Professional Documents
Culture Documents
Analisis Ekonomi Teknik
Analisis Ekonomi Teknik
Analisis Ekonomi Teknik
Jan-18 67.65
Feb-18 65.55
Mar-18 64.53
Apr-18 64.97
May-18 65.9
Jun-18 59.9
Jul-18 64.21
Aug-18 66.02
Sep-18 71.82
Oct-18 93.99
Nov-18 94.8
Dec-18 94.04
HBA yang digunakan 94.04
RATA-RATA 73
Keterangan
Data Input
HBA (US $/TON)
No.
1
2
3
4
5
6
7
8
No
1
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
No
1
2
3
4
5
6
7
8
9
10
11
12
13
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
17
18
19
20
23
24
25
26
No
1
2
3
4
5
6
No
1
2
3
4
5
No
1
2
3
4
5
No
1
2
3
4
5
No
1
No
1
2
3
4
5
6
7
8
9
No
1
2
3
No
1
2
3
4
5
TOTAL
ASUMSI NILAI
Item
1 USD
Harga 1 liter solar industri HSD
Harga 1 liter oli mesin & transmisi
Jumlah Jam Kerja Efektif
Jumlah Jam Kerja Per Shift
Harga Batubara
Luas IUP
Luas Area Kantor, Workshop, Gudang
Harga Alat
Mobil Operasional
Bus Karyawan
Compactor
Motor Grader
Excavator OB
Excavator BB
Dump Truck BB
Dump Truck OB
Sump Pump
Dozer Pit
Dozer Disposal
Dewatering Pompa Pontoon
Diesel Genset
Tower Lamp
Water Truck
Pipe HDPE
Fuel Truck
Fuel Consumption
Mobil Operasional
Bus Karyawan
Diesel Genset
Compactor
Motor Grader
Excavator BB
Excavator OB
Dump Truck BB
Dump Truck OB
Sump Pump
Dozer Pit
Dozer Disposal
Tower Lamp
Water Truck
Fuel Truck
Oil Consumption
Mobil Operasional
Bus Karyawan
Diesel Genset
Compactor
Motor Grader
Excavator OB
Excavator BB
Dump Truck BB
Dump Truck OB
Sump Pump
Dozer Pit
Dozer Disposal
Tower Lamp
Water Truck
Fuel Truck
Salary
Basic salary Project Manager
Basic salary Kepala Teknik Tambang
Basic Salary Manager
Basic salary Sekretaris
Basic salary Superintendent
Basic salary Supervisor
Basic salary Foreman
Basic salary mekanik
Basic salary surveyor
Basic salary helper
Basic salary security
Basic salary office boy / girl
Basic Salary Staf, etc
Target Produksi Dan Jarak
Target Over Burden
Target Over Burden Sequence 1
Target Over Burden Sequence 2
Target Over Burden Sequence 3
Target Over Burden Sequence 4
Jarak Overburden Sequence 1 (KE DISPOSAL)
Jarak Overburden Sequence 2 (KEDISPOSAL)
Jarak Overburden Sequence 3 (INPIT DUMP)
Jarak Overburden Sequence 4 (INPIT DUMP)
Target Coal (LOM)
Target Coal Sequence 1
Target Coal Sequence 2
Target Coal Sequence 3
Target Coal Sequence 4
Jarak Mine to CPP + Port (Sequence 1)
Jarak Mine to CPP + Port (Sequence 2)
Jarak Mine to CPP + Port (Sequence 3)
Jarak Mine to CPP + Port (Sequence 4)
Jarak Pit to Settling Pond sequence 1
Jarak Pit to Settling Pond sequence 2
Jarak Pit to Settling Pond sequence 3
Jarak Pit to Settling Pond sequence 4
Harga Pembelian Peralatan
Computer System
Engineering Software
