The following four-part audit report separates elements of ISO 9001:2008
into the following categories: Planning, Implementation, Evaluation, and
Actions based on performance results. These four sections refer directly to
Shewart and Deming’s “PDCA” methodology for effective process manage-
ment and are foundational to ISO 9001:2008.
Throughout this audit, sections 4.1 and 7.1 recur many times. Because 4.1
is a global planning element, while 7.1 is directed to specific processes,
both are in effect at any one time within the QMS. Both also require PDCA
to be effective at their respective levels and for the system of processes to
work most effectively. This audit structure takes advantage of both the local
and the global perspectives simultaneously to create maximum value
and relevance.
Development of this checklist involved placement of elements specific
to this audit into their respective PDCA sections, in turn adding them to the
generic 4.1 and 7.1 inquiry format provided. Therefore, all audits share a
common, process-driven format based on use of PDCA regardless of the
process or objective under scrutiny.
Auditors are chosen so as not to audit their own work. The results of
all audits are brought to the attention of top management and findings are
addressed through the nonconformance process.
79
80 Appendix A
Part I: Plan
Audit Subject: [Enter the name of the process you’re
auditing]
Date:
Who is [the process] owner (the ultimate authority) and to whom does
he/she report?
Process Driven Comprehensive Audit 81
How are the risks mentioned in the first question managed well through
what you just described to me?
What other parts of the operation benefit from the success of [the
process you’re auditing]?
Can you demonstrate how the process and its performance are
understood among the people who use it? Is any of this recorded in
verification, validation, monitoring, and inspection records? (Get
evidence wherever possible.)
82 Appendix A
At a later time in the audit, when you fully understand the process,
interview several of the above people.
What does each person do? (Do they have Job Descriptions? Get as
much information as possible to use in the last question of this section.)
Are measurements shared with the workers [in the department you’re
auditing] for improvement? (Get records!)
84 Appendix A
Part II: Do
Is this input (or material) analyzed upon arrival to [the process you’re
auditing]? Are there records of this activity? (Get copies or write down
names, dates, PO #’s, and so on, as objective proof.)
Are inputs received properly and well managed? (Are there problems
getting the things you need to do your job?)
Process Driven Comprehensive Audit 85
(If there are measurement tools) How and when do you use these tools?
How did you know what to measure?*
*If these tools are used to measure products to determine whether they meet require-
ments, add all section 7.6 P, D, C, and A elements.
86 Appendix A
Is the output, or what you actually deliver, tested before [the process
you’re auditing] is completed?
Who or what receives [the process output] after you’re done? (Ask their
input.)
At a later time in the audit, go to the recipient(s) and ask: Is the output of
[the process you’re auditing] well received, or is improvement/revision
desired?
Process Driven Comprehensive Audit 87
Performance
(ISO 9001:2008 Sections 4.1(e), 8.4, 8.2.1)
How is performance of [the process you’re auditing] analyzed from the
perspective of both internal and external customer satisfaction?
(Remember to get evidence for each question whenever possible!)
How does the performance data of [the process you’re auditing] indicate
that the risks mentioned in the first question are effectively controlled?
Explain how it does.
Are inspections and reviews proceeding as planned? Are you using the
originally chosen performance criteria, or has the situation required a
different approach?
Improvement Plan
(ISO 9001:2008 Sections 4.1(f), 5.4.2(b), 7.1(d), 7.2.3, 8.5.1)
What evidence is available of action(s) for improvement or revision of the
original plan?
Did top management review any of these revisions before they were
implemented? Did they consider (discuss or ask about) operational
issues in relation to other processes in the system? Are there records of
the decision to revise the process?
Process Driven Comprehensive Audit 89
List and describe any preventive actions to investigate during the audit.
General:
Observations:
Findings: