Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 164 79.553 36.371 12.397 -35.555 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 9
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Line/Cable Length
Line/Cable Length
Line/Cable Length
1411-TX-007 3-Phase 1.600 33.000 0.480 5.00 1.50 0 0 0 0 0 5.0000 Dyn 0.000
2260-TX-044 3-Phase 3.150 33.000 4.160 7.00 8.50 0 0 0 0 0 7.0000 Dyn 0.000
2260-TX-045 3-Phase 1.000 33.000 0.480 5.00 1.50 0 0 0 0 0 5.0000 Dyn 0.000
2260-TX-047 3-Phase 0.400 33.000 4.160 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2260-TX-048 3-Phase 2.500 33.000 0.480 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000
2331-TX-159 3-Phase 0.050 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2371-TX-015 3-Phase 2.000 33.000 4.160 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000
2371-TX-016 3-Phase 0.630 33.000 0.480 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
2371-TX-018 3-Phase 10.000 33.000 4.160 8.00 13.00 0 0 0 0 0 8.0000 Dyn 0.000
2372-TX-020 3-Phase 0.800 33.000 4.160 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2372-TX-021 3-Phase 0.080 4.160 0.480 3.00 1.50 0 0 0 0 0 3.0000 Dyn 0.000
2374-TX-023 3-Phase 0.800 33.000 4.160 5.00 6.00 0 0 0 0 0 5.0000 Dyn 0.000
2374-TX-024 3-Phase 0.800 33.000 4.160 5.00 6.00 0 0 0 0 0 5.0000 Dyn 0.000
2374-TX-025 3-Phase 0.125 13.800 0.480 3.00 1.50 0 0 0 0 0 3.0000 Dyn 0.000
2374-TX-026 3-Phase 37.500 33.000 13.800 8.00 45.00 0 0 0 0 0 8.0000 Dyn 0.000
2374-TX-029 3-Phase 0.800 33.000 0.480 5.00 3.50 0 0 0 0 0 5.0000 Dyn 0.000
2374-TX-030 3-Phase 0.125 13.800 0.480 2.90 1.50 0 0 0 0 0 2.9000 Dyn 0.000
2374-TX-031 3-Phase 37.500 33.000 13.800 8.00 45.00 0 0 0 0 0 8.0000 Dyn 0.000
2374-TX-034 3-Phase 800.000 33.000 0.480 5.00 3.50 0 0 0 0 0 5.0000 Dyn 0.000
2375-TX-036 3-Phase 8.000 33.000 4.160 8.00 13.00 0 0 0 0 0 8.0000 Dyn 0.000
2375-TX-037 3-Phase 3.150 33.000 0.480 7.00 6.00 0 0 0 0 0 7.0000 Dyn 0.000
2375-TX-038 3-Phase 3.150 33.000 0.480 7.00 6.00 0 0 0 0 0 7.0000 Dyn 0.000
2375-TX-039 3-Phase 1.250 33.000 0.480 6.00 6.00 0 0 0 0 0 6.0000 Dyn 0.000
2500-TX-050 3-Phase 0.125 33.000 0.480 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-052 3-Phase 0.125 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-054 3-Phase 1.600 33.000 4.160 3.40 6.00 0 0 0 0 0 3.4000 Dyn 0.000
2520-TX-055 3-Phase 0.315 4.160 0.480 3.00 3.50 0 0 0 0 0 3.0000 Dyn 0.000
2520-TX-165 3-Phase 0.032 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-167 3-Phase 0.160 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-169 3-Phase 0.100 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-171 3-Phase 0.063 33.000 0.480 3.50 3.50 0 0 0 0 0 3.5000 Dyn 0.000
