting Inspection ( Plinth/slab geometry check ) --10+335.102
Track Weld
Weld23Number
(depot)
Number 0592&
0175 &0601
0176 (CH: 10.848). Postponed hoãn is SONO APPROVAL REQUESTS (MAR) SIKA GROUT QC incharge: Mr Kien 0982756102
to Km 11+222.502) 214-11 FOR FOOTING OF COLUMN TRACK drawing CSL- QC incharge: Mr Kien 0982756102
452 23-Sep-19 9:00 AM 1 00413-19 ColumnTrack Pre-Erection and Pouring Grout --Building Weld Number
Weld Number 0591&0600
04, Track
0222
0177 0178 (CH: 10.823).
07&(Depot)
0223 Postponed hoãn
IMP-TRE-STO-L00-00017-E-2A is SONO and and
Mr Viet
Accepted chấp Input material had taken sample and test atTien
sourse andCSL-IMP-
frequency SE Mr
QC Tu:0386108273
incharge: Mr Kien 0982756102
453 23-Sep-19 03:00 PM 1 00414-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds -- -Weld Weld Number
WeldNumber 0590
0179&&0221
Number0220& 0617
0180 (CH: 10.773). Laboratory Proposal:
PPG-STO-D00-00003-E-2A
test follow ITP
LABORATORY-04:
is SONO
of track concrete andofwiness
Thanh
by PIC
Center for
- Weld
- Weld Number
Number 0219
0589& & 0616
0218 (CH: 10.748) thuậnchấp
Accepted Experiment on Materials (TTCEM TTDJSC) - LAS-XD 1733 SE Mr Tu:0386108273
454 23-Sep-19 8:30 AM 1 00415-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW 0181 0182 Design drawing for track concrete S5 to S6 Mr Joydeep:
-- Weld Weld Number
Number 0217
0588&
0183 &0615
184 (CH: 10.723).
0216 thuậnchấp
Accepted CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
CSL-IMP-GCS-STO-L20-80567-B-1A QC incharge: Mr Kien 0982756102
455 24-Sep-19 03:00 PM 1 00416-19 Rail welding Inspection for weld geometrical acceptance of the Aluminothermic Welds CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC
-- Weld Weld Number
Number 0215&
0587& 0614
0186 (CH: 10.698).
0185 &0214 thuận is SONO SE Mr Tu:0386108273
--Track Weld Number
Weld Number 0213
0586&
0187 &0613
02 (KP14+738.931 0212
0188 (CH: 10.673).
to KP 14+838.932) (P223- Accepted chấp Design drawing for track concrete S5 to S6
459 24-Sep-19 4:00 PM 1 00417-19 Track concrete structure Adjusting track 2 -- -Weld
Weld Number
Number 0585& &&0612 (CH: 10.648).
P227) Weld Number
(Station 50234
0189
to 0235
0246
Station 6) thuận CSL-IMP-GCS-STO-L20-80567-B-1B QC incharge: Mr Phuc 0935517681,Mr Kien
-- Weld
Weld Number
Number 0236
0584&&0611
0237 (CH: 10.624). is under review 0982756102
- Weld Number 0238 & 0239
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track - Weld02 (KP14+738.931
Number 0240 & 0241 to KP 14+838.932) (P223- Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
460 24-Sep-19 4:00 PM 1 00418-19 Track concrete structure 0913391325
and track level check) P227)
- Weld(Station
Number50242to Station
& 0243 6) thuận
- Weld Number 0244 & 0245 Input material had taken sample and test at sourse and frequency
Track
Track 22 02 (depot) test follow ITP of track concrete and winess by PIC
461 24-Sep-19 10:00 PM 1 00419-19 Track concrete structure Concrete Pouring "Track 2 (KP14+738.931
- Weld(Station
Number
to KP 14+838.932) (P223- Accepted chấp
-P227) 50248 & 0247
to Station 6) thuận Design drawing for track concrete S5 to S6
- Weld
Weld Number
Number 0584
0250 &0611
& 0249 (CH: 10.624). MATERIAL APPROVAL REQUESTS (MAR) SIKA GROUT
CSL-IMP-GCS-STO-L20-80567-B-1A Surveyor: Mr Aurelien 0986148880
-- Weld
Weld Number
Number 0583&
0252 0610
0251 (CH: 10.599). Accepted chấp 214-11 FORProposal:
FOOTING OF COLUMN TRACK drawing CSL-for QC incharge: Mr Kien 0982756102
462 24-Sep-19 9:00 AM 1 00413-19 ColumnTrack Pre-Erection and Pouring Grout -Building 04, Track
Weld Number 07&(Depot)
0582&0609 (CH: 10.574).
is SONO
Laboratory LABORATORY-04:
IMP-TRE-STO-L00-00017-E-2A isofSONO
Tien Thanh
and -and
Center
CSL-IMP-
Mr Viet
thuậnchấp
Accepted Design drawing
Experiment for track
on Materials concrete
(TTCEM S5 to S6
TTDJSC) LAS-XD 1733 SE Mr Tu:0386108273
463 24-Sep-19 8:30 AM 1 00420-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW - Weld Number 0210& 0211 (CH: 10.549). PPG-STO-D00-00003-E-2A is SONO
CSL-IMP-GCS-STO-L20-80567-B-1B
CSL-IMP-TRE-ZPQ-L00-00018-E-1A:Rejected
Mr Joydeep:
QC incharge: Mr Phuc 0935517681,Mr Kien
Track thuậnchấp
464 25-Sep-19 4:00 PM 1 00421-19 Track concrete structure Adjusting track 2 - Weld02 ( KP 14+638.932
Number 0581& 0572to KP14+738.931
(CH: 10.525) ) (COTP219- Accepted
is under review
CSL-IMP-TRE-ZPQ-L00-00018-E-2A:Under Reviewing by PIC 0982756102
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track P223) (Station
- Weld02 50580&
to Station
( KP 14+638.932
Number 0571 6)
to KP14+738.931
(CH: 10.500). ) (COTP219- thuậnchấp
Accepted SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
465 25-Sep-19 9:00 PM 1 00422-19 Track concrete structure 0913391325
and track level check) P223) (Station
- Weld02
Track Number 50570&
to Station
( KP 14+638.932 0579 6) (CH: 10.475). ) (COTP219-
to KP14+738.931 thuậnchấp
Accepted
466 25-Sep-19 10:00 PM 1 00423-19 Track concrete structure Concrete Pouring - Weld(Station
Number50578& 0569 Surveyor: Mr Aurelien 0986148880
P223) to Station 6) (CH: 10.450). thuận
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 01 (T01-18.20 to T01-99.48 ) Accepted chấp
468 25-Sep-19 8:30 AM 1 00425-19 Track concrete structure
and track level check) (Depot) thuận
SE Mr Tu:0386108273
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 ( KP 15+268.932 to KP15+382.842 ) (3RT243- Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
483 28-Sep-19 9:00 PM 1 00439-19 Track concrete structure 0913391325
and track level check) P248) (Station 5 to Station 6) thuận
Track 01 ( KP 14+352.652
493 30-Sep-19 10:00 PM 1 00449-19 Track concrete structure Concrete Pouring Postponed hoãn
to KP14+457.652 ) (P204-P211) (Station 5)
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 01 ( KP 14+352.652 Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
497 1-Oct-19 9:00 PM 1 00448-19 Track concrete structure
and track level check) to KP14+457.652 ) (P204-P211) (Station 5) thuận 0913391325
Station 1 to Station 2 (P35 to P71): Track 2 ( Km Input material had taken sample and test at sourse and frequency
499 1-Oct-19 2:00 PM 1 00412-19 Track concrete structure Post-Concreting Inspection Postponed hoãn
10+335.102 to Km 11+222.502) test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S1 to S2
CSL-IMP-GCS-STO-L20-80563-B-2C
is SONO
Input material had taken sample and test at sourse and frequency
Laboratory
test Proposal:
follow ITP LABORATORY-04:
of track Tien
concrete and winess by Thanh
PIC Center for
Accepted chấp
500 2-Oct-19 8:30 AM 1 00451-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW Experiment
Design on Materials
drawing for track (TTCEM of TTDJSC)
concrete S5 to S6 - LAS-XD 1733 Mr Joydeep:
"Track 1 (Viaduct) Station 2 to station 3 thuận CSL-IMP-TRE-ZPQ-L00-00018-E-3A: SONO
:CSL-IMP-GCS-STO-L20-80567-B-1A
is SONO
MANUFACTURING DESIGN DRAWINGS
ITEM: Typical Cross Section Of Plinth With Derailment
Containment Device: CSL-IMP-GCS-STO-L20-70559-B-2A
Track 02 ( KP 14+352.652 will be SONO
501 2-Oct-19 4:00 PM 1 00452-19 Track concrete structure Adjusting track 2 Postponed hoãn
to KP14+457.652 ) (P204-P211) (Station 5) Design drawing for track concrete S5 to S6 including
DCD:CSL-IMP-GCS-STO-L20-80567-B-1C QC incharge: Mr Phuc 0935517681,Mr Kien
