Professional Documents
Culture Documents
PERI ACS Core 400
PERI ACS Core 400
PERI ACS Core 400
Edition 01 | 2018
Publisher
PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Strasse 19
89264 Weissenhorn
Germany
info @ peri.com
www.peri.com
Engineering and Services Project Examples
24 PERI services for the best 30 ACS Core 400 in use: reference
results projects with the self-climbing
26 Individual solutions – imple- formwork
mented in partnership
27 PERI services: technical
processing
28 PERI services: pre-assembly
and logistics
29 PERI services: project manage-
ment on the construction site
Important information
All current safety regulations and guidelines ap- reduced to show certain aspects. The safety in-
plicable in those countries where our products stallations which have possibly not been shown
are used must be observed. in these detailed descriptions must nevertheless
still be available. The systems or items shown
The images shown in this brochure feature might not be available in every country.
construction sites in progress. For this reason,
safety and anchor details in particular cannot Safety instructions and load specifications are to
always be considered conclusive or final. These be strictly observed at all times. Separate struc-
are subject to the risk assessment carried out tural calculations are required for any deviations
by the contractor. from the standard design data.
In addition, computer graphics are used which The information contained herein is subject to
are to be understood as system representations. technical changes in the interests of progress.
To ensure a better understanding, these and the Errors and typographical mistakes reserved.
detailed illustrations shown have been partially
3
PERI Self-Climbing Technology
PERI self-climbing technology Development of the first PERI climbing Further developments regarding
streamlines construction work as formwork began in April 1972 with self-climbing solutions through hydrau-
far as possible. Frequently, only patent no. DE 2217 584. In the same lic applications, i.e. eliminating the use
physical laws such as the setting year, large formwork elements were a crane, already took place in the
time of the fresh concrete limit any used on a retractable climbing scaffold 1970s. In particular, the savings made
further acceleration of the con- for the first time for the construction on crane requirements made climbing
struction progress. In this respect, of the Dresdner Bank building in formwork fast and inexpensive.
PERI specialists provide valuable Mannheim. This design significantly
advice and support for realizing rationalised the construction of high
ever high structure. With their buildings because formwork and
know-how and vast experience, climbing scaffold could be moved with
they can find the most economical a single pick of the crane. The form-
solutions for a broad range of work was retracted on the scaffold,
projects. cleaned and then closed again.
4
PERI Self-Climbing Technology
Today’s modular systems – PERI ACS With the ACS Core 400, PERI has set
Automatic Climbing System and RCS yet another milestone in the history of
Rail Climbing System – are products climbing technology: the new PERI
resulting from modern engineering self-climbing system provides even
expertise. In particular, the high degree more speed, safety and efficiency for
of flexibility along with the combina- forming reinforced concrete cores of
tions of different execution variants high-rise buildings. The new high-per-
offer highly efficient solutions for every formance hydraulics lift the complete
project requirement. platform, placing boom, formwork as
well as suspended working platforms
to the next level in only 20 minutes.
5
System Advantages
With the ACS Core 400 for high- construction team. In addition,
rise building cores with large cell large placing booms can be climbed
dimensions, the PERI self-climbing together with the ACS Core 400,
technology executed its next which also supports them during
evolutionary step: the optimized operations. As a result, storey slabs
climbing process ensures simple can be simultaneously concreted
working operations and short cycle with the walls. It makes sense to
times. Climbing the complete core use the system on structures with
formwork minimizes leading edges at least 30 storeys; up to 2 floors
and increases safety levels for the per week can be realized.
6
System Advantages
The ACS Core 400 system has been and striking elements. Optionally, strik- Spacious and particularly stable
optimized for massive high-rise build- ing is carried out hydraulically with a platforms ensure safe, comfortable
ing cores with large cell dimensions, single press of a button. Alternatively, working conditions and the required
and wall heights from 2.70 m to 4.88 m. the system can be used with MAXIMO load-bearing capacity for material
The complete core formwork climbs or TRIO Panel Formwork systems. storage. In addition, the ACS Core 400
continuously in one lift. Thereby, this allows the use of placing booms with
makes the system the most suitable al- The long-stroke cylinders each have a very large reach and can be used
ternative when very short construction a lifting power of 40 t. A systematic without any additional load-bearing
times are required. oil flow control ensures synchronous system during operations.
climbing of the entire internal and
Ideally, the ACS Core 400 is combined external formwork – also with large
with VARIO GT 24 Girder Wall Form- load differences.