2520-TX-173 3-Phase 0.160 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-175 3-Phase 0.200 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-177 3-Phase 0.200 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2520-TX-179 3-Phase 0.050 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
2530-TX-2 3-Phase 10.000 33.000 4.160 8.35 13.00 0 0 0 0 0 8.3500 Dyn 0.000
2530-TX-057 3-Phase 10.000 33.000 4.160 6.00 13.00 0 0 0 0 0 6.0000 Dyn 0.000
2530-TX-160 3-Phase 0.400 4.160 0.480 3.00 1.50 0 0 0 0 0 3.0000 Dyn 0.000
Project: ETAP Page: 13
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
4411-TX-114 3-Phase 0.020 33.000 0.480 4.00 3.50 0 0 0 0 0 4.0000 Dyn 0.000
4413-TX-115 3-Phase 0.400 33.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
4500-TX-126 3-Phase 0.315 33.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
4500-TX-127 3-Phase 0.315 33.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
4500-TX-128 3-Phase 0.500 33.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
4710-TX-101. 3-Phase 100.000 220.000 33.000 8.50 45.00 0 0 0 0 0 8.5000 Dyn 0.000
4710-TX-102. 3-Phase 100.000 220.000 33.000 8.50 45.00 0 0 0 0 0 8.5000 Dyn 0.000
5210-TX-061 3-Phase 8.000 138.000 4.160 7.00 13.00 0 0 0 0 0 7.0000 Dyn 0.000
Project: ETAP Page: 14
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Branch Connections
AC Rating
MVA kV FLA Input Operating Output
Bypass
ID Output Input Output Input Output % EFF % PF V/Hz % Frequency Hz % Imax Switch
VFD1 2.500 4.160 4.160 372.68 346.97 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD3 1.500 4.160 4.160 223.61 208.18 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD4 4.500 4.160 4.160 670.82 624.54 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD5 2.500 4.160 4.160 372.68 346.97 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD7 2.500 4.160 4.160 372.68 346.97 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD8 2.500 4.160 4.160 372.68 346.97 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD9 2.500 13.800 13.800 112.34 104.59 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD10 1.500 4.160 4.160 223.61 208.18 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD14 2.500 13.800 13.800 112.34 104.59 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD26 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD27 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD28 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD29 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD33 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD34 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD35 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD37 3.500 4.160 4.160 543.95 485.75 95.00 94.00 100.00 100.0 60.0 120.0 No