will be SONO 0982756102
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 ( KP 14+352.652 SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
502 2-Oct-19 9:00 PM 1 00453-19 Track concrete structure Postponed hoãn 0913391325
and track level check) to KP14+457.652 ) (P204-P211) (Station 5)
Input material had taken sample and test at sourse and frequency
test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S5 to S6
:CSL-IMP-GCS-STO-L20-80567-B-1A
Track 02 ( KP 14+352.652 is SONO
503 2-Oct-19 10:00 PM 1 00454-19 Track concrete structure Concrete Pouring Postponed hoãn MANUFACTURING DESIGN DRAWINGS
to KP14+457.652 ) (P204-P211) (Station 5)
ITEM: Typical Cross Section Of Plinth With Derailment
Containment Device: CSL-IMP-GCS-STO-L20-70559-B-2A Surveyor: Mr Aurelien 0986148880
will be SONO
Track 02 ( KP 14+352.652 Accepted chấp Design drawing for track concrete S5 to S6 including
504 3-Oct-19 4:00 PM 2 00452-19 Track concrete structure Adjusting track 2 DCD:CSL-IMP-GCS-STO-L20-80567-B-1C QC incharge: Mr Phuc 0935517681,Mr Kien
to KP14+457.652 ) (P204-P211) (Station 5) thuận
will be SONO 0982756102
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 02 ( KP 14+352.652 Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
505 3-Oct-19 9:00 PM 2 00453-19 Track concrete structure 0913391325
and track level check) to KP14+457.652 ) (P204-P211) (Station 5) thuận
Station 2 to Station 3 (P78 to P121): Track 1 (Km Input material had taken sample and test at sourse and frequency QC incharge: Mr Phuc 0935517681
512 4-Oct-19 2:00 PM 1 00459-19 Track concrete structure Post-Concreting Inspection Postponed hoãn
11+327.502 to Km 12+396.372) test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S2 to S3
CSL-IMP-GCS-STO-L20-80564-B-4A
is SONO
Station 2 to Station 3 (P78 to P121): Track 2 (Km Input material had taken sample and test at sourse and frequency QC incharge: Mr Phuc 0935517681
513 4-Oct-19 2:00 PM 1 00460-19 Track concrete structure Post-Concreting Inspection Postponed hoãn
11+327.502 to Km 12+396.372) test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S2 to S3
CSL-IMP-GCS-STO-L20-80564-B-4A
is SONO
Track 25 (T25-18.27 to T25-56.235 ) Accepted chấp QC incharge: Mr Phuc 0935517681 ;Mr Kien
513 4-Oct-19 8:30 AM 1 00461a-19 Track concrete structure Adjusting track 25, 0982756102
Mr Viet
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Depot)
Track 25 (T25-18.27 to T25-56.235 ) thuậnchấp
Accepted
514 4-Oct-19 9:00 AM 1 00461-19 Track concrete structure SE Mr Tu:0386108273
and track level check) (Depot)
Track 25 (T25-18.27 to T25-56.235 ) thuậnchấp
Accepted
515 4-Oct-19 9:00 AM 1 00462-19 Track concrete structure Concrete Pouring
(Depot)
Track 26 (T26-16.904 to T26-22.292 ) thuậnchấp
Accepted
516 4-Oct-19 8:30 AM 1 00463-19 Track concrete structure Adjusting track 26 `
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment (Depot)
Track 26 (T26-16.904 to T26-22.292 ) thuậnchấp
Accepted
517 4-Oct-19 9:00 AM 1 00464-19 Track concrete structure
and track level check) (Depot)
Track 26 (T26-16.904 to T26-22.292 ) thuậnchấp
Accepted Input material had taken sample and test at sourse and frequency
518 4-Oct-19 9:00 AM 1 00465-19 Track concrete structure Concrete Pouring test follow ITP of track concrete and winess by PIC QC incharge: Mr Phuc 0935517681,Mr Kien
Adjusting track 1 (Depot)
Track 01 ( KP 15+487.842 thuậnchấp
Accepted
519 4-Oct-19 4:30 PM 1 00466-19 Track concrete structure Design drawing for track concrete S6 to S7 0982756102 Mr Viet
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment to KP15+561.952 ) (P255-P258) (Station 6 to station 7)
Track 01 ( KP 15+487.842 thuậnchấp
Accepted :CSL-IMP-GCS-STO-L20-80568-B-1A SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
520 4-Oct-19 9:00 PM 1 00467-19 Track concrete structure 0913391325
and track level check) to KP15+561.952
Track ) (P255-P258) (Station 6 to station 7)
01 ( KP 15+487.842 thuậnchấp
Accepted is Under Reviewing
521 4-Oct-19 10:00 PM 1 00468-19 Track concrete structure Concrete Pouring Surveyor: Mr Aurelien 0986148880
to KP15+561.952 ) (P255-P258) (Station 6 to station 7) thuận
Station 1 to Station 2 (P35 to P71): Track 2 ( Km Input material had taken sample and test at sourse and frequency
522 4-Oct-19 10:30 AM 2 00412-19 Track concrete structure Post-Concreting Inspection Postponed hoãn
10+335.102 to Km 11+222.502) test follow ITP of track concrete and winess by PIC
Design drawing for track concrete S1 to S2
CSL-IMP-GCS-STO-L20-80563-B-2C
Input material had taken sample and test at sourse and frequency
is SONOtest follow ITP of track concrete and winess by PIC QC incharge: Mr Phuc 0935517681,Mr Kien
Adjusting track 1 Track 01 ( KP 15+561.952 Accepted chấp
523 5-Oct-19 4:30 PM 1 00469-19 Track concrete structure Design drawing for track concrete S6 to S7 Including DCD 0982756102 Mr Viet
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment to KP15+661.952
Track ) (P258-P262) (Station 6 to station 7)
01 ( KP 15+561.952 thuậnchấp
Accepted :CSL-IMP-GCS-STO-L20-80568-B-1A SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
524 5-Oct-19 9:00 PM 1 00470-19 Track concrete structure 0913391325
and track level check) to KP15+661.952
Track ) (P258-P262) (Station 6 to station 7)
01 ( KP 15+561.952 thuậnchấp
Accepted Will Be SONO
525 5-Oct-19 10:00 PM 1 00471-19 Track concrete structure Concrete Pouring Input material
Laboratory had taken
Proposal: sample and test atTien
LABORATORY-04: sourse and Center
Thanh frequency
for Surveyor: Mr Aurelien 0986148880
to KP15+661.952
"Track ) (P258-P262)
1(Viaduct) Station (Station
2 to station 3 : 6 to station 7) thuậnchấp
Accepted INSTALLATION
test follow ITP of DESIGN
track DRAWINGS
concrete andoftest
winess by PIC
526 5-Oct-19 8:30 AM 1 00472-19 Rail welding Ultrasonic Testing for Aluminothermic Welds & FBW Input material
Experiment
ITEM: Track had
onPlinth, taken
Materials
Powersample
Rail,and
(TTCEM atRail,
TTDJSC)
Running sourse and frequency
- LAS-XD
Fastening 1733 Mr Joydeep:
No. 0155to No.0172 and No.146 to No.163 (18 Welds) thuậnchấp
Accepted Design
test drawing
follow ITP fortrack
of track concrete
concrete
CSL-IMP-TRE-ZPQ-L00-00018-E-3A S1winess
and to S2 by
isSONO PIC
527 5-Oct-19 9:00 AM 1 00473-19 Rail welding Inspection for Power Rail Track 1&2 Input
System material had taken sample and test at sourse and frequency QC
CSL-IMP-GCS-STO-L20-80563-B-2C Mr Hòa: 0977882399
incharge: Mr Phuc (QC Engineer) Kien
0935517681,Mr
"Track 1&2(Viaduct)
Station 1 to Station 2 Station
(P35 to1P71):
to station
Track22 ( Km thuận Design
test drawing
follow
Section: ITP of1fortrack
Station totrack concrete
concrete
Station S2winess
and to S3 by PIC
2 CSL-IMP-GCS-STO-L20-80563-
528 7-Oct-19 10:30 AM 3 00412-19 Track concrete structure Post-Concreting Inspection Postponed hoãn is SONO
CSL-IMP-GCS-STO-L20-80564-B-4A 0982756102
QC incharge: Mr Phuc 0935517681,Mr Kien Mr Viet
10+335.102
Station to Km 11+222.502)
2 to Station 3 (P78 to P121): Track 1 (Km Accepted chấp Design
B-2C isdrawing
SONO for track concrete S2 to S3
529 7-Oct-19 2:00 PM 2 00459-19 Track concrete structure Post-Concreting Inspection is SONO
CSL-IMP-GCS-STO-L20-80564-B-4A 0982756102 Mr Viet
11+327.502
Station to Km 12+396.372)