Survey Equipment
Office Equipment
HT
Safety Equipment & Consumable
Biaya Tidak Langsung
Biaya Lingkungan, K3 dan Comdev
Iuran Tetap (KP Eksploitasi)
Iuran Pembangunan Daerah (US $ 0.5/ton)
PBB
Biaya Administrasi dan Lain-lain
ESTIMASI BIAYA PRA PENAMBANGAN
Biaya Perijinan
Biaya Kegiatan Eksplorasi
Biaya Studi AMDAL
Biaya Studi Kelayakan
Biaya Pembebasan Lahan ( Lokasi Tambang, Jalan, Stockpile, dll) 385,79 ha x Rp 10.000.000
BIAYA PEMBANGUNAN FASILITAS DAN INFRASTRUKTUR
Pembangunan Kantor
Fasilitas dan perlengkapan kantor
Pembangunan Workshop
Stasiun Bahan Bakar
Pembangunan Port + Coal Crushing Plant
PENGOLAHAN BATUBARA
Biaya Pengolahan Batubara
KEGIATAN PENUTUPAN TAMBANG
Pengelolaan lubang bukaan bekas tambang (void)
Reklamasi
Pembongkaran bekas fasilitas pengolahan
Pembongkaran bekas kolam pengendapan
Remidiasi tanah yang terkontaminasi minyak
Pembongkaran bekas jalan tambang
Pembongkaran bekas stockpile
Pembongkaran peralatan, mesin, dan tangki BBM
Pemantauan
SURVEY EQUIPMENT
Total Station
prisma
kompas
SAFETY EQUIPMENT
Safety Helm
Rompi
Safety Shoes
Masker
Safety Glasses
TOTAL
ASUMSI NILAI
40,000,000.00 Rp/Bulan
35,000,000.00 Rp/Bulan
25,000,000.00 Rp/Bulan
15,000,000.00 Rp/Bulan
10,000,000.00 Rp/Bulan
10,000,000.00 Rp/Bulan
7,000,000.00 Rp/Bulan
5,000,000.00 Rp/Bulan
5,000,000.00 Rp/Bulan
2,500,000.00 Rp/Bulan
3,000,000.00 Rp/Bulan
2,000,000.00 Rp/Bulan
4,000,000.00 Rp/Bulan
22,449,120 BCM
7,125,239 BCM
4,476,535 BCM
4,718,788 BCM
3,703,336 BCM
2,703 M
2,703 M
2,703 M
2,703 M
2,228,849 MT
708,947 MT
489,626 MT
519,460 MT
510,817 MT
30,000 m
30,000 m
30,000 m
30,000 m
100 m
137 m
175 m
212 m
4,100,000 Rp
3,500,000 Rp
140,000,000 Rp
12,000,000 Rp
600,000 Rp
39,700,000 Rp
0.55 US $/MT
0.11 US $ / Ha / tahun
0.50 US $/MT
0.10 US $ / Ha / tahun
1,000,000.00 Rp /tahun
150,000,000 Rp
200,000,000 Rp
500,000,000 Rp
400,000,000 Rp
Rp
1,000,000,000 Rp
150,000,000 Rp
2,000,000,000 Rp
300,000,000 Rp
5,000,000,000 Rp
30,000 Rp/MT
1,176,000,000 Rp
10,000,000,000 Rp
200,000,000 Rp
50,000,000 Rp
200,000,000 Rp
100,000,000 Rp
200,000,000 Rp
50,000,000 Rp
200,000,000 Rp
Sokkia 100,000,000 Rp
Sokkia 3,000,000 Rp
Brunton 4,000,000 Rp
100000000 Rp / Tahun
100000000 Rp / Tahun
100000000 Rp / Tahun
50000000 Rp / Tahun
100000000 Rp / Tahun
Satuan
USD/Ton
TABEL
ESTIMASI HARGA ALAT
JUMLAH UNIT
NO ACTIVITIES HARGA (Rp) Total harga (Rp)
DI BELI
1 Computer System 20 4,100,000 82,000,000.00
2 Water Truck 1 606,609,000.00 606,609,000.00
3 Survey Equipment 2 107,000,000 214,000,000.00
4 Office Equipment 1 12,000,000 12,000,000.00
5 Handy Talky 60 600,000 36,000,000.00
6 Mobil Operasional 15 345,000,000 5,175,000,000.00