VFD39 3.500 4.160 4.160 543.95 485.75 95.00 94.00 100.00 100.0 60.0 120.0 No
VFD40 3.500 4.160 4.160 543.95 485.75 95.00 94.00 100.00 100.0 60.0 120.0 No
VFD45 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD46 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD48 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
VFD55 1.500 4.160 4.160 223.61 208.18 95.00 98.00 100.00 100.0 60.0 120.0 No
VFD56 1.500 4.160 4.160 230.67 208.18 95.00 95.00 100.00 100.0 60.0 120.0 No
Project: ETAP Page: 19
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
2520-MCL-047 0.480 96.563 -5.8 0 0 0.026 0.016 Bus179 -0.026 -0.016 38.3 85.0
2520-MCM-011 4.160 97.043 -6.4 0 0 0.912 0.185 2520-LC-010 -1.037 -0.265 153.1 96.9
2520-MCL-021 0.126 0.080 21.3 84.5
VFD55 0.912 0.185 133.0 98.0
2530-MCL-058 0.480 95.688 -7.1 0 0 0.200 0.066 2530-MCM-014 -0.200 -0.066 264.7 95.0
2530-MCM-2 4.160 97.346 -6.0 0 0 1.762 0.579 Bus38 -1.762 -0.579 264.4 95.0
VFD33 0.587 0.193 88.1 95.0
VFD34 0.587 0.193 88.1 95.0
VFD35 0.587 0.193 88.1 95.0
2530-MCM-014 4.160 96.992 -6.5 0 0 3.525 1.159 Bus244 -3.728 -1.228 561.6 95.0
2530-MCL-058 0.202 0.069 30.5 94.7
VFD26 0.440 0.145 66.3 95.0
VFD27 0.440 0.145 66.3 95.0
VFD28 0.440 0.145 66.3 95.0
VFD29 0.442 0.145 66.5 95.0
VFD45 0.442 0.145 66.5 95.0
VFD46 0.440 0.145 66.3 95.0
VFD48 0.440 0.145 66.3 95.0
VFD56 0.440 0.145 66.3 95.0
4700-LC-001A 33.000 99.427 -4.3 0 0 0 0 Bus3 -86.409 -1.394 1520.7 100.0
Bus26 0.003 -19.780 348.1 0.0
2374-LC-002 27.395 13.726 539.2 89.4
OHL 33kV Tunnel Entry 9.944 3.200 183.8 95.2
4700-LC-001B 41.068 1.004 722.9 100.0
TMF 33 kV OHL 7.999 3.245 151.9 92.7
4700-LC-001B 33.000 99.427 -4.3 0 0 0 0 2260-LC-006 2.431 1.369 49.1 87.1
2260-LC-005 1.506 0.947 31.3 84.7
2374-LC-003 27.437 13.681 539.5 89.5
2375-LC-004 9.691 4.788 190.2 89.7
Bus28 0.003 -19.780 348.1 0.0
4700-LC-001A -41.068 -1.004 722.9 100.0
* 4710-MAIN-220 220.000 100.000 0.0 86.563 7.848 0 0 Bus3 86.563 7.848 228.1 99.6
Bus5 0.000 0.000 0.0 0.0
5210-MCM-015 4.160 99.469 -3.4 0 0 5.630 -0.727 Bus211 -6.580 0.132 918.3 -100.0
Bus108 0.950 0.595 156.5 84.7
VFD37 1.877 0.681 278.6 94.0
VFD39 1.877 0.681 278.6 94.0
VFD40 1.877 0.681 278.6 94.0
Bus3 33.000 99.441 -4.2 0 0 0 0 4700-LC-001A 86.420 1.428 1520.7 100.0
Project: ETAP Page: 22
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
VFD26 4.160 100.000 0.0 0.418 0.205 0 0 Bus145 0.418 0.205 64.7 89.8
VFD27 4.160 100.000 0.0 0.418 0.205 0 0 Bus146 0.418 0.205 64.7 89.8
VFD28 4.160 100.000 0.0 0.418 0.205 0 0 Bus147 0.418 0.205 64.7 89.8
