DATA LAPANGAN

Drainase 1
Panjang (P) = 14.00 m
Lebar Atas (Galian) = 1.00 m
Lebar Bawah (Galian) = 1.00 m
Lebar Atas (batu) = 0.30 m
Lebar Bawah (batu) = 0.30 m
Lebar Rabat Saluran = 0.60 m
Tebal Rabat Saluran = 0.15 m
Tinggi Awal = 2.00 m
Tinggi Akhir = 1.00 m 1.50 m
Dalam Pondasi = 0.25 m 1.75 m
Tebal pasir urug = 0.10 m
Ban Banan = 0.10 m
Kepras = 0.20 m

Drainase 1
Panjang (P) = 55.00 m
Lebar Atas (Galian) = 1.00 m
Lebar Bawah (Galian) = 1.00 m
Lebar Atas (batu) = 0.30 m
Lebar Bawah (batu) = 0.30 m
Lebar Rabat Saluran = 0.60 m
Tebal Rabat Saluran = 0.15 m
Tinggi Awal = 2.00 m
Tinggi Akhir = 1.00 m 1.50 m
Dalam Pondasi = 0.25 m 1.75 m
Tebal pasir urug = 0.10 m
Ban Banan = 0.10 m
Kepras = 0.20 m

Vol Dreinase
PEKERJAAN STRIPING/KEPRAS
Kepras x Tinggi x Panjang
Drainase 1 = 0.20 x 1.50 x 14.00
Drainase 2 = 0.20 x 1.50 x 55.00

PEKERJAAN BOWPLANK
Panjang Dimensi 1 + Panjang dimensi 2
Drainase 1 = 14.00 + 55.00

PEKERJAAN GALIAN
(Lebar atas + Lebar bawah)/2 x Tinggi x Panjang
Drainase 1 = 1.00 + 1.00 : 2.00 x 1.75
Drainase 2 = 1.00 + 1.00 : 2.00 x 1.75
PEKERJAAN URUGAN PASIR
Tebal urugan pasir x Lebar Bawah x Panjang
Drainase 1 = 0.10 x 1.00 x 14.00
Drainase 2 = 0.10 x 1.00 x 55.00

PEKERJAAN PASANG BATU KALI


(Lebar Atas + Lebar Bawah)/2 x Tinggi x Panjang x Banyak sisi
Drainase 1 = 0.30 + 0.30 : 2.00 x 1.50
x 2.00
Drainase 2 = 0.30 + 0.30 : 2.00 x 1.50
x 2.00

Lebar Bawah x Dalam Pondasi x Panjang x Banyak sisi


Drainase 1 = 0.30 x 0.25 x 14.00 x 2.00
Drainase 2 = 0.30 x 0.25 x 55.00 x 2.00

Lebar rabat x Tinggi x Panjang


Drainase 1 = 0.60 x 0.15 x 14.00
Drainase 2 = 0.60 x 0.15 x 55.00

Bruk = Panjang x Lebar x Tinggi


- x - x -

PEKERJAAN BETON
Lebar x Tebal x Panjang
Drainase 1 = 0.60 x 0.15 x 14.00
Drainase 2 = 0.60 x 0.15 x 55.00

Lebar x Tebal x Panjang


Plat Beton = 1.50 x 0.15 x 2.50

PEKERJAAN PLESTERAN
(Lebar Atas + Ban Banan) x Panjang x Banyak sisi
Drainase 1 = 0.30 + 0.10 x 14.00 x 2.00
Drainase 2 = 1.00 + 0.10 x 55.00 x 2.00

(Lebar Atas + Ban Banan) x Panjang x Banyak sisi


Bruk = - + 0.10 x - x 2.00

PEKERJAAN SIARAN/SETRIK
(Tinggi - Ban Banan) x Panjang x Banyak sisi
Drainase 1 = 1.50 - 0.10 x 14.00 x 2.00
Drainase 2 = 1.50 - 0.10 x 55.00 x 2.00
Bruk (Tinggi - Ban Banan) x Panjang x Banyak sisi
= - - 0.10 x - x 2.00