2 to Station 3 (P78 to P121): Track 2 (Km thuậnchấp
Accepted Input material had taken sample and test at sourse and frequency QC incharge: Mr Phuc 0935517681,Mr Kien
529 7-Oct-19 2:00 PM 2 00460-19 Track concrete structure Post-Concreting
Adjusting track 1Inspection is SONO
test follow ITP of track concrete and winess by PIC 0982756102
QC incharge: Mr Phuc 0935517681,Mr Kien
11+327.502
Track 01 ( KPto 15+661.952
Km 12+396.372) thuậnchấp
Accepted
530 7-Oct-19 4:30 PM 1 00474-19 Track concrete structure Design drawing for track concrete S6 to S7 Including DCD 0982756102 Mr Viet
to KP15+786.952
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track ) (P262-P267) (Station 6 to station 7)
01 ( KP 15+661.952 thuậnchấp
Accepted :CSL-IMP-GCS-STO-L20-80568-B-1A SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
531 7-Oct-19 9:00 PM 1 00475-19 Track concrete structure 0913391325
and track level check) to KP15+786.952
Track ) (P262-P267) (Station 6 to station 7)
01 ( KP 15+661.952 thuậnchấp
Accepted Will Be SONO
532 7-Oct-19 10:00 PM 1 00476-19 Track concrete structure Concrete Pouring Surveyor: Mr Aurelien 0986148880
to KP15+786.952 ) (P262-P267) (Station 6 to station 7) thuận
Input material had taken sample and test at sourse and frequency
Track 01 (KP16+536.952 to P302 KP16+627.842 ) (P298- test follow ITP of track concrete and winess by PIC
Adjusting Track 1 ,Track2 Accepted chấp QC incharge: Mr Phuc 0935517681,Mr Kien
578 16-Oct-19 4:00 PM 1 00516-19 Track concrete structure P302) & Track2 (KP16+606.952 to KP16+627.842)(P301- Design drawing for track concrete S6 to S7 Including DCD
0982756102
Mr Sao
thuận :CSL-IMP-GCS-STO-L20-80568-B-1A
P302) (S6 to S7)
is SONO
Track 01 (KP16+536.952 to P302 KP16+627.842 ) (P298-
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Accepted chấp SE Track: Duệ 0965730358; Civil Engineer Mr Luân:
579 16-Oct-19 8:30 PM 1 00517-19 Track concrete structure P302) & Track2 (KP16+606.952 to KP16+627.842)(P301- 0913391325
Mr Sao,Mr Viet
and track level check) thuận
P302) (S6 to S7)
Adjusting track 2 of Ramp Track 2(T2-9904 to T2-9842) , (Depot access ramp to Accepted chấp QC incharge: Mr Phuc 0935517681,Mr Hoa
591 18-Oct-19 10:00 AM 3 00526-19 Track concrete structure 0977882399;
Station 1) thuận
Input material had taken sample and test at sourse and frequency
Mr Sao
test follow ITP of track concrete and winess by PIC
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 2(T2-9904 to T2-9842) , (Depot access ramp to Accepted chấp
592 18-Oct-19 02:00 PM 3 00527-19 Track concrete structure INSTALLATION DESIGN DRAWINGS ITEM- Section: Depot Mr Tú: 0386108273
and track level check) Station 1) thuận Access Ramp to Station 1 :CSL-IMP-GCS-STO-L20-80561-B-
1A is Under Review
Track 2(T2-9904 to T2-9842) , (Depot access ramp to Accepted chấp
593 18-Oct-19 10:00 PM 3 00528-19 Track concrete structure Concrete Pouring for Depot Access ramp to Station 1 Surveyor: Mr Aurelien 0986148880 Mr. Viet
Station 1) thuận
Track 08 ( From Weld No 0111 & 0112 -CH 228.279 to Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
Weld No 0119&0120-CH 79.779)(14Nos) Accepted chấp
604 21-Oct-19 8:30 AM 1 00537-19 Rail welding Ultral-sonic Testing for Aluminothermic Welds & FBW Experiment on Materials (TTCEM of TTDJSC) - LAS-XD 1733 Mr Khoi Mr.Sao
Track 10 ( From Weld No 0265& 0266 -CH 128.215 thuận CSL-IMP-TRE-ZPQ-L00-00018-E-3B is SONO
(2Nos)-DEPOT
Adjusting track 1&2 of Ramp Track 1(T1-9824 to T1-9749)&Track 2(T2-9840 to T2- Accepted chấp QC incharge: Mr Phuc 0935517681,Mr Hoa
605 21-Oct-19 10:00 AM 1 00538-19 Track concrete structure Input material had taken sample and test at sourse and frequency 0977882399;
9765) (Depot access ramp to Station 1) thuận
test follow ITP of track concrete and winess by PIC Mr Sao
Pre- Concreting Inspection (Formwork, Track Jigs installation, Track aligment Track 1(T1-9824 to T1-9749)&Track 2(T2-9840 to T2- Accepted chấp INSTALLATION DESIGN DRAWINGS ITEM- Section: Depot
606 21-Oct-19 02:00 PM 1 00539-19 Track concrete structure Access Ramp to Station 1 :CSL-IMP-GCS-STO-L20-80561-B-
Mr Tú: 0386108273
and track level check) 9765) (Depot access ramp to Station 1) thuận
1A & CSL-IMP-GCS-STO-L20-80561-B-1B is Under Review
Track 1(T1-9824 to T1-9749)&Track 2(T2-9840 to T2- Accepted chấp
607 21-Oct-19 10:00 PM 1 00540-19 Track concrete structure Concrete Pouring for Depot Access ramp to Station 1 Surveyor: Mr Aurelien 0986148880 Mr. Viet
9765) (Depot access ramp to Station 1) thuận
Track 19 ( Weld No 0273 & 0274-CH: 45.811)
Track 16 ( Weld No 0272 & 0271-CH: 47.715)
Track 14 ( Weld No 0270 ) -CH: 48.607)
Laboratory Proposal: LABORATORY-04: Tien Thanh Center for
Track 12 ( Weld No 0267 & 0268 -CH: 50.765) Accepted chấp
608 22-Oct-19 8:00 AM 1 00541-19 Rail welding Ultral-sonic Testing for Aluminothermic Welds & FBW Experiment on Materials (TTCEM of TTDJSC) - LAS-XD 1733 Mr Khoi Mr.Sao
Track 10 ( Weld No 0266 & 0265-CH: 128.245) thuận CSL-IMP-TRE-ZPQ-L00-00018-E-3B is SONO
Input material had taken sample and test at sourse and QC incharge: Mr Kien 0982756102
Track 1(T1-9674.210 to T1-9748.632)&Track 2 (T2- frequency test follow ITP of track concrete and winess by PIC Mr Hoa 0977882399; Mr Sao
Requesting đang INSTALLATION DESIGN DRAWINGS ITEM- Section: Depot Access
629 26-Oct-19 09:30 AM 2 00557-19 Track concrete structure Concrete Pouring for Depot Access ramp to Station 1 9773.087 to T2-9682.632) (Depot access ramp to Station
yêu cầu Ramp to Station 1 :CSL-IMP-GCS-STO-L20-80561-B-1A & CSL- Surveyor: Mr Aurelien 0986148880 MR Tuan ( surrveyor of Inspector)
1)
IMP-GCS-STO-L20-80561-B-1B is Under Review
44 27-May-19 10:30 AM 1-Jan-00 T00039 Track concrete supply / Bê tông đường sắt
45 27-May-19 10:30 AM 1-Jan-00 T00040 Track concrete supply / Bê tông đường sắt
46 27-May-19 10:30 AM 31-Dec-99 T00042 Track concrete supply / Bê tông đường sắt
47 27-May-19 10:30 AM 31-Dec-99 T00043 Track concrete supply / Bê tông đường sắt
48 27-May-19 9:00 AM 2 T00044 Rail welding - Track 2
49 27-May-19 9:00 AM 31-Dec-99 T00045 Track concrete supply / Bê tông đường sắt
50 28-May-19 10:00 AM 31-Dec-99 T00046 Track concrete supply / Bê tông đường sắt
51 28-May-19 2:00 PM 31-Dec-99 T00047 Track concrete supply / Bê tông đường sắt
52 29-May-19 10:00 AM 31-Dec-99 T00048 Track concrete supply / Bê tông đường sắt
53 29-May-19 10:00 AM 1-Jan-00 T00049 Track concrete supply / Bê tông đường sắt
54 29-May-19 10:00 AM 31-Dec-99 T00050 Track concrete supply / Bê tông đường sắt
55 30-May-19 10:30 AM 31-Dec-99 T00051 Track concrete supply / Bê tông đường sắt
105 25-Jun-19 9:00 AM 1 T00094 Track concrete supply / Bê tông đường sắt
106 26-Jun-19 9:00 AM 1 T00095 Track concrete supply / Bê tông đường sắt
107 26-Jun-19 9:00 AM 1 T00096 Track concrete supply / Bê tông đường sắt
108 26-Jun-19 9:00 AM 1 T00097 Track concrete supply / Bê tông đường sắt
109 26-Jun-19 11:00 AM 1 T00098 Track concrete supply / Bê tông đường sắt
110 27-Jun-19 3:00 PM 1 T00099 Track concrete supply / Bê tông đường sắt
111 27-Jun-19 3:00 PM 1 T00100 Track concrete supply / Bê tông đường sắt
112 27-Jun-19 3:00 PM 1 T00101 Track concrete supply / Bê tông đường sắt
113 28-Jun-19 3:00 PM 1 T00102 Track concrete supply / Bê tông đường sắt
114 28-Jun-19 3:00 PM 1 T00103 Track concrete supply / Bê tông đường sắt