work and specially developed corner
Convenient, high load-bearing Cost-effective tie technology Fast and safe climbing in one lift
working platforms
Only 2 tie points per support point Synchronous climbing without any
Large-sized platforms for all work along with reusable climbing an- leading edges featuring an innova-
operations and for supporting the chors save costs tive hydraulic system
placing boom when in use
7
System Advantages
If the core is concreted in advance, the The external working platforms For secure access to all working levels,
load-bearing platform beams cantilever (Level 0) provide access and storage PERI UP stair towers and the PERI
beyond the outer edge of the building space for all work which is required on ladder system are normally integrated
core in order to support the enclosure the outer side of the core. The external into the solution.
posts. Apart from the external form- formwork can be retracted a large
work, generously-sized working plat- distance, and the wide Level 0 working
forms are also attached to the platform platforms allow here working in front of
beams. as well as behind the formwork. This
simplifies and accelerates in particular
the reinforcement work.
Level +1
Level 0
Level -1
8
System Advantages
If the floor slabs and walls are simulta- The placing boom on the Level +1 osition the slab formwork on the
p
neously concreted, suspending the working platform typically has a large previous access slab, the inner Level 0
working platform on the external form- reach which means the complete slab working platform is recessed together
work is not required. Work on the outer area can be reached. If required, the with the floor slab. Directly after con-
sides of the core is then carried out slab for the access areas (so-called creting the slab, the walls for all intents
from the slab formwork. lobby slabs) is concreted within the and purposes are concreted in one
core itself. In order to be able to pour.
Level +1
Level 0
Level -1
9
System Advantages
Through its large-sized platforms, For the often complex reinforcement Due to the high load-bearing capacity
the ACS Core 400 offers the best work, ACS Core 400 offers a lot of of all platforms, all required materials
prerequisites for safe, fast working space on Level 0 resulting in high free- and equipment can be comfortably
and material storage. In addition, a dom of movement. When the external stored.
placing boom with a large reach formwork is retracted, work can take
can be climbed at the same time. place in front of and behind the form-
work.
10
System Advantages
Level +1
Level 0
If the external formwork has been retracted, Level 0 provides working If the core is concreted in advance, Level 0 provides a continuous storage
space on both sides of the formwork. As the Level +1 working platform and working area. PERI UP stair towers and the PERI ladder system ensure
is narrower, materials can be brought in by crane. secure access solutions to all working levels.
11
System Advantages
Climbing Bracket
12
System Advantages
Tie DW 26
Threaded Anchor Plate DW 26
(lost components)
Heavy-Duty Cone
M36/DW26-Ø108
Recovering Tool SW 36
13
System Advantages
14
System Advantages
The hydraulic pump is positioned on the working platform (Level 0); depending on requirements, The hydraulic cylinders are arranged in a space-
a 4-cylinder or a 6-cylinder pump is used. The hose connections are equipped with quick-release saving manner in the vertical Uprights which
couplings; furthermore, the remote control has only three buttons which ensures simple and creates maximum available space in the working
easy-to-understand use. areas. The top end of the cylinder is located in
the Upright and can be bolted on here in different
positions. VARIOKIT struts and bracing with Tie
Rods DW 15 provide the required reinforcement
for the steel construction.
15
System Overview and Application Details
16
System Overview and Application Details
The section for concreting the Use of rentable VARIOKIT system components
advancing core presented here
shows the system configuration For bracing the supporting steel construction as well as for the sub-structure
in more detail. of the placing boom, system components from the VARIOKIT Engineering
Construction Kit are used. These components are available from the PERI
The steel girder grillage with the rental parks and optimize the cost-effectiveness.
cantilever beams forms the sub-
structure for the top working plat-
form. This so-called Level +1 sup-
ports the placing boom and serves
as a storage surface for materials. VARIOKIT Struts
The height of the platform can be
varied in 125 mm increments and
can thus be easily adapted to realize
optimal access to the formwork for
concreting and reinforcement work. RCS Climbing Rails
The fact that any required horizontal
bracing can be arranged under
the platform means that tripping
hazards can be avoided. In addition,
continuous up to 2.50 m high
anti-fall protection greatly reduces
the risk of accidents.
17
System Overview and Application Details
until the bottom bolts are fully load- flow control ensures synchronous
ed, the working bracket is then load- climbing.
free and raised by approx. 5 mm.
