EHS@Site Healthcheck Summary

Date
Site Name 7/27/2016
Site conducted

Carried out by Lead Due next Date

Healthcheck Topic Sept FY16 Feb FY17 Sept FY17

1. Dropped Objects 0%
2. Work@Height #REF!
3. Vessel Transfer #REF!
4. Major Projects #REF!
5. Contractor Management #REF!
6. Tools #REF!
7. PPE #REF!
8. Electrical #REF!
9. Stores & Office #REF!
10. EHS Documentation #REF!
11. Driving #REF!
12. Lifting #REF!
Overall Ave #REF! #DIV/0! #DIV/0!
Dropped Objects Health Check
Site Site Name Health check date 7/27/2016

Site Manager Name of Manager Carried out by Lead

Overall impression
Ref Characteristic Remarks
Unacceptable Poor Fair Good Very Good
Goal / Description 0 1 2 3 4

Dropped Object risks are High quality signed TBT Dropped Objects SSN
Dropped Objects Toolbox Basic signed TBT delivered High quality signed TBT
1 communicated to all before No TBT Basic TBT delivered once delivered on a regular basis (TBT) Communication from
Talk (TBT) on a regular basis delivered on a regular basis
start of work with scheduled refreshers Gwynt y Môr

Pre-task planning considers


Pre-task planning considers Dropped object identification
Pre-task planning does not Pre-task planning considers dropped objects and
2 Pre-task planning the potential for dropped No Pre-task planning is enbeded in all pre-task
consider dropped objects dropped objects documents risk and
objects planning stages
mitigations

An opportunity immediately Detailed POWRA/Take5 Development of site


Take 5 carried out
Dropped Objects

Point Of Work Risk before work commences to Basic Take 5 carried out routinely carried out to specific dropped object risk
3 Not Carried out specifically to identify W@H
Assessment identify Dropped Object covering entire task identify W@H & dropped identification tools - share
& dropped object risks
Risks object risks opportunity

Continouse improvement in
Tethering devices for Tethering equipment Tethering equipment is used SAW -050-2015-R1:
No Tethering equipment Tethering equipment tethering equipment and
4 Tethering tooling, parts and equipment available but not routinely at all times as personal Dropped Objects and
available available and routinely used applications routinley sought
to prevent dropped objects used issue tethering requirements

Contained movement of Suitably sized bags with


Bags used with little Wide variety of bags for Development of task,
Lifting, equipment & tools & equipment, None contained Loose sealing/closing facility not
5 consideration for movement differing applications equipment, tool and WTG
carrying bags eliminating potential items transported at height allowing free movement of
of items routinely used specific bags
dropped objects items

Continouse improvement in
Provides a tempoary gap Planning implementation of Sausages or similar gap Sausages or similar gap NOT APPLICABLE at this Site
Gap Filling Packing No Mitigations in place to fill gap filling equipment and
6 filling to prevent objects mitigations i.e. system fillers available on site for fillers fully embedded into - Reduce Max avalable score
(Sausage) gaps and reduce risks applications routinley sought by 4
falling through gaps ordered use site normal operations

m
w

n
g

q
u
o
b

o
p
p

o
b

e
e
c

s
k

e
c

r
r

t
t

i
j

.
Prevents dropped objects
Planning implementation of Skirt or similar system fully
YAW Cable Wrap falling down the DC cable No Mitigations in place to Skirt or similar system
7 Not Considered mitigations i.e. system embedded into site normal Developed by Gwynt-y-Mor
Penetration Skirt penetration using a cover reduce risk available on site for use
ordered operations
skirt

Sockets & spanners with an Planning implementation of


GRiPTITE Tools or similar GRiPTITE Tools or similar
DO Best Practice

internal cam that grips the No Mitigations in place to mitigations i.e. system
8 GRIPTITE Tools or similar Not Considered system available on site for system fully embedded into
bolt or nut and reduces the reduce risk ordered or alternative
use site normal operations
risk of a dropped object SSOW in place

An assessment of the WTG


Basic assessment carried Detailed examination and
Dropped Objects structure including ladders, Assessment carried out
9 Not Considered Considered and planned out and data captured from assessment of all elements
Structural Assessment brackets, grating and cranes identifying potential events
previous events of the WTG
to identify risk

Holsters designed to Planning implementation of


Holsters or similar system
Radio and specialised securely attach tools and No Mitigations in place to mitigations i.e. system Holsters or similar system
10 Not Considered fully embedded into site
equipment Holster radios to the user to avoid reduce risk ordered or alternative available on site for use
normal operations
dropped objects SSOW in place