115 29-Jun-19 10:00 AM 1 T00104 Track concrete supply / Bê tông đường sắt
116 1-Jul-19 10:00 AM 1 T00105 Track concrete supply / Bê tông đường sắt
117 1-Jul-19 10:00 AM 1 T00106 Track concrete supply / Bê tông đường sắt
118 1-Jul-19 10:00 AM 1 T00107 Track concrete supply / Bê tông đường sắt
119 3-Jul-19 10:00 AM 1 T00108 Track concrete supply / Bê tông đường sắt
120 3-Jul-19 10:00 AM 1 T00109 Track concrete supply / Bê tông đường sắt
121 3-Jul-19 10:00 AM 1 T00110 Track concrete supply / Bê tông đường sắt
122 4-Jul-19 10:00 AM 1 T00111 Track concrete supply / Bê tông đường sắt
123 4-Jul-19 10:00 AM 1 T00112 Track concrete supply / Bê tông đường sắt
124 4-Jul-19 10:00 AM 1 T00113 Track concrete supply / Bê tông đường sắt
125 5-Jul-19 9:00 AM 1 T00114 Track concrete supply / Bê tông đường sắt
126 5-Jul-19 9:00 AM 1 T00115 Track concrete supply / Bê tông đường sắt
127 5-Jul-19 9:00 AM 1 T00116 Track concrete supply / Bê tông đường sắt
128 5-Jul-19 9:00 AM 1 T00117 Track concrete supply / Bê tông đường sắt
129 5-Jul-19 9:00 AM 1 T00118 Track concrete supply / Bê tông đường sắt
130 5-Jul-19 9:00 AM 1 T00119 Track concrete supply / Bê tông đường sắt
131 5-Jul-19 9:00 AM 1 T00120 Track concrete supply / Bê tông đường sắt
132 5-Jul-19 3:00 PM 1 T00121 Track concrete supply / Bê tông đường sắt
133 6-Jul-19 9:00 AM 1 T00122 Track concrete supply / Bê tông đường sắt
134 8-Jul-19 9:00 AM 1 T00123 Track concrete supply / Bê tông đường sắt
135 8-Jul-19 9:00 AM 1 T00124 Track concrete supply / Bê tông đường sắt
136 8-Jul-19 9:00 AM 1 T00125 Track concrete supply / Bê tông đường sắt
137 9-Jul-19 9:00 AM 1 T00126 Track concrete supply / Bê tông đường sắt
138 9-Jul-19 9:00 AM 1 T00127 Track concrete supply / Bê tông đường sắt
139 10-Jul-19 3:00 PM 1 T00128 Track concrete supply / Bê tông đường sắt
140 11-Jul-19 9:00 AM 1 T00129 Track concrete supply / Bê tông đường sắt
141 11-Jul-19 9:00 AM 1 T00130 Track concrete supply / Bê tông đường sắt
142 11-Jul-19 9:00 AM 1 T00131 Track concrete supply / Bê tông đường sắt
143 11-Jul-19 3:00 PM 1 T00132 Rail welding - Track 2
144 12-Jul-19 9:00 AM 1 T00133 Track concrete supply / Bê tông đường sắt
145 12-Jul-19 9:00 AM 1 T00134 Track concrete supply / Bê tông đường sắt
146 13-Jul-19 9:00 AM 1 T00135 Track concrete supply / Bê tông đường sắt
147 13-Jul-19 9:00 AM 1 T00136 Track concrete supply / Bê tông đường sắt
148 13-Jul-19 9:00 AM 1 T00137 Track concrete supply / Bê tông đường sắt
149 15-Jul-19 9:00 AM 1 T00138 Track concrete supply / Bê tông đường sắt
150 15-Jul-19 9:00 AM 1 T00139 Track concrete supply / Bê tông đường sắt
151 15-Jul-19 9:00 AM 1 T00140 Track concrete supply / Bê tông đường sắt
152 16-Jul-19 3:00 PM 1 T00141 Track concrete supply / Bê tông đường sắt
153 17-Jul-19 9:00 AM 1 T00142 Track concrete supply / Bê tông đường sắt
154 17-Jul-19 9:00 AM 1 T00143 Track concrete supply / Bê tông đường sắt
155 17-Jul-19 9:00 AM 1 T00144 Track concrete supply / Bê tông đường sắt
156 18-Jul-19 9:00 AM 1 T00145 Track concrete supply / Bê tông đường sắt
157 18-Jul-19 9:00 AM 1 T00146 Track concrete supply / Bê tông đường sắt
158 18-Jul-19 9:00 AM 1 T00147 Track concrete supply / Bê tông đường sắt
159 19-Jul-19 9:00 AM 1 T00148 Track concrete supply / Bê tông đường sắt
160 19-Jul-19 9:00 AM 1 T00149 Track concrete supply / Bê tông đường sắt
161 20-Jul-19 3:00 PM 1 T00150 Track concrete supply / Bê tông đường sắt
162 20-Jul-19 3:00 PM 1 T00151 Track concrete supply / Bê tông đường sắt
163 22-Jul-19 3:00 PM 1 T00152 Track concrete supply / Bê tông đường sắt
164 22-Jul-19 3:00 PM 1 T00153 Track concrete supply / Bê tông đường sắt
165 23-Jul-19 3:00 PM 1 T00154 Track concrete supply / Bê tông đường sắt
166 23-Jul-19 3:00 PM 1 T00155 Track concrete supply / Bê tông đường sắt
167 24-Jul-19 3:00 PM 1 T00156 Track concrete supply / Bê tông đường sắt
168 24-Jul-19 3:00 PM 1 T00157 Track concrete supply / Bê tông đường sắt
169 24-Jul-19 9:00 AM 1 T00158 Track concrete supply / Bê tông đường sắt
170 24-Jul-19 9:00 AM 1 T00159 Track concrete supply / Bê tông đường sắt
171 25-Jul-19 9:00 AM 1 T00158 Track concrete supply / Bê tông đường sắt
172 25-Jul-19 3:00 PM 1 T00159 Track concrete supply / Bê tông đường sắt
173 25-Jul-19 9:00 AM 1 T00160 Track concrete supply / Bê tông đường sắt
174 25-Jul-19 9:00 AM 1 T00161 Track concrete supply / Bê tông đường sắt
175 25-Jul-19 9:00 AM 1 T00162 Track concrete supply / Bê tông đường sắt
176 26-Jul-19 9:00 AM 1 T00163 Track concrete supply / Bê tông đường sắt
177 26-Jul-19 9:00 AM 1 T00164 Track concrete supply / Bê tông đường sắt
178 27-Jul-19 9:00 AM 1 T00165 Track concrete supply / Bê tông đường sắt
179 27-Jul-19 9:00 AM 1 T00166 Track concrete supply / Bê tông đường sắt
180 28-Jul-19 9:00 AM 1 T00167 Track concrete supply / Bê tông đường sắt
181 28-Jul-19 9:00 AM 1 T00168 Track concrete supply / Bê tông đường sắt
182 28-Jul-19 9:00 AM 1 T00169 Track concrete supply / Bê tông đường sắt
183 30-Jul-19 9:00 AM 1 T00170 Track concrete supply / Bê tông đường sắt
184 30-Jul-19 9:00 AM 1 T00171 Track concrete supply / Bê tông đường sắt
185 30-Jul-19 9:00 AM 1 T00172 Track concrete supply / Bê tông đường sắt
186 31-Jul-19 9:00 AM 1 T00173 Track concrete supply / Bê tông đường sắt
187 1-Aug-19 9:00 AM 1 T00174 Track concrete supply / Bê tông đường sắt
188 1-Aug-19 9:00 AM 1 T00175 Track concrete supply / Bê tông đường sắt
189 1-Aug-19 9:00 AM 1 T00176 Track concrete supply / Bê tông đường sắt
190 1-Aug-19 3:00 PM 1 T00177 Track concrete supply / Bê tông đường sắt
191 2-Aug-19 10:00 AM 1 T00178 Track concrete supply / Bê tông đường sắt
192 2-Aug-19 9:00 AM 1 T00179 Track concrete supply / Bê tông đường sắt
193 2-Aug-19 9:00 AM 1 T00180 Track concrete supply / Bê tông đường sắt
194 3-Aug-19 9:00 AM 1 T00181 Track concrete supply / Bê tông đường sắt
195 3-Aug-19 9:00 AM 1 T00182 Track concrete supply / Bê tông đường sắt
196 3-Aug-19 9:00 AM 1 T00183 Track concrete supply / Bê tông đường sắt
197 3-Aug-19 9:00 AM 1 T00184 Track concrete supply / Bê tông đường sắt
198 5-Aug-19 9:00 AM 1 T00185 Track concrete supply / Bê tông đường sắt
199 5-Aug-19 9:00 AM 1 T00186 Track concrete supply / Bê tông đường sắt
200 6-Aug-19 9:00 AM 1 T00187 Track concrete supply / Bê tông đường sắt
201 6-Aug-19 9:00 AM 1 T00188 Track concrete supply / Bê tông đường sắt
202 6-Aug-19 9:00 AM 1 T00189 Track concrete supply / Bê tông đường sắt
203 7-Aug-19 9:00 AM 1 T00190 Track concrete supply / Bê tông đường sắt
204 7-Aug-19 9:30 AM 1 T00191 Track concrete supply / Bê tông đường sắt
205 From 8/8/2019 to 17/08/2019 9:30 AM 1 T00192 Track concrete supply / Bê tông đường sắt
206 8-Aug-19 3:00 PM 1 T00193 Track concrete supply / Bê tông đường sắt
207 9-Aug-19 9:30 AM 1 T00194 Track concrete supply / Bê tông đường sắt
208 10-Aug-19 9:30 AM 1 T00195 Track concrete supply / Bê tông đường sắt
209 10-Aug-19 9:30 AM 1 T00196 Track concrete supply / Bê tông đường sắt
210 12-Aug-19 9:30 AM 1 T00197 Track concrete supply / Bê tông đường sắt
211 13-Aug-19 9:30 AM 1 T00198 Track concrete supply / Bê tông đường sắt
212 13-Aug-19 9:30 AM 1 T00199 Track concrete supply / Bê tông đường sắt
213 13-Aug-19 9:30 AM 1 T00200 Track concrete supply / Bê tông đường sắt
214 14-Aug-19 9:30 AM 1 T00201 Track concrete supply / Bê tông đường sắt
