NEW SOR

UP-2426
GOVERNMENT OF UTTAR PRADESH

RURAL ENGINEERING SERVICE

DISTRICT :- FARRUKHABAD

YEAR : 2005-06 (PHASE-V)

CONSTRUCTION
NAME OF WORK
OF RURAL
: ROADS UNDER
BHARAT NIRMAN YOJANA

TOTAL LENGTH OF ROAD UNDER CONNECTIVITY – 11.73 Km.

REVISED ESTIMATED COST – RS. LACS


Details of Sanction

Name of District - Farrukhabad


Package No. UP2426
Included Sanctioned as per S.T.A. Administrative Sanction As per Estimate Reason for
Sl. No. Name of Road in Core Length in C.D. No. C.D. Pavement Total Cost Length in C.D. No. C.D. Pavement Total Cost Length in C.D. No. C.D. Pavement Total Cost Maint. Total difference.
Network K.m. and Size Cost Cost in Lakhs K.m. and Size Cost Cost in Lakh K.m. and Size Cost Cost in Lakh Cost Cost

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

3 No. 3 No.
Hisampur To 3 No.
1 yes 2.10 2.10 1000m 2.10 1000m 2.97 50.48 53.45 3.09 56.54
Jhijhuki L/R 1000mm.
m. m.

FKD.
Neewalpur 3 No. 3 No. 3 No.
Ugarpur Rd. 1000mm. 1000m 1000m
H.P. 2 m. H.P. m. H.P.
To Katri
2 yes 3.33 No. 3.33 2 No. 3.33 2 No. 23.81 98.37 122.18 4.90 127.08
Gangpur via 2x1000m 2x1000 2x1000
Katri m, 1 No. mm, 1 mm, 1
Dharampur Gul
No. Gul No. Gul
L/R

Total 5.43 11 5.43 11 5.43 11 26.78 148.85 175.63 7.99 183.62

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Reason for
WORLD BANK FUNDED PROJECT (2005-06)
SUMMARY SHEET FORMAT F-1
DISTRICT-FARRUKHABAD
Package No.UP2426

Type of work No. of Total Length No. of New Estimated Cost No. of New Villages Connected
Roads of Road (KM) CD Structure Pavement CD Total Maintenance Total No. of Total SC/ST
5+6 7+8 Villages Villages
1 2 3 4 5 6 7 8 9 10 11
NEW 4 5.43 11 148.85 26.78 175.63 7.99 183.62 4
-
CONSTRUCTION

J.E. A.E. E.E. S.E.


A Proforma - A
WORLD BANK FUNDED PROJECT (2005-06)
DISTRICT WISE SUMMARY OF THE PROPOSALS - 2005-2006

Sl. District Package No. Package wise details


No. No. of Habitations Covered Length Km Value Rs (Lakh) AV Cost/Km Rs. (Lakh)
1 Farrukhabad UP-2426 4 5.43 175.63 32.34
Total 4 5.43 175.63 32.34

Signature:
Name: Secretary
State:

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Proforma - A
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)(T.S.)
DISTRICT WISE SUMMARY OF THE PROPOSALS - 2005-2006

Sl. Package wise details


No. No. of Value Rs (Lakh) AV Cost/Km Rs. (Lakh)
Habitations Length Km
District Package No. Covered const. maint. Total const.
1 Farrukhabad UP-2422 6 6.46 178.75 9.50 188.25 27.67
2 UP-2423 4 7.52 206.46 11.06 217.52 27.45
3 UP-2424 4 5.40 160.63 7.94 168.57 29.75
4 UP-2425 5 7.47 227.16 10.99 238.15 30.41
5 UP-2426 2 5.43 167.09 7.99 175.08 30.77
Total 21 32.28 940.09 47.48 987.57 29.12

Signature:
Name: Secretary
State:

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
AV Cost/Km Rs. (Lakh)

maint.
1.47
1.47
1.47
1.47
1.47
1.47

P.I.U. Farrukhabad
COST OF ESTIMATE
WORLD BANK FUNDED PROJECT (2005-06)

Sl. Package Name of Road Cost as per S.T.A. Cost as per Estimate Technical Sanction
No. No. Cost of Cost of Total Cost of Cost of Total Maintenance Total Cost
Pavement Culvert/CD Cost Pavement Culvert/CD Cost (Package + Maintainence)

1 2426 Hisampur To Jhijhuki L/R 50.48 2.97 53.45 3.09 56.54

FKD. Neewalpur Ugarpur


2 2426 Rd. To Katri Gangpur via 98.37 23.81 122.18 4.90 127.08
Katri Dharampur L/R
TOTAL 148.85 26.78 175.63 7.99 183.62

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Proforma-B
WORLD BANK FUNDED PROJECT (2005-06)
Package Summary

Package Number : UP-2426 State : U.P. District: Farrukhabad

Sl. Name of the Name of the Road Type of Proposed Cost of No. of CD Cost of Total estimated Average Cost
No. Block Proposal Length Pavement Works CD Works Cost(Lacs) per Km(Lacs)
const. maint. const. maint.
From To *N/U Km Rs. Nos. Rs. Rs. Rs. Rs. Rs.

1 Kamalganj Hisampur Jhijhuki N 2.10 50.48 3 2.70 53.18 3.09 25.32 12.06

FKD. Neewalpur Katri Gangpur via


2 Barhpur Ugarpur Rd. Katri Dharampur N 3.33 90.10 8 23.81 113.91 4.90 34.21 10.27

Total Estimated Cost of the Package : Rs. 5.43 140.58 11 26.51 167.09 7.99 59.53 10.96

* N-New Connectivity U-Up gradation

Prepared By : Signature : Technical Security Signature :


Name : done by : Name :
Designation :

Checked By : Signature : Coordinator : Signature :


Name : STA Name :

Scrutinized By : Signature :
Name :
Designation :
WORLD BANK FUNDED PROJECT (2005-06)
District-Farrukhabad
(Cost of Package and Maintenance)
Package No : 2426
Sl. Name of Road Total Estimated Cost Maintenance Cost Maintenace Total cost
No. Length Pavement+CD Ist year IInd year III year IV year V year Total Cost cost of of package with
Structure per Km. per Km per Km per Km per Km per Km Road maintenance
Rs.13633/- Rs.19030/- Rs.30927/- Rs.38840/- Rs.44705/- Rs.147135/- Lac Lac

2 Hisampur To Jhijhuki L/R 2.10 53.18 28629 39963 64947 81564 93881 308984 3.09 56.27

FKD. Neewalpur Ugarpur


3 Rd. To Katri Gangpur via 3.33 113.91 45398 63370 102987 129337 148868 489960 4.90 118.81
Katri Dharampur L/R

5.43 167.09 74027.19 103332.90 167933.61 210901.20 242748.15 798943.05 7.99 175.08

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
WORLD BANK FUNDED PROJECT (2005-06)
Check List for P.I.U. and S.T.A. Proforma- C
(For Individual Road Works)

To be filled by PIU

1 Location :State : UP District : Farrukhabad Block :Mohammadabad


2 Package No. : UP-2426
3 Name of the Road From :B.E. Mohammadabad Achra Taqipur Rd. To :Nagla Moti
4 Length (Km) : Total : Km 2.40 In Built up area : 0.00 Km In Open Area : 2.40 Km
5 Estimated Cost Rs. : #REF! Lakhs Cost Per Km Rs. #REF! Lakhs
6 Type of Proposal
If the proposed road is the new connectivity Yes
Is the road a part of core network Yes
Name of the unconnected Habitation (s) (to be crosschecked with CN-6) Nagla Moti
Population sub served by the proposed road 588
Does the Proposed Road lead up to the habitation for which it is supposed
to provide connectivity (In other words are you sure that the road is not
being made partially? Yes
Does the Proposed Road connect the unconnected habitation to (b)
(a) Another Habitation heaving All-weather road No
(b) Directly to an All weathered road. Yes
If (b), indicate the nature of road to which the proposed road leads. VR
If the proposal is for up gradation No
Is the road a part of core network Yes
Is it Certified that there are no other Unconnected Habitations in the district. N.A.
Population sub served by the proposed road
(a) Whether the Proposed Road has the desired carriage way width, Roadway Yes
width and Road Land Width (RLW) In the built up area (m) In the open area (m)
(b) Indicate the actual widths of the following for the proposed road.
(a) Carriageway 3.00 3.00
(b) Roadway 3.00 7.50
(c) Road Land Width 3.00 12.10
INDEX MAP (Not to scale) Attached
Nagla Moti
Traffic
Volume
Total
CV LCV/Mini Bus Cars/Vans/Jeeps Three Two Cycle Cycles Bullock Motorized Non-Motorized
Wheelers Wheelers Rickshaw Carts
7 18 10 3 125 14 165 24 165 203

9 Growth Rate adopted (%) : 6.00 Projected Traffic : 14 CVPD Curve : 'A'
10 Sub grade CBR 5.65 %
Chainage (Km) 0 - 2.40
Design CBR (%) 5.65
11 Cost Details A. Clearing and Grubbing #REF!
B. Pavement Components
Description of the layer Thickness (mm)
Earth Work* #REF!
Earth work in shoulder #REF!
Subgrade Preparation (GSB)*1st Layer 85 #REF!
(GSB) 2nd Layer 0 #REF!
WBM-2 75 #REF!
WBM-3 75 #REF!
C. Bituminous Layers
Prime Coat - #REF!
PMC - #REF!
Tack Coat - #REF!
MSS Brick Edging - #REF!
PMC with Seal Coat 20 #REF!
D. CD Work No. of Existing CD Works 2 0.00
Do they require any improvements No
If Yes, cost of improvement Rs.
No. of Proposed CD Works 17 No.
Cost of Proposed CD Works #REF!
E. Protection Work Length. 0.00
F. Side Drains (if provided) Length. 0.00
G. Road Logo, other Road Furniture, Misc. #REF!
H. Five Year Routine Maint. Yr1 0.33
Yr2 0.46
Yr3 0.74
Yr4 0.93
Yr5 1.07
(A+B+C+D+E+F+G+H) G. Total #REF!
Nagla Moti

#REF!
12-Whether the road has Geometrics as per Roads Manual (RRM) Yes
13-Whether CD work/protection works are provided as per RRm Yes
14-Whether the Cost estimates are as per standard data analysis and S.S.R. Yes

Certified that information provided is true.


Prepared By Checked By
J.E. A.E. E.E.

To be filled by S.T.A.

Name of the STA I.E.T, Lucknow


15 If the proposal is for the new connectivity
Have you satisfied yourself the proposed Yes/No
Road is a part of the Core Network
Is the unconnected habitation (s) part of Yes/No
list of unconnected Habitations as per CN-6
Does the Proposal ensure full connectivity Yes/No
16 Are you satisfied with the following
Engineering Surveys Yes/No
Soil/Material Investigation Yes/No
Traffic Surveys/Estimation Yes/No
Hydraulic Studies Yes/No
17 Is the design of the following elements as per Rural Roads Manual :
Alignment & Geometric Yes/No
Pavement Design Yes/No
CD work and protection Measures Yes/No
Side drains Yes/No
Drainage Layer Yes/No
18 Does the Estimation conform to Standard rate analysis and SSR Yes/No
19 Does the proposal have provision for
PMGSY Logo Sign Boards
Km/Hm Stones Yes/No
Guard Stones (where necessary) Yes/No
Traffic Sign Boards (as necessary) Yes/No
20 Specific remarks, if any, by STA

Certified that the Design and Estimation for the Proposed Roads works are based on the data and SSR provided
by Engineers. The Proposal may be cleared.

Tech. Scrutiny done by: Coordinator: S.T.A.

Sign. & Name: Sign. & Name:


WORLD BANK FUNDED PROJECT (2005-06)
Check List for P.I.U. and S.T.A.
(For Individual Road Works)

To be filled by PIU

1 Location :State : UP District : Farrukhabad Block : Kamalganj


2 Package No. : UP-2426
3 Name of the Road From : Hisampur To : Jhijhuki
4 Length (Km) : Total : Km 2.10 In Built up area : 0.0 Km In Open Area : 2.10 Km
5 Estimated Cost Rs. 58.12 Lakhs Cost Per Km Rs. 27.68 Lakhs
6 Type of Proposal
If the proposed road is the new connectivity Yes
Is the road a part of core network Yes
Name of the unconnected Habitation (s) (to be crosschecked with CN-6) Jhijhuki
Population sub served by the proposed road 785
Does the Proposed Road lead up to the habitation for which it is supposed
to provide connectivity (In other words are you sure that the road is not
being made partially? Yes
Does the Proposed Road connect the unconnected habitation to (b)
(a) Another Habitation heaving All-weather road No
(b) Directly to an All weathered road. Yes
If (b), indicate the nature of road to which the proposed road leads. VR
If the proposal is for up gradation No
Is the road a part of core network Yes
Is it Certified that there are no other Unconnected Habitations in the district. N.A.
Population sub served by the proposed road
(a) Whether the Proposed Road has the desired carriage way width, Roadway Yes
width and Road Land Width (RLW) In the built up area (m) In the open area (m)
(b) Indicate the actual widths of the following for the proposed road.
(a) Carriageway 3.00 3.00
(b) Roadway 6.00 7.50
(c) Road Land Width 6.00 12.10
INDEX MAP (Not to scale) Attached
Jhijhuki
Traffic
Volume
Total
CV LCV/Mini Bus Cars/Vans/Jeeps Three Two Cycle Cycles Bullock Motorized Non-Motorized
Wheelers Wheelers Rickshaw Carts
6 18 10 3 125 14 165 24 163 203

9 Growth Rate adopted (%) : 6.00 Projected Traffic : 14 CVPD Curve : 'A'
10 Sub grade CBR 4.53 %
Chainage (Km) 0 - 2.10
Design CBR (%) 4.53
11 Cost Details A. Clearing and Grubbing Cost in Rs. 0.15
B. Pavement Components
Description of the layer Thickness (mm) Cost : (Rs Lacs)
Earth Work* 10.40
Earth work in shoulder 1.56
Subgrade Preparation (GSB)*1st Layer 70 6.85
(GSB) 2nd Layer 50 4.06
WBM-2 75 6.44
WBM-3 75 7.37
C. Bituminous Layers
Prime Coat - 1.20
PMC - 4.71
Tack Coat - 0.43
MSS Brick Edging - 2.69
PMC with Seal Coat 20 1.12
D. CD Work No. of Existing CD Works 2
Do they require any improvements No
If Yes, cost of improvement Rs.
No. of Proposed CD Works 3 No.
Cost of Proposed CD Works 2.97
E. Protection Work Length. Cost : 0.00
F. Side Drains (if provided) Length. Cost : 0.00
G. Road Logo, other Road Furniture, Misc. Cost : 8.17
H. Five Year Routine Maint. Yr1 0.28
Yr2 0.40
Yr3 0.65
Yr4 0.82
Yr5 0.94
(A+B+C+D+E+F+G+H) G. Total 61.21
Jhijhuki

58.12
12-Whether the road has Geometrics as per Roads Manual (RRM) Yes
13-Whether CD work/protection works are provided as per RRm Yes
14-Whether the Cost estimates are as per standard data analysis and S.S.R. Yes

Certified that information provided is true.


Prepared By Checked By
J.E. A.E. E.E.

To be filled by S.T.A.

Name of the STA I.E.T, Lucknow


15 If the proposal is for the new connectivity
Have you satisfied yourself the proposed Yes/No
Road is a part of the Core Network
Is the unconnected habitation (s) part of Yes/No
list of unconnected Habitations as per CN-6
Does the Proposal ensure full connectivity Yes/No
16 Are you satisfied with the following
Engineering Surveys Yes/No
Soil/Material Investigation Yes/No
Traffic Surveys/Estimation Yes/No
Hydraulic Studies Yes/No
17 Is the design of the following elements as per Rural Roads Manual :
Alignment & Geometric Yes/No
Pavement Design Yes/No
CD work and protection Measures Yes/No
Side drains Yes/No
Drainage Layer Yes/No
18 Does the Estimation conform to Standard rate analysis and SSR Yes/No
19 Does the proposal have provision for
PMGSY Logo Sign Boards
Km/Hm Stones Yes/No
Guard Stones (where necessary) Yes/No
Traffic Sign Boards (as necessary) Yes/No
20 Specific remarks, if any, by STA

Certified that the Design and Estimation for the Proposed Roads works are based on the data and SSR provided
by Engineers. The Proposal may be cleared.

Tech. Scrutiny done by: Coordinator: S.T.A.


Sign. & Name: Sign. & Name:
WORLD BANK FUNDED PROJECT (2005-06) Proforma :C
Check List for P.I.U. and S.T.A.
(For Individual Road Works)

To be filled by PIU

1 Location :State : UP District : Farrukhabad Block : Barhpur


2 Package No. : UP-2426
3 Name of the Road From : FKD. Neewalpur Ugarpur Rd. To :Katri Gangpur via Katri Dharampur
4 Length (Km) : Total : Km 3.33 In Built up area : 0.00 Km In Open Area : 3.33 Km
5 Estimated Cost Rs. : 122.18 Lakhs Cost Per Km Rs. 36.69 Lakhs
6 Type of Proposal
If the proposed road is the new connectivity Yes
Is the road a part of core network Yes
Name of the unconnected Habitation (s) (to be crosschecked with CN-6) Katri Gangpur
Population sub served by the proposed road 642
Does the Proposed Road lead up to the habitation for which it is supposed
to provide connectivity (In other words are you sure that the road is not
being made partially? Yes
Does the Proposed Road connect the unconnected habitation to (b)
(a) Another Habitation heaving All-weather road No
(b) Directly to an All weathered road. Yes
If (b), indicate the nature of road to which the proposed road leads. VR
If the proposal is for up gradation No
Is the road a part of core network Yes
Is it Certified that there are no other Unconnected Habitations in the district. N.A.
Population sub served by the proposed road
(a) Whether the Proposed Road has the desired carriage way width, Roadway Yes
width and Road Land Width (RLW) In the built up area (m) In the open area (m)
(b) Indicate the actual widths of the following for the proposed road.
(a) Carriageway 3.00 3.00
(b) Roadway 3.00 7.50
(c) Road Land Width 3.00 12.10
INDEX MAP (Not to scale) Attached
Katri Gangpur
Traffic
Volume
Total
CV LCV/Mini Bus Cars/Vans/Jeeps Three Two Cycle Cycles Bullock Motorized Non-Motorized
Wheelers Wheelers Rickshaw Carts
7 18 10 3 125 14 165 24 163 203

9 Growth Rate adopted (%) : 6.00 Projected Traffic : 14 CVPD Curve : 'A'
10 Sub grade CBR 2.62 %
Chainage (Km) 0 - 3.33
Design CBR (%) 2.62
11 Cost Details A. Clearing and Grubbing Cost in Rs. 0.24
B. Pavement Components
Description of the layer Thickness (mm) Cost : (Rs Lacs)
Earth Work* 16.73
Earth work in shoulder 1.94
Subgrade Preparation (GSB)*1st Layer 130 18.34
(GSB) 2nd Layer 100 14.10
WBM-2 75 11.13
WBM-3 75 12.78
C. Bituminous Layers
Prime Coat - 2.10
PMC - 8.23
Tack Coat - 0.75
MSS Brick Edging - 4.26
PMC with Seal Coat 20 2.72
D. CD Work No. of Existing CD Works 2
Do they require any improvements No
If Yes, cost of improvement Rs.
No. of Proposed CD Works 8 No.
Cost of Proposed CD Works 23.81
E. Protection Work Length. Cost : 0.00
F. Side Drains (if provided) Length. Cost : 0.00
G. Road Logo, other Road Furniture, Misc. Cost : 5.06
H. Five Year Routine Maint. Yr1 0.45
Yr2 0.63
Yr3 1.04
Yr4 1.29
Yr5 1.49
(A+B+C+D+E+F+G+H) G. Total 127.08
Katri Gangpur

122.18
12-Whether the road has Geometrics as per Roads Manual (RRM) Yes
13-Whether CD work/protection works are provided as per RRm Yes
14-Whether the Cost estimates are as per standard data analysis and S.S.R. Yes

Certified that information provided is true.


Prepared By Checked By
J.E. A.E. E.E.

To be filled by S.T.A.

Name of the STA I.E.T, Lucknow


15 If the proposal is for the new connectivity
Have you satisfied yourself the proposed Yes/No
Road is a part of the Core Network
Is the unconnected habitation (s) part of Yes/No
list of unconnected Habitations as per CN-6
Does the Proposal ensure full connectivity Yes/No
16 Are you satisfied with the following
Engineering Surveys Yes/No
Soil/Material Investigation Yes/No
Traffic Surveys/Estimation Yes/No
Hydraulic Studies Yes/No
17 Is the design of the following elements as per Rural Roads Manual :
Alignment & Geometric Yes/No
Pavement Design Yes/No
CD work and protection Measures Yes/No
Side drains Yes/No
Drainage Layer Yes/No
18 Does the Estimation conform to Standard rate analysis and SSR Yes/No
19 Does the proposal have provision for
PMGSY Logo Sign Boards
Km/Hm Stones Yes/No
Guard Stones (where necessary) Yes/No
Traffic Sign Boards (as necessary) Yes/No
20 Specific remarks, if any, by STA

Certified that the Design and Estimation for the Proposed Roads works are based on the data and SSR provided
by Engineers. The Proposal may be cleared.

Tech. Scrutiny done by: Coordinator: S.T.A.


Sign. & Name: Sign. & Name:
PRADHAN MANTRI GRAM SADAK YOJNA (2005-06) Proforma : C
Check List for P.I.U. and S.T.A.
(For Individual Road Works)

To be filled by PIU

1 Location :State : UP District : Farrukhabad Block : Rajepur


2 Package No. : UP-2426
3 Name of the Road From : B.E. Kadhar Rd. To: Siya
4 Length (Km) : Total : Km 1.35 In Built up area : 0.00Km In Open Area : 1.35 Km
5 Estimated Cost Rs. : #REF! Lakhs Cost Per Km Rs.: #REF! Lakhs
6 Type of Proposal
If the proposed road is the new connectivity Yes
Is the road a part of core network Yes
Name of the unconnected Habitation (s) (to be crosschecked with CN-6) Siya
Population sub served by the proposed road 733
Does the Proposed Road lead up to the habitation for which it is supposed
to provide connectivity (In other words are you sure that the road is not
being made partially? Yes
Does the Proposed Road connect the unconnected habitation to (b)
(a) Another Habitation heaving All-weather road No
(b) Directly to an All weathered road. Yes
If (b), indicate the nature of road to which the proposed road leads. VR
If the proposal is for up gradation No
Is the road a part of core network Yes
Is it Certified that there are no other Unconnected Habitations in the district. N.A.
Population sub served by the proposed road
(a) Whether the Proposed Road has the desired carriage way width, Roadway Yes
width and Road Land Width (RLW) In the built up area (m) In the open area (m)
(b) Indicate the actual widths of the following for the proposed road.
(a) Carriageway 3.00 3.00
(b) Roadway 3.00 7.50
(c) Road Land Width 3.00 12.10
INDEX MAP (Not to scale) Attached
Siya
Traffic
Volume
Total
CV LCV/Mini Bus Cars/Vans/Jeeps Three Two Cycle Cycles Bullock Motorized Non-Motorized
Wheelers Wheelers Rickshaw Carts
7 18 10 3 125 14 165 24 163 203

9 Growth Rate adopted (%) : 6.00 Projected Traffic : 12 CVPD Curve : 'A'
10 Sub grade CBR 4.29 %
Chainage (Km) 0 - 1.35
Design CBR (%) 4.29
11 Cost Details A. Clearing and Grubbing Cost in Rs. #REF!
B. Pavement Components
Description of the layer Thickness (mm) Cost : (Rs Lacs)
Earth Work* #REF!
Earth work in shoulder #REF!
Subgrade Preparation (GSB)*1st Layer 70 #REF!
(GSB) 2nd Layer 50 #REF!
WBM-2 75 #REF!
WBM-3 75 #REF!
C. Bituminous Layers
Prime Coat - #REF!
PMC - #REF!
Tack Coat - #REF!
MSS Brick Edging - #REF!
PMC with Seal Coat 20 #REF!
D. CD Work No. of Existing CD Works 2
Do they require any improvements No
If Yes, cost of improvement Rs.
No. of Proposed CD Works 6 No.
Cost of Proposed CD Works #REF!
E. Protection Work Length. Cost : 0.00
F. Side Drains (if provided) Length. Cost : 0.00
G. Road Logo, other Road Furniture, Misc. Cost : #REF!
H. Five Year Routine Maint. Yr1 0.18
Yr2 0.27
Yr3 0.42
Yr4 0.52
Yr5 0.60
(A+B+C+D+E+F+G+H) G. Total #REF!
Siya

#REF!
12-Whether the road has Geometrics as per Roads Manual (RRM) Yes
13-Whether CD work/protection works are provided as per RRm Yes
14-Whether the Cost estimates are as per standard data analysis and S.S.R. Yes

Certified that information provided is true.


Prepared By Checked By
J.E. A.E. E.E.

To be filled by S.T.A.

Name of the STA I.E.T, Lucknow


15 If the proposal is for the new connectivity
Have you satisfied yourself the proposed Yes/No
Road is a part of the Core Network
Is the unconnected habitation (s) part of Yes/No
list of unconnected Habitations as per CN-6
Does the Proposal ensure full connectivity Yes/No
16 Are you satisfied with the following
Engineering Surveys Yes/No
Soil/Material Investigation Yes/No
Traffic Surveys/Estimation Yes/No
Hydraulic Studies Yes/No
17 Is the design of the following elements as per Rural Roads Manual :
Alignment & Geometric Yes/No
Pavement Design Yes/No
CD work and protection Measures Yes/No
Side drains Yes/No
Drainage Layer Yes/No
18 Does the Estimation conform to Standard rate analysis and SSR Yes/No
19 Does the proposal have provision for
PMGSY Logo Sign Boards
Km/Hm Stones Yes/No
Guard Stones (where necessary) Yes/No
Traffic Sign Boards (as necessary) Yes/No
20 Specific remarks, if any, by STA

Certified that the Design and Estimation for the Proposed Roads works are based on the data and SSR provided
by Engineers. The Proposal may be cleared.

Tech. Scrutiny done by: Coordinator: S.T.A.


Sign. & Name: Sign. & Name:
REPORT

Name of Work : Construction of rural roads under Pradhan Mantri Gram Sadak Yojana (2005-06, World Bank Funded) in Distt. Farrukhabad U.P.

Package No. : UP-2426

This detailed project report for the construction of the link roads under P.M.G.S.Y. 2005-06 (Phase-V) has been prepared in
compliance of letter of Chief Executive Officer U.P. State Rural Roads Development Authority, Lucknow vide Letter No.
1162/UPRRDA/05 Dated: 13/05/05. The Farrukhabad District has been allocated fund of Rs.18.00 Crores under PMGSY (World
Authority :
Bank Funded ), Phase-V (2005-06) vide the Letter No. 7732/RES/PMGSYCELL/05/108 Dated : 08/09/2005 of Director & Chief
Engineer, Rural Engineering Services, Uttar Pradesh, Lucknow & Letter No.4288/T-40/UPRRDA/05 Dated: 21/12/2005 of Uttar
Pradesh Rural Road Development Agency, Lucknow.

Pradhan Mantri Gram Sadak Yojana has been launched by Central Govt. to provide connectivity to all village and habitation
Scope of Work : having population more than 1000 by end of 2004 and villages of population more than 250 by end of year 2007 by good all
weather roads. Population of habitation has been taken as per census carried out in the year 2001.

IN THIS DETAILED PROJECT REPORT FOLLOWING ROADS HAVE BEEN TAKEN FOR SANCTION IN 2005-2006
Package No. 2426
Village Populatio
Sl. Road Length
No. No.
Block Name of the Road
(km.)
being n as per
Connected Census

1 3028 Kamalganj Hisampur To Jhijhuki L/R 2.10 Jhijhuki 785


Katri
2 1035 Barhpur FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampu 3.33 642
Gangpur
Total 5.43

The above roads have been recommended by Hon'ble Member of Parliament and Member of Legislative assembly. The
approval of such roads have been accorded by Zila Panchayat, Farrukhabad on 02.11.2004 vide proceeding No. 391/ ftyk
iapk;r cSBd@ ih,eth,lokbZ@2005&06 fnukad 03@11@04. These roads are included in the core network of Farrukhabad
District also.

In this Detailed Project Report, the roads taken for construction have been detailed surveyed and their crust have been
Specification : designed on the basis of California Bearing Ratio reckoned as per actual survey of different roads. The crust thickness is fixed
as per guidelines of Rural Road Manual of PMGSY (IRC:SP-20).

Cross drainage, works have been designed and fixed as per actual requirements at site found during detailed survey. The
proposed roads shall be 7.5 m. wide at formation level with more than 60cm high embakment. The bituminous painted width of
these roads shall be 3 m. as traffic intensity is less than 100 CVPD.

The general climate of the area is dry and above roads connect to the habitations with a population of 2001 Census and by constructing this road, it
would facilitate the habitants to avail the facilities of the nearby area.
(2) Road Features :

The road work has been selected on the criteria of providing connectivity to unconnected habitation based on the priority of population.
The proposal has been approved by the Zila Panchayat.

(3) Alignment, Topographical & Geological Features :

The new construction has been proposed on the government revenue track only. The topography of the area is more or less plain
terrain. The soil is mosty silty soil.