■■ Release the bolts and Anchor Sliding
Relieving the
working bracket
18
System Overview and Application Details
Mounting the working bracket Climbing the climbing bracket Completing the climbing procedure
■■ The working bracket is suspended in ■■ By retracting the cylinder, the ■■ The climbing bracket is set down on
the top climbing anchor and fixed in climbing bracket is raised to the the Anchor Sliding Pieces and fixed
position here with an Anchor Sliding next higher climbing anchors. together with the climbing anchors.
piece and bolt. ■■ Additional minimal extension of
■■ The climbing bracket is relieved the cylinders relieve the climbing
through a minimum extension of the brackets.
cylinder, the heavy-duty anchors are ■■ External and internal formwork are
Mounting the
working bracket
Mounting the
climbing bracket
Relieving the
climbing bracket
19
System Overview and Execution Details
20
System Overview and Execution Details
21
System Overview and Execution Details
Fast striking
For a easy and simple striking pro- Striling with the VARIO Shaft ble Striking Corner Profile is positioned
cedure, use the VARIO GT 24 Shaft Corner in every shaft corner. When forcing the
Corner, or TRIO or MAXIMO shaft The VARIO Shaft Corner ensures fast formwork away from the concrete in
elements. Alternatively, a hydraulic striking operations and moving the in- the compensation areas and pulling
solution facilitates faster striking ternal formwork in one working step. together the L-shaped formwork
with even more reduced workload. Time-consuming dismantling and segments (wall centre – corner – wall
re-assembly of individual formwork centre), the entire shaft formwork is
segments are no longer necessary. moved approx. 2 cm off the wall. The
complete shaft internal formwork can
A compensation area is arranged on then be moved in one crane lift.
each side of the formwork while a flexi-
22
System Overview and Execution Details
23
Engineering and Services
24
Engineering and Services
25
Engineering and Services
Customer-specific solutions –
implemented in partnership
PERI engineers provide valuable Over the past decades, PERI has
advice and support for realizing demonstrated through numerous
all high structures; they plan and high-rise buildings, towers, pylons and
dimension climbing formwork other high structures what is feasible
solutions in order to meet any ar- and in which way climbing solutions
chitectural challenge. Taking into can be efficiently and cost-effectively
account the technical requirements, implemented – no matter in what form
framework conditions during the and regardless of the height. Goal of
execution together with individual PERI engineers is always ensuring
customer requirements, optimized process optimization with the objective
solutions are created for each of reducing both execution times and
project task – and this often during costs.
the tender phase.
26
Engineering and Services
Your benefits
Optimized solutions
with project-specific planning including
site-compliant drawings and parts lists
No interface-related loss
through continuous project support and
technical advice from a PERI specialist
– if required, also directly on the jobsite
Planning reliability
through regulation-compliant or
verifiable static calculations
27
Engineering and Services
Your benefits
Perfectly assembled
for the individual component or
structural shapes
With high quality
executed by well-trained skilled staff in
modern prefabrication facilities using
the very latest machine technology
Just-in-time deliveries
assembled and delivered to the con-
struction site on-time and according
to the construction progress
elements
■■ 2D or 3D additional infill spaces as well as complex formwork units
28
Engineering and Services
Your benefits
processes
■■ Compiling key figure reports on
29
Project Examples
30
Project Examples
31
Project Examples
The PERI ACS Core 400 self-climbing formwork shortened the cycle times The ACS Core 400 ensured that the construction team was able to meet
for the construction of this 31-storey high-rise building. the extremely tight schedule.
CEB Tower at Rosslyn Central Place, Arlington, Solitair Brickell, Miami, Florida,
Virginia, United States United States
The CEB Tower with 31 floors was built over the Rosslyn The 48-storey residential tower, built in Miami's flourishing
Metro Station very close to the Potomac River in Washing- Brickel neighborhood, includes seven parking levels, around
ton, D.C.C. After completion, the 120 m high public office 4,500 square feet of retail space on the ground floor as
building will be the tallest structure in the metropolitan well as more than 400 luxurious residential units. Designed
region and will offer an exceptional view of the area thanks by the architect Jonathan Cardello of ADD, the distinctive
to a public viewing platform. design complete with zig-zag balconies resembles that of
a palm tree.