VFD29 4.160 100.000 0.0 0.420 0.177 0 0 Bus148 0.420 0.177 63.2 92.2
VFD33 4.160 100.000 0.0 0.558 0.273 0 0 Bus152 0.558 0.273 86.2 89.8
VFD34 4.160 100.000 0.0 0.558 0.273 0 0 Bus153 0.558 0.273 86.2 89.8
VFD35 4.160 100.000 0.0 0.558 0.273 0 0 Bus154 0.558 0.273 86.2 89.8
VFD37 4.160 100.000 0.0 1.783 0.812 0 0 Bus210 1.783 0.812 271.9 91.0
VFD39 4.160 100.000 0.0 1.783 0.812 0 0 Bus213 1.783 0.812 271.9 91.0
VFD40 4.160 100.000 0.0 1.783 0.812 0 0 Bus214 1.783 0.812 271.9 91.0
VFD45 4.160 100.000 0.0 0.420 0.177 0 0 Bus239 0.420 0.177 63.2 92.2
VFD46 4.160 100.000 0.0 0.418 0.205 0 0 Bus240 0.418 0.205 64.7 89.8
VFD48 4.160 100.000 0.0 0.418 0.205 0 0 Bus246 0.418 0.205 64.7 89.8
VFD55 4.160 100.000 0.0 0.866 0.424 0 0 Bus264 0.866 0.424 133.8 89.8
VFD56 4.160 100.000 0.0 0.418 0.205 0 0 Bus37 0.418 0.205 64.7 89.8
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 28
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
* Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 33
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
4700-LC-001B-C1 Cable 242.19 49.09 20.27
4700-LC-001B-C2 Cable 242.19 31.30 12.92
Cable1 Cable 2698.57 1520.67 56.35
Cable 01 Cable 484.38 10.32 2.13
Cable6 Cable 1041.65 305.00 29.28
Cable7 Cable 1349.28 348.06 25.80
Cable8 Cable 967.58 539.18 55.72
Cable10 Cable 967.58 539.48 55.76
Cable11 Cable 124.58 50.05 40.17
Cable12 Cable 411.16 190.20 46.26
Cable13 Cable 1041.65 821.90 78.90
Cable15 Cable 124.58 81.85 65.70
Cable16 Cable 1609.94 1235.93 76.77
Cable17 Cable 1562.47 852.08 54.53
Cable19 Cable 305.99 32.20 10.52
Cable21 Cable 917.96 192.08 20.92
Cable23 Cable 1349.28 348.06 25.80
Cable25 Cable 967.58 516.84 53.42
Cable31 Cable 1562.47 918.30 58.77
Cable35 Cable 365.27 13.02 3.56
Cable36 Cable 484.38 9.59 1.98
Cable38 Cable 1562.47 561.56 35.94
Cable39 Cable 365.27 103.28 28.28
Cable53 Cable 1349.28 516.81 38.30
Cable55 Cable 1609.94 1235.86 76.76
Cable57 Cable 365.27 12.64 3.46
Cable59 Cable 484.38 10.20 2.11
Cable61 Cable 365.27 100.23 27.44
Cable63 Cable 305.99 103.61 33.86
Cable65 Cable 124.58 37.51 30.11
Cable67 Cable 124.58 37.34 29.97
Cable69 Cable 124.58 13.13 10.54
Cable73 Cable 249.17 38.45 15.43
Project: ETAP Page: 34
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Cable75 Cable 249.17 10.66 4.28
Cable77 Cable 124.58 6.31 5.06
Cable79 Cable 124.58 25.02 20.08
Cable81 Cable 124.58 10.32 8.28
Cable83 Cable 154.00 107.41 69.75
Cable85 Cable 373.75 24.21 6.48
Cable87 Cable 373.75 8.00 2.14
Cable89 Cable 1562.47 264.36 16.92
Tunnel Cable Cable 967.58 173.54 17.94
1411-TX-007 Transformer 1.600 0.920 57.5 0.898 56.1
2260-TX-044 Transformer 3.150 2.184 69.3 2.124 67.4