(4) Environmental & Other Factors :

The proposed roads would open the oppurtunities for the habitants of the village to avail the facilities available in the connected villages.
The socioeconomic status of the villages to be connected would increase manifold. The people would have access to market centre & also would have
access to SDO headquarter of district headquarter in less time.

(5) Right of way. Acquistion :


The Alignment of Road is on the existing tracks of revenue. There are no permanent structures alongside the roadway hence land
acquisition is not involved in this case hence no compensation what so ever required to be paid.

(6) Traffic :

Being rural roads, the traffic plying presently on the routes is less. A 24 hours traffic census has been conducted on all the roads and the
present and projected traffic has been calculated upon the growth rate as 6% per annum as specified in the manual. The traffic more than 3 ton laden
weight (projected) has been considered for design purpose.

(7) Roads Design and Specification :

The structural design for pavement thickness, has been done as per rural roads. Manual IRC-SP-20 and Specification For Rural
Roads, 2004 published by MORD. There is no saving in cost if crust thickness is designed as per S.P.-72-2007.Traffic intensity, CBR results of
the existing soil have been attached as per annexure. As per design, the following specifications have been adopted as follows :

1 One/Two layers of GSB in 3.30 m. width.


2 One layer of 75mm thick compacted metal 63-45mm G2.
3 One layer of 75mm thick compacted 53-22.4mm G3.
4 Primer coat for low porosity on WBM surface.
5 20 mm thick PMC over tack coat and premix seal coat type 'B'.
6 Mechanical widening at curves and culverts.
7 30 cm. wide brick edge soling on both side of the road.

(8) Drainage Facilities including X-drainage structures.


Wherever required cross drainage structers like HP/RCC Culverts and side drains have been taken.

(9) Materials, labour and Equipments :

The suitable material required for road construction is available in Govt. approved quarries. The ballast and grit are available at Fatepur
Sikari/Haldwani/Jhansi. The skilled/unskilled labour is also available in the area. The Road Metal Rates for the material has also been attached as
annexure with the Block details.

(10) Rates :
The rates are taken from Revised Schedule Of Rates (SOR) base on MORD Standard Data Book which has been sanctioned by SE,
UPPWD, Etawah Circle. The consideration for price escalation, local duties and taxes on materials can be taken into account in the
tender premium prevailing in the area.

(11) Construction Programming :


The likely period of the execution would be approximately 12 Months.

(12) Miscellaneous :

Though traffic running on these stretches is very small, yet due attention would be paid to diversification of traffic.
Temprorary by-pass etc. would be provided wherever necessary.

As stated above four no. of roads connecting the villages with all weather roads costing Rs.265.70 Lacs excluding maintenance
cost have been included in this DPR.

The rates taken in preparation of DPR are either currently Sanctioned Schedule of Rate (Revised As Per MORD) or analysed
on the basis of sanctined rates of material and labour by S.E., Etawah Circle of UP PWD or market rate as per Standard Data
Book of Ministry of Rural Transport and Highway, Govt. of India.

The Detailed project Report for construction of Rural Roads under 2005-06 (World Bank) amounting to Rs 265.70 Lacs is
submitted here with for Technical and Administrative Sanctions.

ASSISTANT ENGINEER EXECUTIVE ENGINEER


P.I.U., P.M.G.S.Y. P.I.U., P.M.G.S.Y.
R.E.S. R.E.S.
FARRUKHABAD FARRUKHABAD
Key Index map
on file under My documents\format of package(Dpr)
on Adobe Page maker

..\..\..\..\My Documents\Format of package 2422.p65


CONTENTS

Package : UP- 2426

Sl. Details Format Page


No.
1 Title
2 Check list
3 Contents
4 Reports
5 Certificate and References
6 Package Summary Sheet F1
7 District Map Showing Block M1
8 Blocks Showing Road Networks M2
9 Roads Proposed in P.M.G.S.Y. for Rural Connectivity (Payment layer) F2A
10 Roads Proposed in P.M.G.S.Y. for Rural Connectivity (Cross Drainage Structure) F2B
11 Typical Cross Section of new road construction F3
12 Details of existing Roads (For upgradation) F4
13 Typical Cross Section of new road improvement (Upgradation)/Design of Pavement F5
14 Cost Estimate for Road Construction F6
15 Cost Estimate for Construction of C.D. Works F7
16 Rate Analysis F8
17 Supporting Analysis of Rates and Calculation sheet of Earth Work
COST OF ESTIMATE
WORLD BANK FUNDED PROJECT (2005-06)

Sl. Package Name of Road Cost as per Administrative Sanction Cost as per State Technical Agency Cost as per Technical Sanction
No. No. Cost of Cost of Total Cost of Cost of Total Cost of Cost of Total Cost
Pavement Culvet/CD Cost Pavement Culvet/CD Cost Pavement Culvet/CD

1 UP-2426 #REF! #REF! #REF! #REF!

2 UP-2426 Hisampur To Jhijhuki L/R 50.48 2.70 53.18

FKD. Neewalpur Ugarpur


3 UP-2426 Rd. To Katri Gangpur via 90.10 23.81 113.91
Katri Dharampur L/R

4 UP-2426 #REF! #REF! #REF! #REF!

Total #REF! 26.51 #REF!

J.E./P.I.U. A.E./P.I.U. E.E./P.I.U.


FARRUKHABAD FARRUKHABAD FARRUKHABAD
izfrosnu

izeq[k lfpo] xzkE; fodkl foHkkx] m0 iz0 “kklu ds i= la[;k & 1366@38&4&2003 fnukad 21&06&2003 ,oa vk;qDr xzkE; fodkl foHkkx y[kuÅ ds i=kad 2850 fnukad 28&06&03 ds
funs”kd ,oa eq[; vfHk;Urk] xzkeh.k vfHk;U=.k lsok] y[kuÅ ds i=kad 95@xzk0 v0 ls0@ih0 ,e0 th0 ,l0 okbZ0@fnukad 30 twu 2003 ds }kjk fn;s x;s funsZ”kksa
izeq[k lfpo ,oa funs”kd ,oa eq[; vfHk;Urk] xzkeh.k vfHk;U=.k lsok] mRrj izns”k “kklu }kjk fnukad 05&08&03 dks ckiw Hkou] y[kuÅ esa yh xbZ cSBd esa voxr djk;k

Key Index map

on file under My documents\format of package(Dpr)


on Adobe Page maker
i=kad 2850 fnukad 28&06&03 ds }kjk iz/kkuea=h xzke lM+d ;kstuk ds lQy lapkyu gsrq 16 vfrfjDr tuinksa esa xzkeh.k vfHk;U=.k lsok foHkkx dks dk;Znk;h laLFkk ¼dk;ZØe fdz;kUou bdkbZ½ ds
2003 ds }kjk fn;s x;s funsZ”kksa ds Øe esa lEcfU/kr yksd fuek.kZ foHkkx dh ih0 vkbZ0 ;w0 ls iz/kkuea=h xzke lM+d ;kstuk ls lEcfU/kr leLr vfHkys[k ¼ekLVj Iyku] dksj usV] Mh0 ih0 v
uÅ esa yh xbZ cSBd esa voxr djk;k x;k fd tuin Q#Z[kkckn esa iz/kkuea=h xzkeh.k lM+d ;kstuk ds ¼o’kZ 2002&03½ izLrkfor lkr iSdstksa ls dsoy 3 iSdst ¼la[;k ;w0ih0 2407] ;w0ih0 2408 ,oa 2410½
Fkk ¼dk;ZØe fdz;kUou bdkbZ½ ds :i esa ukfer fd;k x;k gS ftlesa xzkeh.k vfHk;U=.k lsok] iz[k.M & Q#Z[kkckn dk Hkh p;u iz/kkuea=h xzke lM+d ;kstuk esa dk;Znk;h laLFkk ds :i esa fd;k x;k gSA
¼ekLVj Iyku] dksj usV] Mh0 ih0 vkj0 bR;knh½ izkIr dj fy;s x;s gSaA
w0ih0 2407] ;w0ih0 2408 ,oa 2410½ fo”o cSad }kjk iksf’kr ;kstuk esa fy;s tk;saxsA
nk;h laLFkk ds :i esa fd;k x;k gSA mDr i=ksa esa ;g Hkh Li’V fd;k x;k gS fd vkoaVu o’kZ ¼iwoZ dk o’kZ 2002&03½ vc o’kZ 2003&04 esa ekuk tk;sxk ,oa rHkh ls izLrko Lohd`r ,oa ykxw gksxsaA
ls izLrko Lohd`r ,oa ykxw gksxsaA o’kZ 2001&02 ds Lohd`r dk;Z tks yksd fuek.kZ foHkkx }kjk djk;s x;s gSa vkSj izxfr ij gS] os yksd fuek.kZ foHkkx }kjk gh iw.kZ djk;s tk;saxsA
w.kZ djk;s tk;saxsA
izLrqr iSdst la[;k ;w0ih0 2411 dk foLr`r izkdyu ¼Mh0ih0vkj0½ iwoZ esa yksd fuekZ.k foHkkx ¼ih0vkbZ0;w0½ Qrsgx<+ }kjk rS;kj fd;k
izkadyu esa] yksd fuekZ.k foHkkx dh njksa ,oa Hkkjr ljdkj ds xzkeh.k lM+d ifjogu ea=ky; dh LVSUMMZ MkVk cqd esa fn;s
iz/kkuea=h xzke lM+d ;kstuk ¼o’kZ 2002&03½ ds vUrxZr iSdst la[;k ;w0ih0 2411 dk foLr`r izkadyu ftlesa izLrkfor ekxZ dk d

Key Index map

on file under My documents\format of package(Dpr)


on Adobe Page maker
0½ Qrsgx<+ }kjk rS;kj fd;k x;k FkkA ftl ij v/kh{k.k vfHk;Urk yksd fuekZ.k foHkkx] bVkok ds gLrk{kj mijkUr LVsV VSfDudy ,tsUlh ¼vkbZ0vkbZ0Vh
UMMZ MkVk cqd esa fn;s x;s cktkj njksa dks fy;k x;k gSA
dyu ftlesa izLrkfor ekxZ dk dk;Z dh dqy ykxr :0157-50 yk[k gS] iz”kklfud ,oa rduhfd Lohd`fr gsrq lknj izsf’kr gSA
udy ,tsUlh ¼vkbZ0vkbZ0Vh0 :M+dh½ }kjk LØwVuh dh tk pqdh gSA bl izkdyu dk ifj{k.k djus ij Kkr gqvk fd izLrkfor ekxZ dk foLr`r losZ{k.k djus ds c
dk foLr`r losZ{k.k djus ds ckn] lh0oh0vkj0 oSY;w ds vk/kkj ij ,oa iz/kkuea=h xzke lM+d ;sktuk ds :jy eSuqvy esa fn;s x;s funZs”kksa ds vuqlkj ekxZ dh
nZs”kksa ds vuqlkj ekxZ dh ØLV fMtkbZu dh x;h gSA ekxZ dh QkesZ”ku ysoy ij pkSM+kbZ 7-5 eh0 ,oa isfUVM jksM dh pkSM+kbZ 3 eh0 yh xbZ gS
pkSM+kbZ 3 eh0 yh xbZ gSA vko;”drk vuqlkj vyx&vyx pSfut ij lh0 Mh0 dk;Z fy;k x;k gSA izLrkfor ekxZ dk izkadyu 1000 ls vf/kd vkcknh okys xkaoks
s vf/kd vkcknh okys xkaoksa dks iDds ekxksZsa ls tksM+us gsrq rS;kj fd;k x;k gSA
SPECIFICATION & CERTIFICATE

1 This Project has been approved by Zila Panchayat Meeting dated 02.11.2004.

2 All work shall be carried out as per MORD/IRC/UP.P.W.D, detail specification & as per E.N.C. P.W.D. Circulars issued from time to
time.

This project has been framed as per guide lines & specification of P.M.G.S.Y.(I.R.C.-S.P.-20) and Specification For Rural Roads, 2004
3 published by MORD

4 It is certified that land is available for taking up the proposed road work, and no provisions has been made for land acquisition under
this project.

5 Proposals of M.P.'s & M.L.A./M.L.C. have been considered in this project.

6
This project is prepared for New Construction of road to connect habitation for the first time under principle of single connectivity.

7 Certified that the land for the Project will be provided by District Panchayat/Intermediate Panchayat or Revenue officer's of the District
without any Compensation.

8 Certified that Fly Ash is not available within 100 km.

9 There is no saving in cost if crust thickness is designed as per S.P.-72-2007.

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
CERTIFICATE

Name of Scheme : WORLD BANK FUNDED PROJECT (2005-06)

1 Certified that the land for the Project will be provided by District Panchayat/Intermediate Panchayat or Revenue
officer's of the District without any Compensation.

2 Certified that the Project has been framed according to the guide lines of Pradhan Mantri Gram Sadak Yozna.

3 Approval of proposed roads, has been accorded by Zila Panchayat, Farrukhabad on 02.11.04.

J.E. A.E. E.E.


WORLD BANK FUNDED PROJECTS
Final List of Roads Approved by Zila Panchayat, Farrukhabad on the basis of CNCPL
UNIT: P.I.U. P.M.G.S.Y. R.E.S. Farrukhabad Year 2005-06
Phase V
Package No. 2422
Sl. Road Length
Block Name of the Road Population
No. No. (km.)
1 1008 Barhpur Central Jail Yaqootganj Pithupur To Chauspur L/R 0.60 2305
2 3084 Kamalganj Jhasi Rd. To Hisampur L/R 1.00 1524
3 3050 Kamalganj Bahorikpur Mohammadabad Rd. To Karamchandpur L/R 2.50 1310
4 3185 Kamalganj Jahanganj Mohammadabad Rd. To Chunupur Garhiya L/R 1.00 1291
5 4069 Mohmmadabad B.E. Rd. To Daraundi L/R 0.83 1722
6 4033 Mohmmadabad B.E. Rd. To Nisai L/R 0.53 1110
Total 6.46
Package No. 2423
1 4032 Mohammadabad B.E. ROAD TO TERA L/R 1.62 1722
2 2017 Kaimganj Mahmadpur Safa Rd.(Aliapur) To Rashidpur L/R 1.80 1257
3 2026 Kaimganj Farrukhabad Kampil Rd. (Gaurkheda) To Sahipur L/R 1.85 1497
4 5108 Nawabganj Achra Taqipur Rd. To Prahladpur L/R 2.25 1020
Total 7.52
Package No. 2424
Kuiyan Kheda Sahsa Jagdishpur Rd. To Addupur Dehamafi L/R
7197 Shamshabad 0.60 1184
1
2 7012 Shamshabad Chaurahar To Sharifpur Chhichhni L/R 2.75 2073
3 7048 Shamshabad Farrukhabad Kaimganj Rd. (Gusarapur)To Kandhemai L/R 1.25 1015
4 7028 Shamshabad Shamshabad Kaimganj Rd. TO Museypur L/R 2.20 1177
5 7051 Shamshabad Farrukhabad Kaimganj Rd.(Rly. Crossing) To Sahsa Jagdishpur L/R 1.35 604
Total 8.15
Package No. 2425
Sl. Road Length
Block Name of the Road Population
No. No. (km.)
1 4102 Mohammadabad B.E. Rd. To Nagla Swami L/R 2.00 726
2 4034 Mohammadabad B.E. Rd. To Alidadpur L/R 1.50 839
3 4007 Mohmmadabad B.E. Rd. to Gazipur L/R 1.62 556
4 3177 Kamalganj Bahorikpur Mohmmadabad-Tiliyan-Nagaria Rd. To Abhaypur L/R 1.00 717
5 2027 Kaimganj Farrukhabad Kampil - Sahipur Rd. To Bharthari L/R 1.35 735
Total 7.47
Package No. 2426
Sl. Road Length
Block Name of the Road Population
No. No. (km.)
1 4107 Mohammadabad B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R 2.40 588
2 3028 Kamalganj Hisampur To Jhijhuki L/R 2.10 785
3 1035 Barhpur FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R 3.33 642
4 6015 Rajepur B.E.- Kadhar Rd. To Siya L/R 1.35 733
Total 9.18
Grand Total 38.78
Total No. of Roads. = 23

EXECUTIVE ENGINEER
PIU-1, PMGSY
RES, FARRUKHABAD
OK
OK
OK
OK
OK
OK

OK
OK
OK

OK

OK
OK
OK
OK

OK
OK
OK

OK

OK
OK
OK
OK
WORLD BANK FUNDED PROJECT (2005-06)

SUMMARY SHEET
Format- F-1

Name of the Total No. of Unconnected Habitations


Code
Block Habitations >1000 500-999 250-500 <250

4 - 4 - -
Total 4 - 4 - -

Total No. of New No. of New


Estimated Cost Villages
Length of CD
Type of Work No.of Roads Connected
Road (Km) Structures Pavement from CD structure Total
Format = F6 from Format = F7 [(5) + (6)] Total Villages

New Construction 4 5.43 11 0.00 26.78 26.78 4

Total 4 5.43 11 0.00 26.78 26.78 4

J.E. A.E. E.E.


FORMAT F - 2[A]
WORLD BANK FUNDED PROJECT (2005-06)
Road Proposed in PMGSY for Rural Connectivity (pavement Layers)

District : Farrukhabad Package No. : UP-2426


Name of Places Facili
New ty Details of Thickness & Cost for Pavement Layers
/Villages Conn
Constr acca
ected by Road uction/ sed Road CBR/Cr Existing
Upgrad (Use ust
Name of Length Surface Surfacing Total Cost
S.No ation A/B/ Thickne
Block (useN/ C/D/) (Km) ss (cm.) Type Details Clea Earth GSB1 GSB2 WBM2 WBM3 Primer BM Tack Coat (any one) E.W. in Brick Plantat Misc of (Lacs)
From To U) ning Coat Seal Should edging work Pavement
PMC er (Sum of
10) to (24)1)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Thickness
N 4.27 (mm) 70 50 75 75 20
Hisampu
2 Kamalganj Jhijhuki
r
Cost (Rs.)
A 2.10 27 Earth 0.15 10.40 6.85 4.06 6.44 7.37 1.20 - 0.43 4.71 1.12 1.56 2.69 - 8.17 50.48
Katri
FKD. Thickness
Gangpu
Neewalp N 2.62 (mm) 130 100 75 75 20
r via
3 Barhpur ur
Katri
Ugarpur
Dharam Cost (Rs.)
Rd. A 3.33 38 Earth 0.24 16.73 18.34 14.10 11.13 12.78 2.10 - 0.75 8.23 2.72 1.94 4.26 - 5.06 98.37
pur
Total 5.43 0.39 27.13 25.19 18.17 17.57 20.15 3.29 1.18 12.95 3.84 3.49 6.95 13.24 148.85

J.E. A.E. E.E. S.E.


426

(24)1)

.
FORMAT F - 2[B]
WORLD BANK FUNDED PROJECT (2005-06)
Road Proposed in PMGSY for Rural Connectivity (Cross Drainage Structures)

District : Farrukhabad
Name of Block
Existing CD structure by Type Details of P
New
Constructio Total Cost of
Sl. No.

code
Road Total Cost of the
Name of Road n/Upgradati Details Pavement From
Length (Km) Hume Pipe R.C.C. Total Cost Road [(18)+(19)]
on (Use Minor Bridge Hume Pipe Culvert R.C.C. Culvert Box Culvert Format-F5
Culvert Culvert of
N/U)
Total Proposed
No. Dia No. Length No. Length No. Dia. Mm No. Length No. Length CD
Structures

Hisampur To 600 3 No.


2 Kamalganj 03 Jhijhuki L/R
N 2.10 1
mm
- - - - Cost
1000mm.
1000 - - - 3 2.97 50.48 53.45

3 No.
FKD. Neewalpur 1000mm. 2X
Ugarpur Rd. To H.P. 2 5.0m.
1
3 Barhpur 01 Katri Gangpur N 3.33 - - 1 0.6m - - Cost No. 1.0 m.
each
& 8 23.81 98.37 122.18
via Katri 2x1000m 1x3.0
Dharampur L/R m, 1 No. m.
Gul

Total 5.43 11 26.78 148.85 175.63

J.E. A.E. E.E. S.E.


FLEXIBLE PAVEMENT DESIGN
NAME OF WORK :B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R
Design Data :

(i) Annual Rain Fall = 1027.3 mm 12.5CM


15
15 CM
CM
(ii) No. of Initial Commercial Vehicle per day in both direction (P) = 7
(iii) Annual Growth Rate of Commercial Vehicle (r) = 6%
(iv) Design Life (n) = 10 Years
(v) CBR of soil =
20.0
3
6.5
10.0
5.0
27.5
10.0
10
15
20
8.5
CMCM
CM
CM
CM
CM
Design Traffic "T" = P(1+r)n
= 7(1+0.06)1+10
= 7 x 1.898
= 13.286
Say = 14 C.V.P.D. - Represent Traffic Curve 'A'

From Figure 5.1 & CBR Curve "A"

Taking CBR, 5.65 % & Tarrif Curve "A"


Total Pavement Thickness = 23.5 Cm
Provide Pavement Thickness(excluding P.M.C. thickness) = 23.5 Cm
Sub base = 8.5 Cm
Base = 15 Cm

Sub Base - Layer = 8.5 Cm Consolidated = GSBI


Base - Layer (i) = 7.5 Cm Consolidated = WBM Gr-II
Layer (ii) = 7.5 Cm Consolidated = WBM Gr-III

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
FLEXIBLE PAVEMENT DESIGN
NAME OF WORK : Hisampur To Jhijhuki L/R
Design Data :

(i) Annual Rain Fall = 1027.3 mm 15.0


15 CM
15.0 CM
CM
(ii) No. of Initial Commercial Vehicle per day in both direction (P) = 8
(iii) Annual Growth Rate of Commercial Vehicle (r) = 6%
(iv) Design Life (n) = 10 Years
(v) CBR of soil =
12.0
5.0
10
12.5
10.0
12.5
15
10
7.5CM
CM
CM
CM
CM
CM
CM
Design Traffic "T" = P(1+r)n
= 8(1+0.06)1+10
= 8 x 1.898
= 15.184
Say = 15 C.V.P.D. - Represent Traffic Curve 'A'

From Figure 5.1 & CBR Curve "A"

Taking CBR, 4.27 % & Traffic Curve "A"


Total Pavement Thickness = 27.0 cm
Provide Pavement Thickness = 27.0 cm
Sub base = 12.0 Cm
Base = 15.0 Cm

Sub Base - Layer (i) = 7.0 Cm Consolidated = GSB-I


Layer (i) = 5.0 Cm Consolidated = GSB-II
Base - Layer (i) = 7.5 Cm Consolidated = WBM Gr-II
Layer (ii) = 7.5 Cm Consolidated = WBM Gr-III

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
15.0
15 CM
15.0 CM
CM
FLEXIBLE PAVEMENT DESIGN
NAME OF WORK : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R
Design Data :

(i) Annual Rain Fall = 1027.3 mm 15.0


15 CM
15.0 CM
CM
(ii) No. of Initial Commercial Vehicle per day in both direction (P) = 8
(iii) Annual Growth Rate of Commercial Vehicle (r) = 6%
(iv) Design Life (n) = 10 Years
(v) CBR of soil =
12.5
10.0
23.0
6
12.5
15
10
7.5
CM
CM
CM
CM
CM
Design Traffic "T" = P(1+r)n
= 8(1+0.06)1+10
= 8 x 1.898
= 15.184
Say = 15 C.V.P.D. - Represent Traffic Curve 'A'

From Figure 5.1 & CBR Curve "A"

Taking CBR, 2.62 % & Traffic Curve "A"


Total Pavement Thickness = 38 cm
Provide Pavement Thickness(including P.M.C. thickness) = 38 cm
Sub base = 23.0 Cm
Base = 15.0 Cm

Sub Base - Layer (i) = 13.0 Cm Consolidated = GSB-I


Layer (ii) = 10 Cm Consolidated GSB-II
Base - Layer (i) = 7.5 Cm Consolidated = WBM Gr-II
Layer (ii) = 7.5 Cm Consolidated = WBM Gr-III

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
FLEXIBLE PAVEMENT DESIGN
NAME OF WORK : B.E.- Kadhar Rd. To Siya L/R
Design Data :

(i) Annual Rain Fall = 1027.3 mm 15 CM


15.0 CM
(ii) No. of Initial Commercial Vehicle per day in both direction (P) = 7
(iii) Annual Growth Rate of Commercial Vehicle (r) = 6%
(iv) Design Life (n) = 10 Years
(v) CBR of soil =
12.0
10 CM
CM
Design Traffic "T" = P(1+r)n
= 7(1+0.06)1+10
= 7 x 1.898
= 13.286
Say = 14 C.V.P.D. - Represent Traffic Curve 'A'

From Figure 5.1 & CBR Curve "A"

Taking CBR, 4.29 % & Traffic Curve "A"


Total Pavement Thickness = 27.0 cm
Provide Pavement Thickness(excluding P.M.C. thickness) = 27.0 cm
Sub base = 12.0 Cm
Base = 15 Cm

Sub Base - Layer (i) = 7.0 Cm Consolidated = GSB-I


Layer (ii) = 5 Cm Consolidated = GSB-II
Base - Layer (i) = 7.5 Cm Consolidated = WBM Gr-II
Layer (ii) = 7.5 Cm Consolidated = WBM Gr-III

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
ANALYSIS OF RATES

Refere
nce to
Sr. MORD Rate Amount
Description Unit Quantity
No. Specifi (Rs.) (Rs.)
cation
s
1 201 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and
disposal of unserviceable materials and stacking of serviceable material to be used or
auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201.
Unit = Sqm.
Taking output = 1 hectare
(I) By Manual Means
(A) In area of non-thorny jungle
a) Labour
Mate day 6.00 84.00 504.00
Mazdoor (Unskilled) day 150.00 80.00 12,000.00
b) Machinery
Tractor with trolley hour 1.00 234.00 234.00
c) Overhead Charges+Contractor’s profit @ 12.5 % on (a+b) 1,592.25
Rate per hectare = a+b+c 14,330.25
Or, Rate per Sqm 1.433025
Total 1.433025
Say, Rs. 1.43

3.15 301.4 Compacting Original Ground


(i) Compacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting embankment to
facilitate
Unit = cum placement of first layer of embankment, scarified to a depth of 150 mm, mixed
with water
Taking outputat OMC
= 600and
cumthen compacted by rolling so as to achieve minimum dry density
as given in Tables 300.1 and 300.2 for embankment construction as per Technical
a) Labour Clause 301.4.1.
Specification
Mate day 0.08 84.00 6.72
Mazdoor (Unskilled) day 2.00 80.00 160.00
b) Machinery
Tractor with ripper attachment hour 6.00 252.00 1,512.00
Three wheel 80-100 kN Static Roller hour 7.50 297.00 2,227.50
Water tanker 6 kl capacity hour 4.00 250.00 1,000.00
c) Material
Water kl 24.00 11.50 276.00
d) Overheads +Contractor’s profit @ 12.5% on (a+b+c) 647.78
Cost for 600 cum = a+b+c+d 5,830.00
Rate per cum = (a+b+c+d)/600 9.72
Say, Rs 9.70
3.3 301.5 Construction of Embankment with Material Obtained from Roadway Cutting

(i) Construction of embankment with approved materials deposited at site from roadway
cutting and excavation from drain and foundation of other structures graded and compacted
to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause
301.5(Excluding Motor Grader)

Unit = cum

Taking output = 100 cum

a) Labour

Mate day 0.02 84.00 1.68

Mazdoor (Unskilled) day 0.50 80.00 40.00

b) Machinery

Dozer D-50 for spreading @ 200 cum per hour hour 0.50 1,423.00 711.50

Water tanker 6 kl capacity hour 2.00 250.00 500.00

Three wheel 80-100 kN Static Roller hour 1.25 297.00 371.25

c) Material

Water kl 12.00 11.50 138.00

d) Overheads+C.P. @ 12.5% on (a+b+c) 220.30

Rate for 100 cum = a+b+c+d 1,982.73

Rate per cum = (a+b+c+d)/100 19.83

Add Royalty for Earth @ Rs. 6.00/cum. 6.00


(A) Total 25.83

Add Rs. 1.00 on above for 100% compaction 1.00

(B) Total 26.83

Note: In case the earth cutting is done by dozer and pushed for filling in the embankment, the
input of dozer in the cost of embankment shall be deleted as the same is already provided
in the cost of excavation. However, if the earth is dumped by tippers from roadway cutting,
the input of dozer for spreading is required to be provided.

