On a sewing floor an operation has 3 elements (1. Pick up and Position, 2. Stitch and 3. Dispose).

The time stu


was carried out with Decimal Stop watch for 10 cycles. If Operator rating is 95% and different allowances given
Question
15%. Calculate the Observed average cycle time, basic time and standard time for the operation.

Cycle 1 2 3 4 5 6 7
Pick and T
Position R 7 28 51 73 95 20 44
T
Stitch
R 20 40 63 85 9 35 57
T
Dispose
R 22 43 66 89 12 37 60

Soultion
Given
Rating (%) 95
Allowances
15
(%)

Cycle 1 2 3 4 5 6 7
Pick and T 7 6 8 7 6 8 7
Position R 7 28 51 73 95 20 44
T 13 12 12 12 14 15 13
Stitch
R 20 40 63 85 9 35 57
T 2 3 3 4 3 2 3
Dispose
R 22 43 66 89 12 37 60

TOTAL 22 21 23 23 23 25 23
In
In
Decimal In
Second
watch minutes
s
Averag unit
e
23 0.23 13.8
Observ
ed time
Basic
21.85 0.2185 13.11
Time
Std.
Time 25.1275 0.25128 15.0765
ch and 3. Dispose). The time study
% and different allowances given are
for the operation.

8 9 10

68 91 14

80 3 27

83 6 30

8 9 10
8 8 8
68 91 14
12 12 13
80 3 27
3 3 3
83 6 30

23 23 24