Regarding: - Bridge at KM 99/4, Indore Kota Road on

Kalisindh River
Dear Sir,
As per discussion with The Chief Engineer Bridge and The
Executive Engineer, Ujjain our comments on Bridge at KM
99/4, Indore Kota Road on Kalisindh River, are as below:
1. The Actual Ground level on A1 to A6 is 99.900m, the HFL
is 101.000m. The average depth of flow is 1.100m.
2. Due to water spread, the viaduct span may be adopted
to avoid increase in further afflux, and design discharge.
3. As per GAD, the P1 to P6 is kept at Skew angle of 15°, for
which the existing road has been used for running of
traffic and also to avoid dismantling and land acquisition
in the town/village area.