3.5 302(ii) Excavation in Soil with Dozer with lead upto 100 m

Excavation for roadway in soil by mechanical means including cutting and pushing the
earth to site of embankment upto a distance of 100 m, including trimming bottom and
side slopes in accordance with requirements of lines, grades and cross-sections.
Unit = cum

Taking output = 180 cum

a) Labour

Mate day 0.08 84.00 6.72

Mazdoor (Unskilled) day 2.00 80.00 160.00

b) Machinery

Dozer D-50 @ 50 cum per hour (cutting with pushing) hour 3.60 1,423.00 5,122.80

c) Overheads @ 12.5% on (a+b) 661.19

Cost for 180 cum = a+b+c 5,950.71

Rate per cum = (a+b+c)/180 33.06

Say, Rs. 33.10


(A) For 97% compaction, add item No. 301.5(A)+302(ii) 58.93
Say, Rs. 58.90
(B) For 100% compaction for shoulders, add item No. 301.5(B)+302(ii) 59.93
3.4 301.5 Construction of Embankment with Material Obtained from Borrow Pits Say, Rs. 59.90
Construction of embankment with approved material obtained from borrow pits with a lift
upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5(FOR CARTED EARTH)
Unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.04 84.00 3.36
Mazdoor (Unskilled) day 1.00 80.00 80.00
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour hour 1.67 840.00 1,402.80
Tipper 5.5 cum with 10 t capacity hour 4.50 200.00 900.00
Loading of earth as per item 1.1 (ii) cum 100.00 13.65 1,365.00
Unloading of earth as per item 1.1 (iv) cum 100.00 6.80 680.00
Dozer D-50 for spreading @ 200 cum per hour hour 0.50 1,423.00 711.50
Motor grader for grading @ 200 cum per hour hour 0.50 1,545.00 772.50
Water tanker 6 kl capacity hour 2.00 250.00 500.00
Three wheel 80-100 kN Static Roller @ 80 cum per hour hour 1.25 297.00 371.25
c) Material
Water kl 12.00 11.50 138.00
Total(a+b+c) 6,924.41
d) Overhead + C.P. @ 12.5 % (a+b+c) 865.55
Total(a+b+c+d) 7,789.96
Cost for 100 cum = a+b+c+d 7,789.96
Cost per cum = (a+b+c+d/100 77.90
e) Royality for earth @ Rs. 6.00/ Cum. cum 1.00 6.00 6
Total Rate Per Cum. 83.90
Say, Rs. 83.90

4.7 405 Water Bound Macadam Sub-base/base


2) WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill-up the interstices of
coarse aggregate, watering and compacting to the required density grading 2 as per
Technical Specification Clause 405.

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 84.00 846.72
Mazdoor (Skilled) day 2.00 82.00 164.00
Mazdoor (Unskilled) day 250.00 80.00 20,000.00
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum per hour hour 45.00 297.00 13,365.00
Water tanker 6 kl capacity hour 24.00 250.00 6,000.00
Water kl 144.00 11.50 1,656.00
c) Overheads + Contractor’s profit @ 12.5% on (a+b) 5,253.97
Cost for 360 cum = a+b+c+d+e 47,285.69
Rate per cum = (a+b+c)/360 131.35

3) WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening to fill-up the interstices of coarse aggregate,
watering and compacting to the required density Grading 3 as per Technical
Specification Clause 405.

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Labour
Mate day 10.08 84.00 846.72
Mazdoor (Skilled) day 2.00 82.00 164.00
Mazdoor (Unskilled) day 250.00 80.00 20,000.00
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum per hour hour 45.00 297.00 13,365.00
Water tanker 6 kl capacity hour 24.00 250.00 6,000.00
Water kl 144.00 11.50 1,656.00
c) Overheads + Contractor’s profit @ 12.5% on (a+b) 5,253.97
Cost for 360 cum = a+b+c 47,285.69
Rate per cum = (a+b+c)/360 131.35

4.18 412 Brick Soling


Laying brick soling layer on prepared sub-grade with brick on end edging according to lines,
graded and cross-section shown on the drawing filling joints with sand and earth, spreading
25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel
road roller 80-100 kN as per Technical Specification Clause 412
Unit = sqm
Taking ouput = 150 sqm
(a) Labour
Mate day 0.52 84.00 43.68
Mazdoor (Unskilled) day 10.00 80.00 800.00
Mason 1st Class day 3.00 150.00 450.00
(b) Machinery
Three wheel 80-100 kN static roller hour 1.00 297.00 297.00
Water tanker hour 1.00 250.00 250.00
(c) Material
Brick 1st Class No. 8,160.00 2.20 17,952.00
Brick 1st Class on edging No. 1,100.00 2.20 2,420.00
Fine Sand (10 cm thick) cum 15.00 410.00 6,150.00
Water kl 6.00 11.50 69.00
Total(a+b+c) 28,431.68
d) Overhead + C.P. @ 12.5 % (a+b+c) 3,553.96
Total(a+b+c+d) 31,985.64
Cost for 150 cum = a+b+c+d 31,985.64
Cost per cum = (a+b+c+d/150 213.24
Total Rate Per Cum. 213.24

Say, Rs. 213.20

4.19 413 Stone Set Pavement


Providing and laying stone set pavement on prepared surface with sub-base 100 mm thick
compacted Granular Sub-base as per Clause 401.4 and base 75 mm thick compacted
water bound macadam grading 2 as per Clause 405.3. The 150 mm thick hammer desired
stones are laid in the herring one or stretched bond pattern. The stones are compacted into
the bedding sand of 40 mm over the WBM base bounded by edge stone using suitable
compacting device. The gaps are filled with fine sand stone dust as per Technical
Specification Clause 413.4

Unit = sqm
Taking output = 360 sqm
(a) Labour
Mate day 2.16 84.00 181.44
Mazdoor (Unskilled) day 51.00 80.00 4,080.00
Mason 2nd class for laying sett stone and edge stone day 13.00 130.00 1,690.00
(b) Machinery
Three wheel 80-100 kN static roller hour 2.00 297.00 594.00
Water tanker 6 kl capacity hour 1.00 250.00 250.00
(c) Material
(1) Collection of fine sand
3.4x0.285x0.150x1.20 = 0.174 cum 0.174 410.00 71.34
(2) Coarse sand
96x3.35x0.04x1.20 = 15.437 cum cum 15.437 565.24 8,725.61
(3) Collection of stone sett stone
300 mmx200 mmx150 mm Nos 5,168.00 40.00 206,720.00
17x304 = 5168 nos.
(4) Collection of edge stone
450 mmx200 mmx350 mm Nos 464.00 100.00 46,400.00
2x232 = 464 nos.
(5) Water kl 6.00 11.50 69.00
Total(a+b+c) 268,781.39
d) Overhead + C.P. @ 12.5 % (a+b+c) 33,597.67
Total(a+b+c+d) 302,379.06
Cost for 360 cum = a+b+c+d 302,379.06
Cost per cum = (a+b+c+d/360 839.94
Total Rate Per Cum. 839.94

Say, Rs. 839.90

5.1 502 Prime Coat


(ii) Low porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular
base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using
mechanical means as per Technical Specification Clause 502.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day 0.04 84.00
Mazdoor (Unskilled) day 1.00 80.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.40 464.00
Air compressor 210 cfm hour 1.40 206.00
Bitumen emulsion pressure distributor @ 1750 sqm per hour hour 1.00 692.00
Water tanker 6 kl capacity 1 trip per hour hour 0.50 250.00
Water kl 3.00 11.50
c)  Overheads + Contractor’s profit @ 12.5% on (a+b)
Cost of 1750 sqm = a+b+c
Rate per sqm = (a+b+c)/1750
5.2 503 Tack Coat
(i) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the
rate of 0.20 to 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned
with Hydraulic broom as per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day 0.04 84.00
Mazdoor (Unskilled) day 1.00 80.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.40 464.00
Air compressor 210 cfm hour 1.40 206.00
Emulsion pressure distributor @1750 sqm per hour hour 1.00 692.00
c) Overheads + Contractor’s profit @ 12.5% on (a+b)
Cost of 1750 sqm = a+b+c
Rate per sqm = (a+b+c)/1750
5.9 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified
bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm
to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and
level to serve as wearing course on a previously prepared base, including mixing in a suitable plant,
laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of either Type B as per Technical Specification Clause 508.

Case - I By Manual Means


(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day 1.08 84.00
Mazdoor (Unskilled) day 21.00 80.00
Mazdoor (Semi-Skilled) day 6.00 82.00
b)  Machinery
Mixall 6/10 t capacity hour 4.00 826.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 4.00 128.00
Three wheel 80-100 kN static roller hour 2.00 297.00
c) Overheads + Contractor’s profit @ 12.5% on (a+b)
Cost of 500 sqm = a+b+c
Rate per sqm = (a+b+c)/500
5.12 510 Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels,
grade and cross fall using Type B as per Technical Specification Clause 510
A. By Manual Means
Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day 0.85 84.00
Mazdoor (Unskilled) day 15.00 80.00
Mazdoor (Semi-Skilled) day 2.00 82.00
b) Machinery
Mixall 6/10 t capacity hour 2.50 826.00
Three wheel 80-100 kN static roller hour 2.50 297.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.50 128.00
c) Overheads + Contractor’s profit @ 12.5% on (a+b)
Cost of 1250 sqm = a+b+c
Rate per sqm = (a+b+c)/1250
10.10 1700 Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as
per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical
Specification Clause 1703

ii) Ordinary Kilometer Stone (Precast)


Unit = each
Taking output = 14 Nos.
a) M15 grade of concrete
As per item No.12.5 of Chapter 12 cum 3.77 3,075.92
b) Steel reinforcement @ 5 kg per sqm
As per item No.12.6 of Chapter 12 kg 26.32 30.65
c) Excavation in soil for foundation
As per item No.11.1 of Chapter 11 cum 2.77 75.02
d) Painting two coats on concrete surface
As per item No.10.5 of Chapter 10 sqm 11.41 51.96
e) lettering on km post (average 12 letters of 10 cm height each)
As per item No.10.1 of Chapter 10 per cm 1,680.00 0.33
high per
letter
Transportation and fixing
f) Labour
Mate day 0.32 84.00
Mason (1st Class) day 1.00 150.00
Mazdoor (Unskilled) day 7.00 80.00
g) Machinery
50 HP Tractor with trolley hour 6.00 234.00
h) Overheads + Contractor’s profit @ 12.5% on (f+g)
Total
Cost for 14 Nos. ordinary km stone = (a+b+c+d+e+f+g+h)
Rate for each ordinary km stone = (a+b+c+d+e+f+g+h)/14
iii) 200 m stone (precast)
Unit = each
Taking output = 33 Nos.
a) M15 grade of concrete
As per item No.12.5 of Chapter 12 cum 1.58 3,075.92
b) Steel reinforcement @ 5 kg per sqm
As per item No.12.6 of Chapter 12 kg 66.00 30.65
c) Excavation in soil for foundation
As per item No.11.1 of Chapter 11 cum 1.39 75.02
d) Painting two coats on concrete surface
As per item No.10.5 of Chapter 10 sqm 6.27 51.96
e) lettering on km post (average 1 letter of 10 cm height each)
As per item No. 10.1 of Chapter 10 per cm 330.00 0.33
per
litreetter
Transportation and fixing
f) Labour
Mate day 0.34 84.00
Mason (1st Class) day 1.50 150.00
Mazdoor (Unskilled) day 7.00 80.00
g) Machinery
50 HP Tractor with trolley hour 6.00 234.00
h) Overheads + Contractor’s profit @ 12.5% on (f+g)
Total
Cost for 33 Nos. 200 m stone = (a+b+c+d+e+f+g+h)
Rate for each 200 m stone = (a+b+c+d+e+f+g+h)/33

### 1700 Providing and Fixing 'Logo' of PMGSY Project


Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly
welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most
plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG
sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x
450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded
to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows, border etc. will be painted with
ready mixed synthetic enamel paint of superior quality in required shade and colour. All
sections of framed posts and steel tube will be painted with primer and two coats of epoxy
paint as per drawing Clause 1701 and Annexure 1700.1

Taking out put = one typical board


(i) Excavation for foundations
As per item No. 11.1 of Chapter 11 cum 0.252 75.020
(ii) Cement Concrete M15 grade
As per item No. 11.4 of Chapter 11 cum 0.252 2,989.960
(iii) Painting on MS Steel tubes with primer and two coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 10.7 of Chapter 10 sqm 1.80 47.51
iv) Printing new letters and figures of any shade with synthetic enamel paint black or any
other approved
Logo Border colour
60x4x5 to give
= 1200 perancm
even shade.
height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Bottom plate border 150x2x5 = 1500 per cm height per letter
Bottom plate border 60x2x5 = 600 per cm height per letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00
Total 4532.5 per cm height per letter
As per item No.10.1 of Chapter 10 per cm 4,532.50 0.33
a) Labour (for fixing at site) height per
Mate litre
day 0.03 84.00
Mazdoor (Unskilled) day 0.75 80.00
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet 2650 mm long kg 63.15 32.00
1 No. MS tube 47mm x 47mm of 12 SWG 1100 mm long kg 4.47 32.00
Angle iron 50mm x 50mm x 5 mm for lugs kg 2.12 32.00
1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron on logo and middle sqm 1.44 800.00
plate3%
Add angle
costiron 25mm
of MS tubex and
25mm x 5mm
angle iron on bottom
towards theplate
costpainting with stove
of fabrications, drilling
c) enameled
holes, paint
nuts,
Machinery on
bolts, both
etc. sides as per MORD specifications
Tractor with trolley hour 0.24 234.00
Total
d) Overheads + Contractors profit @ 12.5% on (a+b+c)
Total
Cost for one Board= (i+ii+iii+iv+a+b+c+d)
### 300 Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material.
I. Ordinary soil
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 84.00
Mazdoor (Unskilled) day 8.00 80.00
b) Overheads + Contracotr’s profit @ 12.5% on (a)
Total
Cost for 10 cum = a+b
Rate per cum = (a+b)/10
(ii) Cement Concrete M15 grade
II. P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement t 0.275 4,600.00
Coarse sand cum 0.48 565.24
40 mm aggregate cum 0.48 872.24
20 mm aggregate cum 0.24 1,142.24
10 mm aggregate cum 0.08 1,050.44
b) Labour
Mate day 0.08 84.00
Mason (1st Class0 day 0.10 150.00
Mazdoor (Unskilled) day 1.63 80.00
Bhisti day 0.27 84.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 150.00
d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)

e) Overheads + Contractor’s profit @ 12.5% on (a+b+c+d)


Total
Rate per cum = a+b+c+d+e
(iii) Painting on MS Steel tubes with primer and two coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel
surfaces after through cleaning of surface to give an even shade as per drawing and Technical
Specification Clause 1701
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate day 0.25 84.00
Painter (1st Class) day 0.60 135.00
Mazdoor (Unskilled) day 0.40 80.00
b) Material
Epoxy primer/Red-oxide litre 0.60 110.00
Epoxy paint litre 1.25 140.00
Add @ 1 per cent on cost of material for scaffolding wherever required
c) Overheads + Contractor’s profit @ 12.5% on (a+b)
Total
Cost for 10 sqm = (a+b+c)
Rate per sqm = (a+b+c)/10
iv) Printing new letters and figures of any shade with synthetic enamel paint black or any
other approved
Logo Border colour
60x4x5 to give
= 1200 ancm
per even shade.
height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Bottom plate border 150x2x5 = 1500 per cm height per letter
Bottom plate border 60x2x5 = 600 per cm height per letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00
Total 4532.5 per cm height per letter
Printing new letter and figures of any shade with synthetic enamel paint black or any other
ii) English and Roman
Hyphens, commas and the like not to be measured and paid for. Detail for 100 letters
Unit = per cm height per letter
a) Labour
Mate
Painter Ist class
Mazdoor
b) Material
Paint
c) Overheads @ 10% on (a+b)
d) Contractor’s profit @ 10% on (a+b+c)
Cost for 1600 cm = a+b+c+d
Rate per cm height per letter = (a+b+c +d)/1600
a) Labour (for fixing at site)
Mate day 0.03 84.00
Mazdoor (Unskilled) day 0.75 80.00
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet 2650 mm long kg 63.15 32.00
1 No. MS tube 47mm x 47mm of 12 SWG 1100 mm long kg 4.47 32.00
Angle iron 50mm x 50mm x 5 mm for lugs kg 2.12 40.00
1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron on logo and middle sqm 1.44 800.00
plate3%
Add angle
costiron 25mm
of MS tubex and
25mm x 5mm
angle iron on bottom
towards plate
the costpainting with stove
of fabrications, drilling
c) enameled
holes, nuts,paint
Machinery onetc.
bolts, both sides as per MORD specifications
Tractor with trolley hour 0.24 234.00
d) Overhead charges + C.P. @ 12.5% on (a+b+c)
Cost for one Board= (i+ii+iii+iv+a+b+c+d)

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
/Sqm
3.36
80.00

649.60
288.40
692.00
125.00
34.50
234.11
2,106.97
1.20

3.36
80.00

649.60
288.40
692.00
214.17
1,927.53
1.10

90.72
1,680.00
492.00

3,304.00
512.00
594.00
834.09
7,506.81
15.01
71.40
1,200.00
164.00

2,065.00
742.50
320.00
570.36
5,133.26
4.11

11,596.22

806.71

207.81

592.86

554.40

26.88
150.00
560.00
1,404.00
267.61
16,166.49
16,166.49
1,154.75

4,859.95

2,022.90

104.28

325.79

108.90

28.56
225.00
560.00

1,404.00
277.20
9,916.58
9,916.58
300.50
18.91

753.47

85.52

1,495.73

2.52
60.00

2,020.80
143.04
67.84
1,152.00
101.51
56.16
5,957.49
744.69
6,702.17
6,702.17

26.88
640.00
83.36
750.24
750.24
75.02

1,265.00
271.32
418.68
274.14
84.04

6.72
15.00
130.40
22.68

60.00
101.92

331.24
2,981.12
2,981.12
21.00
81.00
32.00

66.00
175.00
2.41
47.18
424.59
424.59
42.46
2.52
60.00

2,020.80
143.04
84.80
1,152.00
102.02

56.16
452.67
10,629.16

khabad
Model Analysis at Fatehgarh
1) Granular Sub-base with Well Graded Material (Table 400.1)

4.11 408 Construction of granular sub-base by providing well graded


material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel roller
to achieve the desired density, complete as per Technical
Specification Clause 401.

(i) For Grading I Material


Unit = cum
Taking output = 300 cum
(a) Labour
Mate day 0.48 84.00 40.32
Mazdoor (Skilled) day 2.00 82.00 164.00
Mazdoor (Unskilled) day 10.00 80.00 800.00
(b) Machinery
Motor grader 110 HP 50 cum per hour hour 6.00 1,545.00 9,270.00
Three wheel 80-100 kN static roller @10 cum per hour hour 30.00 297.00 8,910.00
Tractor with rotavator 25 cum per hour hour 12.00 234.00 2,808.00
Water tanker 6 kl capacity hour 5.00 250.00 1,250.00
(c) Material
Well graded granular sub-base material as per Table
400.1 (as per mix design)
53 mm to 22.4 mm @ 45 per cent cum 135.00 939.46 126827.55
11.2 mm @ 25 per cent (10 - 16 mm) cum 75.00 848.44 63632.73
6 mm stone grit @ 25 per cent cum 75.00 875.44 65657.73
Coarse Sand @ 30 per cent cum 90.00 565.11 50859.90
Water kl 30.00 11.50 345.00
Total (a+b+c) 330,565.22
(d) Overheads + C.P. @ 12.5% on (a+b+c) 41,320.65
Total (a+b+c+d) 371,885.87
Rate per cum = (a+b+c+d)/300 1,239.62

2)
4.7 405 Water Bound Macadam base
1) WBM Grading 2
Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density grading 2 as per
Technical Specification Clause 405. (Table 400.8)

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per cum 435.60 714.26 311,130.16
10 sqm for compacted thickness of 75 mm
0 Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum cum 96.01 848.44 81,458.37
per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for cum 28.80 627.86 18,082.27
Grading 2 material (Quarry dust)
Cost for 360 cum = 410,670.80
Material Rate per cum = 1,140.75
Overhead + Contractor Profit @ 12.5% 142.59
b) Labour rate per cum. 131.35
Total(a+b)= 1,414.70
Say 1,414.70 /cum.
2) WBM Grading 3
Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening to fill-up
the interstices of coarse aggregate, watering and compacting
to the required density Grading 3 as per Technical
Specification Clause 405. (Table 400.8)

(A) By Manual Means


Unit = cum
Taking output = 360 cum

a) Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per cum 435.60 939.46 409,230.23
10 sqm for compacted thickness of 75 mm

Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum cum 86.40 848.44 73,304.90
per 10 sqm

Cost for 360 cum = 482,535.13


Rate per cum = 1,340.38
Overheads + Contractor Profit @ 12.5% 167.55
b) Labour rate per cum. 131.35
Total(a+b)= 1,639.27
Say 1,639.30 /cum.

3)
5.1 502 Prime Coat
(ii) Low porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502.

Unit = sqm
Taking output = 1750 sqm
a) Material
Bitumen emulsion (SS-1) @0.70 kg per sqm 1.225 24,954.81 30,569.64
Cost of 1750 sqm = 30,569.64
Rate per sqm = 17.47
Add : Overhead Charges +C.P @ 12.5 % 2.18
b) Labour rate per sqm. 1.20
Total(a+b)= 20.85
Say 20.90 /sqm.

5.2 503 Tack Coat


(i) Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm t 0.394 25,065.24 9,869.44
Cost of 1750 sqm = 9,869.44
Rate per sqm = 5.64
Add : Overhead Charges + C.P. @ 12.5 % 0.70
b) Labour rate per sqm. 1.10
Total(a+b)= 7.44
Say 7.40 /sqm.

4)
5.9 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration
grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade
bitumen or emulsion to required line, grade and level to serve as wearing
course on a previously prepared base, including mixing in a suitable plant,
laying and rolling with a three wheel 80-100 kN static roller capacity, finished to
required level and grades to be followed by seal coat of either Type B as per
Technical Specification Clause 508.

Case - I By Manual Means


(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Material
Bitumen (S-90) @ 14.60 kg per 10 sqm t 0.73 25,186.12 18,385.87
Crushed stone chipping, 22.4 mm to 11.2 mm @ 0.18 cum per 10 sqm cum 9.00 794.44 7,149.93
(16 - 22.4 mm)
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.09 cum per 10 sqm cum 4.50 848.44 3,817.96
(10 - 16 mm)
Cost of 500 sqm = 29,353.76
Rate per sqm = 58.71
Add: Overhead Charges + C.P. @ 12.5 % 7.34
b) Labour rate per sqm. 15.01
Total(a+b)= 81.06
Say 81.10 /sqm.
5.12 510 Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to
the specified levels, grade and cross fall using Type B as per Technical
Specification Clause 510
A. By Manual Means
Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm t 0.85 25,186.12 21,408.20
Crushed sand or grit as passing 2.36 mm sieve and retained on 180 cum 7.50 565.11 4,238.33
micron sieve applied @ 0.06 cum per 10 sqm (Coarse Sand)
Cost of 1250 sqm = 25,646.53
Rate per sqm = 20.52
Add : Overhead Charges + C.P. @ 12.5% 2.56
b) Labour rate per sqm. 4.11
Total(a+b)= 27.19
Say 27.20 /sqm.

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Granular Sub-base with Well Graded Material (Table 400.1)

4.11 408 Construction of granular sub-base by providing well graded


material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel roller
to achieve the desired density, complete as per Technical
Specification Clause 401.

(i) For Grading I Material


Unit = cum
Taking output = 300 cum
(a) Labour
Mate day 0.48 84.00 40.32
Mazdoor (Skilled) day 2.00 82.00 164.00
Mazdoor (Unskilled) day 10.00 80.00 800.00
(b) Machinery
Motor grader 110 HP 50 cum per hour hour 6.00 1,545.00 9,270.00
Three wheel 80-100 kN static roller @10 cum per hour hour 30.00 297.00 8,910.00
Tractor with rotavator 25 cum per hour hour 12.00 245.00 2,940.00
Water tanker 6 kl capacity hour 5.00 250.00 1,250.00
(C) Material
Water kl 30.00 11.50 345.00
Total (a+b+c) 23,719.32
(d) Overheads + C.P. @ 12.5% on (a+b+c) 2964.915
Total (a+b+c+d) 26,684.24
Rate per cum = (a+b+c+d)/300 88.94745
Say Rs. 88.95

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Granular Sub-base with Well Graded Material (Table 400.1)

Name of Road : Hisampur To Jhijhuki L/R

4.11 408 Construction of granular sub-base by providing well graded


material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel roller
to achieve the desired density, complete as per Technical
Specification Clause 401.

(i) For Grading I Material


Unit = cum
Taking output = 300 cum
(a) Labour
Mate day 0.48 84.00 40.32
Mazdoor (Skilled) day 2.00 82.00 164.00
Mazdoor (Unskilled) day 10.00 80.00 800.00
(b) Machinery
Motor grader 110 HP 50 cum per hour hour 6.00 1,545.00 9,270.00
Three wheel 80-100 kN static roller @10 cum per hour hour 30.00 297.00 8,910.00
Tractor with rotavator 25 cum per hour hour 12.00 245.00 2,940.00
Water tanker 6 kl capacity hour 5.00 250.00 1,250.00
(c) Material
Well graded granular sub-base material as per Table
400.1(asPer Mix Design)
53 mm to 22.4 mm @ 45 per cent cum 135.00 991.45 133845.17
11.2 mm @ 25 per cent (10 - 16 mm) cum 75.00 900.42 67531.40
6 mm stone grit @ 25 per cent cum 75.00 927.42 69556.40
Coarse Sand @ 30 per cent cum 90.00 565.11 50859.90
Water kl 30.00 11.50 345.00
Total (a+b+c) 345,512.19
(d) Overheads + C.P. @ 12.5% on (a+b+c) 43,189.02
Total (a+b+c+d) 388,701.21
Rate per cum = (a+b+c+d)/300 1,295.67

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Granular Sub-base with Well Graded Material (Table 400.1)

Name of Road :FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R

4.11 408 Construction of granular sub-base by providing well graded


material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel roller
to achieve the desired density, complete as per Technical
Specification Clause 401.

(i) For Grading I Material


Unit = cum
Taking output = 300 cum
(a) Labour
Mate day 0.48 84.00 40.32
Mazdoor (Skilled) day 2.00 82.00 164.00
Mazdoor (Unskilled) day 10.00 80.00 800.00
(b) Machinery
Motor grader 110 HP 50 cum per hour hour 6.00 1,545.00 9,270.00
Three wheel 80-100 kN static roller @10 cum per hour hour 30.00 297.00 8,910.00
Tractor with rotavator 25 cum per hour hour 12.00 245.00 2,940.00
Water tanker 6 kl capacity hour 5.00 250.00 1,250.00
(c) Material
Well graded granular sub-base material as per Table
400.1(asPer Mix Design)
53 mm to 22.4 mm @ 45 per cent cum 135.00 980.05 132306.15
11.2 mm @ 25 per cent (10 - 16 mm) cum 75.00 889.02 66676.39
6 mm stone grit @ 25 per cent cum 75.00 916.02 68701.39
Coarse Sand @ 30 per cent cum 90.00 565.11 50859.90
Water kl 30.00 11.50 345.00
Total (a+b+c) 342,263.15
(d) Overheads + C.P.@ 12.5% on (a+b+c) 42,782.89
Total (a+b+c+d) 385,046.05
Rate per cum = (a+b+c+d)/300 1,283.49

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
WORLD BANK FUNDED PROJECT (2005-06)

RATE ANALYSIS

NAME OF WORK : Hisampur To Jhijhuki L/R

4.7 405 Water Bound Macadam base


1) WBM Grading 2
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density grading 2 as per
Technical Specification Clause 405.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Material (Refer Tables 400.7, 8, 9 and 10)

Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum 435.60 766.24 333,773.67
cum per 10 sqm for compacted
thickness of 75 mm
Stone Screening

Type B 11.2 mm for Grading 2 @ cum 96.01 900.42 86,449.20


0.20 cum per 10 sqm

Binding Material
Binding Material @ 0.06 cum per 10 cum 28.80 679.84 19,579.36
sqm for Grading 2 material (Quarry
dust)
Cost for 360 cum = 439,802.23
Material Rate per cum = 1,221.67
Overheads + Contractor Profit @ 12.5% 152.71
b) Labour rate per cum. 131.35
Total(a+b)= 1,505.73
Say 1,505.70 /cum.
2) WBM Grading 3

Providing, laying, spreading and compacting stone


aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening to fill-up the interstices of
coarse aggregate, watering and compacting to the
required density Grading 3 as per Technical
Specification Clause 405.

(A) By Manual Means

Unit = cum

Taking output = 360 cum

a) Material (Refer Tables 400.7, 8, 9 and 10)

Aggregate

Grading 3 53 mm to 22.4 mm @ 0.91 cum 435.60 991.45 431,873.73


cum per 10 sqm for compacted
thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ cum 86.40 900.42 77,796.17
0.18 cum per 10 sqm

Cost for 360 cum = 509,669.91

Rate per cum = 1,415.75

Overheads + Contractor Profit @ 12.5% 176.97

b) Labour rate per cum. 131.35


Total(a+b)= 1,724.07
Say 1724.10 /cum.
WORLD BANK FUNDED PROJECT (2005-06)

RATE ANALYSIS

NAME OF WORK : Hisampur To Jhijhuki L/R

5.1 502 Prime Coat


(ii) Low porosity
Providing and applying primer coat with Bitumen emulsion
(SS-1) on prepared surface of granular base including
cleaning of road surface and spraying primer at the rate of
0.70- 0.9 kg/sqm using mechanical means as per
Technical Specification Clause 502.
Unit = sqm
Taking output = 1750 sqm
a) Material
Bitumen emulsion (SS-1) @ 0.7 kg per sqm t 1.225 25,111.61 30,761.73
Cost of 1750 sqm = 30,761.73
Rate per sqm = 17.58
Add: Overhead Charges + C.P. @ 12.5 % 2.20
b) Labour rate per sqm. 1.20
Total(a+b)= 20.98
Say 21.00 /sqm.