PEKERJAAN PEMBESIAN
(Panjang : Jarak Pemasangan) x Banyak sisi x lebar
Plat lantai (Mendatar) = 2.50 : 0.2 x 1 x 1.50
Plat lantai (Tegak) = 1.50 : 0.2 x 1 x 2.50
Plat Beton
Panjang = 2.50 m
Lebar = 1.50 m
Tebal = 0.15 m

Bruk
Panjang = - m
Tinggi = - m

Lebar = - m

= 4.20 m3
= 16.50 m3
= 20.70 m3

= 69.00 m1

x 14.00 = 24.50 m3
x 55.00 = 96.25 m3
= 24.50 m3
= 1.40 m3
= 5.50 m3
= 6.90 m3

x 14.00 = 12.60 m3

x 55.00 = 49.50 m3

= 2.10 m3
= 8.25 m3

= 1.26 m3
= 4.95 m3

= - m3
= 78.66 m3

= 1.26 m3
= 4.95 m3

= 0.56 m3
= 6.77 m3

= 11.20 m2
= 121.00 m2

= -
= 132.20 m2

= 39.20 m2
= 154.00 m2
= -
= 193.20 m2

= 18.75 m
= 18.75 m
= 37.5 m
= 4 Ljr
DANA DESA (DD) TA. 2020 DESA KALIREJO
ANALISA BIAYA KONSTRUKSI
PEMBANGUNAN TPT (PLENGSENGAN)

Desa : Kalirejo
Kecamatan : Sumber Malang
Kabupaten : Situbondo
Kegiatan : Dana Desa (DD)
Pekerjaan : Pemb. TPT (Plengsengan)
Volume : 17m x 1,15
Lokasi : Dusun Krajan RT 10 RW 03
Tahun Anggaran : 2020
No. R A B : 001

ANALISA SNI 2016


No URAIAN PEKERJAAN Volume Volume
Satuan Koefisien
Pekerjaan Kebutuhan
1 2 3 4 5 6
1 1M2, Pek. Stripping Tanah Tebing ABK 2.3.1.7 SNI'16 581
Tenaga Kerja
Pekerja Hok 0.05 20.70 1.04
Ketua kelompok Hok 0.005 20.70 0.10
2 1 M1, Pek. Bouwplank Kode ABK 2.2.1.4. SNI'16 Hal 572
Bahan
Kayu balok 5/7 m3 0.012 69.00 0.83
Paku 2" - 3" kg 0.02 69.00 1.38
Kayu papan 3/20 m3 0.007 69.00 0.48

Tenaga
Pekerja Hok 0.100 69.00 6.90
Tukang Hok 0.100 69.00 6.90
Ketua Kelompok Hok 0.005 69.00 0.35
3 1 M3, Pek. Galian Tanah ABK 2.3.1.1 SNI'16 Hal 579
Tenaga
Pekerja Hok 0.75 24.50 18.38
Ketua Kelompok Hok 0.025 24.50 0.61
4 1 M3, Pek. Urugan Pasir ABK 2.3.1.11 SNI'16 Hal 583
Bahan
Pasir urug m3 1.200 6.90 8.28

Tenaga kerja
Pekerja Hok 0.75 6.90 5.18
Ketua Kelompok Hok 0.025 6.90 0.17
5 1M3, Pek. Pondasi Batu Kali 1 PC : 5 PP ABK 3.2.1.3 SNI'16 Hal 586
Bahan
Batu kali m3 1.20 78.66 94.39
Semen PC (40kg) zak 3.40 78.66 267.44
Pasir pasang m3 0.544 78.66 42.79

Tenaga kerja
Pekerja Hok 1.50 78.66 117.99
Tukang Hok 0.75 78.66 59.00
Ketua kelompok Hok 0.075 78.66 5.90
6 1M2, Pek. Plesteran Ciprat 1PC : 2PP (15mm) ABK 4.4.2.23 SNI'16 Hal 653
Bahan
Semen PC (40kg) zak 0.108 132.20 14.28
Pasir pasang m3 0.006 132.20 0.79