Altogether, the team from Clark Concrete realized around
2,500 m² (27,000 ft²) of 25 cm thick reinforced concrete Using the ACS Core 400 climbing system, Baker Concrete
slabs featuring unstressed as well as additional prestressed Construction could achieve fast cycle times – without being
reinforcement. The top slab, which later forms the viewing dependent on the available jobsite crane. The especially
platform at the top of the tower, is 45 cm thick. powerful long-stroke cylinders of the self-climbing formwork
synchronously lifted the complete core formwork up to the
With the ACS Core 400 self-climbing formwork, the con- next level in each case. The formwork was thus climbed in
struction team was able to simultaneously construct the a single lift and raised from one storey to the next without
elevator walls of the north and south sides – without having requiring any time-consuming intermediate climbing steps.
to rely on the only available tower crane. In the process, the
walls were concreted at the same time as the slabs by The construction team confirmed the reliability and easy
means of a large placing boom. In this way, the cycle times handling of the PERI climbing formwork. The project
for each floor were shortened by at least one day. manager described the ACS Core 400 as a key component
in the reduction of the crane time.
32
Project Examples
Tower ICE with 66 floors was built in the Ice District in Edmonton whereby Integrated roofing for the climbing formwork accelerated the installation of
the building core is being realized with the ACS Core 400 the elevators by almost one year.
ICE District Stantec Tower, Edmonton, 8th and Howell Hotel, Seattle, Washington,
Canada United States
Completion of the 250 m high Tower E, also known as The 8th and Howell Hotel is one of the largest construction
Stantec Tower, is planned for 2019. Subsequently, the projects Seattle has ever seen. After completion in 2018,
66-storey tower will be the tallest building in Edmonton – it will be the largest hotel in Seattle featuring 48 floors and
and also the tallest building in Canada outside of Toronto. offering 1.4 million m² of usable floor space; it is located
In the 10-hectare city district, many striking buildings have very close to the Washington State Convention Center.
been built including a stadium and a cinema complex.
PERI delivered three sets of ACS Core 400 climbing units
The ACS Core 400 is being used for the walls of the for the realization of the three massive reinforced concrete
three-piece building core with axial dimensions of around shafts which form the 10.65 m x 27.40 m reinforced con-
27.50 m x 13.50 m. In the course of construction progress, crete core. In this case, the climbing solution is combined
one RCS Climbing Protection Panel will subsequently with the MAXIMO Panel Formwork which is characterized
be used to enclose the storeys of the building shell and by the one-sided tie technology.
providing anti-fall protection. SKYDECK and SKYTABLE are
used as slab formwork while a large part of the walls are In addition, PERI engineers planned a construction com-
formed using the tried and tested TRIO Panel Formwork. prised of VARIOKIT system components that were used
to provide roofing for the elevator shafts during the entire
construction and keep them dry. Thus, installation of the ele-
vators could be carried out immediately after formworking
operations. The pre-fabricated rebar cages for the walls
were lowered directly into the wall formwork by means
of integrated, hydraulically operated flaps in the VARIOKIT
construction.
33
PERI International
RU
CA
KZ
US AZ
TR
KR JP
TN LB
MA IL IR
JO KW
DZ
EG QA
MX SA AE IN
HK
OM
TH
PH
PA VN
NG
CO MY
SG
ID
TZ
PE BR
AO MZ
NA
CL AU
ZA
AR
MX Mexico DZ
Algeria AZ
Azerbaijan LB
Lebanon
PERI Cimbras y Andamios, S.A. de C.V. S.A.R.L. PERI PERI Repesentative Office PERI Lebanon Sarl
www.peri.com.mx www.peri.dz www.peri.com.tr lebanon@peri.de
PA
Panama EG
Egypt HK
Hong Kong MY
Malaysia
PERI Panama Inc. Egypt Branch Office PERI (Hong Kong) Limited PERI Formwork Malaysia Sdn. Bhd.
www.peri.com.pa www.peri.com.eg www.perihk.com www.perimalaysia.com
US
USA MA
Morocco ID
Indonesia OM
Oman
PERI Formwork Systems, Inc. PERI S.A. PT Beton Perkasa Wijaksana PERI (L.L.C.)
www.peri-usa.com www.peri.ma www.betonperkasa.com www.peri.ae
MZ
Mozambique IL
Israel PH
Philippines
PERI (Pty.) Ltd. PERI F.E. Ltd. PERI-Asia Philippines, INC.