5.2 503 Tack Coat


(iii) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared granular surfaces treated
with primer & cleaned with Hydraulic broom as per
Technical Specification Clause 503.

Unit = sqm
Taking output = 1750 sqm
a) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm t 0.394 25,125.38 9,893.12
Cost of 1750 sqm = 9,893.12
Rate per sqm = 5.65
Add: Overhead Charges + C.P. @ 12.5 % 0.71
b) Labour rate per sqm. 1.10
Total(a+b)= 7.46
Say 7.50 /sqm.
WORLD BANK FUNDED PROJECT (2005-06)

RATE ANALYSIS

NAME OF WORK : Hisampur To Jhijhuki L/R

5.9 508 20mm thick Open-Graded Premix Carpet using Bituminous


(penetration grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and
level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of either Type A or Type B or
Type C as per Technical Specification Clause 508.

Case - I By Manual Means

(I) Bitumen (S-90)

Unit = sqm
Taking output = 500 sqm (10 cum)
a) Material (As per SP-20 Table 8.17)
Bitumen (S-90) @ 14.60 kg per 10 sqm t 0.73 25,246.08 18,429.64

Crushed stone chipping, 22.4 mm to 11.2 cum 9.00 846.42 7,617.77


mm @ 0.18 cum per 10 sqm (16 - 22.4 mm)

Crushed stone chipping, 13.2 mm to 5.6 mm cum 4.50 900.42 4,051.88


@ 0.09 cum per 10 sqm (10 - 16 mm)

Cost of 500 sqm = 30,099.29

Rate per sqm = 60.20

7.52
Add: Overhead Charges + C.P.@ 12.5 %
b) Labour rate per sqm. 15.01
Total(a+b)= 82.74
Say 82.70 /sqm.
5.12 510 Seal Coat

Providing and laying seal coat sealing the voids in a bituminous


surface laid to the specified levels, grade and cross fall using Type
A, Type B and Type C as per Technical Specification Clause 510

A. By Manual Means

Case - II : Type B

(I) Bitumen (S-90)

Unit = sqm

Taking output = 1250 sqm

a) Material

Bitumen (S-90) @ 6.80 kg per 10 sqm t 0.85 15,342.60 13,041.21

Crushed sand or grit as passing 2.36 mm cum 7.50 565.11 4,238.33


sieve and retained on 180 micron sieve
applied @ 0.06 cum per 10 sqm
Cost of 1250 sqm = 17,279.54
Rate per sqm = 13.82

1.73
Add: Overhead Charges + C.P. @ 12.5 %
b) Labour rate per sqm. 4.11
Total(a+b)= 19.66
Say 19.70 /sqm.
WORLD BANK FUNDED PROJECT (2005-06)

RATE ANALYSIS

NAME OF WORK : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R

4.7 405 Water Bound Macadam base


1) WBM Grading 2
Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density grading 2 as per
Technical Specification Clause 405.

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for cum 435.60 754.84 328,807.78
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10 sqm cum 96.01 889.02 85,354.67

Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80 668.44 19,251.04
material (Quarry dust)
Cost for 360 cum = 433,413.49
Material Rate per cum = 1,203.93

Overheads + Contractor Profit @ 12.5% 150.49


b) Labour rate per cum. 131.35
Total(a+b)= 1,485.77
Say 1,485.80 /cum.

2) WBM Grading 3

Providing, laying, spreading and compacting stone aggregates


of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening to fill-up
the interstices of coarse aggregate, watering and compacting to
the required density Grading 3 as per Technical Specification
Clause 405.

(A) By Manual Means

Unit = cum

Taking output = 360 cum

a) Material (Refer Tables 400.7, 8, 9 and 10)

Aggregate

Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm cum 435.60 980.05 426,907.84
for compacted thickness of 75 mm

Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10 sqm cum 86.40 889.02 76,811.20

Cost for 360 cum = 503,719.05

Rate per cum = 1,399.22

Overheads + Contractor Profit @ 12.5% 174.90

b) Labour rate per cum. 131.35


Total(a+b)= 1,705.47
Say 1705.50 /cum.
WORLD BANK FUNDED PROJECT (2005-06)

RATE ANALYSIS

NAME OF WORK : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R

5.1 502 Prime Coat


(ii) Low porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70- 0.9 kg/sqm using mechanical means
as per Technical Specification Clause 502.
Unit = sqm
Taking output = 1750 sqm
a) Material
Bitumen emulsion (SS-1) @ 0.70 kg per sqm t 1.225 25,124.67 30,777.73
Cost of 1750 sqm = 30,777.73
Rate per sqm = 17.59
Add: Overhead Charges + C.P. @ 12.5 % 2.20
b) Labour rate per sqm. 1.20
Total(a+b)= 20.99
Say 21.00 /sqm.

5.2 503 Tack Coat


(iii Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503.

Unit = sqm
Taking output = 1750 sqm
a) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm t 0.394 25,138.44 9,898.26
Cost of 1750 sqm = 9,898.26
Rate per sqm = 5.66
Add: Overhead Charges + C.P. @ 12.5 % 0.71
b) Labour rate per sqm. 1.10
Total(a+b)= 7.46
Say 7.50 /sqm.
WORLD BANK FUNDED PROJECT (2005-06)

RATE ANALYSIS

NAME OF WORK : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R

5.9 508 20mm thick Open-Graded Premix Carpet using Bituminous


(penetration grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and level to
serve as wearing course on a previously prepared base, including mixing in
a suitable plant, laying and rolling with a three wheel 80-100 kN static roller
capacity, finished to required level and grades to be followed by seal coat
of either Type A or Type B or Type C as per Technical Specification Clause
508.

Case - I By Manual Means

(I) Bitumen (S-90)

Unit = sqm

Taking output = 500 sqm (10 cum)

a) Material (As per SP-20 Table 8.17)

Bitumen (S-90) @ 14.60 kg per 10 sqm t 0.73 25,259.14 18,439.17

Crushed stone chipping, 22.4 mm to 11.2 mm @ 0.18 cum per 10 cum 9.00 835.02 7,515.17
sqm (16 - 22.4 mm)

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.09 cum per 10 sqm cum 4.50 889.02 4,000.58
(10 - 16 mm)

Cost of 500 sqm = 29,954.92


Rate per sqm = 59.91
Add: Overhead Charges + C.P. @ 12.5 % 7.49
b) Labour rate per sqm. 15.01
Total(a+b)= 82.41
Say 82.40 /sqm.
5.12 510 Seal Coat

Providing and laying seal coat sealing the voids in a bituminous surface
laid to the specified levels, grade and cross fall using Type A, Type B and
Type C as per Technical Specification Clause 510

A By Manual Means
.
Case - II : Type B

(I) Bitumen (S-90)

Unit = sqm

Taking output = 1250 sqm

a) Material

Bitumen (S-90) @ 6.80 kg per 10 sqm t 0.85 25,259.14 21,470.27

Crushed sand or grit as passing 2.36 mm sieve and retained on 180 cum 7.50 565.11 4,238.33
micron sieve applied @ 0.06 cum per 10 sqm

Cost of 1250 sqm = 25,708.59

Rate per sqm = 20.57

2.57
Add: Overhead Charges + C.P. @ 12.5 %
b) Labour rate per sqm. 4.11
Total(a+b)= 27.24
Say 27.20 /sqm.
Hisampur To Jhijhuki L/R ( 2.10 Km.)

Details of Measurement / Abstract of Cost


(For each Road Seperatly)
Description of item (with brief specification L B D Quantity Unit Rate Amount
Referen
and reference to book of specification) (m) (m) (m)
S.No.

ce to
MORD (Rs./Unit) (Rs.)
Specific
ations
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
DISTRICT-FARRUKHABAD
Name of Road--Hisampur To Jhijhuki L/R ( 2.10 Km.)
1 201 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation,
grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be 2100.00 5.00 - 10500.00 Sqm. 1.43 15015.00
used or auctioned, upto a lead of 1000 m including removal and
disposal of top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201.

2 301.5 Construction of Embankment with Material Obtained from


Borrow Pits
Construction of embankment with approved material obtained from
borrow pits with a lift upto 1.5 m, transporting to site, spreading,
grading to required slope and compacting to meet requirement of As Per Sheet Attached 17659.88 Cum. 58.90 1040166.93
Tables 300.1 and 300.2 with a lead upto 50 m as per Technical
Specification Clause 301.5(FOR LOCAL EARTH).

3 Providing and fixing of level pillar (35mm x 350mm x 1500mm) at the


interval of 50m both side of the road made of M-150 brick masonry
with cement(43 grade,O.P.C.,I.S.8112) and sand(Course Modulus-
2.50) in proportion of 1:3 mortor, of required height and including its
1:6 cement, sand, mortor plastering, white washing and marking 2100.00 - - 0.00 No. 0.00 0.00
different chainages and levels in different colour including supply of
all materials, labour, T&P etc,required for proper completion of work
.

Name of Road--Hisampur To Jhijhuki L/R ( 2.10 Km.)


4 301.5 Construction of Embankment with Material Obtained from
Borrow Pits
Construction of embankment with approved material obtained from
borrow pits with a lift upto 1.5 m, transporting to site, spreading,
grading to required slope and compacting to meet requirement of As Per Sheet Attached 0.00 Cum. 0.00 0.00
Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5(FOR CARTED EARTH)

5 303.1 Construction of Subgrade and Earthen Shoulders


Hisampur To Jhijhuki L/R ( 2.10 Km.)
Construction of subgrade and earthen shoulders with approved
material obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope and
compacted to meet requirement of Table 300.2 with lead upto 50 m 4200.00 2.48 0.25 2598.75 Cum. 59.90 155665.13
as per Technical Specification Clause 303.1. 2x2100.00=4200.00

6 408 Granular sub-base/base/surface course with local materials


(Table 400.13) by mix in place method.
Construction of granular sub-base in Ist Layer by providing well
graded material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at 1900.00 438.90
3.30 0.070
OMC, and compacting with smooth wheel roller to achieve the 200.00 90.00 Cum. 1295.67 685280.23
3.00 0.150
desired density, complete as per Technical Specification Clause 528.90
401.
7 Construction of granular sub-base in IInd Layer by providing well
graded material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at
OMC, and compacting with smooth wheel roller to achieve the 1900.00 3.3 0.05 313.50 Cum. 1295.67 406192.76
desired density, complete as per Technical Specification Clause
401.
8 405 Water Bound Macadam Sub-base/base
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill-up 1900.00 3.0 0.075 427.50 Cum. 1505.70 643686.75
the interstices of coarse aggregate, watering and compacting to the
required density grading 2 as per Technical Specification Clause
405. (Table 400.8)

Name of Road--Hisampur To Jhijhuki L/R ( 2.10 Km.)


WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening to fill-up the interstices of 1900.00 3.0 0.075 427.50 Cum 1724.10 737052.75
coarse aggregate, watering and compacting to the required density
Grading 3 as per Technical Specification Clause 405. (Table 400.8)

9 502 Prime Coat


Low porosity
Hisampur To Jhijhuki L/R ( 2.10 Km.)
Providing and applying primer coat with Bitumen emulsion (SS-1)
on prepared surface of granular base including cleaning of road
surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using 1900.00 3.0 - 5700.00 Sqm. 21.00 119700.00
mechanical means as per Technical Specification Clause 502.
10 503 Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1)
using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on
the prepared granular surfaces treated with primer & cleaned with 1900.00 3.0 - 5700.00 Sqm. 7.50 42750.00
Hydraulic broom as per Technical Specification Clause 503.
Name of Road--Hisampur To Jhijhuki L/R ( 2.10 Km.)
11 508 20mm thick Open-Graded Premix Carpet using Bituminous
(penetration grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and
level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a three 1900.00 3.0 - 5700.00 Sqm. 82.70 471390.00
wheel 80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of either Type B as per Technical
Specification Clause 508.

12 510 Seal Coat


Providing and laying seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using Type B 1900.00 3.0 - 5700.00 Sqm. 19.70 112290.00
as per Technical Specification Clause 510
13 412 Laying brick soling layer on prepared sub-grade with brick on end
edging according to lines, graded and cross section shown in the
drawing filling joints with sand and earth, spreading 25 mm thick
layer of earth over brick soling, watering and rolling the same with 4200.00 0.30 - 1260.00 Sqm. 213.20 268632.00
three wheel road roller 50-100 kN as per Technical Specification
Clause 412 (Brick edge soling on both sides of roadway)

14 Construction of "KC" drain in village portion of the road with 10 cm.


1:3:6 cement-coarse sand and 40 mm stone ballast base concrete &
1:3 cement sand mortar in brick work including all as directed by 2x200 - - 400.00 m. 718.80 287520.00
Engineer-in-charge.
15 1700 Kilometre Stone
(a) Reinforced cement concrete M15 grade kilometre stone/local stone
of standard design as per IRC:8 fixing in position including painting
and printing, etc as per drawing and Technical Specification Clause 3 - - 3.00 No. 1154.75 3464.25
1703
Name of Road--Hisampur To Jhijhuki L/R ( 2.10 Km.)
200m Stone
Hisampur To Jhijhuki L/R ( 2.10 Km.)
(b) Reinforced cement concrete M15 grade 200m stone/local stone of
standard design as per IRC:8 fixing in position including painting and
printing, etc as per drawing and Technical Specification Clause 1703 8 - - 8.00 No. 300.50 2404.02

16 1700 Providing and Fixing 'Logo' of PMGSY Project : Providing and


fixing of typical PMGSY/CITIZEN informatory sign board with Logo
as per MORD specifications and drawing. Three MS Plates of 1.6
mm thick, top and middle plate duly welded with MS flat iron 25mm x
5m size on back on edges. The lower plate will be welded with MS
angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of
the lower most plate and flat iron frame of middle plate will be
welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly
embedded in cement concrete M-15 grade blocks of 450mm x
450mm x 600mm, 600mm below ground level. The top most 2 - - 2.00 No. 8493.00 16986.00
diamond plate will be welded to middle plate by 47mm x 47mm of 12
SWG steel plate tube. All M.S. will be stove enameled on both
sides. Lettering and printing arrows, border etc. will be painted with
ready mixed synthetic enamel paint of superior quality in required
shade and colour. All sections of framed posts and steel tube will be
painted with primer and two coats of epoxy paint as per drawing
Clause 1701 and Annexure 1700.1

17 Construction of Ramps 15m. Long with BOE soling on embankment


compacted to 97% Proctor density including material, labour, T&P 2 No. - - 2.00 No. 11051.80 22103.60
etc.(As per detail estimate) B=(7.5+3.5)/2
18 Construction of Junction with 15m Long 2 Ramps with BOE soling
on embankment compacted to 97% Proctor density including 0 No. - 0.00 No. 22103.60 0.00
material, labour, T&P etc.(As per detail estimate) B=(7.5+3.5)/3
19 Construction of Stacking Platform with BOE soling on embankment
compacted to 97% Proctor density including material, labour, T&P
etc.(As per detail estimate) Size=10mx3mx0.3m 1 No. - - 1.00 No. 6926.10 6926.10

20 Mechanical widening of the road at the curves with pavement from


5x50 0.6 - 150.00 Sqm. 588.40 88260.00
earthwork level to flexible PMC (with seal coat) to 50m. Length.
21 Survey investigation and preparation of DPR 2100.00 2.10 Km 10000.00 21000.00
22 Cement Concrete with 2 cm gauge stone grit instead of 4 cm gauge
stone ballast, coarse sand and cement in proportion of 4:2:1
including supply of all materials, labour Tools & Plants etc required 200 3.0 0.17 102.00 Cum 3615.29 368759.58
for proper completion of work as per SI No. 279(A) of UPPWD.
(Over G-2 & G-3 layer of 7.5 cm each in village portion.)
Total 5048276.86
Say Rs. LAC. 50.48
Conctruction Of Culvert
1 1x1000mm dia Hume Pipe 3 - - 3 No. 0.99 2.97
NET TOTAL 53.45
Hisampur To Jhijhuki L/R ( 2.10 Km.)

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Hisampur To Jhijhuki L/R ( 2.10 Km.)

0.15015

10.40
Hisampur To Jhijhuki L/R ( 2.10 Km.)

1.5566513

6.8528023

4.0619276

6.4368675

7.3705275
Hisampur To Jhijhuki L/R ( 2.10 Km.)

1.197 200

0.4275

4.7139

1.1229

2.68632

2.88
Hisampur To Jhijhuki L/R ( 2.10 Km.)

8.17
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)

Details of Measurement / Abstract of Cost


(For each Road Seperatly)
Description of item (with brief specification L B D Quantity Unit Rate
Referen
and reference to book of specification) (m) (m) (m)
S.No.

ce to
MORD (Rs./Unit)
Specific
ations
[1] [2] [3] [4] [5] [6] [7] [8] [9]
DISTRICT-FARRUKHABAD
Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
1 201 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m including removal and 3330.00 5.00 - 16650.00 Sqm. 1.43
disposal of top organic soil not exceeding 150 mm in thickness as per Technical
Specification Clause 201.

2 301.5 Construction of Embankment with Material Obtained from Borrow Pits


Construction of embankment with approved material obtained from borrow pits with
a lift upto 1.5 m, transporting to site, spreading, grading to required slope and
compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 50 m As Per Sheet Attached 28396.48 Cum. 58.90
as per Technical Specification Clause 301.5(FOR LOCAL EARTH).
3 Providing and fixing of level pillar (35mm x 350mm x 1500mm) at the interval of
50m both side of the road made of M-150 brick masonry with cement(43
grade,O.P.C.,I.S.8112) and sand(Course Modulus- 2.50) in proportion of 1:3
mortor, of required height and including its 1:6 cement, sand, mortor plastering, 3330.00 - - 0.00 No. 0.00
white washing and marking different chainages and levels in different colour
including supply of all materials, labour, T&P etc,required for proper completion of
work .

Name of Road--B.E. Rd. to Gazipur L/R ( 1.62 Km.)


4 301.5 Construction of Embankment with Material Obtained from Borrow Pits

Construction of embankment with approved material obtained from borrow pits with
a lift upto 1.5 m, transporting to site, spreading, grading to required slope and
compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 As Per Sheet Attached 0.00 Cum. 0.00
m as per Technical Specification Clause 301.5(FOR CARTED EARTH)

5 303.1 Construction of Subgrade and Earthen Shoulders


FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
6 Construction of subgrade and earthen shoulders with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of Table 300.2 with lead upto 6660.00 2.48 0.25 4120.88 Cum. 59.90
50 m as per Technical Specification Clause 303.1. 2x3330.00=6660.00
7 408 Granular sub-base/base/surface course with local materials (Table 400.13) by
mix in place method.
8 Construction of granular sub-base in Ist Layer by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with smooth wheel roller to 3330.00 3.3 0.13 1428.57 Cum. 1283.49
achieve the desired density, complete as per Technical Specification Clause 401.

9 Construction of granular sub-base in IInd Layer by providing well graded material,


spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with smooth wheel roller to 3330.00 3.3 0.1 1098.90 Cum. 1283.49
achieve the desired density, complete as per Technical Specification Clause 401.

Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
8 405 Water Bound Macadam Sub-base/base
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening/binding materials to fill-up the 3330.00 3.0 0.075 749.25 Cum. 1485.80
interstices of coarse aggregate, watering and compacting to the required density
grading 2 as per Technical Specification Clause 405. (Table 400.8)

WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening to fill-up the interstices of coarse 3330.00 3.0 0.075 749.25 Cum 1705.50
aggregate, watering and compacting to the required density Grading 3 as per
Technical Specification Clause 405. (Table 400.8)

9 502 Prime Coat


Low porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning of road surface and spraying primer at
the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical 3330.00 3.0 - 9990.00 Sqm. 21.00
Specification Clause 502.
10 503 Tack Coat
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as per Technical Specification 3330.00 3.0 - 9990.00 Sqm. 7.50
Clause 503.
Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
11 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration
grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade
bitumen or emulsion to required line, grade and level to serve as wearing course on
a previously prepared base, including mixing in a suitable plant, laying and rolling 3330.00 3.0 - 9990.00 Sqm. 82.40
with a three wheel 80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of either Type B as per Technical Specification
Clause 508.

12 510 Seal Coat


Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type B as per Technical Specification 3330.00 3.0 - 9990.00 Sqm. 27.20
Clause 510
13 412 Laying brick soling layer on prepared sub-grade with brick on end edging according
to lines, graded and cross section shown in the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling 6660.00 0.30 - 1998.00 Sqm. 213.20
the same with three wheel road roller 50-100 kN as per Technical Specification
Clause 412 (Brick edge soling on both sides of roadway)

14 Construction of "KC" drain in village portion of the road with 10 cm. 1:3:6 cement-
coarse sand and 40 mm stone ballast base concrete & 1:3 cement sand mortar in 0 - - 0.00 m. 718.80
brick work including all as directed by Engineer-in-charge.
15 1700 Kilometre Stone
(a) Reinforced cement concrete M15 grade kilometre stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per 5 - - 5.00 No. 1154.75
drawing and Technical Specification Clause 1703
Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
200m Stone
(b) Reinforced cement concrete M15 grade 200m stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per 13 - - 13.00 No. 300.50
drawing and Technical Specification Clause 1703
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
16 1700 Providing and Fixing 'Logo' of PMGSY Project : Providing and fixing of typical
PMGSY/CITIZEN informatory sign board with Logo as per MORD specifications
and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded
with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x
75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15
grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top
2 - - 2.00 No. 8493.00
most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG
steel plate tube. All M.S. will be stove enameled on both sides. Lettering and
printing arrows, border etc. will be painted with ready mixed synthetic enamel paint
of superior quality in required shade and colour. All sections of framed posts and
steel tube will be painted with primer and two coats of epoxy paint as per drawing
Clause 1701 and Annexure 1700.1

17 Construction of Ramps 15m. Long with BOE soling on embankment compacted to


97% Proctor density including material, labour, T&P etc.(As per detail estimate) 11 No. - - 11.00 No. 11051.80
B=(7.5+3.5)/2
18 Construction of Junction with 15m Long 2 Ramps with BOE soling on embankment
compacted to 97% Proctor density including material, labour, T&P etc.(As per detail 0 No. - 0.00 No. 22103.60
estimate) B=(7.5+3.5)/3
19 Construction of Stacking Platform with BOE soling on embankment compacted to
97% Proctor density including material, labour, T&P etc.(As per detail estimate) 1 No. - - 1.00 No. 6926.10
Size=10mx3mx0.3m
20 Mechanical widening of the road at the curves with pavement from earthwork level
18x50 0.6 - 540.00 Sqm. 588.40
to flexible PMC (with seal coat) to 50m. Length.
21 Survey investigation and preparation of DPR 3330.00 3.33 Km 10000.00
Total
Say Rs.LAC.
Conctruction Of Culvert
1x350mm dia Hume Pipe(Gul Cul) 1 - - 1 No. 0.119
1

1x1000mm dia Hume Pipe 3 - - 3 No. 0.99


2x1000mm dia Hume Pipe 2 - - 2 No. 1.48
1x3m Span R.C.C. Cul. 1 - - 1 No. 6.59
3x5m(2Span) R.C.C.Box Cul. 1 - - 1 No. 11.39
8 - - 8
Say Rs.LAC.

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)

Amount

(Rs.)

[10]

23809.50

0.238095

1672552.67

0.00

0.00
16.73
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)

193681.36
1.9368136

1833550.78

18.335508

1410423.67

14.104237

1113235.65

11.132357

1277845.88

12.778459

209790.00
2.0979
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)

74925.00
0.74925

823176.00

8.23176

271728.00
2.71728

425973.60

4.259736

0.00
0.00

5773.74

3906.53
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)

16986.00

121569.80

0.00

6926.10

317736.00
33300.00 5.06
9836890.28
98.37

0.119
2.97
2.96
6.59
11.39
24.029
122.40

P.I.U. Farrukhabad
Details of Measurement / Abstract of Cost
(For each Road Seperatly)
Description of item (with brief specification L B D Quantity Unit Rate Amount
Referen
and reference to book of specification) (m) (m) (m)
S.No.

ce to
MORD (Rs./Unit) (Rs.)
Specific
ations
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
DISTRICT-FARRUKHABAD
Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
1 201 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m including removal and 3330.00 5.00 - 16650.00 Sqm. 1.43 23809.50
disposal of top organic soil not exceeding 150 mm in thickness as per Technical
Specification Clause 201.

2 301.5 Construction of Embankment with Material Obtained from Borrow Pits


Construction of embankment with approved material obtained from borrow pits with
a lift upto 1.5 m, transporting to site, spreading, grading to required slope and
compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 50 m As Per Sheet Attached 28396.48 Cum. 58.90 1672552.67
as per Technical Specification Clause 301.5(FOR LOCAL EARTH).
3 Providing and fixing of level pillar (35mm x 350mm x 1500mm) at the interval of
50m both side of the road made of M-150 brick masonry with cement(43
grade,O.P.C.,I.S.8112) and sand(Course Modulus- 2.50) in proportion of 1:3
mortor, of required height and including its 1:6 cement, sand, mortor plastering, 3330.00 - - 0.00 No. 0.00 0.00
white washing and marking different chainages and levels in different colour
including supply of all materials, labour, T&P etc,required for proper completion of
work .

Name of Road--B.E. Rd. to Gazipur L/R ( 1.62 Km.)


4 301.5 Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with
a lift upto 1.5 m, transporting to site, spreading, grading to required slope and
compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 As Per Sheet Attached 0.00 Cum. 0.00 0.00
m as per Technical Specification Clause 301.5(FOR CARTED EARTH)

5 303.1 Construction of Subgrade and Earthen Shoulders


6 Construction of subgrade and earthen shoulders with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of Table 300.2 with lead upto 6660.00 2.48 0.25 4120.88 Cum. 59.90 193681.36
50 m as per Technical Specification Clause 303.1. 2x3330.00=6660.00
7 408 Granular sub-base/base/surface course with local materials (Table 400.13) by
mix in place method.
8 Construction of granular sub-base in Ist Layer by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with smooth wheel roller to 3330.00 3.3 0.13 1428.57 Cum. 1283.49 1833550.78
achieve the desired density, complete as per Technical Specification Clause 401.

9 Construction of granular sub-base in IInd Layer by providing well graded material,


spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with smooth wheel roller to 3330.00 3.3 0.1 1098.90 Cum. 1283.49 1410423.67
achieve the desired density, complete as per Technical Specification Clause 401.

Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
8 405 Water Bound Macadam Sub-base/base
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening/binding materials to fill-up the 3330.00 3.0 0.075 749.25 Cum. 1485.80 1113235.65
interstices of coarse aggregate, watering and compacting to the required density
grading 2 as per Technical Specification Clause 405. (Table 400.8)

WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening to fill-up the interstices of coarse 3330.00 3.0 0.075 749.25 Cum 1705.50 1277845.88
aggregate, watering and compacting to the required density Grading 3 as per
Technical Specification Clause 405. (Table 400.8)

9 502 Prime Coat


Low porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning of road surface and spraying primer at
the rate of 0.70- 1.0 kg/sqm using mechanical means as per Technical 3330.00 3.0 - 9990.00 Sqm. 21.00 209790.00
Specification Clause 502.
10 503 Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as per Technical Specification 3330.00 3.0 - 9990.00 Sqm. 7.50 74925.00
Clause 503.
Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
11 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration
grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade
bitumen or emulsion to required line, grade and level to serve as wearing course on
a previously prepared base, including mixing in a suitable plant, laying and rolling 3330.00 3.0 - 9990.00 Sqm. 82.40 823176.00
with a three wheel 80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of either Type B as per Technical Specification
Clause 508.