7 Bus Karyawan 4 252,000,000 1,008,000,000.00
8 Compactor 1 310,000,000 310,000,000.00
9 Motor Grader 1 525,000,000 525,000,000.00
10 Excavator OB 1 1,200,000,000 1,200,000,000.00
11 Excavator BB 2 530,467,893 1,060,935,786.00
12 Dump Truck OB 4 606,690,000 2,426,760,000.00
13 Dump Truck BB 8 693,000,000 5,544,000,000.00
14 Sump Pump 1 310,000,000 310,000,000.00
15 Dozer Pit 1 250,000,000 250,000,000.00
16 Dozer Disposal 1 350,000,000 350,000,000.00
17 Dewatering Pompa Pontoon 1 300,000,000 300,000,000.00
18 Diesel Genset 1 96,427,000 96,427,000.00
19 Tower Lamp 4 81,285,000 325,140,000.00
20 Pipe HDPE 453 1,977,000 895,581,000.00
21 Fuel Truck 1 525,000,000 525,000,000.00
Total 7,107,155,893 21,252,452,786.00
Keterangan
Input
ESTIMASI PEMAKAIAN BBM DAN OLI
Konsumsi
Bahan Bakar
NO NAMA ALAT Activity
Liter/ Jam
Keterangan :
Data Input
LAMA PEMAKAIAN Biaya BBM Rupiah / Biaya Oli Rupiah /
Konsumsi Oli Jumlah Alat
(Jam) Tahun Tahun
Rp 654,024,685,600
Rp 2,836,834,000
Rp 656,861,519,600
LAMA PEMAKAIAN Jumlah Alat Biaya BBM Rupiah / Biaya Oli Rupiah / LAMA PEMAKAIAN
(Jam) Tahun Tahun (Jam)
Tahun -4 Tahun -4
8,610,000,000 95,550,000
3,444,000,000 19,110,000
2,870,000,000 8,190,000
2,296,000,000 8,190,000
13,776,000,000 32,760,000
9,184,000,000 16,380,000
46,494,000,000 245,700,000
66,010,000,000 209,300,000
3,062,864,000 18,200,000
1,033,200,000 8,190,000
849,520,000 8,190,000
265,188,000 2,730,000
459,200,000 7,280,000
803,600,000 6,370,000
918,400,000 8,190,000
160,075,972,000 694,330,000
SUPPORTING & GENERAL
PRESENTASE BIAYA
LAMA PEMAKAIAN REPAIR DAN
NO NAMA ALAT JUMLAH ALAT (JAM) MAINTENANCE
(10%)
LAMA PEMAKAIAN = WAKTU EFEKTIF ALAT BEKERJA DALAM SATUAN JAM SETIAP 1 TAHUN
BIAYA REPAIR &
MAINTENANCE (Rupiah)
517,500,000
75,600,000
31,000,000
52,500,000
120,000,000
212,187,157
242,676,000
554,400,000
62,000,000
25,000,000
35,000,000
30,000,000
9,642,700
8,128,500
60,660,900
2,036,295,257
ESTIMASI BIAYA PRA PENAMBANGAN
NO URAIAN
1 Biaya Perijinan
2 Biaya Kegiatan Eksplorasi
3 Biaya Studi AMDAL
4 Biaya Studi Kelayakan
5 Biaya Jaminan Reklamasi (60.000.000/Ha)
TOTAL
NO URAIAN
1 Pembangunan Kantor, Pos Security, Laboratorium dan Mess
2 Fasilitas dan perlengkapan kantor
3 Pembangunan Workshop
4 Pembangunan Stasiun Bahan Bakar
5 Port dan Fasilitas Pengolahan Batubara
6 Pembangunan Jalan ( 25km)
TOTAL
Keterangan
BIAYA (Rp) Satuan Unit AMORTISASI (Rp)
150,000,000 1 Unit 150,000,000
500,000,000 1 Unit 500,000,000
500,000,000 1 Unit 500,000,000
400,000,000 1 Unit 400,000,000
60,000,000 385.79 Hektar 23,147,400,000
1,610,000,000 24,697,400,000
FRASTRUKTUR
58,147,400,000
Input