Tenaga kerja
Pekerja Hok 0.300 132.20 39.66
Tukang Hok 0.100 132.20 13.22
Ketua kelompok Hok 0.015 132.20 1.98
7 1M2, Pek. Acian ABK 4.4.2.27 SNI'16 Hal 655
Bahan
Semen PC (40kg) zak 0.081 132.20 10.71

Tenaga kerja
Pekerja Hok 0.200 132.20 26.44
Tukang Hok 0.100 132.20 13.22
Ketua kelompok Hok 0.010 132.20 1.32
8 1M2, Pek. Siar/Setrik 1PC : 2PP (Luar) ABK 4.4.2.26 SNI'16 Hal 655
Bahan
Semen PC (40kg) zak 0.050 193.20 9.66
Pasir Pasang m2 0.012 193.20 2.32

Tenaga kerja
Pekerja Hok 0.300 193.20 57.96
Tukang Hok 0.15 193.20 28.98
Ketua Kelompok Hok 0.015 193.20 2.90
9 1M2, Pek. Pengecetan
Bahan
Cat Dasar kg 0.1 132.20 13.22
Cat Penutup kg 0.26 132.20 34.37

Tenaga kerja
Pekerja Hok 0.02 132.20 2.64
Tukang Hok 0.063 132.20 8.33
Ketua kelompok Hok 0.003 132.20 0.40
10 1M3, Pek Rabat Beton ABK 2.3.1.1 SNI 16 Hal 579
Bahan
Semen PC (40kg) Zak 247 6.77 41.82
Pasir Pasang m3 0.621 6.77 4.21
Koral m3 0.555 6.77 3.76

Tenaga kerja
Pekerja Hok 1.650 6.77 11.17
Tukang Hok 0.275 6.77 1.86
Ketua kelompok Hok 0.083 6.77 0.56
11 1M3, Pek Bekisting Beton ABK 4.1.1.20 SNI 16 Hal 600
Bahan
Kayu Papan m3 0.040 0.56 0.02
Paku kg 0.300 0.56 0.17
Minyak Bekisting ltr 0.100 0.56 0.06

Tenaga Kerja
Pekerja Hok 0.520 0.56 0.29
Tukang Hok 0.260 0.56 0.15
Ketua Kelompok Hok 0.026 0.56 0.01

Kebutuhan Tenaga kerja, Alat & Bahan Satuan Jumlah Satuan Jumlah
Bahan
1 Kayu balok 5/7 m3 0.83 lonjor 79.00
2 Paku 2" - 3" kg 1.55 kg 2.00
3 Kayu papan 3/20 m3 0.02 lonjor 2.00
4 Pasir urug m3 8.28 m3 9.00
5 Batu kali m3 94.39 m3 95.00
6 Semen PC (40kg) zak 343.91 zak 344.00
7 Pasir pasang m3 50.11 m3 51.00
8 Cat Dasar kg 13.22 kg 14.00
9 Cat Penutup kg 34.37 kg 35.00
10 Koral m3 3.76 m3 4.00
Tenaga kerja
1 Pekerja Hok 287.65 Hok 288.00
2 Tukang Hok 131.65 Hok 132.00
3 Ketua Kelompok Hok 14.31 Hok 15.00
kayu 5/7 0.05 0.07 3 0.0105

kayu 3/20 0.03 0.2 2.5 0.015


DANA DESA (DD) TA. 2020 DESA SUMBER ARGO
RINCIAN ANGGARAN BIAYA BAHAN, UPAH DAN ALAT
PEKERJAAN TPT / PLENGSENGAN

Desa : Kalirejo
Kecamatan : Sumber Malang
Kabupaten : Situbondo
Kegiatan : Dana Desa (DD)
Pekerjaan : Pemb. TPT / Plengsengan
Volume : 17m x 1,15m
Lokasi : Dusun Krajan Rt 10 Rw 03
Tahun Anggaran : 2019
No. R A B : 001

NO URAIAN SATUAN HARGA

(1) (2) (3) (4)