Support information including TBT's, Lessons Learnt, Safety Alerts and guidance can be found at the EHS Sharepoint Site
14
Total Score
40
Max Available Score
35%
Compliance Score %
Unrestricted
Dropped Objects Health Check
Site Site Name Health check date 7/27/2016

Site Manager Name of Manager Carried out by Lead

Overall impression
Ref Characteristic Remarks
Unacceptable Poor Fair Good Very Good
Goal / Description 0 1 2 3 4

Dropped Object risks are High quality signed TBT Dropped Objects SSN
Dropped Objects Toolbox Basic signed TBT delivered High quality signed TBT
1 communicated to all before No TBT Basic TBT delivered once delivered on a regular basis (TBT) Communication from
Talk (TBT) on a regular basis delivered on a regular basis
start of work with scheduled refreshers Gwynt y Môr

Pre-task planning considers


Pre-task planning considers Dropped object identification
Pre-task planning does not Pre-task planning considers dropped objects and
2 Pre-task planning the potential for dropped No Pre-task planning is embedded in all pre-task
consider dropped objects dropped objects documents risk and
objects planning stages
mitigations

An opportunity immediately Detailed POWRA/Take5 Development of site


Take 5 carried out
Dropped Objects

Point Of Work Risk before work commences to Basic Take 5 carried out routinely carried out to specific dropped object risk
3 Not Carried out specifically to identify W@H
Assessment identify Dropped Object covering entire task identify W@H & dropped identification tools - share
& dropped object risks
Risks object risks opportunities

Continuous improvement in
Tethering devices for Tethering equipment Tethering equipment is used SAW -050-2015-R1:
No Tethering equipment Tethering equipment tethering equipment and
4 Tethering tooling, parts and equipment available but not routinely at all times as personal Dropped Objects and
available available and routinely used applications routinley sought
to prevent dropped objects used issue tethering requirements

Contained movement of Suitably sized bags with


Bags used with little Wide variety of bags for Development of task,
Lifting, equipment & tools & equipment, None contained Loose sealing/closing facility not
5 consideration for movement differing applications equipment, tool and WTG
carrying bags eliminating potential items transported at height allowing free movement of
of items routinely used specific bags
dropped objects items

Continouse improvement in
Provides a tempoary gap Planning implementation of Sausages or similar gap Sausages or similar gap
Gap Filling Packing No Mitigations in place to fill gap filling equipment and
6 filling to prevent objects mitigations i.e. system fillers available on site for fillers fully embedded into
(Sausage) gaps and reduce risks applications routinley sought
falling through gaps ordered use site normal operations

m
w

n
g

q
u

n
o
b

o
p
p

o
b

s
e
c

s
k

e
c

r
r

t
t

i
j

.
Prevents dropped objects
Planning implementation of Skirt or similar system fully
YAW Cable Wrap falling down the DC cable No Mitigations in place to Skirt or similar system
7 Not Considered mitigations i.e. system embedded into site normal Developed by Gwynt-y-Mor
Penetration Skirt penetration using a cover reduce risk available on site for use
ordered operations
skirt

Sockets & spanners with an Planning implementation of


GRiPTITE Tools or similar GRiPTITE Tools or similar
internal cam that grips the No Mitigations in place to mitigations i.e. system
8 GRIPTITE Tools or similar Not Considered system available on site for system fully embedded into
bolt or nut and reduces the reduce risk ordered or alternative
use site normal operations
risk of a dropped object SSOW in place
DO Best Practice

An assessment of the WTG


Basic assessment carried Detailed examination and
Dropped Objects structure including ladders, Assessment carried out
9 Not Considered Considered and planned out and data captured from assessment of all elements
Structural Assessment brackets, grating and cranes identifying potential events
previous events of the WTG
to identify risk

Holsters designed to Planning implementation of


Holsters or similar system
Radio and specialised securely attach tools and No Mitigations in place to mitigations i.e. system Holsters or similar system
10 Not Considered fully embedded into site
equipment Holster radios to the user to avoid reduce risk ordered or alternative available on site for use
normal operations
dropped objects SSOW in place

New method of working New method is periodically


Best practice shared, Considered and
Carbon Shoes & Cover No consideraion given to SA-040- 2015 TRA SM052 adopted by reviewed and checked at
11 tethering used when communicated verbally still Developed by LINCS
Removal potential for dropped objects communicated site, plate is tethered before the point of work for
carrying out the task working to DS1257852
removing final 4 bolts compliance

Support information including TBT's, Lessons Learnt, Safety Alerts and guidance can be found at the EHS Sharepoint Site
0
Total Score
44
Max Available Score
0%
Compliance Score %
Unrestricted