Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS EMMANUEL M. BUSTARDE
- DETAIL SECTION OF R.C. RAMP
REGIONAL OFFICE I CONSTRUCTION OF MODIFIED STANDARD - WALL TO TIE BEAMS CONN. DETAIL ARCHITECT I (COS)
PANGASINAN 2ND TWO (2) STOREY, FOUR (4) - DETAIL OF WF-1
PREPARED:
S 20
CLASSROOM SCHOOL BUILDING - DETAIL SECTION OF STAIR ON FILL SHEBA M. ESTRADA FERNANDO F. BUGARIN ERICSON A. PAZ EDITA L. MANUEL
DISTRICT ENGINEERING OFFICE AT PASIBE WEST ELEMENTARY SCHOOL - DETAIL PLAN OF STF-1
ASSISTANT CHIEF / ENGINEER III OIC-CHIEF, PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 04 11 40
- TYPICAL DETAIL OF FOOTINGS
ALVEAR STREET, LINGAYEN, PANGASINAN URBIZTONDO, PANGASINAN - SCHEDULE OF FOOTINGS
ERNESTO M. FLOR PLANNING AND DESIGN SECTION DATE: DATE: DATE:
- SCHEDULE OF FOOTING TIE BEAMS ENGINEER II DATE:

You might also like