12 510 Seal Coat


Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type B as per Technical Specification 3330.00 3.0 - 9990.00 Sqm. 27.20 271728.00
Clause 510
13 412 Laying brick soling layer on prepared sub-grade with brick on end edging according
to lines, graded and cross section shown in the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling 6660.00 0.30 - 1998.00 Sqm. 213.20 425973.60
the same with three wheel road roller 50-100 kN as per Technical Specification
Clause 412 (Brick edge soling on both sides of roadway)

14 Construction of "KC" drain in village portion of the road with 10 cm. 1:3:6 cement-
coarse sand and 40 mm stone ballast base concrete & 1:3 cement sand mortar in 0 - - 0.00 m. 718.80 0.00
brick work including all as directed by Engineer-in-charge.
15 1700 Kilometre Stone
(a) Reinforced cement concrete M15 grade kilometre stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per 5 - - 5.00 No. 1154.75 5773.74
drawing and Technical Specification Clause 1703
Name of Road--FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R ( 3.33Km.)
200m Stone
(b) Reinforced cement concrete M15 grade 200m stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per 13 - - 13.00 No. 300.50 3906.53
drawing and Technical Specification Clause 1703
16 1700 Providing and Fixing 'Logo' of PMGSY Project : Providing and fixing of typical
PMGSY/CITIZEN informatory sign board with Logo as per MORD specifications
and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded
with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x
75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15
grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top
2 - - 2.00 No. 8493.00 16986.00
most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG
steel plate tube. All M.S. will be stove enameled on both sides. Lettering and
printing arrows, border etc. will be painted with ready mixed synthetic enamel paint
of superior quality in required shade and colour. All sections of framed posts and
steel tube will be painted with primer and two coats of epoxy paint as per drawing
Clause 1701 and Annexure 1700.1

17 Construction of Ramps 15m. Long with BOE soling on embankment compacted to


97% Proctor density including material, labour, T&P etc.(As per detail estimate) 11 No. - - 11.00 No. 11051.80 121569.80
B=(7.5+3.5)/2
18 Construction of Junction with 15m Long 2 Ramps with BOE soling on embankment
compacted to 97% Proctor density including material, labour, T&P etc.(As per detail 0 No. - 0.00 No. 22103.60 0.00
estimate) B=(7.5+3.5)/3
19 Construction of Stacking Platform with BOE soling on embankment compacted to
97% Proctor density including material, labour, T&P etc.(As per detail estimate) 1 No. - - 1.00 No. 6926.10 6926.10
Size=10mx3mx0.3m
20 Mechanical widening of the road at the curves with pavement from earthwork level
18x50 0.6 - 540.00 Sqm. 588.40 317736.00
to flexible PMC (with seal coat) to 50m. Length.
21 Survey investigation and preparation of DPR 3330.00 3.33 Km 10000.00 33300.00
Total 9836890.28
Say Rs.LAC. 98.37
Conctruction Of Culvert
1x350mm dia Hume Pipe(Gul Cul) 1 - - 1 No. 0.119 0.119
1

1x1000mm dia Hume Pipe 3 - - 3 No. 0.99 2.97


2x1000mm dia Hume Pipe 2 - - 2 No. 1.48 2.96
1x3m Span R.C.C. Cul. 1 - - 1 No. 6.59 6.59
2x5mSpan R.C.C. Cul. 1 - - 1 No. 13.93 13.93
8 - - 8 26.569
Say Rs.LAC. 124.94

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
0.238095

16.73
1.9368136

18.335508

14.104237

11.132357

12.778459

2.0979
0.74925

8.23176

2.71728

4.259736

0.00
5.06
SR No. Estimate of KC Drain

Description of item (with brief specification L B D Quantity Unit Rate Amount


and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)
1 2 3 4 5 6 7 8 9
1 Clearing and grubbing of road land including uprooting
vegetation grass,bush shrubs and trees of girth up to 300
mm and removal of unserviceable materials up to 100
m.from road boundry including all labour T&P etc. 1.00 1.00 - 1.00 Sqm. 1.43 1.43
required for proper completion of work as per direction of
Engineer-in-charge.

2 Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
contruction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of
50m., dressing of sides and bottom and backfilling in
1.00 1.00 0.50 0.50 Cum. 75.02 37.51
trenches with excavated suitable material for foundation of
retaining walls as per SOR item no. 11.1.1.(i)

3 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203. as per SOR
item no. 11.4.1.(ii) P.C.C. grade M 10 (Nominal mix 1:3:6, 1.00 1.00 0.10 0.100 Cum. 2993.76 299.38
Hand mixing).

4 Brick masonary work in cement mortor 1:4 (C/S) in


substructure complete exluding pointing and plastering, as
per drawing and technical specification Clause 602,603,
604, 1202 & 1204. as per SOR no. 12.1 (ii)

1. Bed 1.00 0.23 0.11 0.025


2. Vertical Side 1.00 0.11 0.34 0.037
3. Side Near Road 1.00 0.66 0.11 0.073
Total 0.135 Cum. 2244.31 303.66
5 Plastering with cement mortar (1:4), 15 mm thick on
brickwork in substructure as per technical specification
Clauses 613.4 & 1204 as per SOR item no. 12.3 1.00 1.00 _ 1.00 Sqm. 78.28 78.28

Total 718.82
Cost per running meter. Say, Rs. 718.80
Per mtere

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
ENVIRONMENTAL ASPECTS

1 Major climatic phenomenon


a Rainfall 1027.30mm (Avg.)
b Temprature 8 Degree - 42 Degree
c Humidity Moderate

2 Utilization of alternative material.


a Characteristics and availability of alternative material : Not available

3 Design Modification, if any for minimizing material requirement


a Reduction in formation width : Nil
b Restriction of embankment height to 0.3 to 0.5 m : 0.60 Mtr (Min.)
c Use of flyash or other alternative material as per Ecop 4.0 "Alternative Material" : N.A.
Not available within 100 Kms.
d Reutilizing construction waste as per Table 10-2 ECoP 10.0 Waste Management : N.A.

4 Site Preparation
a Stake out the alignment by establishment working benchmarks on ground : Yes
b Take over the possesion of the proposed ROW : MOU's for additional land from land owner
have been signed.
c Obtaining required clearness from government agencies : Yes

5 Sources of water for Construction in water scarce area Water is Available


Hydrological studies viz.
* Catchment area and ground pattern : Studied
* Cross-Section : Enclosed
* Maximum Highest Flood Level : Marked
* Longitudinal Section : Yes
* Flow direction and velocity : Marked

6 Location of Silt Fencing


a Natural Drainage or any other water body near the construction site : Not applicable

7 Rehabiliation of water bodies : No water bodies near the alignment of ROW


8 Measures of Slope Stabilization Yes

9 Measures of Erosion Control : Yes


10 Conservation of Topsoil
a Extent of loss of top soil : No
b Area requirement for topsoil conservation : N.A.
c Inclusion fo conservation of topsoil in Bid Document : N.A.
11 Impact on Culture Property/ Common property Resources : Not applicable
a Identification of locally significant cultural properties should be done.
b Assesment of likely impacts on each clultural property due to project implementation
c Possible measures for avoidance :
(I) Identification of alternative routes
(ii) Relocation of Culture property in consultation with the local community
12 Location of Natural Habitats : Not applicable
LAYOUT OF CONSTRUCTION CAMPS
1 Identification of site for construction camp to be done by the contractor.
2 Preparation of detailed layout plan as per Annexure 3.1 of ECoP 3.0 Construction Camp
List of Licensed Quarry
1 Within the district to adjoining with respect to : No
a Quantity of material; available in quarries : Fatehpur Sikari, Haldwani & Jhansi
b Lead from various existing quarries : 218, 221 & 265 Kms respectively
c Adequancy of material for the project in these quarries : Yes

2 Incase of non-availability of existing quarries : N.A.


Opening of new quarry in accordance to Mines and Mineral (Development & Regulation)
a
Act 1957.
b Inclusion of exhaust quarry redevelopment plan in bid document.
ESTIMATE OF WATER REQUIREMENT :
IDENTIFICATION OF POTENTIAL SOURCES OF WATER
Prior to commencement of extraction of water Letter of Consent (LoC) as per Annexure 8-1 of Ecop
1
shall be obtained.
LOCATION OF WASTE DISPOSAL : N.A.

1Waste Land, Low Lying areas and Landfill Sites after obtaining No Objection Certificate NoC) as per
Annexure 10 - 1 of ECoP
LOCATION OF DISPOSAL SITE OF TOXIC WASTE : N.A.
OUTFALLS OF LOCATION FOR LONGITUDINAL DRAINS : Not Required
1 Outfall should be at such level that there would be no back flow.
2 Incase of outfall is in natural stream, measures shall be taken to prevent sediment into the stream.
LOCATION OF HIGH EMBANKMENT & PROVISION OF LINED CHANNEL DRAINS : Not Required
To drain surface run off and prevent erosion from the slope, lined channels as per IRC SP-20 : 2002
1
shall be designed.
PROVISION OF PERSONAL PLANT EQUIPMENT : Clause included in Bid document.
Section 4 Part-I General Condition of Contract Specified in Standard Bidding Document for Pradhan
1
Mantri Gram Sadak Yozana (PMGSY)
PROVISION OF DPR FOR SAFETY AND HEALTH : Included in Bid Document
Selection Criteria for setting up Construction Camps (as per ECoP 3.0 "Construction Camps" Borrow
1
Areas (as per ECoP 5.0, "Borrow Area") and in case of opening new quarry areas (as per ECoP-7.0,
"Quarry Areas")
2 Safety Concerns to Roads User during Operational Phase
a Selection and location of regulatory as well as informatory signs as per IRC : 67:2001
depending upon the geometry of the road : Included
b Incase of hill roads, provision of passing places and parapet wall should be included in road
design : Not applicable
TREE PLANTATION PROVISION
Preparation of road side landscape plan in accordance with IRC : SP 21-1979 and IRC : 66-1976 : No
1
provision made in the DPR.
2 The plan may be in the form of avenue trees or cluster plantation.
The plantation shall be carried out on the areas where water can be made available during dry seasons
3 and the plant can be made available during dry seasons and the plant can be protected during the
initial stages of their growth.
The species shall be identified in consultants with officials of forest department, giving due importance
4
to local flora.
A MoU shall be signed between the Gram Panchayat and PIU towards maintenance of the trees, and
5
empowering the PRI's to be entitled the any revenue generated out these trees.

INDENTIFY LOCATIONS SUSCEPTIBLE TO INDUCED DEVEPLOPMENT


Location vulnerable to induced development : In such location the Panchayat has committed not to
1 allow building construction acitivity.
a Lands within 50 m of junctions.
b Agricultural lands within 100 m of settlements.

cStretches within 100 m of templates, weekely fairs and locations of community mass
gatherings.
ROLES AND RESPONSIBILITIES OF VILLAGE PANCHAYATS IN REGULATING DEVELOPMENT
The Gram panchayat shall lay down restrictions on building activities along the rural roads : Gram
1
Panchayat will enforce restriction on building activity within 15 m on either side of road.

2 Development of Residential sites Outside Existing Settlement : Not Required

3 Regulating the development by : The panchayat would be assigned on the following points :
Restriction of planning the activity to one side of the road to minimise pedestrians crossing
a
the road
b Provide parking areas if necessary and clearly delineating the parking areas from the road
c Providing a good visibility on the approaches to the market area
d These sites should not be within 150 m of the access or egress points of a major juction.
The commercial areas should be preferably planned lateral to the road than in parallel
e
direction :

4 Appropriate measures toward the removal of encroachments onto the public land to be taken
ENVIRONMENTAL AUDIT AS PER CHECKLIST OF DPR PREPARATION
DETAILED INVENTORY OF NATURAL ENVIRONMENTAL FEATURES
1 Area of natural habitat : NIL
2 Type of number of endangered species of flora and fauna : NIL
3 Stream and water bodies : NIL
4 Breeding ground and seasons : NIL
5 Migration season of bird species : NIL
6 Animal crossing : Provided
E.E
PIU, PMGSY
RES, FARRUKHABAD
Estimate for Mechanical Widening at the Curves
District : Farrukhabad
Division : PIU Farrukhabad (U.P.) SR No.
SI.No

Description of item (with brief specification L B D Quantity Unit Rate Amount


and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
MORT & H S.

1 Clearing and grubbing of road land including uprooting vegetation


grass,bush shrubs and trees of girth up to 300 mm and removal of
unserviceable materials up to 100 m.from road boundry including all 1.00 1.00 - 1.00 Sqm. 1.43 1.43
No. 201

labour T&P etc. required for proper completion of work as per direction of
Engineer-in-charge.

2 Earthwork in embankment mechanically compacted to 97% of maximum


dry density/proctor density in ordinary soil. Excavation to be in the form of
MORT& H Specification N0 301,305

regular pits not exceeding 0.5 m. in depth and earth work in embankment
to be in 20 cm.layers, watering the earth to bring it to required optimum
moisture content, compacting with Roller 8 to 10 tonnes ramming and
dressing the surface to required level and slope and also including 1.5m
lift and lead 30m. The earth from cutting is to be used in making
embankment or to be stacked as spoil banks within 30m distance as
directed by the Engineer-in-charge including cost of level pillar at the 1.0mx1.0mx0.6m 0.60 Cum. 58.90 35.34
interval of 50m both side of the road made of M-100 brick masonry with
cement(43 grade,O.P.C.,I.S.8112) and sand(Fineness Modulus- 1.25) in
proportion of 1:6 mortor, of required height and including its plastering,
white washing and marking different chainages and levels in different
colour including supply of all materials, labour, T&P etc,required for
proper completion of work .

3 Construction of granular sub-base (Ist Layer) by providing local material


MORT & H Sp.No.-401 MORT & H Sp.No.-401

spreading in uniform layers with motor grader on prepared surface, mixing


by mix in place method with rotavator at once and compacting with 1.00 1.0 0.075 0.08 Cum. 1239.62 92.97
smooth wheeled roller to achieve the desired density complete as per
Clause 401.4 as per Technical Specification Clause 408.

4 Construction of granular sub-base (IInd Layer) by providing local material


spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at once and compacting with
smooth wheeled roller to achieve the desired density complete as per 1.00 1.0 0.075 0.08 Cum. 1239.62 92.97
Clause 401.4 as per Technical Specification Clause 408.
5 Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and brooming, stone
1.00 1.0 0.075 0.08 Cum. 1414.70 106.10
screening/binding materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density grading 2 as per
Technical Specification Clause 405. (Table 400.8)

6 Providing, laying, spreading and compacting stone aggregates of specific


sizes to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and brooming, stone
1.00 1.0 0.075 0.08 Cum 1639.30 122.95
screening to fill-up the interstices of coarse aggregate, watering and
compacting to the required density Grading 3 as per Technical
Specification Clause 405. (Table 400.8)

7 Providing and applying primer coat with Bitumen emulsion (SS-1) on


MORT & H Sp.No.-502 and 503.3.1

prepared surface of granular base including cleaning of road surface and


spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means 1.0 1.0 - 1.00 Sqm. 20.90 20.90
as per Technical Specification Clause 502.
8 Providing and applying tack coat with Bitumen emulsion (RS-1) using
MORT & H Sp. No.-503

emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared
granular surfaces treated with primer & cleaned with Hydraulic broom as 1.0 1.0 - 1.00 Sqm. 7.40 7.40
per Technical Specification Clause 503.

9 Providing, laying and rolling of open-graded premix carpet of 20 mm


U.P. L.N.V. SI No.-784

thickness composed of 13.2 mm to 5.6 mm aggregates either using


penetration grade bitumen or emulsion to required line, grade and level to
serve as wearing course on a previously prepared base, including mixing
1.0 1.0 - 1.00 Sqm. 81.10 81.10
in a suitable plant, laying and rolling with a three wheel 80-100 kN static
roller capacity, finished to required level and grades to be followed by seal
coat of either Type B as per Technical Specification Clause 508.

10 Providing and laying seal coat sealing the voids in a bituminous surface
MORT & H sp.No.-513

laid to the specified levels, grade and cross fall using Type B as per 1.0 1.0 - 1.00 Sqm. 27.20 27.20
Technical Specification Clause 510
Total Cost of Pavement = 588.36
Say, PerSqm 588.40

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Estimate for Mechanical Widening at H.P. Culverts
District : Farrukhabad
Division : PIU Farrukhabad (U.P.)
SR No.
SI.No

Description of item (with brief specification L B D Quantity Unit Rate Amount


and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
1 Construction of granular sub-base (Ist Layer) by providing local material spreading in
MORT & H Sp.No.-401

uniform layers with motor grader on prepared surface, mixing by mix in place method with
rotavator at once and compacting with smooth wheeled roller to achieve the desired 3.50 1.5 0.075 0.39 Cum. 1239.62 488.10
density complete as per Clause 401.4 as per Technical Specification Clause 408.
2 Construction of granular sub-base (IInd Layer) by providing local material spreading in
MORT & H Sp.No.-401

uniform layers with motor grader on prepared surface, mixing by mix in place method with
rotavator at once and compacting with smooth wheeled roller to achieve the desired 3.50 1.5 0.075 0.39 Cum. 1239.62 488.10
density complete as per Clause 401.4 as per Technical Specification Clause 408.
3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill-up the interstices of 3.50 1.5 0.075 0.39 Cum. 1414.70 557.04
coarse aggregate, watering and compacting to the required density grading 2 as per
Technical Specification Clause 405. (Table 400.8)

4 Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening to fill-up the interstices of coarse aggregate, 3.50 1.5 0.075 0.39 Cum 1639.30 645.47
watering and compacting to the required density Grading 3 as per Technical Specification
Clause 405. (Table 400.8)

5 Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of
MORT & H Sp.No.-502 and 503.3.1

granular base including cleaning of road surface and spraying primer at the rate of 0.70- 3.5 1.5 - 5.25 Sqm. 20.90 109.73
1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.
6 Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion
MORT & H Sp. No.-503

distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granular surfaces treated
with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 3.5 1.5 - 5.25 Sqm. 7.40 38.85

7 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed


U.P. L.N.V. SI No.-784

of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to


required line, grade and level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static 3.5 1.5 - 5.25 Sqm. 81.10 425.78
roller capacity, finished to required level and grades to be followed by seal coat of either
Type B as per Technical Specification Clause 508.

8 Providing and laying seal coat sealing the voids in a bituminous surface laid to the
MORT & H sp.No.-513

specified levels, grade and cross fall using Type B as per Technical Specification Clause 3.5 1.5 - 5.25 Sqm. 27.20 142.80
510
Total Cost of Pavement =2895.86
Cost of Pavement per S 551.59
Say, Rs.Per Sq 551.60
J.E.(R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)
Estimate for Protection Work

Construction of retaining wall/toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5/1604.
SR No.

Description of item (with brief specification L B D Quantity Unit Rate Amount


SI.No

and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)


[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
1 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, contruction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50m., dressing of sides and bottom and 1.00 0.90 0.75 0.675 Cum. 75.02 50.64
backfilling in trenches with excavated suitable material for foundation of retaining walls as per
SOR item no. 11.1.1.(i)
2 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203. as per SOR item no. 11.4.1.(ii) 1.00 0.90 0.15 0.135 Cum. 3116.52 420.73
P.C.C. grade M 10 (Nominal mix 1:3:6, Hand mixing).
3 Brick masonary work in cement mortar(1:4 C/S) in foundation complete excepting pointing and
plastering as per drawing and technical specifications Clause 600, 1202 & 1203 as per SOR
item no. 11.5 (ii)
(i) Step first. 1.00 0.90 0.10 0.090
(ii) Step second. 1.00 0.80 0.10 0.080
(iii) Step Third 1.00 0.70 0.10 0.070
Total 0.24 Cum. 2198.27 527.58
4 Brick masonary work in cement mortor 1:4 (C/S) in substructure complete exluding pointing
and plastering, as per drawing and technical specification Clause 602,603, 604, 1202 & 1204. 1.00 (0.6+0.
1.80 0.86 Cum. 2244.31 1918.89
as per SOR no. 12.1 (ii) 35)/2

5 Pointing with cement mortor (1:3 C/S) on brickwork as per drawing and technical specification
Clauses 613.3 and 1204 on outer face above ground level as per SOR item no. 12.2 1.00 - 1.50 1.50 Sqm. 23.17 34.76

6 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as
per drawing and technical specicification Clauses 615, 710 and 1204.3.11 as per SOR item 1.00 - - 1.00 m. 218.70 218.70
no. 12.13
7 Providing weepholes in brick masonary/stone masonary, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face complete as per drawing face 3 Nos. 3.00 No. 215.08 645.24
complete as per drawing and technical specification Clause 614, 709, 1204.3.7 as per SOR
item no. 12.9
Total 3816.53
Cost per running mete Say, Rs. 3816.50
Per mtere

J.E.(R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U.Farrkhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
WORLD BANK FUNDED PROJECTS (2005-06)
DETAILED ESTIMATE FOR RAMPS
District : Farrukhabad

L B D Rate Amount
Sl.No. Description of Item Quantity Unit
(m) (m) (m) (Rs.) (Rs.)
1 2 3 4 5 6 7 8 9
(2) Earth work in embankment mechanically compacted to
95 % proctor density in ordinary soil excavation to the in
form of regular pit not exceeding 0.50 Mt in depth and
earth work in embankment to be in 20 cm layers including
ramming and dressing the surface to required levels and
slopes and also including 1.50mt lift & 30 Mt lead. The
1 15.00 5.50 0.30 24.75 Cum. 58.90 1457.78
earth work from cutting to be used in making embankment
are to deposited as spoil bank with in 30 Mt. distance as
directed by engineer incharge including supply of labour
T& P and roller etc. required for proper completion of work
as per M.O.T. specification no. 301:2:1 (U.P.L.M.V.
schedule of rate for NH page no. 12)
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and cross
section shown in the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick
2 soling, watering and rolling the same with three wheel road 15 3 0 45.00 Sqm. 213.20 9594.00
roller 50-100 kN as per Technical Specification Clause 412
(Brick edge soling on both sides of roadway)

Total 11051.78
Say 11051.80

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
WORLD BANK FUNDED PROJECTS (2005-06)

DETAILED ESTIMATE FOR JUNCTION


District : Farrukhabad

L B D Rate Amount
Sl.No. Description of Item Quantity Unit
(m) (m) (m) (Rs.) (Rs.)
1 2 3 4 5 6 7 8 9
Earth work in embankment mechanically compacted to 95
% proctor density in ordinary soil excavation to the in form
of regular pit not exceeding 0.50 Mt in depth and earth
work in embankment to be in 20 cm layers including
ramming and dressing the surface to required levels and
slopes and also including 1.50mt lift & 30 Mt lead. The
1 30.00 5.50 0.30 49.50 Cum. 58.90 2915.55
earth work from cutting to be used in making embankment
are to deposited as spoil bank with in 30 Mt. distance as
directed by engineer incharge including supply of labour
T& P and roller etc. required for proper completion of work
as per M.O.T. specification no. 301:2:1 (U.P.L.M.V.
schedule of rate for NH page no. 12)
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and cross
section shown in the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick
2 soling, watering and rolling the same with three wheel road 30 3 0 90.00 Sqm. 213.20 19188.00
roller 50-100 kN as per Technical Specification Clause 412
(Brick edge soling on both sides of roadway)

Total 22103.55
Say 22103.60

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
WORLD BANK FUNDED PROJECTS (2005-06)

DETAILED ESTIMATE OF MATERIAL STACKING PLATFORM


Road From : Package No. :
Length of the Road (Km.) : Block : District : Farrukhabad

B D Rate Amount
Sl.No. Description of Item L (m) Unit Quantity
(m) (m) (Rs.) (Rs.)
1 2 3 4 5 6 7 8 9
Earth work in embankment mechanically compacted to 95
% proctor density in ordinary soil excavation to the in form
of regular pit not exceeding 0.50 Mt in depth and earth
work in embankment to be in 20 cm layers including
ramming and dressing the surface to required levels and
slopes and also including 1.50mt lift & 30 Mt lead. The
1 10.00 3.00 0.30 9.00 Cum. 58.90 530.10
earth work from cutting to be used in making embankment
are to deposited as spoil bank with in 30 Mt. distance as
directed by engineer incharge including supply of labour
T& P and roller etc. required for proper completion of work
as per M.O.T. specification no. 301:2:1 (U.P.L.M.V.
schedule of rate for NH page no. 12)
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and cross
section shown in the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick
2 soling, watering and rolling the same with three wheel road 10 3 0 30.00 Sqm. 213.20 6396.00
roller 50-100 kN as per Technical Specification Clause 412
(Brick edge soling on both sides of roadway)

Total 6926.10
Say, Rs. 6926.10

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
WORLD BANK FUNDED PROJECTS (2005-06)
DETAILS OF CURVES
Name of work : B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R
Length of the Road (Km.) : 2.40 District : Farrukhabad
S.No. Chainage(In Mtr.) (In Deg.) Rc. (Mtr.) Deg. V (km/h) e Lc. ( Mtr.) Ts (In Mtr.) Es (In Mtr.) Ls (In Mtr.) Remarks
1 600 30 L/S 200 50.00 0.055 104.66 40.27 6.39 60 -
Total No. of Curves = 01

Road From : Hisampur To Jhijhuki L/R


Length of the Road (Km.) : 2.10

S.No. Chainage(In Mtr.) (In Deg.) Rc. (Mtr.) Deg. V (km/h) e Lc. ( Mtr.) Ts (In Mtr.) Es (In Mtr.) Ls (In Mtr.) Remarks

1 200 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61


2 900 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61
Only Circular Curve is taken
3 1800 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61 due to Land Constraint. Here
Ls = Straight Elevated Length
4 1950 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61
5 2050 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61
Total No. of Curves = 05

Name of Road : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur
Length of the Road (Km.) : 3.33

S.No. Chainage(In Mtr.) (In Deg.) Rc. (Mtr.) Deg. V (km/h) e Lc. ( Mtr.) Ts (In Mtr.) Es (In Mtr.) Ls (In Mtr.) Remarks

1 1020 50 L/S 175 40.00 0.041 152.63 67.12 10.65 60


2 1125 50 R/S 175 40.00 0.041 152.63 67.12 10.65 60
3 1420 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61
4 1455 50 R/S 175 40.00 0.041 152.63 67.12 10.65 60
5 1600 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61
6 1710 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61
7 2010 30 R/S 200 50.00 0.055 104.66 40.27 6.39 60
Only Circular Curve is taken
8 2040 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61 due to Land Constraint. Here
Ls = Straight Elevated Length
9 2220 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61
10 2355 50 L/S 175 40.00 0.041 152.63 67.12 10.65 60
11 2410 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61
12 2520 50 L/S 175 40.00 0.041 152.63 67.12 10.65 60
13 2610 50 L/S 175 40.00 0.041 152.63 67.12 10.65 60
14 2685 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61
15 3030 50 R/S 175 40.00 0.041 152.63 67.12 10.65 60
Total No. of Curves = 15
WORLD BANK FUNDED PROJECTS (2005-06)
DETAILS OF CURVES

Name of Road : FKD. B.E.- Kadhar Rd. To Siya L/R


Length of the Road (Km.) : 1.35

S.No. Chainage(In Mtr.) (In Deg.) Rc. (Mtr.) Deg. V (km/h) e Lc. ( Mtr.) Ts (In Mtr.) Es (In Mtr.) Ls (In Mtr.) Remarks
Only Circular Curve is taken
1 250 80 L/S 60 30.74 0.07 83.78 50.37 18.33 10.61 due to Land Constraint. Here
Ls = Straight
Only CircularElevated
Curve is Length
taken
2 480 80 R/S 60 30.74 0.07 83.78 50.37 18.33 10.61 due to Land Constraint. Here
Ls = Straight Elevated Length
Total No. of Curves = 02
E.E.
PIU, PMGSY
RES, FARRUKHABAD
DETAILS OF JUNCTIONS & RAMPS

Name of work : B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R
Length of the Road (Km.) : 2.40 District : Farrukhabad

S.No. Chainage Particulars Length Breadth Area Slope

1 280 Junction 2x15 (7.50+3.50)/2 345 1:25


2 600 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
3 760 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25
4 1170 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
5 1740 Junction 2x15 (7.50+3.50)/2 345 1:25
6 2150 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25

Total No. of Ramp = 06

Road From : Hisampur To Jhijhuki L/R


Length of the Road (Km.) : 2.10

S.No. Chainage Particulars Length Breadth Area Slope

1 200 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25


2 1800 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25

Total No. of Ramp = 2

E.E.
PIU, PMGSY
RES, FARRUKHABAD
DETAILS OF JUNCTIONS & RAMPS

Name of Road : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur
Length of the Road (Km.) : 3.33 District : Farrukhabad

S.No. Chainage Particulars Length Breadth Area Slope


1 175 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
2 480 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25
3 520 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
4 550 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25
5 690 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25
6 840 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
7 1020 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25
8 1880 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
9 3030 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
10 3075 R/S Ramp 15 (7.50+3.50)/2 172.5 1:25
Total No. of Ramp = 10

Name of Road : FKD. B.E.- Kadhar Rd. To Siya L/R


Length of the Road (Km.) : 1.35

S.No. Chainage Particulars Length Breadth Area Slope


1 480 L/S Ramp 15 (7.50+3.50)/2 172.5 1:25
2 935 Junction 2x15 (7.50+3.50)/2 345 1:25
3 990 Junction 2x15 (7.50+3.50)/2 345 1:25

Total No. of Ramp = 01


Total No. of Junction = 02
E.E.
PIU, PMGSY
RES, FARRUKHABAD
Statement Showing Land Area Required for Const. Of Road

District Farrukhabad
Name of State : U.P.
Name of work : B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R
Division - PIU, RES, Farrukhabad
Khasara Land Owner Land Area Required
Type of
S.No. Chainage Revenue Remark
No. Name BPL/SC/ST Sqm. Acre Land
Village
1 2 3 4 5 6 7 8 9 10
1 Land is available in
full width, so no
extra land required
2 NIL

Road From : Hisampur To Jhijhuki L/R


Khasara Land Owner Land Area Required
Type of
S.No. Chainage Revenue Remark
No. Name BPL/SC/ST Sqm. Acre Land
Village
1 2 3 4 5 6 7 8 9 10
1 Land is available in
full width, so no
2 NIL extra land required

Name of Road : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur
Khasara Land Owner Land Area Required
Type of
S.No. Chainage Revenue Remark
No. Name BPL/SC/ST Sqm. Acre Land
Village
1 2 3 4 5 6 7 8 9 10
1 Land is available in
full width, so no
2 NIL extra land required

Name of Road : FKD. B.E.- Kadhar Rd. To Siya L/R


Khasara Land Owner Land Area Required
Type of
S.No. Chainage Revenue Remark
No. Name BPL/SC/ST Sqm. Acre Land
Village
1 2 3 4 5 6 7 8 9 10
1 Land is available in
full width, so no
2 NIL extra land required

E.E.
PIU, PMGSY
RES, FARRUKHABAD
Details of Core Network along with Map
Road From : Gurushadinagar To Bhatkurri L/R District :
State :

Village's/Name & Code Whether


Block Link
Sl. Corridor Connected/ Type of Road
Name & Route /
No. Name Not Work
Code No.
Beneficiary Connected
From To
Village

Gurushad
Mohmmad Gurusha Not
1 inagar To 4029 Bhatkurri Bhatkurri New
abad (4) dinagar Connected
Bhatkurri

Moham
Mohamma madaba Not
2 Barkhiriya 4085 Barkhiriya Barkhiriya New
dabad d Connected
Sankisa

Moham
Mohamma madaba Not
3 Singtuea 4052 Singtuea Singtuea New
dabad d Connected
Sankisa

The map for the Core Network should clearly communicate


* Administrative Boundaries (District/Block/Tehsil/Village)
* Link Route and Length
* Name of connected habitation/s
ng with Map
Format 1 :

Population Estimated Estimated


Cost Length
(Rs. Lakhs) (Kms)
Total SC/ST

2119 205 1.47

1483 56 2.73

2232 166 2.58

E.E.
PIU, PMGSY
RES, FARRUKHABAD
S.No. S.No. S.No.