215 14-Aug-19 9:30 AM 1 T00202 Track concrete supply / Bê tông đường sắt
216 15-Aug-19 3:00 PM 1 T00203 Track concrete supply / Bê tông đường sắt
217 15-Aug-19 3:00 PM 1 T00204 Track concrete supply / Bê tông đường sắt
218 15-Aug-19 3:00 PM 1 T00205 Track concrete supply / Bê tông đường sắt
219 15-Aug-19 3:00 PM 2 T00206 Track concrete supply / Bê tông đường sắt
220 16-Aug-19 3:00 PM 1 T00207 Track concrete supply / Bê tông đường sắt
221 16-Aug-19 3:00 PM 1 T00208 Track concrete supply / Bê tông đường sắt
222 17-Aug-19 9:00 AM 1 T00209 Track concrete supply / Bê tông đường sắt
223 17-Aug-19 9:00 AM 1 T00210 Track concrete supply / Bê tông đường sắt
224 19-Aug-19 9:00 AM 1 T00211 Track concrete supply / Bê tông đường sắt
225 19-Aug-19 9:00 AM 1 T00212 Track concrete supply / Bê tông đường sắt
226 19-Aug-19 9:00 AM 1 T00213 Track concrete supply / Bê tông đường sắt
227 20-Aug-19 9:00 AM 1 T00214 Track concrete supply / Bê tông đường sắt
228 20-Aug-19 9:00 AM 1 T00215 Track concrete supply / Bê tông đường sắt
229 20-Aug-19 9:30 AM 1 T00216 Track concrete supply / Bê tông đường sắt
230 From 21/8/2019 to 27/08/2019 9:30 AM 1 T00217 Track concrete supply / Bê tông đường sắt
231 21-Aug-19 9:00 AM 1 T00218 Track concrete supply / Bê tông đường sắt
232 21-Aug-19 9:00 AM 1 T00219 Track concrete supply / Bê tông đường sắt
233 22-Aug-19 9:00 AM 1 T00220 Track concrete supply / Bê tông đường sắt
234 22-Aug-19 9:00 AM 1 T00221 Track concrete supply / Bê tông đường sắt
235 22-Aug-19 9:00 AM 1 T00222 Track concrete supply / Bê tông đường sắt
236 23-Aug-19 9:00 AM 1 T00223 Track concrete supply / Bê tông đường sắt
237 24-Aug-19 9:00 AM 1 T00224 Track concrete supply / Bê tông đường sắt
238 24-Aug-19 9:00 AM 1 T00225 Track concrete supply / Bê tông đường sắt
239 24-Aug-19 9:00 AM 1 T00226 Track concrete supply / Bê tông đường sắt
240 24-Aug-19 9:00 AM 1 T00227 Track concrete supply / Bê tông đường sắt
241 26-Aug-19 9:00 AM 1 T00228 Track concrete supply / Bê tông đường sắt
242 26-Aug-19 9:00 AM 1 T00229 Track concrete supply / Bê tông đường sắt
243 27-Aug-19 9:00 AM 1 T00230 Track concrete supply / Bê tông đường sắt
244 27-Aug-19 9:00 AM 1 T00231 Track concrete supply / Bê tông đường sắt
245 27-Aug-19 9:00 AM 1 T00232 Track concrete supply / Bê tông đường sắt
246 27-Aug-19 2:00 PM 1 T00233 Track concrete supply / Bê tông đường sắt
247 28-Aug-19 9:00 AM 1 T00234 Track concrete supply / Bê tông đường sắt
248 28-Aug-19 2:00 PM 2 T00233 Track concrete supply / Bê tông đường sắt
249 29-Aug-19 9:00 AM 1 T00234 Track concrete supply / Bê tông đường sắt
250 30-Aug-19 9:00 AM 1 T00235 Track concrete supply / Bê tông đường sắt
251 31-Aug-19 9:00 AM 1 T00236 Track concrete supply / Bê tông đường sắt
252 31-Aug-19 9:00 AM 1 T00237 Track concrete supply / Bê tông đường sắt
253 31-Aug-19 9:00 AM 1 T00238 Track concrete supply / Bê tông đường sắt
254 3-Sep-19 9:00 AM 1 T00239 Track concrete supply / Bê tông đường sắt
255 3-Sep-19 9:00 AM 1 T00240 Track concrete supply / Bê tông đường sắt
256 3-Sep-19 9:00 AM 1 T00241 Track concrete supply / Bê tông đường sắt
257 4-Sep-19 9:00 AM 1 T00242 Track concrete supply / Bê tông đường sắt
258 4-Sep-19 9:00 AM 1 T00243 Track concrete supply / Bê tông đường sắt
259 4-Sep-19 9:00 AM 1 T00244 Track concrete supply / Bê tông đường sắt
260 5-Sep-19 9:30 AM 1 T00245 Track concrete supply / Bê tông đường sắt
261 5-Sep-19 2:00 PM 1 T00246 Track concrete supply / Bê tông đường sắt
262 5-Sep-19 2:00 PM 1 T00247 Track concrete supply / Bê tông đường sắt
263 5-Sep-19 2:00 PM 1 T00248 Track concrete supply / Bê tông đường sắt
264 6-Sep-19 2:00 PM 1 T00249 Track concrete supply / Bê tông đường sắt
265 6-Sep-19 2:00 PM 1 T00250 Track concrete supply / Bê tông đường sắt
265 7-Sep-19 9:00 AM 1 T00251 Track concrete supply / Bê tông đường sắt
266 9-Sep-19 9:00 AM 1 T00252 Track concrete supply / Bê tông đường sắt
267 10-Sep-19 9:00 AM 1 T00253 Track concrete supply / Bê tông đường sắt
268 10-Sep-19 9:00 AM 1 T00254 Track concrete supply / Bê tông đường sắt
269 10-Sep-19 2:00 PM 1 T00255 Track concrete supply / Bê tông đường sắt
270 10-Sep-19 2:00 PM 1 T00256 Track concrete supply / Bê tông đường sắt
271 11-Sep-19 2:00 PM 1 T00257 Track concrete supply / Bê tông đường sắt
272 11-Sep-19 9:00 AM 1 T00258 Track concrete supply / Bê tông đường sắt
273 11-Sep-19 9:00 AM 1 T00259 Track concrete supply / Bê tông đường sắt
274 12-Sep-19 9:00 AM 1 T00260 Track concrete supply / Bê tông đường sắt
275 12-Sep-19 9:00 AM 1 T00261 Track concrete supply / Bê tông đường sắt
276 12-Sep-19 9:00 AM 1 T00262 Track concrete supply / Bê tông đường sắt
277 12-Sep-19 9:00 AM 1 T00263 Track concrete supply / Bê tông đường sắt
278 13-Sep-19 9:00 AM 1 T00264 Track concrete supply / Bê tông đường sắt
279 14-Sep-19 9:30 AM 1 T00265 Track concrete supply / Bê tông đường sắt
280 14-Sep-19 9:00 AM 1 T00266 Track concrete supply / Bê tông đường sắt
281 14-Sep-19 9:00 AM 1 T00267 Track concrete supply / Bê tông đường sắt
282 16-Sep-19 9:00 AM 1 T00268 Track concrete supply / Bê tông đường sắt
283 16-Sep-19 9:00 AM 1 T00269 Track concrete supply / Bê tông đường sắt
284 17-Sep-19 1:30 PM 1 T00270 Track concrete supply / Bê tông đường sắt
285 17-Sep-19 1:30 PM 1 T00271 Track concrete supply / Bê tông đường sắt
286 17-Sep-19 9:00 AM 1 T00272 Height Adjustable Shim-Rail System 3
288 18-Sep-19 9:00 AM 1 T00274 Track concrete supply / Bê tông đường sắt
289 18-Sep-19 2:00 PM 2 T00275 Track concrete supply / Bê tông đường sắt
290 18-Sep-19 9:00 AM 1 T00276 Track concrete supply / Bê tông đường sắt
291 18-Sep-19 3:30 PM 1 T00277 Track concrete supply / Bê tông đường sắt
292 18-Sep-19 10:30 AM 1 T00278 Track concrete supply / Bê tông đường sắt
293 19-Sep-19 09:00 1 T00279 Track concrete supply / Bê tông đường sắt
294 19-Sep-19 09:00 1 T00280 Track concrete supply / Bê tông đường sắt
295 20-Sep-19 09:00 1 T00281 Track concrete supply / Bê tông đường sắt
296 20-Sep-19 09:00 1 T00282 Track concrete supply / Bê tông đường sắt
297 21-Sep-19 09:00 1 T00283 Track concrete supply / Bê tông đường sắt
298 21-Sep-19 09:00 1 T00284 Track concrete supply / Bê tông đường sắt
299 21-Sep-19 09:00 1 T00285 Track concrete supply / Bê tông đường sắt
300 23-Sep-19 09:00 1 T00286 Track concrete supply / Bê tông đường sắt
301 23-Sep-19 09:00 1 T00287 Track concrete supply / Bê tông đường sắt
303 24-Sep-19 9:00 AM 1 T00289 Track concrete supply / Bê tông đường sắt
304 24-Sep-19 9:00 AM 1 T00290 Track concrete supply / Bê tông đường sắt
305 24-Sep-19 9:00 AM 1 T00291 Track concrete supply / Bê tông đường sắt
306 24-Sep-19 9:30 AM 1 T00292 Track concrete supply / Bê tông đường sắt
307 25-Sep-19 9:00 AM 1 T00293 Track concrete supply / Bê tông đường sắt
308 25-Sep-19 9:00 AM 1 T00294 Track concrete supply / Bê tông đường sắt
309 25-Sep-19 10:00 AM 1 T00295 Track concrete supply / Bê tông đường sắt
310 26-Sep-19 10:00 AM 1 T00296 Track concrete supply / Bê tông đường sắt
311 26-Sep-19 10:00 AM 1 T00297 Track concrete supply / Bê tông đường sắt
312 26-Sep-19 10:00 AM 1 T00298 Track concrete supply / Bê tông đường sắt
313 26-Sep-19 9:00 AM 1 T00299 Track concrete supply / Bê tông đường sắt
314 27-Sep-19 10:00 AM 1 T00300 Track concrete supply / Bê tông đường sắt
