CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
I. Preliminaries
1.1 Mobilization/ Demobilization 1 lot 92,848.76 4.42%
1.2 Temfacil, Tools & Equipment 1 lot 21,277.84 1.01%
1.3 As-built Plans Sign & Sealed by P.E.E. 1 lot - 0.00%
1.4 Bonds & Insurances 1 lot 13,540.44 0.64%
1.5 Testing & Commissioning 1 lot 7,737.40 0.37%
1.6 Consumables 1 lot 21,277.84 1.01%
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
Wireway 250mm x 100mm x 2.4m w/ Cover (Powder Coated) 129 pcs 52,413.99 2.50%
Unistrut Channel 33 pcs 2,681.01 0.13%
Flat Bar 1 1/2" x 1/4" x 6m 47 pcs 3,504.75 0.17%
Bolt & Nut 1/4" x 1" 806 pcs 592.26 0.03%
EMT Pipe 1/2"Ø 1622 pcs 47,543.98 2.26%
EMT Coupling 1/2"Ø 1546 pcs 4,545.36 0.22%
EMT Connector 1/2"Ø 2193 pcs 6,871.78 0.33%
Full Threaded 3/8"Ø 598 pcs 11,220.39 0.53%
Anchor Grip 3/8"Ø 1431 pcs 2,767.86 0.13%
Nut & Washer 3/8"Ø 3780 pcs 5,098.94 0.24%
Unistrut Channel 86 pcs 6,777.26 0.32%
Unistrut Clamp 1/2"Ø 2919 pcs 13,551.18 0.65%
Junction Box (Metal) 968 pcs 9,305.77 0.44%
Utility Box (Metal) 18 pcs 217.61 0.01%
Square Box (Metal) 53 pcs 768.90 0.04%
FMC 1/2"Ø 1452 pcs 7,162.12 0.34%
FMC Connector 1/2"Ø 983 pcs 950.73 0.05%
3.2 Wires
3.5mm2 THHN, Copper 585 boxes 153,896.82 7.33%
3.3 Wiring Devices
Switch Bank, Wall Mounted with 11 sets (3Gang Switch) 3 sets 3,423.80 0.16%
1gang Switch 2 pcs 365.59 0.02%
2gang Switch 11 pcs 574.50 0.03%
SMARTBAY 80W (OSM) 414 sets 64,708.62 3.08%
SMARTBAY 40W (OSM) 508 sets 17,687.69 0.84%
LED Flourescent Duo 2x30W (OSM) 207 sets 18,979.45 0.90%
T5 lights, 28W CDL (OSM) 750 sets 67,025.20 3.19%
Track Lights 35W 360 sets 34,121.92 1.62%
Page 2 of 26
Project : All Home Naga, Civil Works
Location : Brgy Del Rosario, Naga City
SUB-CONT : Mr. Wilcon Villalon
Subject : Progress Billing #1
Date : February 5, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
Page 3 of 26
Project : All Home Naga, Civil Works
Location : Brgy Del Rosario, Naga City
SUB-CONT : Mr. Wilcon Villalon
Subject : Progress Billing #1
Date : February 5, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
VI. MDP-ACCU&FCU
6.1 Roughing-Ins
Cable Tray ladder 600mm x 100mm x 2.4m 17 pcs 7,398.89 0.35%
Cable Tray ladder 500mm x 100mm x 2.4m 70 pcs 28,028.72 1.33%
Cable Tray ladder 300mm x 100mm x 2.4m 7 pcs 2,640.39 0.13%
Horizontal Elbow 600mmx100mm 1 pcs 232.12 0.01%
Vertical Elbow 300mmx100mm 2 pcs 657.68 0.03%
3way Junction 600mm x 500mm 1 pc 270.81 0.01%
Reducer 600mm x 300mm 1 pc 232.12 0.01%
Horizontal Elbow 300mmx100mm 1 pc 232.12 0.01%
IMC Pipe 2"Ø 20 pcs 3,407.16 0.16%
LQT Flexible 2"Ø 69 meters 5,472.27 0.26%
LQT Connector 2"Ø 46 pcs 1,583.85 0.08%
Locknut & Bushing 2"Ø 46 pairs 658.45 0.03%
LQT Flexible 3/4"Ø 69 meters 1,948.66 0.09%
LQT Connector 3/4"Ø 46 pcs 355.92 0.02%
Page 4 of 26
Project : All Home Naga, Civil Works