Village Name Village Name Village Name


Name of State : U.P.
District Farrukhabad

Name of PAP Name of PAP Name of PAP


Division - PIU, RES, Farrukhabad

NIL
NIL
NIL

Road From : Hisampur To Jhijhuki L/R

Scheduled Caste Scheduled Caste Scheduled Caste

Scheduled Tribe Scheduled Tribe Scheduled Tribe

Below Poverty Below Poverty Below Poverty


Line Line Line

Valunerable Category
Valunerable Category
Valunerable Category

Woment Headed Woment Headed Woment Headed


Household Household Household
Name of work : B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R

Handicap Handicap Handicap


Name of Road : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur

Land (Sqm) Land (Sqm) Land (Sqm)


Statement Showing Land Reqd. for Constn. Of Road

Livelihood Livelihood Livelihood

Shelter Shelter Shelter


Type of Impact/Loss
Type of Impact/Loss
Type of Impact/Loss

CPR CPR CPR

Land (m) Land (m) Land (m)

Structure (Nos) Structure (Nos) Structure (Nos)


Extend of Loss
Extend of Loss
Extend of Loss

Whether Entitled Whether Entitled Whether Entitled


Executive Engineer

Person Yes/No Person Yes/No Person Yes/No


PIU, PMGSY
RES, FARRUKHABAD
Statement Showing Land Reqd. for Constn. Of Road

Name of Road : FKD. B.E.- Kadhar Rd. To Siya L/R

Valunerable Category Type of Impact/Loss Extend of Loss

Whether Entitled
Person Yes/No
Scheduled Caste

Woment Headed
Scheduled Tribe

Structure (Nos)
Below Poverty
Name of PAP
Village Name

Land (Sqm)
Household

Livelihood
Handicap

Land (m)
Shelter
S.No.

CPR
Line
NIL

Executive Engineer
PIU, PMGSY
RES, FARRUKHABAD
ANNEXURE 4 CENSUS QUESTIONNAIRE

Project Corridor

Household Identification number

Head of House hold

SC ST Women HH Handicap
Tick here

Proof of BPL (ration card) Yes N.A.


No

Card No.

Household size / No. of Persons

No. of earning members (adult)

No. of dependents

Agricluture Agri Resi Comm Other (specify)


Tick here

size of holding (for agri) < Marginal


> Maginal

Extent of Impact <10% >10% 1


Tick here

Size of Residual holding

Residences

Plot size

Extent of Impact

Residual plot viable

Alternate house site (if relocation required) Yes No If yes, specify


Tick here

Commercial establishments

Extent of Impact

Residual plot viable

Asset loss

Inventory assets lost


Livelihood loss

Alternative livelihood sources Yes No If yes, specify


Tick here

Indebtedness
Handicap
lM+d ij isM+ksa dh fLFkfr@vU;
Name of work : B.E. Mohammadabad Achra Taqipur Rd. To Nagla Moti L/R
Division - PIU, RES, Farrukhabad (U.P.)
lM+d dsUnz ls nwjh ¼eh0½
Øe0 la0 pSust ¼eh0½ isM+ dh fdLe fooj.k ¼eksVkbZ½] eh0
cka;ha vksj nka;ha vksj
1 5.00 4.00 - &'kh'ke 0.70
2 360.00 - 3.75 ihiy 0.60
3 450.00 - 4.00 vke 0.50, 1.20
4 480.00 - 3.80 vke 1.60

Road From : Hisampur To Jhijhuki L/R


Division - PIU, RES, Farrukhabad (U.P.)
lM+d dsUnz ls nwjh ¼eh0½
Øe0 la0 pSust ¼eh0½ isM+ dh fdLe fooj.k ¼eksVkbZ½] eh0
cka;ha vksj nka;ha vksj
NIL

Name of Road : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur
Division - PIU, RES, Farrukhabad (U.P.)
lM+d dsUnz ls nwjh ¼eh0½
Øe0 la0 pSust ¼eh0½ isM+ dh fdLe fooj.k ¼eksVkbZ½] eh0
cka;ha vksj nka;ha vksj
NIL

Name of Road : FKD. B.E.- Kadhar Rd. To Siya L/R


Division - PIU, RES, Farrukhabad (U.P.)
lM+d dsUnz ls nwjh ¼eh0½
Øe0 la0 pSust ¼eh0½ isM+ dh fdLe fooj.k ¼eksVkbZ½] eh0
cka;ha vksj nka;ha vksj
NIL

Executive Engineer
PIU, PMGSY
RES, FARRUKHABAD
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


(Construction of 1 row 1000 mm NP-3 Hume Pipe Culvert-As per IRC, SP-20, 2002)
SR No.

Description of item (with brief specification No. L B D Quantity Unit Rate Amount
SI.No

and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)


[1] [2] [3] [5] [6] [7] [8] [9] [10] [11]
DISTRICT-FARRUKHABAD
HUME PIPE CULVERTS
1 Earth work in excavation in foundation in
ordionary soil (Loam clay, or sand) including
U.P. L.N.V. S.I. No.-251.

lift upto 1.5 metre and lead upto 30 m. &


including filling, watering and ramming of
excavated earth into the trenches or into the
space between the Hume pipe and the sides
of foundation trenches or into the plinth and
removal and disposal of surplus earth as
directed by the Engineer-in-Charge. S.I. No.
501Item No.(11.1)1(i)

(i) Head Walls 2 6.45 1.40 1.55 27.99


(ii) For Hume Pipe 1 5.00 1.53 0.35 2.68
Total 30.67 Cum 75.02 2300.90
2 Concrete in foundation with 40 mm guage
stone ballast, coarse sand ( Fineness
U.P. L.N.V.S.I. No.-280.

Modulas 2.2-3.6 ) and cement (43 grade,


O.P.C. I.S. 8112) in proportion 6:3:1 including
supply of all materials, labour and T&P etc
required for proper completion of work as per
direction of Engineer-in-charge as per item
no.11.4(i) For Head Walls

2 6.45 1.40 0.15 2.709 Cum 2993.76 8110.10


3 M-150 brick work in 1:4 cement (43 grade,
U.P.L.N.V. S.I. No.-305

O.P.C. I.S. 8112) and fine sand (Fineness


Modulas 1.25) mortar in foundation and plinth
including supply of all materials, labour,T&P
etc. Item No.11.5(ii) (1.25+0.40)
For Head Walls 2 6.15 2 2.50 25.37
Less for Hume Pipe 0.4+0.82
2 3.14x0.6x0.6 2 - 1.83
Total 23.54 Cum 2198.27 51741.78
4 Same as item No.-4 but in 1:5 cement (43
MORT & H sp.No.-1520(B). MORT & H Sp.cl.No.-1000/2300 U.P. L.N.V. S.I. No.-303.

grade, O.P.C, I.S. 8112) and coarse sand


(Fineness Modulus 2.2 to 3.6).Item
No.12.1(iii)
Parapet 2 6.15 0.40 0.60 2.95 Cum 2216.90 6544.29
5 Providing laying and jointing 1000 mm. dia.
NP 3 Hume Pipe (confirming to I.S.I. 458-
1988) in culvert including cost of collers, all
materials, cartage, labour, T&P etc. required
for proper completion of work as directed by
the Engineer-in-Charge. Item No.9.3(B)
3 2.50 - - 7.50 Rm 3443.66 25827.45
6 Providing and filling of moorum/Sand (P.I.- 4
to 6) in foundation below and sides of Hume
Pipe includindg supply of all materials, labour
and T&P etc, as per direction of Engineer-in-
charge.Item No.11.2(i)Clauses305.3.9
1 5.85 1.53 0.55 4.92
Less for Hume Pipe 1 3.14 0.6*0.6 0.30 0.34
Total 4.58 Cum 791.02 3625.76
7 Struck pointing with cement (43 grade, O.P.C.
U.P. L.N.V. S.I. N0.-571

I.S. 8112) and fine sand ( Fineness Modulas


1.25) in proportion 1:2 on brick work including
supply of all materials, labour and T&P etc.
Item No.12.2Clauses613.3&1204
For Head Walls

2 6.15 - 2.80 34.44


Sides 4 0.40 - 0.40 0.64
Less for Hume Pipe 1 2.00 3.14 0.55*0.55 1.90
Total 33.18 Sqm 23.17 768.79
COST OF CONSTRUCTION Total 98919.07
Say, Rs. 0.99
J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)
P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Lacs
E.E. (R.E.S.)
P.I.U. Farrukhabad
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


SR No. (Construction of 2 row 1000 mm NP-3 Hume Pipe Culvert-As per IRC, SP-20, 2002)
D Qty Unit Rate Amount
SI.No

Description of item (with brief specification No. L W


and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.) (Rs.)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11]
DISTRICT-FARRUKHABAD
HUME PIPE CULVERTS (1 No.)
Earthwork in excavation in foundation
trenches in ordinary soil etc. not exceeding 2
m depth including dressing of bottom and
sides of trenches, stacking the excavated
1 soil clear from the edge of the excavation
and subsequent filling around hume pipes/
ma.Item No.(11.1)1(i)

(i) Head Walls 2 8.18 1.40 1.50 34.36


(ii) For Hume Pipe 1 5.00 3.23 0.37 5.89
Total 40.25 Cum 75.02 3019.61
Cement concrete mix 1:3:6 with stone
aggregates 20 mm normal size in foundation
upto a length of 1.5 m below ground level
2 and 1.5 m above ground/bed level (As per
MOST specification No. 1000/1700)Item
No.11.4(I) For Head Walls
2 8.18 1.40 0.15 3.4356 Cum 2993.76 10285.361856
Providing and filling granular material in
foundation trenches and below pipe bed in
layers not exceeding 150 mm thickness
3 including all lead and lift (As Per MOST
specification NO. 2904(I))Item
No.11.2(I)Clause305.3.9

Around the pipes 1 6.27 3.23 0.55 11.14


Less for Hume pipe 2 6.27 3.14 0.55*0.55*0.3 3.57
Total 7.57 Cum 791.02 5984.32
First class brick work in cement mortar 1:4
(1cement : 4coarse sand) up to a depth of
1.5 m below ground and in cement mortar
4 1:5 ( 1cement: 5 fine sand) upto 1.5 above
bed/ground level (As per MORD Item No.
12.1iii)
in headwall 1:5 Item NO.11.5(ii) 2 7.88 1.25+0.42 2.47 32.11
deduction for humepipes 2 3.14 0.55*0.55 0.83+0.40 2 1.17
Total 30.95 Cum 2198.27 68029.03624
Same as item No.-4 but in 1:5 cement (43
grade, O.P.C, I.S. 8112) and coarse sand
5 (Fineness Modulus 2.2 to 3.6).Item
No.12.1(iii)
Parapet 2 7.88 0.40 0.60 3.78 Cum 2216.90 8385.20
Providing laying and fixing reinforced
cement concrete pipes NP3 for culverts
including pointing ends and fixing collar with
6 cement mortar 1:2 (1cement : 2coarse sand)
(As per MOST specification No. 1000/2900)
Item No.9.3(B)
2 7.50 15.00 Rm 3443.66 51654.9
Cement pointing 1:2 deep variety (cut or
weather) on brick and tile work (As per
10 MORTH specification No. 1000/1300)Item
No.12.2
Out side face 2 7.88 - 1.8 28.37 Sq.m.
Top 2 7.88 0.4 - 6.30 Sq.m.
inside face 2 7.88 0.5 - 7.88 Sq.m.
side face walls 4 0.4 0.5 - 0.80 Sq.m.
Deduct for hume pipes 4 3.14 0.55*0.55 3.80 Sq.m.
39.55 Sq.m. 23.17 916.43
Total (Rs.) 148274.86454
Say 1.48

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
.E. (R.E.S.)
. Farrukhabad
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


(Construction of 350mm NP-3 Hume Pipe Gule Culvert)
Description of item (with brief specification No. L B D Quantity Unit Rate Amount
SI.No

SR No.

and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)


[2] [1] [3] 4 [5] [6] [7] [8] [9] [10] [11]
DISTRICT-FARRUKHABAD
Gule Culvert
1 Earth work in excavation in foundation in ordionary
soil (Loam clay, or sand) including lift upto 1.5 metre
U.P. L.N.V. S.I. No.-251.

and lead upto 30 m. & including filling, watering and


ramming of excavated earth into the trenches or into
the space between the Hume pipe and the sides of
foundation trenches or into the plinth and removal 1x1 10.00 0.70 1.00 7.00 Cum 75.02 525.14
and disposal of surplus earth as directed by the
Engineer-in-Charge. S.I. No. 501.Item no(11.1)1(1)

2 Providing laying and jointing 350 mm. dia. NP 3


MORT & H sp.No.-1520(B). MORT & H Sp.cl.No.-1000/2300

spigot Hume Pipeall materials, cartage, labour, T&P


etc. required for proper completion of work as 1x5 2.00 - - 10.00 Rm 970.37 9703.70
directed by the Engineer-in-Charge.
AsS,I.N0.9.7(1100)
3 Providing and filling of moorum (P.I.- 4 to 6) in
foundation below and sides of Hume Pipe includindg
supply of all materials, labour and T&P etc, as per 1x1 10.00 0.70 0.195 1.37
direction of Engineer-in-charge.Item
No.11.2(i)Clause-305.3.9

Deduct for pipe embedment (-)


10.00 0.21x0.21 0.12 -0.17
1x1x22/7
Total 1.20 Cum 791.02 948.2995
U.P.L.N.V. S.I. No.-305

4 M-150 brick work in 1:4 cement (43 grade, O.P.C.


I.S. 8112) and fine sand (Fineness Modulas 1.25)
mortar in foundation and plinth including supply of all
materials, labour,T&P etc. Item 1x2 0.75 0.35 0.75 0.39
No.11.5(ii)Clauses600,1202& 1203

1x2x22/7 0.21 0.21 0.35 0.10


Total 0.30 Cum 2198.27 652.49
5 Struck pointing with cement (43 grade, O.P.C. I.S. 1x2 0.75 - 0.75 1.13
U.P. L.N.V. S.I. N0.-571

8112) and fine sand ( Fineness Modulas 1.25) in 1x2 0.75 0.35 - 0.53
proportion 1:2 on brick work including supply of all (-)1x2x22/7 0.21 0.21
materials, labour and T&P etc. Item
- -0.28
No.12.2Clauses613.3&1204 Total 1.37 Sqm 23.17 31.81361
COST OF CONSTRUCTION Total 11861.44
Say 0.119 Lacs
JE(PIU-I) FBD AE(PIU-I) FBD EE(PIU-I) FBD
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


(Construction of 500mm NP-3 Hume Pipe Gule Culvert)
Description of item (with brief specification L B D
Quantity Unit Rate Amount
SI.No

SR No.

and reference to book of specification) (m) (m) (m) (Rs./Unit) (Rs.)


[2][1] [3] [5] [6] [7] [8] [9] [10] [11]
DISTRICT-FARRUKHABAD
Gule Culvert
1 Earth work in excavation in foundation
in ordionary soil (Loam clay, or sand)
including lift upto 1.5 metre and lead
upto 30 m. & including filling, watering
and ramming of excavated earth into
the trenches or into the space between
U.P. L.N.V. S.I. No.-251.

the Hume pipe and the sides of


foundation trenches or into the plinth
and removal and disposal of surplus 10.00 0.60 0.25 1.50 Cum 75.02 112.53
earth as directed by the Engineer-in-
Charge. S.I. No. 501.Item no(11.1)1(1)

2 Providing laying and jointing 500 mm.


dia. NP 3 Hume Pipe (confirming to
I.S.I. 458-1988) in culvert including cost
of collers, all materials, cartage, labour,
MORT & H Sp.cl.No.-1000/2300

T&P etc. required for proper completion


of work as directed by the Engineer-in-
Charge. Item No.(9.7)
10.00 10.00 Rm 1212.97 12129.70
(Construction of 500mm NP-3 Hume Pipe Gule Culvert)
3 Providing and filling of moorum (P.I.- 4
MORT & H sp.No.-1520(B).

to 6) in foundation below and sides of


Hume Pipe includindg supply of all
materials, labour and T&P etc, as per
10.00 0.60 0.20 1.20
direction of Engineer-in-charge.Item
No.11.2(i)Clause-305.3.9

Deduct for pipe embedment (-) 10.00 0.45 0.125 0.56


0.64 Cum 791.02 506.2528
4 M-150 brick work in 1:4 cement (43
grade, O.P.C. I.S. 8112) and fine sand
(Fineness Modulas 1.25) mortar in
U.P.L.N.V. S.I. No.-305

foundation and plinth including supply


of all materials, labour,T&P etc. Item 2x0.75x0.35x0.75=0.39
No.11.5(ii)Clauses600,1202& 1203 0.28 Cum 2198.27 615.52
(-) 2x0.159x0.35= (-)0.11

5 Struck pointing with cement (43 grade,


U.P. L.N.V. S.I. N0.-571

O.P.C. I.S. 8112) and fine sand


( Fineness Modulas 1.25) in proportion
1:2 on brick work including supply of all 2x0.75x0.75 = 1.13 0.81 Sqm 23.17 18.77
materials, labour and T&P etc. Item (-)2x0.159 = (-) 0.32
No.12.2Clauses613.3&1204

COST OF CONSTRUCTION 13382.77


Say 0.134 lacs
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


R.C.C. CULVERT,1X5.00m span
DESIGN PARAMETERS : FOR ABOVE PARAMETERS DEPTH OF SLAB 0.42
SPAN 5.00 m. (As per IRC Special PublicatDEPTH OF ABUTMENT CAP 0.15
HEIGHT 3.00 M B1= 2.00
LENGTH 8.30 M B2= 3.60
No. of Spa 1 Nos. b3= 0.40
SI. No. Item of Work Nos. Length Breadth Height Quantity Unit Rate Amount
1 Earthwork in excavation in foundation trenches in ordinary soil
etc. not exceeding 30 m depth including dressing of bottom
and sides of trenches, stacking the excavated soil clear from
the edge of the excavation and subsequent filling around hume
pipes/ masonary in 15 cm layers with compection including
disposal of all surplus soil as directed with in a lead of 30 m.
S,I.No.501 Item no.(11.1)1(i)

(a) Abutment 2 8.3 4.9 (1.2+3.0)/2 170.81


s
(c) Wingwalls 4 6.0 (2.88+1.65)/2 0.3 16.31
Total 187.12 Cum 75.02 14037.74
2 Cement concrete mix 1:3:6 with stone aggregates 40 mm
normal size mechanically mixed and vibrated in foundation upto
a depth of 1.5 m below ground level and 1.50 m above
Ground/bed level.Item no.11.4(i)
Outer Step 2 8.30 4.90 0.20 16.27
Inner Step 2 7.90 4.50 0.20 14.22
Foundation of Curtain Wall 4 4.55 0.60 0.15 1.64
Wing wall 4 6.0 (2.88+1.65)/2 0.40 21.74
Total 53.87 Cum 2993.76 161261.88
3 First class brick work in cement mortar 1:3 (1cement : 3 coarse
sand) up to a depth of 1.50 m below ground and above 1.50 m
from bed/ground level in foundation.Item no.11.5(i)
Abutments
Lower step 2.00 7.50 4.10 0.40 24.60
Upper step 2.00 7.50 (4.1+3.7)/2 0.40 23.40
Wing walls
Lower step 4.00 6.00 (2.48+1.75)/2 0.40 17.90
(2.48+2.08+1
4.00 6.00 0.40 15.98
Upper step 0.25+0.85)/4
End Pillars 4.00 1.00 1.25 0.40 2.00
End Pillars 4.00 1.00 (1.25+0.85)/2 0.40 1.68
For Curtain wall 2.00 4.45 0.40 0.30 2.45
Total 88.01 Cum 2359.73 207679.84
4 First class brick work in cement mortar 1:3 (1cement : 3course
sand) up to a depth of 1.50 m below ground and above 1.50 m
from bed/ground level in super structure.
Abutments 2.00 7.50 (2.7+0.7)/2 3.80 96.90
2.00 7.50 0.23 0.65 2.24

4.00 6.00 (2.08+0.5+0. (4.0+1.0)/2 58.95


S.I.No.12.1 Wing walls 85+0.5)/4
158.09 Cum 2274.76 359616.81
End Pillar 4.00 1.00 (085+0.3)/2 1.00 5.40
Parapet 2.00 7.40 0.46 0.20 2.28
2.00 7.40 0.35 0.40 3.47
S.I.No.13.9 11.15 Cum 2181.03 24318.48
S.I.No.14.7(iii) BOE Flooring (1:3 Brick work) 1.00 7.50 4.45 0.12 4.01
Total 4.01 Cum 2566.56 10291.91
5 Reinforced cement concrete M20 (1:2:4) mix with stone
aggregates 20mm nominal size mechanically mixed and
vibrated for bed plates excluding steel reinforcement but
including with 2% reinforcement, equally distributed at top &
bottom in both directionsAs S.I.No.12.5(iii)

Bed Block 2.00 7.50 0.47 0.20 1.41


Total 1.41 Cum 3841.26 5416.18
6
Reinforced cement concrete M20 (1:2:4) mix with stone
aggregates 20mm nominal size mechanically mixed and
vibrated for reinforced concrete work in slab excluding steel
reinforcement, but including centering shuttering, laid in
position.13.1(i)

7 Width of Baring = 0.40 1.00 5.94 7.50 0.42 18.71 Cum 4164.92 77929.82
8 Cement concrete M20 (1:2:4) mix with stone aggregates 20mm
nominal size mechanically mixed and vibrated for reinforced
concrete work in bearing coat of slab.12.5II(i)
1.00 5.94 7.50 0.08 3.56 Cum 3615.29 12884.89
Steel reinforcement for R.C.C. works including bending and (1.41+18.
placing in postion Mild steel bars conforming to IS 432/1966 71)x1.1/1
GRADE I tested steel as SI No.12.8 00 *78.5 17.37 Qtl. 3065.46 53247.04
For Slab
For Bed Block per slab
9
Struck Cement pointing 1:2 deep variety (cut weather) on brick
and tile work.12.2
2.00 7.50 3.80 114.00 Sq.m.
Wingwalls
4.00 6.00 (4+1)/2 60.00 Sq.m.
Parapets 2.00 6.40 1.66 41.17 Sq.m.
4.00 0.46 0.20 0.37 Sq.m.
4.00 0.35 4.00 0.56 Sq.m.
4.00 6.70 0.50 13.40 Sq.m.
4.00 1.00 0.50 2.00 Sq.m.
Total 231.50 Sq.m. 23.17 5363.86
10 Providing weepholes in brick masonry/stone masonry
,plain/reinforced concrete abutment,wing wall with 100 mm dia. 36.00 36.00
AC pipe extending through the full width of the structures with 36.00 36.00
slope of 1(V):20(H) towards drawing face complete as per Total 72.00 No. 215.08 15485.76
drawing and technical specification clauses
614,709,1204.3.7(Item no. 12.9)

11 Providing and laying filter media withgranular crushed


aggregates as per specification to a thickness of not less than 2.00 7.50 0.60 4.00 36.00 Cu.m.
600 mm with smaller size towards the soil and bigger size 4.00 6.00 0.60 (4+1)/2 36.00 Cu.m.
towards the wall and providing over the entire surface behind
abutment, wingwall,return wall to the full height, compacted to
firm condition complete as per drawing and technical
specification clause 1204.3.8 (Item no. 12.11).
Total 72.00 Cu.m. 841.23 60568.56
12 Earthwork in embankment mechanically compacted to 97% of
maximum dry density/proctor density in ordinary soil.
Excavation to be in the form of regular pits not exceeding 0.5
m. in depth and earth work in embankment to be in 20
cm.layers, watering the earth to bring it to required optimum
moisture content, compacting with Roller 8 to 10 tonnes
ramming and dressing the surface to required level and slope (11.5 + 7.5) / (1.5 +
2x1 50.00 807.50 C.um 58.90 47561.75
and also including 1.5m lift and lead 30m. The earth from 2 0.20)/2
cutting is to be used in making embankment or to be stacked
as spoil banks within 30m distance as directed by the Engineer-
in-charge above average formation level. (For both side
approach of RCC Culvert )

Total 1055664.51
Say, Rs.Lac. 10.56

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


R.C.C. CULVERT,2X5.00m span
DESIGN PARAMETERS : FOR ABOVE PARAMETERS DEPTH OF SLAB 0.42
SPAN 5.00 m. (As per IRC Special Publication no. - DEPTH OF ABUTMENT CAP 0.15
HEIGHT 3.00 M B1= 2.00
LENGTH 8.30 M B2= 3.60
No. of Spa 2 Nos. b3= 0.40
SI. No. Item of Work Nos. Length Breadth Height Quantity Unit Rate Amount
1 Earthwork in excavation in foundation trenches in ordinary soil etc.
not exceeding 30 m depth including dressing of bottom and sides
of trenches, stacking the excavated soil clear from the edge of the
excavation and subsequent filling around hume pipes/ masonary in
15 cm layers with compection including disposal of all surplus soil
as directed with in a lead of 30 m.