Rincian Karyawan
Jumlah
No Karyawan Divisi
(Orang)
1 Direktur 1 -
2 Manager Proyek 1 -
3 Manager General 1 -
4 Manager Keuangan 1 -
5 Sekretaris General 1 -
6 Sekretaris Keuangan 1 -
7 Manajer Tambang (KTT) 1 -
8 Kabag. Engineering 1 Engineering
9 Spv. Mine Plan 2 Engineering
10 Helper Survey 4 Engineering
11 Spv. Pit Control 1 Engineering
12 Spv. Survey 1 Engineering
13 Spv. Cost Control 1 Engineering
14 Kabag. HR & GA 1 HR & GA
15 Spv. Finance & Administration 1 HR & GA
16 Spv. HR 1 HR & GA
17 Spv. Marketting 1 HR & GA
18 Administration 2 HR & GA
19 Security 3 HR & GA
20 Kabag. HSE & Comdev 1 HSE & Comdev
21 Spv. Comdev 1 HSE & Comdev
22 Safety Officer 2 HSE & Comdev
23 Spv. HSE 1 HSE & Comdev
24 Staff HSE 3 HSE & Comdev
25 Kabag. Mine Production 1 Mine Production
26 Spv. Mine Production 2 Mine Production
27 Foreman Operasi Produksi 4 Mine Production
28 Adm. Produksi 2 Mine Production
29 Checker 4 Mine Production
30 Kabag. Repair & Maintenance 1 Repair & Maintenance
31 Mekanik 4 Repair & Maintenance
32 Helper Mekanik 4 Repair & Maintenance
33 Electric 2 Repair & Maintenance
34 Foreman Maintenance 2 Repair & Maintenance
35 Operator 20 Mine Operation
80
NO DESCRIPTION TOTAL
I Manager Proyek 1
Manager General 1
Manager Keuangan 1
Sekretaris General 1
Sekretaris Keuangan 1
Manajer Tambang (KTT) 1
SUB TOTAL I 6
II ENGINEERING
Kabag. Engineering 1
Spv. Mine Plan 2
Helper Survey 4
Spv. Pit Control 1
Spv. Survey 1
Spv. Cost Control 1
SUB TOTAL II 10
III HR & GA
Kabag. HR & GA 1
Spv. Finance & Administration 1
Spv. HR 1
Spv. Marketting 1
Staf Administration 2
Security 3
SUB TOTAL III 9
V Mine Production
Kabag. Mine Production 1
Spv. Mine Production 2
Foreman Operasi Produksi 4
Adm. Produksi 2
Checker 4
SUB TOTAL V 13
BPJS
Ketenagakerjaan Biaya
(1,74% dari Gaji Asuransi Konsumsi Rp
Pokok) (Rp/Bulan)
(Rp/Bulan)
Rp
674,352,000.00
428,220,000.00
428,220,000.00
264,132,000.00
264,132,000.00
592,308,000.00
2,651,364,000
182,088,000.00
332,352,000.00
215,352,000.00
182,088,000.00
182,088,000.00
182,088,000.00
1,276,056,000
346,176,000.00
182,088,000.00
182,088,000.00
182,088,000.00
184,176,000.00
183,837,600.00
1,260,453,600
346,176,000.00
182,088,000.00
184,176,000.00
182,088,000.00
270,396,000.00
1,164,924,000
346,176,000.00
332,352,000.00
473,385,600.00
184,176,000.00
301,363,200.00
1,637,452,800
346,176,000.00
318,470,400
136,196,000
158,817,600
184,787,200
1,144,447,200
360,916,641.36
9,495,614,241
DEPRESIASI PERALATAN
Jumlah Tahun Depresiasi Alat = 4 Tahun
Keterangan
Input
TABEL
DEPRESIASI PERALATAN PERTAHUN & NILAI SISA PERALATAN
Tahun Tahun
URAIAN
1 2
Produksi (MT) 708,947 489,626