1 Bahan
Pasir Urug M3 220,000.00
Semen 40 Kg Sak 65,000.00
Pasir Pasang/beton M3 250,000.00
Batu Kali m3 247,500.00
Batu Pecah 2-3 / koral M3 350,000.00
Air Liter
Besi beton polos Ø 8 ljr 50,000.00
Kawat beton kg
Kayu Begisting 20x30 Lembar
Paku 5 - 12 cm Kg 16,000.00
Minyak Bekisting ltr
Papan Nama Proyek ls
Prasasti bh
Buis beton bh
Cat Catylac kg 45,500.00
Kayu 5/7 (3m) ljr 30,000.00
Kayu papan 3/20 ljr 14,000.00
2 TENAGA KERJA
Pekerja hok 75,000.0
Tukang hok 85,000.0
Ketua Kelompok hok 90,000.0

3 ALAT
Timba Bh 15,000.00
Benang Bh 11,000.00
Selang air 50m Bh 300,000.00
Meteran tali 100m Bh 120,000.00
Meteran 5m Bh 20,000.00
Pacul Bh 95,000.00
Skop Bh 150,000.00
Cangkul Bh 75,000.00
Roda + Klaher Argo Bh 150,000.00
Kereta dorong (Argo) Bh 600,000.00
Molen
Papan Proyek ls 250,000.00
Prasasti Bh 350,000.00
RENCANA ANGGARAN BIAYA (RAB)
DESA KALIREJO KECAMATAN SUMBERMALANG

PROGRAM : Dana Desa


LOKASI : Dsn. Krajan Rt 10 Rw 03
DESA : Kalirejo Ukuran Dimensi
KECAMATAN : Sumbermalang Bidang
KABUPATEN : Situbondo Kegiatan

Harga Satuan
URAIAN Volume Satuan Harga Langsiran

a b c d e
1. BAHAN
1 Kayu balok 5/7 (3m) 79 lonjor Rp 30,000
2 Paku 2" - 3" 2 kg Rp 16,000
3 Kayu papan 3/20 (2,5m) 2 lonjor Rp 14,000
4 Pasir urug 9 m3 Rp 220,000
5 Batu kali 95 m3 Rp 247,500
6 Semen PC (40kg) 344 zak Rp 65,000
7 Pasir pasang 51 m3 Rp 250,000
8 Cat Dasar 14 kg Rp 45,500
9 Cat Penutup 35 kg Rp 45,500
10 Koral 4 m3 Rp 350,000
11 Besi d 8 4 lonjor Rp 50,000
Sub Total 1)
2. ALAT
1 Timba 10 Bh Rp 15,000
2 Papan Proyek 1 Unit Rp 250,000
3 Prasasti 1 Unit Rp 350,000
4 Benang 5 Rol Rp 11,000
5 Pacul 1 Bh Rp 95,000
6 Cangkul 1 Bh Rp 75,000
7 Roda + Kelaher Argo 3 Set Rp 150,000
8 Kereta dorong 2 Unit Rp 600,000
Sub Total 2)
3. UPAH
1 Pekerja 288 Hok Rp 75,000
2 Tukang 132 Hok Rp 85,000
3 Biaya Langsir Hok
4 Ketua Kelompok 15 Hok Rp 90,000
Sub Total 3)
Total biaya

Total Biaya DD
Total PKT

mengetahui :
KEPALA DESA KALIREJO

Sulaiman
RAB)
ERMALANG

171m x 1,5m
: Pembangunan Desa
: Saluran Irigasi

Jumlah Harga
Jumlah Total
Langsiran

f=bxd g

Rp 2,370,000.0
Rp 32,000.0
Rp 28,000.0
Rp 1,980,000.0
Rp 23,512,500.0
Rp 22,360,000.0
Rp 12,750,000.0
Rp 637,000.0
Rp 1,592,500.0
Rp 1,400,000.0
Rp 200,000.0
Rp 66,862,000

Rp 150,000
Rp 250,000
Rp 350,000
Rp 55,000
Rp 95,000
Rp 75,000
Rp 450,000
Rp 1,200,000
Rp 2,625,000

Rp 21,600,000
Rp 11,220,000

Rp 1,350,000
Rp 34,170,000
Rp 103,657,000

Rp 103,657,000
33

Dibuat oleh :
KASI KESRA

Nurhadi