2260-TX-045 Transformer 1.000 0.606 60.6 0.589 58.9
2260-TX-047 Transformer 0.400 0.358 89.6 0.350 87.4
2260-TX-048 Transformer 2.500 1.421 56.9 1.388 55.5
2331-TX-159 Transformer 0.050 0.030 59.3 0.029 58.2
2371-TX-015 Transformer 2.000 1.367 68.3 1.337 66.8
2371-TX-016 Transformer 0.630 0.452 71.7 0.440 69.8
2371-TX-018 Transformer 10.000 6.064 60.6 5.974 59.7
2372-TX-020 Transformer 0.800 0.585 73.1 0.577 72.1
2372-TX-021 Transformer 0.080 0.056 70.3 0.055 69.1
2374-TX-023 Transformer 0.800 0.739 92.4 0.717 89.7
2374-TX-024 Transformer 0.800 0.718 89.7 0.698 87.3
2374-TX-025 Transformer 0.125 0.046 36.9 0.046 36.6
2374-TX-026 Transformer 37.500 29.347 78.3 28.535 76.1
2374-TX-029 Transformer 0.800 0.545 68.1 0.529 66.2
2374-TX-030 Transformer 0.125 0.046 36.9 0.046 36.6
2374-TX-031 Transformer 37.500 29.346 78.3 28.534 76.1
2374-TX-034 Transformer 800.000 0.579 0.1 0.579 0.1
2375-TX-036 Transformer 8.000 5.885 73.6 5.749 71.9
2375-TX-037 Transformer 3.150 2.130 67.6 2.062 65.5
2375-TX-038 Transformer 3.150 2.121 67.3 2.053 65.2
2375-TX-039 Transformer 1.250 0.746 59.7 0.728 58.2
2500-TX-050 Transformer 0.125 0.090 72.0 0.088 70.1
2520-TX-052 Transformer 0.125 0.077 61.5 0.075 60.4
2520-TX-054 Transformer 1.600 1.081 67.6 1.071 66.9
Project: ETAP Page: 35
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
2520-TX-055 Transformer 0.315 0.149 47.3 0.147 46.8
2520-TX-165 Transformer 0.032 0.022 71.3 0.022 69.8
2520-TX-167 Transformer 0.160 0.104 65.2 0.102 63.9
2520-TX-169 Transformer 0.100 0.045 44.6 0.044 44.0
2520-TX-171 Transformer 0.063 0.044 70.5 0.044 69.1
2520-TX-173 Transformer 0.160 0.091 57.0 0.090 56.0
2520-TX-175 Transformer 0.200 0.138 68.8 0.135 67.3
2520-TX-177 Transformer 0.200 0.138 69.0 0.135 67.6
2520-TX-179 Transformer 0.050 0.031 62.6 0.031 61.4
2530-TX-2 Transformer 10.000 1.866 18.7 1.855 18.5
2530-TX-057 Transformer 10.000 3.965 39.6 3.926 39.3
2530-TX-160 Transformer 0.400 0.213 53.4 0.211 52.6
4411-TX-114 Transformer 0.020 0.013 66.7 0.013 65.4
4413-TX-115 Transformer 0.400 0.258 64.6 0.252 63.1
4500-TX-126 Transformer 0.315 0.136 43.2 0.134 42.5
4500-TX-127 Transformer 0.315 0.136 43.2 0.134 42.5
4500-TX-128 Transformer 0.500 0.301 60.2 0.294 58.8
4710-TX-101. Transformer 100.000 86.918 86.9 86.432 86.4
4710-TX-102. Transformer 100.000
5210-TX-061 Transformer 8.000 6.617 82.7 6.583 82.3
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
1411-TX-007 0.868 0.303 -0.853 -0.280 15.1 22.6 98.6 96.2 2.31
4700-LC-001B-C2 -1.506 -0.946 1.506 0.947 0.4 0.3 99.4 99.4 0.03
Cable77 0.317 0.166 -0.317 -0.166 0.0 0.0 99.4 99.4 0.00
Cable79 1.188 0.780 -1.188 -0.780 0.0 0.0 99.4 99.4 0.00