(a) Abutment
s 2 8.3 4.9 (1.2+3.0)/2 170.81
(b) Pier 1 9.5 4.0 1.50 57.00
(c) Wingwalls
4 6.0(2.88+1.65)/2 0.3 16.31
Total 244.12 Cum 75.02 18313.88
2 Cement concrete mix 1:3:6 with stone aggregates 40 mm normal
size mechanically mixed and vibrated in foundation upto a depth of
1.5 m below ground level and 1.50 m above Ground/bed level.
Outer Step 2 8.30 4.90 0.20 16.27
Inner Step 2 7.90 4.50 0.20 14.22
Below Flooring 1 9.50 4.00 0.20 7.60
Above Flooring 1 9.10 3.60 0.20 6.55
Foundation of Curtain Wall 4 4.55 0.60 0.15 1.64
Wing wall 4 6.0(2.88+1.65)/2 0.40 21.74
Total 68.02 Cum 2993.76 203629.57
3 First class brick work in cement mortar 1:3 (1cement : 3course
sand) up to a depth of 1.50 m below ground and above 1.50 m
from bed/ground level in foundation.
Abutments
Lower step 2.00 7.50 4.10 0.40 24.60
Upper step 2.00 7.50 (4.1+3.7)/2 0.40 23.40
Pier 1.00 8.70(3.20+2.60)/2 1.10 27.75
Wing walls
Lower step 4.00 6.00 (2.48+1.75) 0.40 17.90
(2.48+2.0
4.00 6.00 8+10.25+ 0.40 15.98
Upper step 0.85)/4
End Pillars 4.00 1.00 1.25 0.40 2.00
End Pillars 4.00 1.00(1.25+0.85)/2 0.40 1.68
For Curtain wall 4.00 4.45 0.40 0.30 2.45
Total 115.76 Cum 2359.73 273162.34
4 First class brick work in cement mortar 1:3 (1cement : 3course
sand) up to a depth of 1.50 m below ground and above 1.50 m
from bed/ground level in super structure.
Abutments 2.00 7.50 (2.7+0.7)/2 3.80 96.90
2.00 7.50 0.23 0.65 2.24
Pier 1.00 7.50 (2.0+1.0)/2 3.80 42.75
2.00 0.45(2.0+0+1+0)/4 3.80 2.56
(2.08+0.5
4.00 6.00 +0.85+0.5 (4.0+1.0)/2 58.95
S.I.No.12.1 Wing walls )/4
203.40 Cum 2274.76 462686.18
End Pillar 4.00 1.00 (085+0.3)/2 1.00 5.40
Parapet 2.00 12.40 0.46 0.20 2.28
2.00 12.40 0.35 0.40 3.47
S.I.No.13.9 11.15 Cum 2181.03 24318.48
S.I.No.14.7(iii) BOE Flooring (1:3 Brick work) 2.00 7.50 4.45 0.12 8.01
Total 8.01 Cum 2566.56 20558.15
5 Reinforced cement concrete M20 (1:2:4) mix with stone aggregates
20mm nominal size mechanically mixed and vibrated for bed plates
excluding steel reinforcement but including with 2% reinforcement,
equally distributed at top & bottom in both directionsAs
S.I.No.12.5(iii)
Bed Block 2.00 7.50 0.47 0.20 1.41
1.00 7.50 1.00 0.20 1.50
Total 2.91 Cum 3841.26 11178.07
6 Reinforced cement concrete M20 (1:2:4) mix with stone aggregates
20mm nominal size mechanically mixed and vibrated for reinforced
concrete work in slab excluding steel reinforcement, but including
centering shuttering, laid in position.13.1(i) 2.00 5.97 7.50 0.42 37.61 Cum 4164.92 156646.81
Width of Baring = 0.40
7 Cement concrete M20 (1:2:4) mix with stone aggregates 20mm
nominal size mechanically mixed and vibrated for reinforced
concrete work in bearing coat of slab.12.5II(i) 2.00 5.97 7.50 0.08 7.16 Cum 3615.29 25885.48
8 Steel reinforcement for R.C.C. works including bending and placing (2.91+35.
in postion Mild steel bars conforming to IS 432/1966 GRADE I 82)x1.1/1
tested steel as SI No.12.8 00 *78.5 33.44 Qtl. 3065.46 102508.98
For Slab
For Bed Block per slab

9 Struck Cement pointing 1:2 deep variety (cut weather) on brick and
tile work.12.2
4.00 7.50 3.80 114.00 Sq.m.
4.00 6.00 (4+1)/2 60.00 Sq.m.
2.00 12.40 1.66 41.17 Sq.m.
4.00 0.46 0.20 0.37 Sq.m.
4.00 0.35 4.00 0.56 Sq.m.
4.00 6.70 0.50 13.40 Sq.m.
4.00 1.00 0.50 2.00 Sq.m.
Total 231.50 Sq.m. 23.17 5363.86
10 Providing weepholes in brick masonry/stone masonry
,plain/reinforced concrete abutment,wing wall with 100 mm dia. AC 36.00 36.00
pipe extending through the full width of the structures with slope of 36.00 36.00
1(V):20(H) towards drawing face complete as per drawing and Total 72.00 No. 215.08 15485.76
technical specification clauses 614,709,1204.3.7(Item no. 12.9)

11 Providing and laying filter media withgranular crushed aggregates


as per specification to a thickness of not less than 600 mm with 2.00 7.50 0.60 4.00 36.00 Cu.m.
smaller size towards the soil and bigger size towards the wall and 4.00 6.00 0.60 (4+1)/2 36.00 Cu.m.
providing over the entire surface behind abutment, wingwall,return
wall to the full height, compacted to firm condition complete as per
drawing and technical specification clause 1204.3.8 (Item no.
12.11).
Total 72.00 Cu.m. 841.23 60568.56
12 Earthwork in embankment mechanically compacted to 97% of
maximum dry density/proctor density in ordinary soil. Excavation to
be in the form of regular pits not exceeding 0.5 m. in depth and
earth work in embankment to be in 20 cm.layers, watering the earth
to bring it to required optimum moisture content, compacting with
Roller 8 to 10 tonnes ramming and dressing the surface to required
level and slope and also including 1.5m lift and lead 30m. The (11.5 + (1.5 +
2x1 15.00 216.75 C.um 58.90 12766.58
earth from cutting is to be used in making embankment or to be 7.5) /2 0.20)/2
stacked as spoil banks within 30m distance as directed by the
Engineer-in-charge above average formation level. (For both side
approach of RCC Culvert )

Total 1393072.69

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


R.C.C. CULVERT,3X5.00m span
DESIGN PARAMETERS : FOR ABOVE PARAMETERS DEPTH OF SLAB 0.42
SPAN 5.00 m. (As per IRC Special Publication no.DEPTH OF ABUTMENT CAP 0.15
HEIGH3.00 M B1= 2.00
LENGTH 8.30 M B2= 3.60
No. of 3 Nos. b3= 0.40
SI.
No. Item of Work Nos. LengthBreadth Height Quantity Unit Rate Amount
1 Earthwork in excavation in foundation trenches in
ordinary soil etc. not exceeding 30 m depth including
dressing of bottom and sides of trenches, stacking the
excavated soil clear from the edge of the excavation
and subsequent filling around hume pipes/ masonary in
15 cm layers with compection including disposal of all
surplus soil as directed with in a lead of 30 m.
(a) Abut
ments 2 8.3 4.9 (1.2+3.0)/2 170.81
(b) Pier 2 9.5 4.0 1.50 114.00
(c) Wing
walls 4 6.0 (2.88+1.65)/2 0.3 16.31
Total 301.12 Cum 72.00 21680.64
2 Cement concrete mix 1:3:6 with stone aggregates 40
mm normal size mechanically mixed and vibrated in
foundation upto a depth of 1.5 m below ground level
and 1.50 m above Ground/bed level. Outer Step 2 8.30 4.90 0.20 16.27
Inner Step 2 7.90 4.50 0.20 14.22
Below Flooring 3 9.50 4.00 0.20 22.80
Above Flooring 3 9.10 3.60 0.20 19.66
Foundation of Curtain Wall 6 4.55 0.60 0.15 2.46
Wing wall 4 6.0 (2.88+1.65)/2 0.40 21.74
Total 97.14 Cum 3187 ###
3 First class brick work in cement mortar 1:3 (1cement :
3course sand) up to a depth of 1.50 m below ground
and above 1.50 m from bed/ground level in foundation.
Abutments
Lower step 2.00 7.50 4.10 0.40 24.60
Upper step 2.00 7.50 (4.1+3.7)/2 0.40 23.40
Pier 2.00 8.70 (3.20+2.60)/2 1.10 55.50
Wing walls
Lower step 4.00 6.00 (2.48+1.75)/2 0.40 17.90
4.00 6.00 (2.48+2.08+1 0.40 15.98
Upper step 0.25+0.85)/4
End Pillars 4.00 1.00 1.25 0.40 2.00
End Pillars 4.00 1.00 (1.25+0.85)/2 0.40 1.68
For Curtain wall 6.00 4.45 0.40 0.30 3.20
Total 144.26 Cum ### ###
4 First class brick work in cement mortar 1:3 (1cement :
3course sand) up to a depth of 1.50 m below ground
and above 1.50 m from bed/ground level in super
structure. Abutments 2.00 7.50 (2.7+0.7)/2 3.80 96.90
2.00 7.50 0.23 0.65 2.24
Pier 2.00 7.50 (2.0+1.0)/2 3.80 85.50
4.00 0.45 (2.0+0+1+0)/4 3.80 5.12
(2.08+0.5+0.
4.00 6.00 (4.0+1.0 58.95
Wing walls 85+0.5)/4
End Pillar 4.00 1.00 (085+0.3)/2 1.00 5.40
Parapet 2.00 17.40 0.46 0.20 2.28
2.00 17.40 0.35 0.40 3.47
BOE Flooring (1:3 Brick work) 3.00 7.50 4.45 0.12 12.02
Total 271.88 Cum ### ###
5 Reinforced cement concrete M20 (1:2:4) mix with stone
aggregates 20mm nominal size mechanically mixed
and vibrated for bed plates excluding steel
reinforcement but including with 2% reinforcement,
equally distributed at top & bottom in both directions
Bed Block 4.00 7.50 0.47 0.20 2.82
4.00 7.50 1.00 0.20 6.00
Total 8.82 Cum ### 33665.94
6 Reinforced cement concrete M20 (1:2:4) mix with stone
aggregates 20mm nominal size mechanically mixed
and vibrated for reinforced concrete work in slab
excluding steel reinforcement, but including centering 3.00 5.97 7.50 0.42 56.42 Cum ### ###
shuttering, laid in position.
Width of Baring = 0.40
7 Cement concrete M20 (1:1.5:3) mix with stone
aggregates 20mm nominal size mechanically mixed
and vibrated for reinforced concrete work in bearing 3.00 5.97 7.50 0.08 10.75 Cum ### 39588.26
(4.37
coat of slab.
8 Steel reinforcement for R.C.C. works including bending +53.7
and placing in postion Mild steel bars conforming to IS 3)x1.
432/1966 GRADE I tested steel 1/100 *78.5 50.17 Qtl. ### ###
For Slab
For Bed Block per slab
9 Struck Cement pointing 1:2 deep variety (cut weather)
on brick and tile work.
6.00 7.50 3.80 171.00 Sq.m.
4.00 6.00 (4+1)/2 60.00 Sq.m.
2.00 12.40 1.66 41.17 Sq.m.
4.00 0.46 0.20 0.37 Sq.m.
4.00 0.35 4.00 5.60 Sq.m.
6.00 6.70 0.50 20.10 Sq.m.
6.00 1.00 0.50 3.00 Sq.m.
Total 301.24 Sq.m. 23.70 7139.29
10 Providing weepholes in brick masonry/stone
masonry ,plain/reinforced concrete abutment,wing wall 36.00 36.00
with 100 mm dia. AC pipe extending through the full 36.00 36.00
width of the structures with slope of 1(V):20(H) towards Total 72.00 No. 251.00 18072.00
drawing face complete as per drawing and technical
specification clauses 614,709,1204.3.7(Item no. 12.9)

11 Providing and laying filter media withgranular crushed


aggregates as per specification to a thickness of not 2.00 7.50 0.60 4.00 36.00 Cu.m.
less than 600 mm with smaller size towards the soil and 4.00 6.00 0.60 (4+1)/2 36.00 Cu.m.
bigger size towards the wall and providing over the
entire surface behind abutment, wingwall,return wall to
the full height, compacted to firm condition complete as
per drawing and technical specification clause 1204.3.8
Total 72.00 Cu.m. 966.00 69552.00
(Item no. 12.11).
12 Earthwork in embankment mechanically compacted to
97% of maximum dry density/proctor density in ordinary
soil. Excavation to be in the form of regular pits not
exceeding 0.5 m. in depth and earth work in
embankment to be in 20 cm.layers, watering the earth
to bring it to required optimum moisture content,
compacting with Roller 8 to 10 tonnes ramming and 2x1 15.00 (11.5 + 7.5) / (1.5 + 216.75 C.um 44.70 9688.73
dressing the surface to required level and slope and 2 0.20)/2
also including 1.5m lift and lead 30m. The earth from
cutting is to be used in making embankment or to be
stacked as spoil banks within 30m distance as directed
by the Engineer-in-charge above average formation
level. (For both side approach of RCC Culvert )
Total ###
Say, Rs. 19.12 Lacs
Details of Measurement / Abstract of Cost

(For Culverts And Minor Bridges)


(Construction of R.C.C. Culvert, 1x3m Span)
DESIGN PARAMETERS : FOR ABOVE PARAMETERS DEPTH OF SLAB 0.305 M
SPAN 3.00 M (As per IRC Special Publication noDEPTH OF ABUTMENT CAP 0.15 M
HEIGHT 2.00 M B1= 1.50 M
LENGTH 8.30 M B2= 2.70 M
No. of Spans1 Nos. B3= 0.30 M
SI. No. Item of Work Nos. Length Breadth Height Quantity Unit Rate Amount(Rs.)
1 Earthwork in excavation in foundation trenches in ordinary soil etc. not
exceeding 30 m depth including dressing of bottom and sides of trenches,
stacking the excavated soil clear from the edge of the excavation and
subsequent filling around hume pipes/ masonary in 15 cm layers with
compection including disposal of all surplus soil as directed with in a lead
of 30 m. Item No.(11.1)1(i)

(a) Abutments 2 8.3 2.7 1.5 67.23 Cum


(c) Wingwalls
4 6.0 (2.45+1.65)/2 1.5 73.8 Cum
Total 141.03 Cum 75.02 10580.0706
2 Cement concrete mix 1:3:6 with stone aggregates 40 mm normal size
mechanically mixed and vibrated in foundation upto a depth of 1.5 m
below ground level and 1.50 m above Ground/bed level.Item No.11.4(i) Cum
Outer Step 2 8.3 2.7 0.2 8.964 Cum
Inner Step 2 8.3 2.3 0.2 7.636 Cum
Below Flooring 1 7.5 5.3 0.1 3.975 Cum
Foundation of Curtain Wall 2 5.3 0.6 0.15 0.954 Cum
Wing wall 4 6.0 (2.45+1.65)/2 0.40 19.68 Cum
Total 41.21 Cum 2993.76 123369.8558
3 First class brick work in cement mortar 1:3 (1cement : 3 course sand) up
to a depth of 1.50 m below ground and above 1.50 m from bed/ground
level in foundation.ITEM NO.11.5(I)
Abutments
Lower step 2.00 7.50 2.50 0.40 15.00 Cum
Upper step 2.00 7.50 2.30 0.40 13.80 Cum
Wing walls Cum
Lower step 4.00 6.00 (2.45+1.65)/2 0.40 19.68 Cum
(2.45+2.08+1
4.00 6.00 0.40
Upper step .25+0.85)/4 15.91 Cum
End Pillars 4.00 1.00 1.25 0.40 2.00 Cum
End Pillars 4.00 1.00 (1.25+0.85)/2 0.40 1.68 Cum
For Curtain wall 2.00 4.45 0.40 0.30 1.07 Cum
Total 69.14 Cum 2359.73 163147.0127
4 First class brick work in cement mortar 1:3 (1cement : 3course sand) up
to a depth of 1.50 m below ground and above 1.50 m from bed/ground
level in super structure.
Item No.12.1 Abutments 2.00 7.50 (2.1+0.7)/2 2.30 6.30 Cum
2.00 7.50 0.23 0.65 2.24 Cum
(2.08+0.5+0.
4.00 6.00 (4.0+1.0)/2 58.95
Wing walls 85+0.5)/4 Cum
67.49 Cum 2274.76 153523.5524
Item No.13.9 End Pillar 4.00 1.00 (085+0.3)/2 1.00 2.30 Cum
Parapet 2.00 4.50 0.46 0.20 0.83 Cum
2.00 4.50 0.35 0.40 1.26 Cum
4.39 Cum 2181.03 9570.36
Item No.14.7(iii) BOE Flooring (1:3 Brick work) 2.00 7.50 4.45 0.12 8.01 Cum
Total 8.01 Cum 2566.56 20558.1456
5 Reinforced cement concrete M20 (1:2:4) mix with stone aggregates
20mm nominal size mechanically mixed and vibrated for bed plates
excluding steel reinforcement .Item No.12.5(iii)

Bed Block 2.00 7.50 0.47 0.20 1.41 Cum 3841.26 5416.1766
6 Reinforced cement concrete M20 (1:2:4) mix with stone aggregates
20mm nominal size mechanically mixed and vibrated for reinforced
concrete work in slab excluding steel reinforcement, but including
centering shuttering, laid in position.
Width of Bearing = 0.40m. 1.00 3.80 7.50 0.31 8.84 Cum 4164.92 36797.0682
7 Cement concrete M20 (1:2:4) mix with stone aggregates 20mm nominal
size mechanically mixed and vibrated for concrete work in bearing coat of
slab.Item No.12.5(II)(I)
1.00 3.80 7.50 0.08 2.28 Cum 3615.29 8242.8612
(1.41
8 Steel reinforcement for R.C.C. works including bending and placing in +8.8
postion Mild steel bars conforming to IS 432/1966 GRADE I tested steel 4)x1.
MS bar Reinforcement . Item No.12.8 1/100 *78.5 8.85 Qtl. 3065.46 27129.321
For Slab
For Bed Block per slab
9 First class brick in cement mortar 1:3 upto a depth of 1.50 below ground
and above form Bed/Ground levelItem No.11.5(I) in floor. 2.00 4.20 0.35 0.90 2.65
2.00 4.20 0.23 0.60 1.16
3.81 cum. 2359.73 8979.24
10 Struck Cement pointing 1:2 deep variety (cut weather) on brick and tile
work.
Item No.12.2 2.00 7.50 2.30 34.50 Sq.m.
4.00 6.00 (4+1)/2 60.00 Sq.m.
2.00 5.30 1.66 17.596 Sq.m.
4.00 0.46 0.20 0.368 Sq.m.
4.00 6.70 0.50 13.4 Sq.m.
4.00 1.00 0.50 2 Sq.m.
Total 127.86 Sq.m. 23.17 2962.61
11 Providing weepholes in brick masonry/stone masonry ,plain/reinforced
concrete abutment,wing wall with 100 mm dia. AC pipe extending through 36.00 36.00
the full width of the structures with slope of 1(V):20(H) towards drawing 36.00 36.00
face complete as per drawing and technical specification clauses Total 72.00 No. 215.08 15485.76
614,709,1204.3.7(Item no. 12.9)
12 Providing and laying filter media withgranular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size 2.00 7.50 0.60 4.00 36.00 Cu.m.
towards the soil and bigger size towards the wall and providing over the 4.00 6.00 0.60 (4+1)/2 36.00 Cu.m.
entire surface behind abutment, wingwall,return wall to the full height,
compacted to firm condition complete as per drawing and technical
specification clause 1204.3.8 (Item no. 12.11).
Total 72.00 Cu.m. 841.23 60568.56
13 Earthwork in embankment mechanically compacted to 97% of maximum
dry density/proctor density in ordinary soil. Excavation to be in the form of
regular pits not exceeding 0.5 m. in depth and earth work in embankment
to be in 20 cm.layers, watering the earth to bring it to required optimum
moisture content, compacting with Roller 8 to 10 tonnes ramming and
dressing the surface to required level and slope and also including 1.5m
lift and lead 30m. The earth from cutting is to be used in making 2x1 (11.5 + 7.5) / (1.5 +
15.00 216.75 C.um 58.90 12766.58
embankment or to be stacked as spoil banks within 30m distance as 2 0.20)/2
directed by the Engineer-in-charge above average formation level. (For
both side approach of RCC Culvert )

G. Total =Rs. 659097.17


Say Lac. 6.59

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Detailed Calculation for granular material below 1000 mm dia Hume pipe

Outer radius of pipe = dial/2 + pipe thickness


GRANULAR MATERIAL 1000/2 + 100
600
AC = 600 - 260 -100
=240
Hence CD = (600 x 600 - 240 x 240)
= 550.00

A Angle a = acos(240/600)
= 66.4

A Area of ABD = PI/4 x DIA x DIA x 66.4 x 2/360


=0.417

B D
J K
B C
D
260 Area of triangle ABD = 2x1/2 x 240 x 550
4.35
= 0.132
100
75 B D
M L Hence area of = 0.417 - 0.132
1600
=0.285
E

Area of JKLM = 1.60 x 0.435


=0.696

Hence X-sectional area of granular work = 0.41 sqm


pe thickness
Analysis of Level Pillar

(As per New SOR)

Providing and fixing of level pillar (35mm x 350mm x 1500mm) at the interval of 50m both side of the road made of
M-150 brick masonry with cement(43 grade,O.P.C.,I.S.8112) and sand(Course Modulus- 2.50) in proportion of 1:3
mortor, of required height and including its 1:6 cement, sand, mortor plastering, white washing and marking different
chainages and levels in different colour including supply of all materials, labour, T&P etc,required for proper
completion of work .
1- Brickwork in 1:3 c/s mortar (As per item no. 11.5 (1))
= 0.35 x 0.35 x 1.50 = 0.184 Cum. @ 2233.00 = 410.872
2- Plaster in 1:6 c/s mortor
= 4 x 0.35 x 1.10 = 1.54
1 x 0.35 x 0.35 = 0.12
1.66 Sqm. @ 78.60 = 130.476
3- White washing 2 Coat same item no.2 1.66 Sqm. @ 8.00/sqm. = 13.28
4- Hindi Letter writing (Height per cm. per letter) 38 @ 0.32 = 12.16
(As per item no. 10.1) Total = 566.788
Add: Overhead+ C.P. @ 12.5 % = 70.85
Grand Total = 637.6365
Say, Rs. 637.60 per pillar
Model ROAD METAL RATE
District : Farrukhabad
FatehgarhTo Ghata/Bakol 232 Km
Fatehgarh To Jhansi 265 Km Fatehgarh To Lalkuan=208 km.
Fatehgarh To Haldwani 221 Km
Tota
Quarry l
Cost of Cartage Wastage
Rate(incl. Amo Convey
Royalty) Less unt ance
Name of after 15% Km. After Sales Total
Sl. Bulkag Total. Total Amt. Charge Remark
Quarry Deductio deduc Tax 8% Cost
e s (13-5)
n of ting 5+9 % Amt. Column
P K
Loading 10%C.
Charges Cost P.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
45-63mm
1 Ghata/Bakol 120.35 0.00 120.35 232.00 0.00 642.70 584.28 704.63 0 0 704.63 9.63 714.26 584.28 Detail of Cartage
22.4-53 mm (Crusher Broken) 1st Km=49.60@49.60
2 Lal Kuan 376.35 0.00 376.35 208.00 0.00 586.30 533.01 909.36 0 0 909.36 30.11 939.46 533.01 2nd & 3rd Km=17.80@8.90
Coarse sand(F.M. 1-2) 4th & 5th=12.60@6.30
3 At Fatehgar 650.00 84.89 565.11 0.00 0.00 0.00 0.00 565.11 0 0 565.11 0.00 565.11 0.00 6th to 10th=26.00@5.20
16-22.4mm(13.2mm) 11th to 20th=35.00@3.50
4 Haldwani 216.35 0.00 216.35 221.00 0.00 616.85 560.78 777.13 0 0 777.13 17.31 794.44 560.78 21st to 30th=26.00@2.60
10-16 mm 31st to 50th=48.00@2.40
5 Haldwani 266.35 0.00 266.35 221.00 0.00 616.85 560.78 827.13 0 0 827.13 21.31 848.44 560.78 Above 50Km@2.35
6.7mm Total=1st to 50th Km=
6 Haldwani 291.35 0.00 291.35 221.00 0.00 616.85 560.78 852.13 0 0 852.13 23.31 875.44 560.78 Rs.215.00
2.8 mm (Quarry Dust) For Kuchha Road @
7 Ghata/Bakol 40.35 0.00 40.35 232.00 0.00 642.70 584.28 624.63 0 0 624.63 3.23 627.86 584.28 3.13/Km
Analysis of Bitumen

3% Cost of Cartage Conveyance


Name of Type of Rate at
20% Sale
16% Educa 1% St. one way charges After
Total
Sl. Refiner
Tax
Excise tional Dev. Total. deducting
Amount
Road Bitumin y Duty CESS Tax 10%C.P.
on ED Km. Col.13x2
P K Cost Remark
1 2 3 4 5 7 8 9 10 11 12 13 14 15 16

Emulsion(SS- Detail of Cartage1st


17402.31 3480.46 2784.37 83.53 237.51 23988.18 234 0.0 531.64 24954.81
1) Km=39.63@39.632nd & 3rd
966.63 Km=14.06@7.03 4th &
5th=10.0@5.00 6th to
10th=20.65@4.13 11th to
Emulsion(RS-
1 At Fatehghar 17412.31 3482.46 2785.97 83.58 237.64 24001.96 234 0.0 531.64 1063.28 25065.24 20th=27.50@2.7521st to
1) 30th=21.00@2.1031st to
50th=40.00@2.00Above
50Km@1.95Total=1st to 50th
80/100(S-90) Km=Rs.172.84 For Kuchha
17500.00 3500.00 2800.00 84.00 238.84 24122.84 234 0.0 531.64 1063.28 25186.12 Road @ 2.63/Km
Maxphalt

J.E. A.E. E.E.


ANALYSIS OF RATE FOR BITUMEN
District : Farrukhabad
Name of Refinery: MathuDistance : Mathura To Fatehgarh (234 Km)
Mathura To Mohammadabad (220 Km)

3% Cost of Cartage Conveyan Total


16% Educati 1% ST, one way ce Amount
Rate at 20% Sale
Sl. Name of Road Type of Bitumin Refinery Tax
Excise onal Dev. Total. Charges
Duty CESS Tax
on ED Km. Col.10x2
P K Cost 7+11 Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Emulsion(SS-1) 17402.31 3480.46 2784.37 83.53 202.70 ### 257 1.0 579.12 1158.24 25111.61
Detail of Cartage1st
Hisampur To Jhijhuki Emulsion(RS-1) Km=39.63@39.632nd & 3rd
1 17412.31 3482.46 2785.97 83.58 202.82 ### 257 1.0 579.12 1158.24 25125.38
L/R Km=14.06@7.03 4th &
5th=10.0@5.00 6th to
80/100 Maxphalt 17500.00 3500.00 2800.00 84.00 203.84 ### 257 1.0 579.12 1158.24 25246.08 10th=20.65@4.13 11th to
20th=27.50@2.7521st to
FKD. Neewalpur Emulsion(SS-1) 17402.31 3480.46 2784.37 83.53 202.70 ### 259 2.0 585.65 1171.30 25124.67
30th=21.00@2.1031st to
50th=40.00@2.00Above
Ugarpur Rd. To Katri 50Km@1.95Total=1st to 50th
2 Emulsion(RS-1) 17412.31 3482.46 2785.97 83.58 202.82 ### 259 2.0 585.65 1171.30 25138.44 Km=Rs.172.84 For Kuchha Road
Gangpur via Katri @ 2.63/Km
Dharampur L/R 80/100 Maxphalt 17500.00 3500.00 2800.00 84.00 203.84 ### 259 2.0 585.65 1171.30 25259.14

J.E. A.E. E.E. S.E.


ROAD METAL RATE
Name of Road : Hisampur To Jhijhuki L/R
FatehgarhTo Ghata/Bakoli 232 Km
Fatehgarh To Jhansi 265 Km Fatehgarh To Jhijhuki Rd. = 23 Km.
Fatehgarh To Haldwani 221 Km Fatehgarh To Lal Kuan=208 km.
District : Farrukhabad Block : Kamalganj

Total
Less Cost of Cartage Amount Wastage Conveyance
Name of Quarry 15% Total Sales Total
Sl. Rate After Bulkag Total. Charges (13-
Quarry Deduction After Amt. Tax 8% Cost 5) Column
e Km.
of Loading deducting 5+9 % Amt.
Charges P K Cost 10%C.P.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
45-63mm
1 Ghata/Bakoli 120.35 0.00 120.35 255 1.0 699.88 636.26 756.61 0 0.00 756.61 9.63 766.24 645.89
22.4-53 mm (Crusher Broken)
2 Lal Kuan 376.35 0.00 376.35 231 1.0 643.48 584.99 961.34 0 0.00 961.34 30.11 991.45 615.10
Course sand
3 At Fatehgarh 650.00 84.89 565.11 0 0.0 0.00 0.00 565.11 0 0.00 565.11 0.00 565.11 0.00
16-22.4mm (13.2mm)
4 Haldwani 216.35 0.00 216.35 244 1.0 674.03 612.76 829.11 0 0.00 829.11 17.31 846.42 630.07
10-16 mm (11.2mm)
5 Haldwani 266.35 0.00 266.35 244 1.0 674.03 612.76 879.11 0 0.00 879.11 21.31 900.42 634.07
6.7mm
6 Haldwani 291.35 0.00 291.35 244 1.0 674.03 612.76 904.11 0 0.00 904.11 23.31 927.42 636.07
2.8 mm
7 Ghata/Bakoli 40.35 0.00 40.35 255 1.0 699.88 636.26 676.61 0 0.00 676.61 3.23 679.84 639.49

J.E. A.E. E.E.


Remark

17

Detail of Cartage
1st Km=49.60@49.60
2nd & 3rd Km=17.80@8.90
4th & 5th=12.60@6.30
6th to 10th=26.00@5.20
11th to 20th=35.00@3.50
21st to 30th=26.00@2.60
31st to 50th=48.00@2.40
Above 50Km@2.35
Total=1st to 50th Km=
Rs.215.00
For Kuchha Road @
3.13/Km

S.E.
ROAD METAL RATE
Name of Road : FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri Dharampur L/R
FatehgarhTo Ghata/Bakoli 232 Km
Fatehgarh To Jhansi 265 Km Fatehgarh To Katri Dharampur = 15 Km.
Fatehgarh To Haldwani 221 Km Fatehgarh To Lal Kuan=208 km.
District : Farrukhabad Block : Barhpur

Total
Cost of Cartage Amount Wastage
Less
Name of Total Sales Total Conveyance
Quarry 15%
Sl. Total. Charges (13- Remark
Quarry Rate After Bulkag Km. Amt. Tax 8% Cost 5) Column
Deduction e After
of Loading deducting 5+9 % Amt.
P K
Charges Cost 10%C.P.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
45-63mm
1 Ghata/Bakoli 120.35 0.00 120.35 247 3.0 687.34 624.86 745.21 0 0.00 745.21 9.63 754.84 634.49 Detail of Cartage
22.4-53 mm (Crusher Broken) 1st Km=49.60@49.60
2 Lal Kuan 376.35 0.00 376.35 223 3.0 630.94 573.59 949.94 0 0.00 949.94 30.11 980.05 603.70 2nd & 3rd Km=17.80@8.90
Course sand 4th & 5th=12.60@6.30
3 At Fatehgarh 650.00 84.89 565.11 0 0.0 0.00 0.00 565.11 0 0.00 565.11 0.00 565.11 0.00 6th to 10th=26.00@5.20
16-22.4mm (13.2mm) 11th to 20th=35.00@3.50
4 Haldwani 216.35 0.00 216.35 236 3.0 661.49 601.36 817.71 0 0.00 817.71 17.31 835.02 618.67 21st to 30th=26.00@2.60
10-16 mm (11.2mm) 31st to 50th=48.00@2.40
5 Haldwani 266.35 0.00 266.35 236 3.0 661.49 601.36 867.71 0 0.00 867.71 21.31 889.02 622.67 Above 50Km@2.35
6.7mm Total=1st to 50th Km=
6 Haldwani 291.35 0.00 291.35 236 3.0 661.49 601.36 892.71 0 0.00 892.71 23.31 916.02 624.67 Rs.215.00
2.8 mm For Kuchha Road @
7 Ghata/Bakoli 40.35 0.00 40.35 247 3.0 687.34 624.86 665.21 0 0.00 665.21 3.23 668.44 628.09 3.13/Km

J.E. A.E. E.E. S.E.