South America www.peri.co.mz www.peri.co.il www.peri.com.ph
AR
Argentina NA
Namibia IN
India QA
Qatar
PERI S.A. PERI (Pty.) Ltd. PERI (India) Pvt Ltd PERI Qatar LLC
www.peri.com.ar www.peri.na www.peri.in www.peri.qa
BR
Brazil NG
Nigeria IR
Iran SA Saudi Arabia
PERI Formas e Escoramentos Ltda. PERI Nigeria Ltd. PERI Pars. Ltd. PERI Saudi Arabia Ltd.
www.peribrasil.com.br www.peri.ng www.peri.ir www.peri.com.sa
CL
Chile TN
Tunisia JO
Jordan SG
Singapore
PERI Chile Ltda. PERI S.A.U. PERI GmbH – Jordan PERI Asia Pte Ltd
www.peri.cl www.peri.es www.peri.com www.periasia.com
CO
Colombia TZ
Tanzania JP
Japan TH
Thailand
PERI S.A.S. PERI Formwork and Scaffolding Ltd PERI Japan K.K. Peri (Thailand) Co., Ltd.
www.peri.com.co www.peri.co.tz www.peri.co.jp www.peri.co.th
PE
Peru ZA South Africa KR
Korea TR
Turkey
PERI Peruana S.A.C. PERI Formwork Scaffolding (Pty) Ltd PERI (Korea) Ltd. PERI Kalıp ve İskeleleri
www.peri.com.pe www.peri.co.za www.perikorea.com www.peri.com.tr
KW
Kuwait VN
Vietnam
PERI Kuwait W.L.L. PERI ASIA PTE LTD
www.peri.com.kw www.peri.com.vn
IS
FI
NO
SE EE
RU
LV
DK
LT
IR GB BY
NL PL
BE DE
LU CZ UA
SK
PERI GmbH
Formwork Scaffolding Engineering AT
CH HU
Rudolf-Diesel-Strasse 19 FR SI RO
89264 Weissenhorn HR
Germany
Tel. +49 (0)7309.950-0 BA RS
Fax +49 (0)7309.951-0 IT
BG
info@peri.com
www.peri.com
AL
ES
PT GR
TR
Oceania
AU
Australia DK
Denmark IT
Italy SE
Sweden
PERI Australia Pty. Ltd. PERI Danmark A/S PERI S.r.l. PERI Sverige AB
www.periaus.com.au www.peri.dk www.peri.it www.peri.se
EE
Estonia LT
Lithuania SI
Slovania
PERI AS PERI UAB PERI oplate i skele d.o.o
Europe www.peri.ee www.peri.lt www.peri.com.hr
AL
Albania ES
Spain LU
Luxembourg SK
Slovakia
PERI Kalıp ve İskeleleri PERI S.A.U. N.V. PERI S.A. PERI spol. s. r.o.
www.peri.com.tr www.peri.es www.peri.lu www.peri.sk
AT
Austria FI
Finland LV
Latvia UA
Ukraine
PERI Ges.mbH PERI Suomi Ltd. Oy PERI SIA TOW PERI
www.peri.at www.perisuomi.fi www.peri-latvija.lv www.peri.ua
BE
Belgium GB United Kingdom NO
Norway
PERI N.V. PERI Ltd. PERI Norge AS
www.peri.be www.peri.ltd.uk www.peri.no
BG
Bulgaria GR
Greece PL
Poland
PERI Bulgaria EOOD PERI Hellas Ltd. PERI Polska Sp. z o.o.
www.peri.bg www.perihellas.gr www.peri.com.pl
BY
Belorussia HR
Croatia PT
Portugal
IOOO PERI PERI oplate i skele d.o.o. Pericofragens Lda.
www.peri.by www.peri.com.hr www.peri.pt
CH
Switzerland HU
Hungary RO
Romania
PERI AG PERI Kft. PERI România SRL
www.peri.ch www.peri.hu www.peri.ro
CZ Czech Republic IR
Ireland RS
Serbia
PERI spol. s r.o. Siteserv Access & Formwork PERI oplate d.o.o.
www.peri.cz www.siteservaccess.ie www.peri.rs
DE
Germany IS
Iceland RU
Russia
PERI GmbH Armar ehf. OOO PERI
www.peri.de www.armar.is www.peri.ru
The optimal System
for every Project and
every Requirement
PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Strasse 19
89264 Weissenhorn
Germany
Tel. +49 (0)7309.950-0
Fax +49 (0)7309.951-0
info@peri.com
www.peri.com