4700-LC-001B-C1 -2.430 -1.368 2.431 1.369 0.8 0.6 99.4 99.4 0.04
Cable73 1.919 1.043 -1.919 -1.043 0.0 0.0 99.4 99.4 0.00
Cable75 0.511 0.325 -0.511 -0.325 0.0 0.0 99.4 99.4 0.00
2260-TX-045 -0.500 -0.310 0.511 0.325 10.3 15.4 96.6 99.4 2.78
Cable11 -0.314 -0.154 0.314 0.154 0.2 0.2 96.9 96.9 0.06
Cable6 -1.906 -0.934 1.907 0.936 0.6 2.1 96.6 96.7 0.07
2260-TX-048 -1.180 -0.731 1.188 0.780 8.1 48.4 97.1 99.4 2.30
2331-TX-159 -0.025 -0.015 0.025 0.016 0.2 0.7 97.5 99.3 1.78
Cable19 1.658 0.746 -1.658 -0.746 0.1 0.3 98.8 98.8 0.01
Cable83 5.876 1.500 -5.875 -1.499 0.6 0.7 98.8 98.8 0.01
Tunnel Cable -9.334 -2.978 9.360 3.027 26.0 49.2 98.8 99.2 0.40
Line12 1.800 0.732 -1.800 -0.732 0.1 -0.3 98.8 98.8 0.01
Cable85 1.254 0.543 -1.254 -0.543 0.0 0.0 98.8 98.8 0.00
Cable87 0.403 0.203 -0.403 -0.203 0.0 0.0 98.8 98.8 0.00
2371-TX-016 -0.396 -0.192 0.403 0.203 7.4 11.0 96.3 98.8 2.51
Cable21 -1.244 -0.486 1.245 0.487 0.3 0.8 96.5 96.6 0.04
Cable17 -5.849 -1.188 5.852 1.199 3.0 11.1 97.2 97.3 0.08
Cable 01 -0.568 -0.139 0.568 0.139 0.0 0.0 99.2 99.2 0.00
Cable81 0.568 0.139 -0.568 -0.139 0.0 0.0 99.2 99.2 0.00
2372-TX-021 -0.053 -0.017 0.053 0.018 0.7 1.0 96.0 97.7 1.71
Cable15 -0.563 -0.122 0.564 0.122 0.4 0.4 97.7 97.8 0.08
Cable8 -27.383 -13.702 27.395 13.726 12.6 23.7 99.4 99.4 0.07
Cable25 26.327 12.976 -26.325 -12.971 2.9 5.5 99.4 99.3 0.02
Cable35 0.632 0.383 -0.632 -0.383 0.0 0.0 99.4 99.4 0.00
Cable36 0.423 0.343 -0.423 -0.343 0.0 0.0 99.4 99.4 0.00
Cable10 -27.425 -13.658 27.437 13.681 12.6 23.8 99.4 99.4 0.07
Cable53 26.327 12.974 -26.325 -12.969 1.6 4.9 99.4 99.3 0.01
Cable57 0.632 0.340 -0.632 -0.340 0.0 0.0 99.4 99.4 0.00
Cable59 0.466 0.344 -0.466 -0.344 0.0 0.0 99.4 99.4 0.00
2374-TX-029 -0.418 -0.325 0.423 0.343 5.2 18.1 96.6 99.4 2.79
Project: ETAP Page: 37
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
2374-TX-034 -0.466 -0.344 0.466 0.344 0.0 0.0 99.4 99.4 0.00
Cable39 -0.626 -0.348 0.627 0.349 0.7 0.9 96.2 96.4 0.14
Cable16 -26.267 -11.089 26.283 11.109 16.7 19.8 96.5 96.6 0.08
2374-TX-025 0.044 0.015 -0.043 -0.014 0.3 0.5 96.5 95.6 0.91
Cable61 -0.626 -0.307 0.627 0.308 0.7 0.9 96.5 96.7 0.14
Cable55 -26.267 -11.088 26.284 11.108 16.7 19.8 96.5 96.6 0.08
2374-TX-030 0.044 0.013 -0.044 -0.013 0.3 0.4 96.5 95.7 0.85
Cable12 -9.687 -4.782 9.691 4.788 3.5 5.3 99.4 99.4 0.05
Cable63 5.533 2.004 -5.533 -2.004 0.2 0.5 99.4 99.4 0.01
Cable65 1.769 1.187 -1.769 -1.187 0.1 0.1 99.4 99.4 0.01
Cable67 1.761 1.181 -1.761 -1.181 0.1 0.1 99.4 99.4 0.01
Cable69 0.623 0.410 -0.623 -0.410 0.0 0.0 99.4 99.4 0.00
Cable13 -5.502 -1.638 5.506 1.654 4.1 15.5 96.9 97.1 0.14