315 27-Sep-19 9:00 AM 1 T00301 Track concrete supply / Bê tông đường sắt
316 28-Sep-19 9 AM 1 T00302 Track concrete supply / Bê tông đường sắt
317 28-Sep-19 9:00 AM 1 T00303 Track concrete supply / Bê tông đường sắt
318 30-Sep-19 9 AM 1 T00304 Track concrete supply / Bê tông đường sắt
319 30-Sep-19 2:00 PM 3 T00275 Track concrete supply / Bê tông đường sắt
320 1-Oct-19 8:30 AM 1 T00305 Track concrete supply / Bê tông đường sắt
321 1-Oct-19 2:00 PM 1 T00306 Track concrete supply / Bê tông đường sắt
322 1-Oct-19 2:00 PM 4 T00275 Track concrete supply / Bê tông đường sắt
323 1-Oct-19 9:00 AM 1 T00307 Track concrete supply / Bê tông đường sắt
324 2-Oct-19 9:00 AM 1 T00308 Track concrete supply / Bê tông đường sắt
325 2-Oct-19 9:00 AM 1 T00309 Track concrete supply / Bê tông đường sắt
326 2-Oct-19 9:00 AM 1 T00310 Track concrete supply / Bê tông đường sắt
327 3-Oct-19 9:00 AM 1 T00311 Track concrete supply / Bê tông đường sắt
328 3-Oct-19 9:00 AM 1 T00312 Track concrete supply / Bê tông đường sắt
329 3-Oct-19 9:00 AM 1 T00313 Track concrete supply / Bê tông đường sắt
330 4-Oct-19 9:00 AM 1 T00314 Track concrete supply / Bê tông đường sắt
331 5-Oct-19 9:00 AM 1 T00315 Track concrete supply / Bê tông đường sắt
332 5-Oct-19 9:00 AM 1 T00316 Track concrete supply / Bê tông đường sắt
333 7-Oct-19 9:00 AM 1 T00317 Track concrete supply / Bê tông đường sắt
334 7-Oct-19 9:00 AM 1 T00318 Track concrete supply / Bê tông đường sắt
335 7-Oct-19 9:00 AM 1 T00318 Track concrete supply / Bê tông đường sắt
336 7-Oct-19 9:00 AM 1 T00319 Track concrete supply / Bê tông đường sắt
337 7-Oct-19 9:00 AM 1 T00320 Track concrete supply / Bê tông đường sắt
338 8-Oct-19 9:00 AM 1 T00321 Track concrete supply / Bê tông đường sắt
339 10-Oct-19 9:00 AM 1 T00322 Track concrete supply / Bê tông đường sắt
340 10-Oct-19 9:00 AM 1 T00323 Track concrete supply / Bê tông đường sắt
341 10-Oct-19 2:00 PM 1 T00324 Track concrete supply / Bê tông đường sắt
342 11-Oct-19 8:30 AM 1 T00325 Track concrete supply / Bê tông đường sắt
343 11-Oct-19 2:00 PM 1 T00326 Track concrete supply / Bê tông đường sắt
344 11-Oct-19 9:00 AM 1 T00327 Track concrete supply / Bê tông đường sắt
345 11-Oct-19 9:00 AM 1 T00328 Track concrete supply / Bê tông đường sắt
346 12-Oct-19 9:00 AM 1 T00329 Track concrete supply / Bê tông đường sắt
347 12-Oct-19 9:00 AM 1 T00330 Track concrete supply / Bê tông đường sắt
348 12-Oct-19 9:00 AM 1 T00331 Track concrete supply / Bê tông đường sắt
349 14-Oct-19 9:00 AM 1 T00332 Track concrete supply / Bê tông đường sắt
350 14-Oct-19 9:00 AM 1 T00333 Track concrete supply / Bê tông đường sắt
351 15-Oct-19 9:00 AM 1 T00334 Track concrete supply / Bê tông đường sắt
352 15-Oct-19 9:00 AM 1 T00335 Track concrete supply / Bê tông đường sắt
353 15-Oct-19 9:00 AM 1 T00336 Track concrete supply / Bê tông đường sắt
354 16-Oct-19 9:00 AM 1 T00337 Track concrete supply / Bê tông đường sắt
355 16-Oct-19 9:00 AM 1 T00338 Track concrete supply / Bê tông đường sắt
356 17-Oct-19 9:00 AM 1 T00339 Track concrete supply / Bê tông đường sắt
357 17-Oct-19 9:00 AM 1 T00340 Track concrete supply / Bê tông đường sắt
358 17-Oct-19 9:00 AM 1 T00341 Track concrete supply / Bê tông đường sắt
359 18-Oct-19 9:00 AM 1 T00342 Track concrete supply / Bê tông đường sắt
360 18-Oct-19 9:00 AM 1 T00343 Track concrete supply / Bê tông đường sắt
361 19-Oct-19 9:00 AM 1 T00344 Track concrete supply / Bê tông đường sắt
362 19-Oct-19 9:00 AM 1 T00345 Track concrete supply / Bê tông đường sắt
363 19-Oct-19 9:00 AM 1 T00346 Track concrete supply / Bê tông đường sắt
364 19-Oct-19 8:30 AM 1 T00347 Track concrete supply / Bê tông đường sắt
365 21-Oct-19 9:00 AM 1 T00348 Track concrete supply / Bê tông đường sắt
366 21-Oct-19 9:00 AM 1 T00349 Track concrete supply / Bê tông đường sắt
367 21-Oct-19 2:00 PM 1 T00350 Track concrete supply / Bê tông đường sắt
368 22-Oct-19 9:00 AM 1 T00351 Track concrete supply / Bê tông đường sắt
369 22-Oct-19 9:00 AM 1 T00352 Track concrete supply / Bê tông đường sắt
370 22-Oct-19 9:00 AM 1 T00353 Track concrete supply / Bê tông đường sắt
371 23-Oct-19 9:00 AM 1 T00354 Track concrete supply / Bê tông đường sắt
372 23-Oct-19 9:00 AM 1 T00355 Track concrete supply / Bê tông đường sắt
373 24-Oct-19 2:00 PM 1 T00356 Track concrete supply / Bê tông đường sắt
374 24-Oct-19 9:00 AM 1 T00357 Track concrete supply / Bê tông đường sắt
375 24-Oct-19 9:00 AM 1 T00358 Track concrete supply / Bê tông đường sắt
376 25-Oct-19 9:00 AM 1 T00359 Track concrete supply / Bê tông đường sắt
377 25-Oct-19 9:00 AM 1 T00360 Track concrete supply / Bê tông đường sắt
378 26-Oct-19 9:00 AM 1 T00361 Track concrete supply / Bê tông đường sắt
379 26-Oct-19 9:00 AM 1 T00362 Track concrete supply / Bê tông đường sắt
380 26-Oct-19 9:00 AM 1 T00363 Track concrete supply / Bê tông đường sắt
GHIỆM CỦA CSL
Sampling and testing raw materials for track concrete / Lấy mẫu và thí
CSL-IMP-PPG-STO-L00-00002
nghiệm vật liệu sử dụng cho bê tông đường sắt
Trial mix concrete grade C35, slump S4 for Track Concrete at
CSL-IMP-PPG-STO-L00-00002
Laboratory / Trộn thử bê tông mác C35, độ sụt S4 tại PTN)
Trial mix concrete grade C35, slump S4 for Track Concrete at Batching
CSL-IMP-PPG-STO-L00-00002
Plant / Trộn thử bê tông mác C35, độ sụt S4 tại trạm trộn)
Inspection for sampling and continuous testing for Nghi Son Cement,
PC40 (TCVN 2682:2009) for cement MAR - 2nd source, used for Track
concrete production / Nghiệm thu công tác lấy mẫu và thí nghiệm xi CSL-IMP-PPG-STO-L00-00002
măng Nghi Sơn PC40 (TCVN 2682:2009) phục vụ cho công tác xin phê
duyệt xi măng - nguồn số 2 cho sản xuất bê tông đường sắt.
Slow bend test on Flash Butt Welding sample (frequency test) CSL-IMP-PPG-STO-L00-00001-E-3A
Flash Butt Welding - Taking one test weld sample (3rd frequency
CSL-IMP-PPG-STO-L00-00001-E-3A
sample)
Flash Butt Welding - Taking one test weld sample (3rd frequency
CSL-IMP-PPG-STO-L00-00001-E-3A
sample)
Concrete Compression test and Splitting tensile test 7 days of concrete
samples for Track Plinths: T16-32.995 to T16-133.729/ Thí nghiệm nén
CSL-IMP-PPG-STO-L00-00002
và thí nghiệm kéo khi bửa mẫu bê tông 7 ngày của cấu kiện bê tông bệ
đỡ ray đường sắt, T16-32.995 to T16-133.729
Concrete
Slow bendCompression test Welding
test on Flash Butt and Splitting
sampletensile test 7test)
(frequency days of concrete CSL-IMP-PPG-STO-L00-00001-E-3A
samples for Track Plinths: T15-123 to T15-224/ Thí nghiệm nén và thí
CSL-IMP-PPG-STO-L00-00002
nghiệm kéo khi bửa mẫu bê tông 7 ngày của cấu kiện bê tông bệ đỡ ray
đường sắt, T15-123 to T15-224
Concrete Compression test and Splitting tensile test 7 days of concrete
samples for trial mix at ASEAN batching plant/ Thí nghiệm nén và thí
nghiệm kéo khi bửa mẫu bê tông 7 ngày của cấp phối trộn thử tại trạm
Slow bend test on Flash Butt Welding sample (frequency test)
ASEAN. CSL-IMP-PPG-STO-L00-00001-E-3A
Concrete Compression test and Splitting
Take water sample at ASEAN batching plant tensile test 28 days of concrete
samples for Track Plinths: T17-220 to T15-294/ Thí nghiệm nén và thí
CSL-IMP-PPG-STO-L00-00002
nghiệm kéo khi bửa mẫu bê tông 7 ngày của cấu kiện bê tông bệ đỡ ray
đường
Taking sắt, T17-220
sample to T15-294
for frequency testSplitting tensile test 7 days of concrete
Concrete Compression test and
samples for
Concrete Track Plinths:
