1.0 PURPOSE:
Page 2 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
1.1 This Procedure is intended to provide guidance and instructions for carrying out start-up
& shutdown of Auxiliary Boiler.
2.0 SCOPE:
2.1 This Procedure is applicable Auxiliary Boiler of 3x660MW .
3.0 INPUT:
3.1DM water, HSD/LDO Oil, Power & Air.
4.0 OUTPUT:
4.1 Steam.
5.0 RESPONSIBILITY:
5.1 Auxiliary Boiler Operator.
A basic auxiliary boiler is a machine with the simplest arrangement of the internal
parts. The main job of a boiler is to make high pressure steam. The feed water supplied to the boiler
drum utilizes the heat of the energy released by burning the fuel. This energy of the burning fuel is
stored in the form of steam with high temperature and pressure. The fuel is burnt in a combustion
chamber inside the boiler. To attain high efficiency and complete combustion, air is supplied to this
combustion chamber through a separate arrangement. The heat generated in this combustion
chamber is transferred to the water from the boiler drum through a large surface area, which enables
the highest rate of energy transfer.
In our TSPL, Auxiliary Boiler is a forced draft boiler. Every Auxiliary Boiler have two
burners and every burner have one Fuel Oil pump.
TYPE CNDQ-10/3.2
Aux Boiler Company name Max Steam
Page 3 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
Auxiliary Boiler Capacity 20T/H
High Pressure Cut-Off 14Kg/Cm2(We can change also)
Working Pressure 8-12 Kg/Cm2
Working Temperature of Aux 200-205⁰C (Out let of Aux Boiler)
Boiler
Working Temperature of Super 240-250⁰C(Out let of Super Heater)
Heater
Fuel Oil Motor Current 5A
Fuel Oil Motor voltage 415V
Fuel Oil Motor speed 1420RPM
Fuel Oil Motor power 2.2KW
Fuel Oil Pump Capacity
100L/H
Fuel Oil Pump discharge
5-8Kg/Cm2
Pressure
Burner inlet pressure 4-8 Kg/Cm2
Burner outlet pressure 2-4 Kg/Cm2
BFP Motor current 50A
BFP Motor voltage 415V
BFP Motor Power 22KW
BFP Motor speed 2950RPM
Feed Pump Head 180m
Feed Pump discharge Pressure
10-15Kg/Cm2
Feed Pump capacity 30T/H
Blower Motor power 11KW
Blower Motor Voltage 415V
Blower Motor Speed 2920RPM
Blower Motor current 20A
3.7 KW
SH Blower motor power
SH Blower motor voltage 415V
83%
SH Blower motor efficiency
Page 4 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
AUX BOILER-2
1. Boiler High Pressure Auto Cut-Off
Auto cut-off 14 Kg/cm2
2. Boiler Drum 1st Safety Valve.
Pop Up- 16.0 Kg/cm2
Reset- 15.0 Kg/cm2
3. Boiler Drum 2nd Safety Valve.
Pop Up- 15.5 Kg/cm2
Reset- 14.5 Kg/cm2
4. Super Heater Safety Valve.
Pop Up- 16.5 Kg/cm2
Reset- 16 Kg/cm2
Page 5 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
PRE START
PROCESS
Page 6 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
POST START
When the Boiler drum pressure comes greater than 2Kg/Cm2, then close the vent
valve of boiler drum.
When the boiler drum pressure comes 3 to 4 Kg/Cm2, then open the main stop
valve (MSV) very slowly to charge the Super Heater.
Now, if we want more temperature then we can start the fuel pump of Super Heater
burner
Then, Super Heater pressure will raise gradually.
When super Heater pressure comes more than 5-6Kg/Cm2, we can warm up the
AUX header for charging.
Drain the aux header till all the condensate drained out, then close all the drain
valves near about 90%.
At beginning keep the header pressure 2-3Kg/Cm2 and then slowly raise the
header pressure up-to 8-9Kg/Cm2.
Now, the header is charged.
Then maintain the header pressure 6-8Kg/Cm2(As per requirement)
If the Steam consumption is heavy, we can change the flames normal condition to
High flames condition by using MODULATION ON switch
Then the Boiler pressure is raises gradually and keep the header pressure as per
requirement by contact with CCR Desk Engineer.
Open the blow down valve for 1-2minutes in between 4 hours during working
condition for the maintenance and to increase the lifetime of Aux Boiler.
DM WATER MAKE UP
Page 7 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
Required Fuel oil tank level is ≤ 80%
Fuel Oil makeup line is a tapping taken from HSD/LDO Supply line to main Boiler
area in FOPH.
Check the sample by DM plant chemist.
14. REFERENCE:-
O&M Manual-Auxiliary Boiler
Page 8 of 9
TALWANDI SABO POWER LIMITED,
3 x 660MW POWER PLANT, MANSA.
QESH MANAGEMENT SYSTEM
Evacuate immediate area: Eliminate any possible sources of ignition, and provide
maximum explosion- proof ventilation. Shut off source of Auxiliary Boiler, if possible. If
leaking from Auxiliary Boiler, or valve, call the fire emergency phone number.
Fire Fighting Measures:-
Fire Fighting Instructions:
CO2, dry chemical, water spray or fog for surrounding area
Special Fire Fighting instruction: Evacuate all personnel from danger area.
Immediately cool container with water spray from maximum distance, taking care not to
extinguish flames. If flames are accidentally extinguished, explosive re-ignition may occur.
Stop flow of gas if without risk while continuing cooling water spray.
Unusual fire and Explosion hazards: Burns with a pale blue, nearly invisible flame.
HSD/LDO is easily ignited with low-ignition energy, including static electricity. Auxiliary
Boiler is very danger area and can accumulate in the upper sections of enclosed spaces.
Pressure in a container can build up due to heat, and it may rupture if pressure relief
devices should fail to function.
Page 9 of 9