2375-TX-037 -1.752 -1.086 1.769 1.187 16.8 100.8 96.2 99.4 3.21
2375-TX-038 -1.745 -1.081 1.761 1.181 16.6 99.8 96.2 99.4 3.19
2375-TX-039 -0.619 -0.383 0.623 0.410 4.4 26.7 97.0 99.4 2.41
2500-TX-050 -0.074 -0.046 0.076 0.048 1.5 2.2 96.5 99.1 2.65
2520-TX-054 1.042 0.290 -1.037 -0.265 4.3 25.5 98.0 97.0 0.97
2520-TX-052 -0.064 -0.040 0.065 0.042 0.5 1.9 97.1 99.0 1.85
2520-TX-055 -0.125 -0.078 0.126 0.080 0.6 2.2 96.0 97.0 1.09
2520-TX-165 -0.019 -0.012 0.019 0.012 0.2 0.6 96.7 98.8 2.16
2520-TX-167 -0.087 -0.054 0.088 0.057 0.8 2.7 96.7 98.6 1.97
2520-TX-169 -0.037 -0.023 0.038 0.024 0.2 0.8 96.7 98.0 1.35
2520-TX-171 -0.037 -0.023 0.037 0.024 0.3 1.1 96.2 98.1 1.88
2520-TX-173 -0.076 -0.047 0.077 0.049 0.6 2.1 96.4 98.1 1.73
2520-TX-175 -0.114 -0.071 0.116 0.075 1.1 3.8 96.1 98.1 2.09
2520-TX-177 -0.115 -0.071 0.116 0.075 1.1 3.8 96.2 98.3 2.10
2520-TX-179 -0.026 -0.016 0.026 0.017 0.2 0.8 96.6 98.5 1.90
2530-TX-160 -0.200 -0.066 0.202 0.069 2.0 3.0 95.7 97.0 1.30
Cable89 -1.762 -0.579 1.762 0.580 0.2 0.6 97.3 97.4 0.02
Cable38 -3.728 -1.228 3.728 1.230 0.8 2.9 97.0 97.0 0.04
Cable1 -86.409 -1.394 86.420 1.428 11.3 33.7 99.4 99.4 0.01
Cable7 0.003 -19.780 0.000 19.789 3.0 8.8 99.4 99.5 0.04
4700-LC-001A-C1 9.944 3.200 -9.930 -3.170 13.7 30.0 99.4 99.2 0.22
Cable23 0.003 -19.780 0.000 19.789 3.0 8.8 99.4 99.5 0.04
4710-TX-101. 86.563 7.848 -86.420 -1.428 142.7 6419.9 100.0 99.4 0.56
4710-TX-102. 0.000 0.000 0.000 0.000 100.0 100.0
Project: ETAP Page: 38
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable31 -6.580 0.132 6.582 -0.124 2.1 7.7 99.5 99.5 0.03
Line30 0.950 0.595 -0.947 -0.587 3.6 8.6 99.5 98.8 0.68
2375-TX-036 -5.506 -1.654 5.533 2.004 26.9 349.7 97.1 99.4 2.29
2374-TX-026 -26.283 -11.109 26.325 12.971 41.4 1861.3 96.6 99.3 2.75
Line5 -0.063 -0.031 0.063 0.030 0.0 -0.4 98.6 98.6 0.00
2374-TX-031 -26.284 -11.108 26.325 12.969 41.4 1861.1 96.6 99.3 2.75
2260-TX-044 -1.907 -0.936 1.919 1.043 12.5 106.6 96.7 99.4 2.73
Line94 -9.360 -3.027 9.362 3.032 1.9 4.1 99.2 99.2 0.03
Line96 -0.568 -0.139 0.568 0.138 0.0 -0.7 99.2 99.2 0.00
5210-TX-061 6.612 0.258 -6.582 0.124 29.4 381.9 100.0 99.5 0.50
2374-TX-023 0.632 0.383 -0.627 -0.349 5.7 34.1 99.4 96.4 2.97
2530-TX-2 -1.762 -0.580 1.764 0.610 2.3 30.2 97.4 98.0 0.62
Line100 -0.025 -0.012 0.025 0.009 0.0 -3.4 98.8 98.8 0.00
2260-TX-047 -0.314 -0.154 0.317 0.166 3.6 12.5 96.9 99.4 2.45
Line7 -1.523 -0.610 1.523 0.609 0.0 -0.2 98.6 98.6 0.00
2372-TX-020 -0.564 -0.122 0.568 0.139 4.8 16.7 97.8 99.2 1.43
2374-TX-024 0.632 0.340 -0.627 -0.308 5.4 32.2 99.4 96.7 2.70
Line102 -0.126 -0.061 0.126 0.061 0.0 -0.5 98.8 98.8 0.00
2371-TX-018 5.875 1.499 -5.852 -1.199 23.1 300.7 98.8 97.3 1.46