Pendapatan (Rupiah) 729,506,334,375 503,824,639,500
Tahun Tahun
3 4
519,460 510,817
534,524,185,650 525,630,821,625
BIAYA PRODUKSI OVERBURDEN & BATUBARA
NO URAIAN TAHUN - 1
A Overburden Activity
I Overburden Removal 81,884,224,000
Sub Total 81,884,224,000
B Coal Activity
II Coal Hauling 65,738,328,000
II Coal Processing (Pengolahan Batubara) 21,268,406,250
SEQUENCE 1 SEQUENCE 2
NO URAIAN
TAHUN 1 TAHUN 2
1 Mobil Operasional 9,451,740,000 8,705,550,000
2 Bus Karyawan 3,759,948,000 3,463,110,000
3 Compactor 3,124,892,000 2,878,190,000
4 Motor Grader 2,501,692,000 2,304,190,000
5 Sump Pump 3,345,155,200 3,081,064,000
6 Dozer Pit 1,130,652,000 1,041,390,000
7 Dozer Disposal 931,228,000 857,710,000
8 Diesel Genset 290,882,400 267,918,000
9 Tower Lamp 506,464,000 466,480,000
10 Fuel Truck 879,396,000 809,970,000
11 Water Truck 1,006,012,000 926,590,000
TOTAL (Rupiah) 26,928,061,600 24,802,162,000
SEQUENCE 3 SEQUENCE 4
TAHUN 3 TAHUN 4
8,705,550,000 8,705,550,000
3,463,110,000 3,463,110,000
2,878,190,000 2,878,190,000
2,304,190,000 2,304,190,000
3,081,064,000 3,081,064,000
1,041,390,000 1,041,390,000
857,710,000 857,710,000
267,918,000 267,918,000
466,480,000 466,480,000
809,970,000 809,970,000
926,590,000 926,590,000
24,802,162,000 24,802,162,000
ESTIMASI KEBUTUHAN INVESTASI
No.
I.
-
-
-
-
-
Biaya Produksi
-
-
-
-
-
-
Uraian
MODAL TETAP
Biaya Pra penambangan
Biaya Perijinan IUP
Biaya Kegiatan Eksplorasi
Biaya Studi AMDAL
Biaya Studi Kelayakan
Biaya Jaminan Reklamasi 60,000,000/Ha x 385,79
Computer System
Water Truck
Survey Equipment
Office Equipment
Handy Talky
Mobil Operasional
Bus Karyawan
Compactor
Motor Grader
Excavator OB
Excavator BB
Dump Truck OB
Dump Truck BB
Sump Pump
Dozer Pit
Dozer Disposal
Dewatering Pompa Pontoon
Diesel Genset
Tower Lamp
Pipe HDPE
Fuel Truck
Biaya Pembangunan Fasilitas & Infrastruktur
Pembangunan Kantor, Pos Security, Laboratorium dan Mess
Fasilitas dan perlengkapan kantor
Pembangunan Workshop
Pembangunan Stasiun Bahan Bakar
Port dan Fasilitas Pengolahan Batubara
Pembangunan Jalan 30
Biaya Produksi
Biaya Awal Produksi OB
Biaya Awal Produksi BB
Biaya Awal Coal Processing
Biaya Awal Supporting & General
Upah Karyawan
Biaya Tidak Langsung ( Iuran, Royalty, dll)
Total Modal Tetap
150,000,000
500,000,000
500,000,000
400,000,000
23,147,400,000
24,697,400,000
82,000,000
606,609,000
214,000,000
12,000,000
36,000,000
5,175,000,000
1,008,000,000
310,000,000
525,000,000
1,200,000,000
1,060,935,786
2,426,760,000
5,544,000,000
310,000,000
250,000,000
350,000,000
300,000,000
96,427,000
325,140,000
895,581,000
525,000,000
1,000,000,000
150,000,000
2,000,000,000
300,000,000
