Disposition of Variances
Disposition of Variances
OVERHEAD
VARIANCES
By: Group 3 MW 10:30-12:00 GR 346
--
Spending
actual hours)
Overhead
Efficiency
--
Budgeted OH @ standard Variance
-
Volume
Applied overhead Variance
Standard (FOH +
VOH)
2-WAY
Actual overhead
(VOH + FOH) - Controllable
--
Variance
Budgeted OH @
standard
FOH + (VOH rate x AP x
-
Variance
Applied overhead
OH rate x AP x
unit
1-WAY
Actual overhead
(VOH + FOH) - Total
Overhead
-
Variances
Applied
overhead
Disposition of Variances
Variances can be disposed of in one of two ways.
inventories
For interim If the variance results from a planned fluctuation
statements
the variance account.
interim statement.
material:
If not material:
factory overhead
size of variance
standards)
ENTRIES
Work in process xx
Finished goods xx