2371-TX-015 -1.245 -0.487 1.254 0.543 9.4 56.7 96.6 98.8 2.19
Line32 -0.039 -0.019 0.039 0.019 0.0 -0.4 98.6 98.6 0.00
Line105 -0.039 -0.019 0.039 0.019 0.0 -0.4 98.6 98.6 0.00
Line106 -1.483 -0.592 1.484 0.591 0.2 -1.3 98.6 98.6 0.03
Line111 -0.025 -0.012 0.025 0.012 0.0 -0.4 98.6 98.6 0.00
Line112 -1.458 -0.582 1.458 0.581 0.2 -1.0 98.6 98.6 0.02
Line118 -0.590 -0.281 0.590 0.278 0.1 -2.4 98.5 98.6 0.02
Line121 -0.393 -0.190 0.393 0.190 0.0 -0.4 98.5 98.5 0.00
Line123 -0.157 -0.076 0.157 0.075 0.0 -1.5 98.5 98.5 0.00
Line124 -0.039 -0.019 0.039 0.018 0.0 -1.5 98.5 98.5 0.00
4413-TX-115 -0.214 -0.133 0.218 0.139 3.7 5.6 97.1 99.4 2.37
Line198 -1.764 -0.610 1.764 0.610 0.1 -0.2 98.0 98.0 0.01
Line160 -7.779 -3.103 7.781 3.106 1.3 2.8 99.4 99.4 0.03
Line162 7.664 3.031 -7.663 -3.028 1.3 2.7 99.4 99.4 0.03
4500-TX-126 0.115 0.073 -0.114 -0.071 1.3 2.0 99.4 97.8 1.58
Line165 7.548 2.956 -7.547 -2.953 1.2 2.6 99.4 99.3 0.03
4500-TX-127 0.115 0.073 -0.114 -0.071 1.3 2.0 99.4 97.8 1.58
Line166 7.292 2.792 -7.291 -2.790 1.1 2.4 99.3 99.3 0.03
Project: ETAP Page: 39
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
4500-TX-128 0.254 0.161 -0.250 -0.155 4.1 6.1 99.3 97.1 2.21
Line175 7.266 2.774 -7.258 -2.757 8.0 16.3 99.3 99.1 0.18
Line176 7.085 2.626 -7.077 -2.610 7.6 15.5 98.8 98.6 0.18
Line177 -7.103 -2.638 7.111 2.654 7.6 15.6 98.8 99.0 0.18
Line178 -7.176 -2.695 7.182 2.709 6.7 13.6 99.0 99.1 0.15
Line187 -6.982 -2.539 6.989 2.554 7.4 15.0 98.5 98.6 0.17
Line188 6.956 2.522 -6.950 -2.511 5.2 10.6 98.5 98.3 0.12
Line189 6.543 2.231 -6.542 -2.230 0.9 1.8 98.0 98.0 0.02
Line190 -6.581 -2.255 6.583 2.259 1.9 3.7 98.0 98.1 0.05
Line191 -6.620 -2.283 6.622 2.287 1.9 3.8 98.1 98.1 0.05
Line192 -6.699 -2.336 6.700 2.338 1.0 1.9 98.1 98.1 0.02
Line193 -6.815 -2.413 6.819 2.421 4.0 8.1 98.1 98.2 0.09
Line194 -6.830 -2.428 6.834 2.436 4.0 8.1 98.2 98.3 0.10
4411-TX-114 0.011 0.007 -0.011 -0.007 0.1 0.4 98.2 96.2 2.03
Line197 -5.500 -1.938 5.501 1.939 0.7 1.2 98.0 98.0 0.02
2530-TX-057 3.736 1.328 -3.728 -1.230 7.5 97.9 98.0 97.0 0.96
Line14 1.753 0.713 -1.753 -0.713 0.1 -0.3 98.8 98.8 0.01
Line98 0.047 0.019 -0.047 -0.019 0.0 -0.5 98.8 98.8 0.00
Line19 1.627 0.653 -1.626 -0.657 1.2 -4.6 98.8 98.6 0.12
Line23 1.563 0.627 -1.562 -0.628 0.2 -1.1 98.6 98.6 0.03
Line122 0.197 0.091 -0.197 -0.092 0.0 -1.5 98.5 98.5 0.00
673.7 12368.2
Project: ETAP Page: 40
Location: 16.2.0C Date: 09-18-2019
Contract: SN: AUSENCOSVC
Engineer: Revision: Base
Study Case: LF
Filename: Zafranal Actualización Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 103.0
UnderVoltage 95.0 96.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 1