5,000,000,000
25,000,000,000
81,884,224,000
65,738,328,000
21,268,406,250
26,928,061,600
9,495,614,241
37,501,164,649
346,913,051,526
138,765,220,610
138,765,220,610
208,147,830,915.67
8,846,282,814
355,759,334,340
Bunga Pinjaman Bank 10%/tahun
URAIAN BIAYA $
Biaya Lingkungan dan Masyarakat
Biaya Lingkungan, K3 dan Comdev Tahun ke-1 900
Biaya Lingkungan, K3 dan Comdev Tahun ke-2 900
Biaya Lingkungan, K3 dan Comdev Tahun ke-3 900
Biaya Lingkungan, K3 dan Comdev Tahun ke-4 900
Iuran dan Royalti
Iuran Tetap (KP Eksploitasi) 4.00
PBB 0.50
Biaya Administrasi dan Lain-lain 1,000,000,000.00
Royalty Tahun ke 1(5% dari Penjualan) 5.00
Royalty Tahun ke 2(5% dari Penjualan) 5.00
Royalty Tahun ke 3(5% dari Penjualan) 5.00
Royalty Tahun ke 4(5% dari Penjualan) 5.00
TOTAL
A TIDAK LANGSUNG
Rp/MT 1 43,405
Rp/MT 1 29,977
Rp/MT 1 31,804
Rp/MT 1 31,275
US $ / Ha / TAHUN 1 22,684,452
US $ / Ha / TAHUN 1 3,163,478
Rp/TAHUN 1 1,000,000,000.00
% 1 36,475,316,719
% 1 25,191,231,975
% 1 26,726,209,283
% 1 26,281,541,081
IDR 115,700,283,447.67
URAIAN
- Produksi Overburden (BCM)
- Produksi Batubara (MT)
- SR
Biaya Produksi Overburden
Biaya Produksi Batubara
Total Biaya Produksi
Biaya Supporting & General
Upah Karyawan
Amortisasi
Pembangunan Infrastruktur
Depresiasi Peralatan
Repair and Maintenance
Safety Equipment
Nilai Sisa Peralatan
Biaya Tidak Langsung (Iuran, Royalty,dll)
Cicilan Pinjaman Bank
Biaya Reklamasi
Modal Pinjaman Bank
Modal Sendiri
Rp700,000,000,000
Rp600,000,000,000
Rp500,000,000,000
Rp400,000,000,000
Rp300,000,000,000
Rp200,000,000,000
Rp100,000,000,000
Rp-
Rp400,000,000,000
Rp300,000,000,000
Rp200,000,000,000
Rp100,000,000,000
Rp-
Rp(100,000,000,000)
Unit TAHUN 0 TAHUN 1
BCM 7,125,239
MT 708,947
Rp/BCM Rp 11,492
Rp/MT Rp 122,727
Rp Rp 134,219
Rp Rp 26,928,061,600
Rp Rp 9,495,614,241
Rp Rp 24,697,400,000 Rp -
Rp Rp 33,450,000,000
Rp Rp 3,881,929,238
Rp Rp 2,036,295,257
Rp Rp 450,000,000
Rp
Rp Rp 37,501,208,054
Rp Rp 72,851,740,820
Rp
Rp 208,147,830,916
Rp 138,765,220,610
Rp/MT Rp 1,029,000
Rp Rp 729,506,334,375
Rp Rp (346,913,051,526) 494,477,261,164.75
Rp Rp 148,343,178,349
Rp Rp (346,913,051,526) Rp 346,134,082,815
Rp Rp (346,913,051,526) Rp (778,968,711)
Rp 1
708,947
Tahun
MT
Chart Title
Rp700,000,000,000
Rp600,000,000,000
Rp500,000,000,000
Rp400,000,000,000
Rp300,000,000,000
Rp200,000,000,000
Rp100,000,000,000
Rp-
Rp400,000,000,000
Rp300,000,000,000
Rp200,000,000,000
Rp100,000,000,000
Rp-
Rp(100,000,000,000)
Row 29
TAHUN 2 TAHUN 3 TAHUN 4
4,476,535 4,718,788 3,703,336
489,626 519,460 510,817
Chart Title
2,500,000
2,000,000
1,500,000
1,000,000
500,000
1,500,000
1,000,000
500,000
-
Row 31