Compression testTrack 1,Kp10610.102
and Splitting to Kp10660.102/Thí
tensile test 7 days of concrete CSL-IMP-PPG-STO-L00-00002
nghiệm nén
samples
Concrete for và thí nghiệm
Track testkéo
Plinths:
Compression andkhi
Track bửa
18 mẫu bê tông
(T18-722.995
Splitting tensile testto728
ngày
dayscủa cấu kiện
T18-821.251)/Thí
of concrete
bê tông bệ đỡ ray đường sắt, Kp10610.102 to Kp10660.102 CSL-IMP-PPG-STO-L00-00002
nghiệm nén
samples và thí nghiệm
for Track Plinths: kéo khi17
Track bửa mẫu bê tôngto7 T17-206)/Thí
(T17-105.387 ngày của cấu kiện
bê tông bệ đỡ ray đường sắt, T18-722.995 to T18-821.251 CSL-IMP-PPG-STO-L00-00002
nghiệm
Flash nénWelding
Butt và thí nghiệm
- Takingkéoone
khiweld
bửa sample
mẫu bê for
tông 7 ngàyfrequency
testing, của cấu kiện
bê tông bệ đỡ ray đường sắt, T18-722.995 to T18-821.251 CSL-IMP-PPG-STO-L00-00001-E-3A
No.4 / Mối hàn đối đầu - Lấy mẫu thí nghiệm, tần suất lần 4
Flash Butt Welding for rail production - Slow bend test for frequency
No.3 (weld
Flash number for
Butt Welding 0444railcut from two -25m
production Slowrail long)/
bend testMối hàn đối đầu
for frequency CSL-IMP-PPG-STO-L00-00001-E-4A
gia
No.4công ray
(weld - Thí
number nghiệm
0628 uốn
cut chậm,
from LWR tần suất
080 lần
LR)/ 3(mối
Mối
Flash Butt Welding for rail production - Slow bend test for frequency hàn
hàn số đầu
đối 0444gia
được cắt CSL-IMP-PPG-STO-L00-00001-E-4A
công
No.3 Butttừ
Flash ray
(weld mốinghiệm
- Thí hànfor
number
Welding 2 ray
uốn
0444 dài
railcut 25m)
chậm,
from tần
twosuất
production -25m lần
Slow 3(mối
rail long)/
bend hàn
testMốisốfrequency
for 0628đối
hàn được
đầu
CSL-IMP-PPG-STO-L00-00001-E-4A
cắt
gia
No.3từ mốiray
công
(weld
Concrete hàn LWR
- Thí
number
Compression 080test
nghiệm
0628 LR)uốn
cut chậm,
from
and LWR tần080
Splitting suấtLR)/
tensilelần 3(mối
Mối
test hànof
hàn
7 days sốconcrete
đối 0444gia
đầu
được cắtfor
từ mối hàn 2 ray CSL-IMP-PPG-STO-L00-00001-E-4A
công ray
samples
Concrete -Compression
Thí nghiệm
Track testdài
uốn
Plinths: and25m)
chậm,
Track tần(T19-145.800
19 suấttensile
Splitting lần 3(mối hàn
testto28 số 0628 được
T19-244.102)/Thí
days of concrete CSL-IMP-PPG-STO-L00-00002
cắt từ mối
nghiệm
samples forhàn
nén và LWR
Track 080 LR)
thí nghiệm
Plinths: kéo khi bửa
Track16 mẫu bêtotông
(T16-146 7 ngày củanghiệm
T16-247)/Thí cấu kiện
bê tông bệ đỡ ray đường sắt, T19-145.800 to T19-244.102 CSL-IMP-PPG-STO-L00-00002
nén và thí nghiệm kéo khi bửa mẫu bê tông 28 ngày của cấu kiện bê
tông bệ đỡ ray đường sắt, T16-146 to T16-247
Flash Butt Welding - Taking one weld sample for testing, frequency
CSL-IMP-PPG-STO-L00-00001-E-3A
No.5 / Mối hàn đối đầu - Lấy mẫu thí nghiệm, tần suất lần 5
Flash Butt Welding - Taking one weld sample for testing, frequency
CSL-IMP-PPG-STO-L00-00001-E-3A
No.5 / Mối hàn đối đầu - Lấy mẫu thí nghiệm, tần suất lần 5
Concrete Compression test and Splitting tensile test 7 days of concrete
samples for
Concrete Track Plinths:
Compression testTrack 12 (T12-35
and Splitting to T12-137)/Thí
tensile test 7 days of nghiệmconcrete CSL-IMP-PPG-STO-L00-00002
nén và thífor
samples
Concrete nghiệm
Track kéo
Compression khi
testbửa
Plinths:Trackandmẫu1, KPbê tông
Splitting 7 ngày
10-760.102
tensile của
testto KPcấu
28 kiện bê tông
10-835.102/Thí
days of concrete
bệ đỡ ray đường sắt số 12, T12-35 to T12-137 CSL-IMP-PPG-STO-L00-00002
nghiệm nén
samples for
Concrete và thí nghiệm
Track Plinths:
Compression kéo
testTrack khi bửa mẫu
16 (T16-32.995
and Splitting bê tông 7 ngày của
to T16-133.729)/Thí
tensile test cấu
7 days of concrete kiện
bê tông nén
bệ CSL-IMP-PPG-STO-L00-00002
nghiệm
samples forđỡvàray
Trackthí đường
Plinths:sắt
nghiệm sốkhi
kéo
Track 1,10
KP
bửa 10-760.102
mẫu bê tôngto
(T10-113.394 to28 KP 10-835.102
ngày của cấu
T10-214.183)/Thí
Flash
kiện bêButt CSL-IMP-PPG-STO-L00-00002
nghiệm nénWelding
tông bệthí
và for đường
đỡnghiệm
ray railkéo
production
sắt
khisố
bửa - (T16-32.995
Slow
16,mẫu bêbend
tông test
7 to for
ngày frequency
T16-133.729)
của cấu kiện
No.3
Flash (weld
bê tôngButt number
bệ Welding
đỡ ray đường 0442)
for rail Mối hàn
sắtproduction đối đầu gia công
- Slow bendtotest
số 110 (T10-113.394 ray - Thí nghiệm
for frequency
T10-214.183) CSL-IMP-PPG-STO-L00-00001-E-4A
uốn
Flashchậm,
No.4 (weld tần
Butt Weldingsuất lần
number for 3(mối
0628)/
rail Mốihàn sốđối
hàn
production 0442)
- đầu
Slowgia công
bend testray
for- frequency
Thí nghiệm CSL-IMP-PPG-STO-L00-00001-E-4A
Concrete
uốn chậm, Compression
tần suất lần test
4(mối and Splitting tensile test 7 days of concrete
No.5 (weld
Concrete
samples
number
Compression
for Track
0741)/
test
Plinths: andhàn
Mối
Track
sốđối
hàn 0628
Splitting
10
đầu ) gia test
tensile
(T10-113.394
công28ray
to
- Thí
days of nghiệm
concrete CSL-IMP-PPG-STO-L00-00001-E-4A
T10-214.183)/Thí
uốn chậm,
samples fortần
TracksuấtPlinths:
lần 5(mối hàn1số
Track ( KP0741)
10-335.102 CSL-IMP-PPG-STO-L00-00002
nghiệm
Concrete nén và thí nghiệm
Compression test kéo
and khi bửa
Splitting mẫu bê tông
tensile test 7to
28
KP 10-
ngày
days của
of cấu kiện
concrete
385.102)/Thí
bê tông bệ đỡ nghiệm
ray đường nén sắt
và thí nghiệm
số 110 kéo khi bửa
(T10-113.394 to mẫu bê tông 28
T10-214.183) CSL-IMP-PPG-STO-L00-00002
samples
ngày for Track
của Compression Plinths:
cấu kiện bê tông Track
bệ 15 (T15-238
đỡSplitting
ray đường to
sắt số T15-337)/Thí
1,8( days nghiệm
KP 10-335.102 to CSL-IMP-PPG-STO-L00-00002
Concrete
nén vàButt
Flash thí nghiệm
Weldingkéo testbửa
khi
- Taking and
onemẫuweld tensile
bê sample
tông 28for test
ngày của cấu
testing, ofkiện
concrete
frequency bê
KP 10-385.102)
samples forray
Track CSL-IMP-PPG-STO-L00-00001-E-3A
tông
No.6 bệ đỡ
/ Mối
Concrete hàn đốiPlinths:
đường
Compression đầusắt Track
số
- Lấy
test 15,
andmẫu 1 thí
(KPnghiệm,
(T15-238
Splitting
10-910.102
to T15-337)
tensile tần to KP
suất
test 7 lần10-
days 6of concrete
960.102)/Thí nghiệm nén và thí nghiệm kéo khi bửa mẫu bê tông 8 ngày CSL-IMP-PPG-STO-L00-00002
samples
Concrete for
của cấu kiện Track
Compression
bê tôngPlinths:đỡTrack
bệtest 11 (T11-029.027
and đường
ray Splitting sắttensile
số 1 (KP testto10-910.102
T11-129.779)/Thí
28 days of concrete
to KP CSL-IMP-PPG-STO-L00-00002
nghiệm
samples nén và thí nghiệm
for Track
10-960.102) Plinths: kéoTrackkhi15
bửa mẫu bê to
(T15-123 tông 7 ngày của nghiệm
T15-224)/Thí cấu kiện
bê CSL-IMP-PPG-STO-L00-00002
néntông bệ nghiệm
và thí đỡ ray đường
kéo khisắt bửasốmẫu
1 (T11-029.027
bê tông 7 ngày to T11-129.779)
của cấu kiện bê tông
bệ đỡ ray đường sắt số 15 (T15-123 to T15-224)
Test CL- and SO3 at 28 days of trial mix sample at ASEAN batching
CSL-IMP-PPG-STO-L00-00002
plant
Taking Sample for material input U-Bolt M12- Use for Ramp CSL-IMP-TRE-STO-L00-00025-E-2A
VILAS-047/LAS-XD1256 of TECHNO-SCIENCE OF
TRANSPORT CENTER.
Address: A4 Building, University of transportation and
Communication, No.3 Cau Giay-Hanoi and/
Thí nghiệm tại phòng VILAS-047/LAS-XD1256, thuộc TRUNG TÂM Accepted chấp thuận
KHOA HỌC CÔNG NGHỆ GTVT.
Địa chỉ: Tòa nhà A4, Trường ĐH GTVT, Số 3- Cầu Giấy - Hà Nôi
VILAS-047/LAS-XD1256 of TECHNO-SCIENCE OF
TRANSPORT CENTER.
Address: A4 Building, University of transportation and
Communication, No.3 Cau Giay-Hanoi and/
Thí nghiệm tại phòng VILAS-047/LAS-XD1256, thuộc TRUNG TÂM Accepted chấp thuận
KHOA HỌC CÔNG NGHỆ GTVT.