Name of the road :- Hisampur To Jhujhki L/R ( 2.10 KM)

EARTH WORK CALCULATION SHEET

Name of the road :- Hisampur To Jhujhki L/R ( 2.10 KM)

Sl. Proposed Earth Work Average Area Length. Quantity in


No. Chainage Width Depth Cross Sectional Area in Sq.m in Mtr Cubic Mtr.
B1 D1 A1=B1d1+Sd2Sqm
1 0 8.70 0.15 1.31 0.00 0.00 0.00
2 50 8.70 0.57 5.64 3.48 50.00 173.76
3 100 8.70 0.66 6.61 6.13 50.00 306.33
4 150 8.70 0.68 6.79 6.70 50.00 335.13
5 200 8.70 0.67 6.69 6.74 50.00 337.15
6 250 8.70 0.75 7.62 7.16 50.00 357.77
7 300 8.70 0.75 7.70 7.66 50.00 382.92
8 350 8.70 0.79 8.10 7.90 50.00 395.11
9 400 8.70 0.81 8.36 8.23 50.00 411.59
10 450 8.70 0.81 8.33 8.34 50.00 417.11
11 500 8.70 0.79 8.10 8.21 50.00 410.73
12 550 8.70 0.81 8.41 8.26 50.00 412.87
13 600 8.70 0.82 8.44 8.43 50.00 421.37
14 650 8.70 0.79 8.14 8.29 50.00 414.57
15 700 8.70 0.86 8.96 8.55 50.00 427.48
16 750 8.70 0.87 9.14 9.05 50.00 452.41
17 800 8.70 0.88 9.26 9.20 50.00 459.81
18 850 8.70 0.87 9.07 9.16 50.00 458.07
19 900 8.70 0.88 9.24 9.15 50.00 457.63
20 950 8.70 0.90 9.47 9.35 50.00 467.68
21 1000 8.70 0.86 8.98 9.22 50.00 461.15
22 1050 8.70 0.88 9.19 9.08 50.00 454.15
23 1100 8.70 0.89 9.31 9.25 50.00 462.43
24 1150 8.70 0.90 9.43 9.37 50.00 468.55
25 1200 8.70 0.91 9.59 9.51 50.00 475.58
26 1250 8.70 0.92 9.70 9.64 50.00 482.19
27 1300 8.70 0.92 9.66 9.68 50.00 483.96
28 1350 8.70 0.93 9.80 9.73 50.00 486.61
29 1400 8.70 0.88 9.20 9.50 50.00 475.20
30 1450 8.70 0.94 9.93 9.57 50.00 478.31
31 1500 8.70 0.89 9.36 9.64 50.00 482.24
32 1550 8.70 0.80 8.29 8.83 50.00 441.33
33 1600 8.70 0.85 8.84 8.57 50.00 428.28
34 1650 8.70 0.84 8.70 8.77 50.00 438.55
Name of the road :- Hisampur To Jhujhki L/R ( 2.10 KM)

35 1700 8.70 0.82 8.48 8.59 50.00 429.52


36 1750 8.70 0.81 8.33 8.40 50.00 420.10
37 1800 8.70 0.81 8.36 8.34 50.00 417.11
38 1850 8.70 0.76 7.73 8.05 50.00 402.32
39 1900 8.70 0.79 8.17 7.95 50.00 397.64
40 1950 8.70 0.85 8.89 8.53 50.00 426.60
41 2000 8.70 0.87 9.05 8.97 50.00 448.50
42 2050 8.70 0.87 9.08 9.07 50.00 453.27
43 2100 8.70 0.86 8.93 9.00 50.00 450.23
Total Quantity (in Cubic Mtr.) 17863.30

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Name of the road :- Hisampur To Jhujhki L/R ( 2.10 KM)
Unit in m.
CH. RL-C RL-R1 RL-R2 RL-R3 RL-L1 RL-L2 RL-L3 Av.RL F.L. Av.depth
0 100.07 100.09 100.03 100.05 100.05 100.06 100.03 100.05 100.20 0.15
50 99.67 99.65 99.65 99.56 99.68 99.64 99.54 99.63 100.20 0.57
100 99.54 99.54 99.56 99.51 99.56 99.55 99.52 99.54 100.20 0.66
150 99.56 99.54 99.42 99.46 99.58 99.57 99.54 99.52 100.20 0.68
200 99.56 99.60 99.60 99.52 99.48 99.53 99.44 99.53 100.20 0.67
250 99.46 99.47 99.44 99.41 99.47 99.47 99.45 99.45 100.20 0.75
300 99.48 99.46 99.46 99.41 99.47 99.45 99.39 99.45 100.20 0.75
350 99.45 99.45 99.43 99.39 99.42 99.38 99.36 99.41 100.20 0.79
400 99.42 99.40 99.43 99.36 99.41 99.37 99.34 99.39 100.20 0.81
450 99.44 99.42 99.42 99.31 99.46 99.38 99.32 99.39 100.20 0.81
500 99.42 99.39 99.44 99.47 99.41 99.39 99.36 99.41 100.20 0.79
550 99.39 99.38 99.41 99.37 99.42 99.39 99.34 99.39 100.20 0.81
600 99.41 99.39 99.40 99.34 99.39 99.39 99.36 99.38 100.20 0.82
650 99.44 99.46 99.42 99.37 99.43 99.39 99.35 99.41 100.20 0.79
700 99.35 99.35 99.36 99.30 99.38 99.35 99.29 99.34 100.20 0.86
750 99.32 99.33 99.32 99.27 99.35 99.37 99.32 99.33 100.20 0.87
800 99.35 99.33 99.32 99.30 99.33 99.32 99.26 99.32 100.20 0.88
850 99.37 99.33 99.31 99.29 99.38 99.32 99.32 99.33 100.20 0.87
900 99.35 99.35 99.33 99.29 99.32 99.31 99.27 99.32 100.20 0.88
950 99.31 99.32 99.31 99.27 99.33 99.30 99.25 99.30 100.20 0.90
1000 99.37 99.35 99.33 99.30 99.39 99.35 99.28 99.34 100.20 0.86
CH. RL-C RL-R1 RL-R2 RL-R3 RL-L1 RL-L2 RL-L3 Av.RL F.L. Av.depth
1000 99.37 99.35 99.33 99.30 99.39 99.35 99.28 99.34 100.20 0.86
1050 99.36 99.32 99.32 99.24 99.38 99.33 99.30 99.32 100.20 0.88
1100 99.34 99.32 99.30 99.26 99.35 99.32 99.29 99.31 100.20 0.89
1150 99.34 99.34 99.31 99.25 99.36 99.27 99.24 99.30 100.20 0.90
1200 99.32 99.31 99.29 99.27 99.33 99.31 99.19 99.29 100.20 0.91
1250 99.31 99.29 99.27 99.24 99.29 99.29 99.27 99.28 100.20 0.92
1300 99.32 99.31 99.31 99.27 99.29 99.27 99.21 99.28 100.20 0.92
1350 99.31 99.29 99.26 99.24 99.35 99.29 99.16 99.27 100.20 0.93
1400 99.36 99.34 99.34 99.31 99.34 99.29 99.26 99.32 100.20 0.88
1450 99.34 99.29 99.26 99.23 99.27 99.24 99.20 99.26 100.20 0.94
1500 99.34 99.34 99.32 99.25 99.36 99.29 99.25 99.31 100.20 0.89
1550 99.46 99.62 99.38 99.24 99.44 99.38 99.25 99.40 100.20 0.80
1600 99.36 99.36 99.34 99.30 99.38 99.37 99.34 99.35 100.20 0.85
1650 99.41 99.38 99.32 99.33 99.40 99.36 99.33 99.36 100.20 0.84
1700 99.40 99.39 99.40 99.35 99.38 99.41 99.33 99.38 100.20 0.82
1750 99.45 99.42 99.41 99.36 99.42 99.38 99.31 99.39 100.20 0.81
1800 99.41 99.38 99.36 99.25 99.45 99.45 99.43 99.39 100.20 0.81
1850 99.46 99.46 99.45 99.40 99.50 99.48 99.35 99.44 100.20 0.76
1900 99.44 99.44 99.42 99.40 99.41 99.39 99.34 99.41 100.20 0.79
1950 99.42 99.41 99.37 99.31 99.39 99.32 99.20 99.35 100.20 0.85
2000 99.37 99.37 99.34 99.26 99.36 99.35 99.28 99.33 100.20 0.87
2000 99.37 99.37 99.34 99.26 99.36 99.35 99.28 99.33 100.20 0.87
2050 99.40 99.37 99.34 99.27 99.37 99.36 99.29 99.34 100.20 0.86
2100 99.37 99.36 99.29 99.22 99.36 99.31 99.26 99.31 100.20 0.89

L-Section of Hiampur To Jhujhki L/R


100.40

100.20

100.00

99.80
100.20

100.00

99.80

99.60
RL in m.

99.40

99.20

99.00

98.80

98.60
0 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Chinage in m.

L-Section of Hiampur To Jhujhki L/R II

100.40
RL in m.

98.60
98.80
99.00
99.20
99.40
99.60
99.80
100.00
100.20
100.40
1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

1550

1600

1650
L-Section of Hiampur To Jhujhki L/R II

1700

1750

1800

1850

1900

1950

2000
98.60
98.80
99.00

1000

1050

1100

1150

1200

1250

1300

1350

1400

1450

1500

1550

1600
Chainage in m.

1650

1700

1750

1800

1850

1900

1950

2000
00 75
0
80
0
85
0
90
0
95
0 00
10
1800

1850

1900

1950

2000

2000

2050

2100
1800

1850

1900

1950

2000

2000

2050

2100
L -S e c tio n o fF a ru k h a b a d Ne e wa lp u rUg a rp u rRo a d To Ka triBh imp u rL /R
1 0 0 .5
1 00
9 9 .5
99
9 8 .5
98
9 7 .5
RL in m.

97
9 6 .5
96

0 50 10 0 15 0 20 0 25 0 30 0 35 0 40 0 45 0 50 0 5 50 600 65 0 70 0 75 0 80 0 85 0 90 0 95 0 10 00 CH. 10 00 10 50 11 00 11 50 1
Ch a in a g e in m.
L -S e c tio n o fF a ru k h a b a d Ne e wa lp u rUg a rp u rRo a d To Ka triBh imp u rL /R

CH. 10 00 10 50 11 00 11 50 12 00 12 50 13 00 13 50 14 00 14 50 15 0 0 1 55 0 1 60 0 16 50 17 00 17 50 18 00 18 50 19 00 19 50 20 00 20 50 21 00 21 50 2 20 0
Ch a in a g e in m.
Name of the road :- FKD. KMG Rd. Neewalpur Ugarpur To Katri Gangpur via. Katri Dharampur L/R ( 3.33 KM)
EARTH WORK CALCULATION SHEET

Name of the road :- FKD. KMG Rd. Neewalpur Ugarpur To Katri Gangpur via. Katri Dharampur L/R ( 3.33 KM)

Sl. Proposed Earth Work Average Area Length. Quantity in


No. Chainage Width Depth Cross Sectional Area in Sq.m in Mtr Cubic Mtr.
B1 D1 A1=B1d1+Sd2Sqm
1 0 8.70 0.38 3.61 0.00 0.00 0.00
2 50 8.70 0.50 4.87 4.24 50.00 212.06
3 100 8.70 0.41 3.89 4.38 50.00 219.05
4 150 8.70 0.54 5.31 4.60 50.00 230.04
5 200 8.70 0.39 3.73 4.52 50.00 226.15
6 250 8.70 0.50 4.87 4.30 50.00 215.17
7 300 8.70 0.67 6.75 5.81 50.00 290.60
8 350 8.70 0.78 8.05 7.40 50.00 369.91
9 400 8.70 0.77 7.92 7.98 50.00 399.09
10 450 8.70 0.64 6.44 7.18 50.00 358.85
11 500 8.70 0.66 6.65 6.54 50.00 327.03
12 550 8.70 0.82 8.46 7.55 50.00 377.68
13 600 8.70 0.45 4.31 6.38 50.00 319.17
14 650 8.70 0.43 4.13 4.22 50.00 210.95
15 700 8.70 0.44 4.24 4.19 50.00 209.27
16 750 8.70 0.38 3.64 3.94 50.00 196.91
17 800 8.70 0.65 6.52 5.08 50.00 254.07
18 850 8.70 0.65 6.50 6.51 50.00 325.61
19 900 8.70 0.78 8.06 7.28 50.00 364.05
20 950 8.70 1.56 18.49 13.28 50.00 663.86
21 1000 8.70 0.71 7.16 12.83 50.00 641.33
22 1050 8.70 0.55 5.40 6.28 50.00 313.96
23 1100 8.70 0.75 7.62 6.51 50.00 325.36
24 1150 8.70 0.81 8.39 8.00 50.00 400.25
25 1200 8.70 0.93 9.79 9.09 50.00 454.47
26 1250 8.70 1.15 12.60 11.19 50.00 559.70
27 1300 8.70 0.98 10.47 11.54 50.00 576.91
28 1350 8.70 0.94 9.92 10.20 50.00 509.81
29 1400 8.70 0.84 8.70 9.31 50.00 465.51
30 1450 8.70 0.94 9.91 9.31 50.00 465.29
31 1500 8.70 0.79 8.12 9.02 50.00 450.77
32 1550 8.70 0.61 6.00 7.06 50.00 353.12
33 1600 8.70 0.65 6.45 6.23 50.00 311.38
34 1650 8.70 0.26 2.40 4.42 50.00 221.22
Name of the road :- FKD. KMG Rd. Neewalpur Ugarpur To Katri Gangpur via. Katri Dharampur L/R ( 3.33 KM)
35 1700 8.70 0.54 5.34 3.87 50.00 193.32
36 1750 8.70 0.47 4.55 4.94 50.00 247.23
37 1800 8.70 1.06 11.52 8.03 50.00 401.72
38 1850 8.70 0.88 9.19 10.35 50.00 517.57
39 1900 8.70 1.11 12.16 10.67 50.00 533.65
40 1950 8.70 0.58 5.73 8.95 50.00 447.33
41 2000 8.70 0.64 6.43 6.08 50.00 304.05
42 2050 8.70 0.70 7.13 6.78 50.00 338.87
43 2100 8.70 0.59 5.85 6.49 50.00 324.31
44 2150 8.70 1.00 10.75 8.30 50.00 414.99
45 2200 8.70 1.10 11.99 11.37 50.00 568.61
46 2250 8.70 0.94 9.95 10.97 50.00 548.38
47 2300 8.70 0.77 7.87 8.91 50.00 445.33
48 2350 8.70 1.05 11.34 9.60 50.00 480.20
49 2400 8.70 0.88 9.20 10.27 50.00 513.40
50 2450 8.70 0.72 7.30 8.25 50.00 412.42
51 2500 8.70 0.70 7.10 7.20 50.00 360.09
52 2550 8.70 0.73 7.43 7.27 50.00 363.41
53 2600 8.70 0.91 9.63 8.53 50.00 426.71
54 2650 8.70 0.72 7.28 8.46 50.00 422.77
55 2700 8.70 0.74 7.53 7.40 50.00 370.23
56 2750 8.70 0.83 8.59 8.06 50.00 403.09
57 2800 8.70 0.83 8.56 8.57 50.00 428.65
58 2850 8.70 0.82 8.52 8.54 50.00 426.94
59 2900 8.70 0.79 8.13 8.33 50.00 416.28
60 2950 8.70 1.08 11.78 9.95 50.00 497.62
61 3000 8.70 0.84 8.77 10.27 50.00 513.66
62 3050 8.70 1.61 19.20 13.99 50.00 699.32
63 3100 8.70 1.24 13.91 16.56 50.00 827.85
64 3150 8.70 1.23 13.78 13.84 50.00 692.19
65 3200 8.70 1.22 13.62 13.70 50.00 684.88
66 3250 8.70 1.21 13.46 13.54 50.00 677.12
67 3300 8.70 1.20 13.31 13.39 50.00 669.38
68 3330 8.70 1.18 12.98 13.15 50.00 657.35
Total Quantity (in Cubic Mtr.) 28047.51
Name of the road :- FKD. KMG Rd. Neewalpur Ugarpur To Katri Gangpur via. Katri Dharampur L/R ( 3.33 KM)

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Name of the road :- FKD. KMG Rd. Neewalpur Ugarpur To Katri Gangpur via. Katri Dharampur L/R ( 3.33 KM)
Unit in m.
CH. RL-C RL-L1 RL-L2 RL-L3 RL-R1 RL-R2 RL-R3 Av.RL F.L.
0 100.090 100.050 99.960 100.010 100.050 99.960 100.010 100.02 100.40
50 100.015 99.940 99.770 99.960 99.940 99.770 99.960 99.91 100.41
100 100.010 100.025 100.170 100.300 99.990 99.775 99.810 100.01 100.42
150 99.990 99.950 99.910 99.715 99.910 99.895 99.840 99.89 100.43
200 99.990 99.925 100.100 100.280 99.790 100.110 100.130 100.05 100.44
250 99.760 99.880 99.900 100.120 99.705 100.240 100.030 99.95 100.45
300 99.840 99.865 99.800 99.605 99.880 99.780 99.745 99.79 100.46
350 99.710 99.700 99.545 99.810 99.700 99.505 99.835 99.69 100.47
400 99.895 99.835 99.520 99.645 99.850 99.520 99.685 99.71 100.48
450 100.090 100.010 99.810 99.650 99.975 99.675 99.710 99.85 100.49
500 100.040 99.990 99.985 99.660 99.955 99.570 99.660 99.84 100.50
550 99.990 99.840 99.430 99.610 99.910 99.310 99.750 99.69 100.51
600 100.170 100.080 100.040 100.040 100.040 100.065 100.065 100.07 100.52
650 100.260 100.120 100.045 99.900 100.170 100.190 100.000 100.10 100.53
700 100.400 100.255 100.150 99.680 100.200 99.920 100.080 100.10 100.54
750 100.410 100.315 100.360 99.960 100.395 99.890 99.830 100.17 100.55
800 100.100 100.040 99.800 99.970 99.925 99.735 99.785 99.91 100.56
850 100.165 99.990 99.930 99.615 99.990 99.850 99.900 99.92 100.57
900 99.760 99.635 99.825 99.775 99.610 99.845 100.115 99.80 100.58
950 99.305 99.255 98.515 98.645 99.015 99.135 99.315 99.03 100.59
1000 99.915 99.885 99.835 99.785 99.695 100.085 100.045 99.89 100.60
CH. RL-C RL-L1 RL-L2 RL-L3 RL-R1 RL-R2 RL-R3 Av.RL F.L.
1000 99.915 99.885 99.835 99.875 99.695 100.085 100.045 99.89 100.60
1050 100.110 100.200 99.645 100.015 100.265 100.260 99.920 100.06 100.61
1100 99.910 100.200 99.580 100.050 100.050 99.740 99.580 99.87 100.62
1150 99.770 99.950 99.550 99.850 99.890 100.140 99.570 99.82 100.63
1200 99.770 99.810 99.700 99.790 99.880 99.550 99.490 99.71 100.64
1250 99.460 99.600 99.570 99.390 99.490 99.475 99.540 99.50 100.65
1300 99.635 99.920 99.650 99.620 99.990 99.150 99.780 99.68 100.66
1350 99.900 99.940 99.630 99.570 100.005 99.280 99.800 99.73 100.67
1400 99.990 100.060 99.660 99.660 99.970 99.510 100.040 99.84 100.68
1450 99.870 100.100 100.100 99.180 99.910 99.480 99.630 99.75 100.69
1500 100.040 100.200 100.130 99.210 100.190 99.760 99.840 99.91 100.70
1550 100.050 100.230 99.570 100.190 100.220 100.300 100.170 100.10 100.71
1600 100.170 100.290 99.860 100.110 100.240 99.910 99.940 100.07 100.72
1650 100.620 100.670 100.300 100.040 100.770 100.420 100.470 100.47 100.73
1700 100.300 100.400 100.250 100.095 100.360 99.840 100.120 100.20 100.74
1750 100.370 100.440 100.235 100.260 100.470 99.930 100.240 100.28 100.75
1800 99.860 99.970 99.240 99.980 99.910 99.125 99.720 99.69 100.75
1850 100.030 100.080 99.750 99.620 100.090 99.590 99.940 99.87 100.75
1900 99.440 99.400 99.540 99.630 99.620 99.820 100.010 99.64 100.75
1950 100.390 100.450 100.040 100.100 100.440 99.490 100.270 100.17 100.75
2000 100.195 100.430 99.610 100.170 100.340 99.930 100.070 100.11 100.75
CH. RL-C RL-L1 RL-L2 RL-L3 RL-R1 RL-R2 RL-R3 Av.RL F.L.
2000 100.195 100.430 99.610 100.170 100.340 99.930 100.070 100.11 100.75
2050 100.230 100.240 99.660 99.960 100.270 99.995 99.960 100.05 100.75
2100 100.220 100.240 99.840 100.310 100.350 100.070 100.080 100.16 100.75
2150 100.030 100.020 99.320 99.840 99.930 99.520 99.560 99.75 100.75
2200 99.600 99.750 99.890 99.870 99.500 99.400 99.540 99.65 100.75
2250 99.940 100.000 99.770 99.790 100.000 99.600 99.570 99.81 100.75
2300 100.060 100.200 99.970 100.000 100.180 99.690 99.770 99.98 100.75
2350 99.820 99.870 99.450 99.600 99.860 99.970 99.330 99.70 100.75
2400 100.050 100.090 99.850 99.895 99.960 99.575 99.675 99.87 100.75
2450 100.120 100.190 99.900 99.960 100.170 99.940 99.930 100.03 100.75
2500 100.160 100.230 100.170 100.200 100.230 99.650 99.690 100.05 100.75
2550 100.070 100.140 99.690 100.130 100.160 99.870 100.070 100.02 100.75
2600 99.855 99.915 99.395 99.925 99.925 99.875 99.955 99.84 100.75
2650 100.160 100.295 99.715 100.165 100.205 99.645 100.040 100.03 100.75
2700 100.085 100.095 99.475 99.905 100.245 100.250 100.015 100.01 100.75
2750 100.035 100.015 99.775 99.895 100.085 99.745 99.895 99.92 100.75
2800 99.985 100.005 99.785 99.885 100.125 99.795 99.885 99.92 100.75
2850 99.975 100.035 99.775 99.905 100.125 99.775 99.895 99.93 100.75
2900 100.015 100.015 99.895 99.985 100.095 99.815 99.895 99.96 100.75
2950 99.655 99.765 99.145 99.655 99.845 99.735 99.865 99.67 100.75
3000 99.895 99.915 99.605 99.380 100.165 100.180 100.200 99.91 100.75
3050 99.355 99.435 99.475 99.465 98.985 98.725 98.535 99.14 100.75
3100 99.455 99.495 99.595 99.665 99.445 99.435 99.455 99.51 100.75
3150 99.475 99.525 99.575 99.645 99.475 99.445 99.475 99.52 100.75
3200 99.545 99.495 99.525 99.655 99.465 99.505 99.505 99.53 100.75
3250 99.575 99.515 99.505 99.705 99.505 99.485 99.485 99.54 100.75
3300 99.605 99.545 99.605 99.645 99.525 99.465 99.465 99.55 100.75
3330 99.605 99.565 99.585 99.625 99.565 99.455 99.625 99.58 100.75

L-Section of FKD. KMG. Rd. Neewalpur Ugarpur To Katri Gangpur via.


101.000

100.500

100.000

99.500

99.000
m.
100.000

99.500

99.000
RL in m.

98.500

98.000

97.500

97.000
0

50

100

150

200

300

350

400

450

500

550
250

Chainage in m.

L-Section of FKD. KMG. Rd. Neewalpur Ugarpur To Katri Gangpur via.

101.000

100.500

100.000
RL in m.

99.500

99.000

98.500
99.500

RL in
99.000

98.500

98.000
1000

1050

1100

1300

1400

1450
1150

1200

1250

1350

1500

1550
Chainage in m.

L-Section of FKD. KMG. Rd. Neewalpur Ugarpur To Katri Gan

101.000

100.500

100.000

99.500
RL in m.

99.000

98.500

98.000

97.500
97.000
97.500
98.000

2000

2050

2100

2150

2200

2250

2300

2350

2400

2450

2500

2550

2600

2650
Chainage in m.

2700
L/R ( 3.33 KM)
Cross Section At Chainage 00 X-Section At 500
Av.depth distance RL-Gra. RL-Farm. distance RL-Gra. RL-Farm.
0.38 -9 100.01 100.01 L-3 -9 99.66 99.66
0.50 -6 99.96 100.4 L-2 -6 99.985 100.50
0.41 -3 100.05 100.4 L-1 -3 99.99 100.50
0.54 0 100.09 100.4 C 0 100.04 100.50
0.39 3 100.05 100.4 R-1 3 99.55 100.50
0.50 6 99.96 100.4 R-2 6 99.57 100.50
0.67 9 100.01 100.01 R-3 9 99.66 99.66
0.78
0.77 100.5
0.64 100.4
0.66 100.3
0.82 100.2
0.45 100.1 RL-Gra.
0.43 100 RL-Farm.
99.9
0.44
99.8
0.38 99.7
0.65 1 2 3 4 5 6 7
0.65
0.78
1.56
0.71
Av.depth
0.71
0.55
0.75
0.81
0.93
1.15
0.98
0.94
0.84
0.94
0.79
0.61
0.65
0.26
0.54
0.47
1.06
0.88
1.11
0.58
0.64
Av.depth
0.64
0.70
0.59
1.00
1.10
0.94
0.77
1.05
0.88
0.72
0.70
0.73
0.91
0.72
0.74
0.83
0.83
0.82
0.79
1.08
0.84
1.61
1.24
1.23
1.22
1.21
1.20
1.18

rpur To Katri Gangpur via. Katri Dharampur L/R


500

550

600

700

750

800

850

900

950
650

1000
ainage in m.

pur To Katri Gangpur via. Katri Dharampur L/R II


1650

1700

1750

1800

1850

1900
1500

1550

1600

1950

2000
ainage in m.

alpur Ugarpur To Katri Gangpur via. Katri Dharampur L/R III


2600

2650

Chainage in m.
2700

2750

2800

2850

2900

2950

3000

3050

3100

3150

3200

3250

3300

3330
X _Section At 500m.

100.6
100.4
100.2 RL-Gra.
100 RL-Farm.
99.8
99.6
99.4
99.2
99
-9

-6

-3

9
RL-Gra.
RL-Farm.
Design Discharge and Provision of Culverts

Sl. No. Name of Road/Chainage Catchment Area Culvert Provided Discharge (Cum/s)

1 Hisampur To Jhijhuki L/R


1200m. 7.4 Ha. 1.0m. H.P. 1.67
1970m. 7.6 Ha. 1.0m. H.P. 1.68
2060m. 7.3 Ha. 1.0m. H.P. 1.66
FKD. Neewalpur Ugarpur Rd. To Katri Gangpur via Katri
2 Dharampur L/R
560m. 7.4 Ha. 1.0m. H.P. 1.65
930m. 39.1 Ha. 1x3.0m. RCC 5.53
1278m. 15.4 Ha. 2x1m. H.P. 3.46
1400m. 1.73 Ha. Gul Culvert 0.52
1890m. 76.2 Ha. 2x5m. RCC Box -
2025m. 7.4 Ha. 1.0m. H.P. 1.65
2210m. 15.4 Ha. 2x1m. H.P. 3.46
3000m. 7.3 Ha. 1.0m. H.P. 1.63

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
Package Summary
P.I.U. -1, Farrukhabad District- Farrukhabad
Name of Plan-PMGSY (W-B)

Sr. Name of Road Name of Proposed No. of CD Cost of Cost of CD Total Cost Maintenanc Total Cost
No. Block length Works Pavement of Road e Cost
1 Hisampur To Jhijhuki L/R Kamalganj 2.10 3 50.48 2.97 53.45 3.09 56.54
FKD. Neewalpur Ugarpur Rd. To
2 Katri Gangpur via Katri Barhpur 3.33 8 98.37 23.81 122.18 4.90 127.08
Dharampur L/R
Total 5.43 11 148.85 26.78 175.63 7.99 183.62

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad
DETAILS OF C.D.
P.I.U. -1, Farrukhabad District- Farrukhabad
Package No. UP2424 Name of Plan-PMGSY (W-B)

Sr. Name of Road Type of Ist IInd IIIrd IVth Vth VIth VIIth VIIIth IXth Xth Total
No. CD. HP or
RCC
1 Hisampur To Jhijhuki Type &
1.0m. 1.0m. 1.0m.
L/R size of CD 3
H.P. H.P. H.P.

Chainage
of CD (m.) 1200 1970 2060

2 FKD. Neewalpur Type &


1x3m. 2x5m. 1.0m.
Ugarpur Rd. To Katri size of CD 1.0m. H.P. RCC
2x1m. H.P. Gul Culvert
RCC Box
1.0m. H.P. 2x1m. H.P.
H.P.
8
Gangpur via Katri
Dharampur L/R Chainage
of CD (m.) 560 930 1278 1400 1890 2025 2210 3000

Total 11

J.E. (R.E.S.) A.E. (R.E.S.) E.E. (R.E.S.)


P.I.U. Farrukhabad P.I.U. Farrukhabad P.I.U. Farrukhabad

You might also like