Địa chỉ: Tòa nhà A4, Trường ĐH GTVT, Số 3- Cầu Giấy - Hà Nôi
LAS-XD03, Institute for Concrete Technology (ICT),
Vietnam Institute for Building Science and Technology,
address: 81 Tran Cung- Nghia Tan-Cau Giay-Hanoi/
Accepted chấp thuận
Phòng thí nghiệm LAS-XD03, Viện chuyên nghành bê
tông, thuộc Viện Khoa Học Công Nghệ Xây Dựng, 81-
LAS-XD03, Institute
Trần Cung - Nghĩa for- Concrete
Tân Cầu GiấyTechnology
- Hà Nôi (ICT),
Vietnam Institute
LAS-XD03, for Building
Institute Science
for Concrete and Technology,
Technology (ICT),
address:
Vietnam 81 Tran
Institute Cung-
for Nghia
Building Tan-Cau
Science Giay-Hanoi/
and Technology,
LAS-XD03, Institute for Concrete Technology (ICT), Accepted chấp thuận
Phòng
address:
Vietnam thí81
LAS-XD03, nghiệm
Tran
Institute LAS-XD03,
Cung-
for
Institute forNghia
Building Viện chuyên
Tan-Cau
Science
Concrete nghành bê
Giay-Hanoi/
and Technology,
Technology (ICT), Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, Viện
nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
forNghia
Building ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
and Technology,
Technology (ICT),
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, Viện
nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
forNghia
Building ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
and Technology,
Technology (ICT),
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông, thuộc
Phòng thí81
address:
Vietnam Viện
nghiệm Khoa
Tran Cung-
Institute for Học
LAS-XD03, Công
Nghia Viện
Building Nghệ Xây
chuyên
Tan-Cau
Science and Dựng,
nghành 81-
bê
Giay-Hanoi/
Technology,
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông,
Phòng thuộc Viện Khoa Học Công Nghệ Xây Dựng,
address: 81 Tran Cung- Nghia Tan-Cau Giay-Hanoi/bê
thí nghiệm LAS-XD03, Viện chuyên nghành 81-
Trần Cung -Viện
Nghĩa TânHọc
- Cầu Giấy - HàXây
Nôi Accepted chấp thuận
tông,
Phòng thuộc
thí nghiệm Khoa
LAS-XD03, Công
ViệnNghệ
chuyên Dựng, 81-
nghành bê
Trần Cung
tông, thuộc -Viện
Nghĩa
KhoaTânHọc
- Cầu Giấy
Công - HàXây
Nghệ NôiDựng, 81-
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi
ASEAN batching plant – Lot 11- Nguyen Khe Industrial
Accepted chấp thuận
Zone – Dong Anh Dist.- Hanoi
LAS-XD03, Institute for Concrete Technology (ICT),
Vietnam Institute
LAS-XD03, for Building
Institute Science
for Concrete and Technology,
Technology (ICT),
address:
LAS-XD03, 81 Tran
Vietnam Institute Cung- Nghia
for Building
Institute Tan-Cau
Science
for Concrete Giay-Hanoi/
and Technology,
Technology (ICT), Accepted chấp thuận
Phòng
address:thí
81nghiệm
Tran
Vietnam Institute
LAS-XD03, LAS-XD03,
Cung-
Institute Nghia
for Building Viện chuyên
Tan-Cau
Science
for Concrete nghành bê
Giay-Hanoi/
and Technology,
Technology (ICT), Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, Viện
nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
forNghia
Building ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
and Technology,
Technology (ICT),
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, Viện
nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
forNghia
Building ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
and Technology,
Technology (ICT),
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông, thuộc
Phòng thí81
address:
Vietnam Viện
nghiệm Khoa
Tran Cung-
Institute for Học
LAS-XD03, Công
Nghia Viện
Building Nghệ Xây
chuyên
Tan-Cau
Science and Dựng,
nghành 81-
bê
Giay-Hanoi/
Technology,
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông, thuộc Viện
Phòng thí81nghiệm
address: Khoa Học
LAS-XD03,
Tran Cung- Công
Nghia ViệnNghệ Xây
chuyên
Tan-Cau Dựng, 81-
nghành bê
Giay-Hanoi/
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông, thuộc Viện Khoa Học Công Nghệ
Phòng thí nghiệm LAS-XD03, Viện chuyên nghànhXây Dựng, 81-
bê
Trần Cung
tông, thuộc -Viện
Nghĩa
KhoaTânHọc
- Cầu Giấy
Công - HàXây
Nghệ NôiDựng, 81-
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi
Manufacturer: Bahru Stainless Sdn.Bhd - Malaysia 1. Supplier:
Inhouse Industrial Structure Supplier JSC Adress: Duc Dong, Trang Accepted chấp thuận
Quan, An Duong, Hai Phong
Manufacturer: Hanitel Group - Factory at Son Tay- Ha Noi Accepted chấp thuận
- Test in Las 105 at ROAD Laboratory I - Institute of transport
science and technology.
Address:No. 1252 Lang Road, Dong Da district -HN
Postponed hoãn
VILAS-047/LAS-XD1256 of TECHNO-SCIENCE OF
Địa chỉ: Số 1252 đường Láng. Quận Đống Đa -HN
TRANSPORT CENTER.
Address: A4 Building, University of transportation and
Communication, No.3 Cau Giay-Hanoi and/
Thí nghiệm tại Institute
LAS-XD03, phòng VILAS-047/LAS-XD1256,
formẫu
Concrete Technologythuộc TRUNG
(ICT), TÂM
Sampling
KHOA HỌC on CÔNG
site CP08/ Lấy
NGHỆ GTVT.tại công trường CP08 Accepted chấp thuận
Vietnam
LAS-XD03,
Địa chỉ: Tòa Institute
nhà A4,for
Institute Building
for ĐH
Trường Science
Concrete
GTVT, Số 3-and
CầuTechnology,
Technology Giấy(ICT),
- Hà Nôi Accepted chấp thuận
address:
Vietnam
LAS-XD03, 81
-Chemical test inTran
Institute Cung-
for
Institute
Las 105for Nghia
Building Tan-Cau
Science
Concrete
at ROAD Giay-Hanoi/
and
Technology
Laboratory Technology,
(ICT),
I - Institute of Accepted chấp thuận
Phòng
address:
transport
Vietnam thí
81nghiệm
Tran
science and
Institute LAS-XD03,
Cung- Nghia
technology.
for Building Viện chuyên
Tan-Cau
Science
LAS-XD03, Institute for Concrete Technology (ICT), nghành
Giay-Hanoi/
and Technology,bê
Accepted chấp thuận
tông,
Phòng
address:
Vietnam thuộc
Address:No.
LAS-XD03, thí81 Viện
1252
nghiệm
Tran
Institute Khoa
Lang
Cung-
for
Institute Học
Road,
LAS-XD03, Công
Dong
forNghia
Building DaNghệ
Viện chuyên
Tan-Cau
Science
Concrete Xây
district
and-HN
Technology Dựng,
nghành
Giay-Hanoi/
Technology,
(ICT),81-
bê
Địa
Trầnchỉ:
CungSố 1252
-Việnđường
Nghĩa Láng.
Tân Quận
- Cầu Đống
Giấy - Đa -HN
HàXâyNôiDựng, 81- Accepted chấp thuận
tông,
Phòng
address:
Vietnam thuộc
thí81
LAS-XD03, nghiệm
Tran
Institute Khoa
Cung-
for
Institute Học
LAS-XD03,
forNghia
Building Công
Viện
Tan-Cau
Science
Concrete Nghệ
chuyên nghành bê
Giay-Hanoi/
and Technology,
Technology (ICT),
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông,
Phòng thuộc
thí
address: 81
Vietnam
LAS-XD03, Viện
nghiệm
Tran
InstituteKhoa
Cung- Học
LAS-XD03, Công
forNghia
for Building
Institute ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên
and Dựng,
nghành 81-
bê
Giay-Hanoi/
Technology,
Technology (ICT),
Trần Cung -Viện
Nghĩa Tân - Cầu Giấy - Hàand
Nôi Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
Nghia
Building
for ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
Technology,
Technology (ICT),
Trần Cung -Viện
Nghĩa Tân - Cầu Giấy - Hàand
Nôi Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
Nghia
Building
for ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
Technology,
Technology (ICT),
Trần Cung -Viện
Nghĩa Tân - Cầu Giấy - Hàand
Nôi Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81
LAS-XD03, nghiệm
Tran
InstituteKhoa
Cung-
for
Institute Học
LAS-XD03, Công
Nghia
Building
for ViệnNghệ
Tan-Cau
Science
Concrete Xây
chuyên Dựng,
nghành 81-
bê
Giay-Hanoi/
Technology,
Technology (ICT),
Trần Cung -Viện
Nghĩa Tân - Cầu Giấy - Hàand
Nôi Accepted chấp thuận
tông,
Phòng thuộc
address:
Vietnam thí81nghiệm
Tran
InstituteKhoa
Cung-
for Học
LAS-XD03, Công
Nghia
Building ViệnNghệ
Tan-Cau
Science Xây
chuyên Dựng, 81-
nghành bê
Giay-Hanoi/
Technology,
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông, thuộc
Phòng
address: Viện
Tran Khoa
thí81nghiệm Học
LAS-XD03,
Cung- Công
Nghia ViệnNghệ Xây
chuyên
Tan-Cau Dựng, 81-
nghành bê
Giay-Hanoi/
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi Accepted chấp thuận
tông, thuộc
Phòng Viện Khoa
thí nghiệm Học Công
LAS-XD03, ViệnNghệ Xâynghành
chuyên Dựng, 81-
bê
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi
tông, thuộc Viện Khoa Học Công Nghệ Xây Dựng, 81-
Trần Cung - Nghĩa Tân - Cầu Giấy - Hà Nôi
Sampling on site CP08/ Lấy mẫu tại công trường CP08 Accepted chấp thuận
Person in-charge
Mr. Nguyen Van Ha
Person in-charge
NGUYEN THI KIM LAN
Person in-charge
NGUYEN THI KIM LAN
Person in-charge
NGUYEN THI KIM LAN
Person in-charge
NGUYEN THI KIM LAN
Person in-charge
PHAM HUU PHUC
(Tel: 0935. 517681)
Person in-charge
Mr. Joydeep
Person in-charge
Mr. Joydeep
& Mrs. Lan