Location : Brgy Del Rosario, Naga City
SUB-CONT : Mr. Wilcon Villalon
Subject : Progress Billing #1
Date : February 5, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
VII. PP-SCALATOR,ELEVATOR
7.1 Roughing-Ins
EMT Pipe 1"Ø 49 pcs 2,720.28 0.13%
EMT Coupling 1"Ø 49 pcs 153.39 0.01%
EMT Connector 1"Ø 16 pcs 53.00 0.00%
Full threaded 3/8"Ø 59 pcs 2,248.29 0.11%
Nut 3/8"Ø 117 pcs 158.23 0.01%
LQT Conduit 1"Ø 23 meters 676.25 0.03%
LQT Connector 1"Ø 14 pcs 89.37 0.00%
Page 5 of 26
Project : All Home Naga, Civil Works
Location : Brgy Del Rosario, Naga City
SUB-CONT : Mr. Wilcon Villalon
Subject : Progress Billing #1
Date : February 5, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
Page 6 of 26
Project : All Home Naga, Civil Works
Location : Brgy Del Rosario, Naga City
SUB-CONT : Mr. Wilcon Villalon
Subject : Progress Billing #1
Date : February 5, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
IX. PANELBOARDS
UNITIZED PANEL MDP/AHU, N1 FREE-STANDING 400V 3P,W/ NEUTRAL,METERING &
9.1 1 set 5,222.74 0.25%
GROUNDING BUS
Main: ACB 3200AT/3200AF, 3P, 400V, 85kaic, Draw Out
Brs: 1 - ACB 2500AT/2500AF, 3P, 400V, Fixed Type
1 - 250AT/250AF, 3P, 400V
9 - 100AT/100AF, 3P, 400V
1 - Space 100AF
22 - 250AT/AF, 3P, 400V
9.3 DP-ACCU/FCU, N3R WALL MOUNTED 400V 3P,& GROUNDING BUS 20 sets 24,295.42 1.16%
Main: 200AT/AF, 3P, 400V, 35Kaic
Brs: 1 - 160AT/AF, 3P, 400V
1 - 40AT/100AF, 3P, 400V
9.4 PP-ELEV/SCAL, N1 WALL MOUNTED 400V 3P,W/ NEUTRAL & GROUNDING BUS 1 set 1,354.04 0.06%
Main: 250AT/250AF, 3P, 400V, 35KAIC, Industrial Type CB
Brs: 8 - 50AT/100AF, 3P, 400V
9.5 PP-CHARGER, N1 WALL MOUNTED 400V 3P,W/ NEUTRAL & GROUNDING BUS 1 set 1,354.04 0.06%
Main: 100AT/AF, 3P, 400V, 35KAIC, Industrial Type CB
Brs: 2 - 40AT/100AF, 3P, 400V
8 - 40AT/50AF, 1P, 230V
9.6 PP-MODULE, N1 WALL MOUNTED 400V 3P,W/ NEUTRAL & GROUNDING BUS 1 set 1,354.04 0.06%
Page 7 of 26
Project : All Home Naga, Civil Works
Location : Brgy Del Rosario, Naga City
SUB-CONT : Mr. Wilcon Villalon
Subject : Progress Billing #1
Date : February 5, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT % WT
AMOUNT
Prepared by : Noted by :
Page 9 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 10 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 11 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 12 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 13 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 14 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 15 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 16 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
Page 17 of 26
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% BALANCE
% AMOUNT % AMOUNT % AMOUNT
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
- - 0.00% - 100.00%
0.00% - 0.00% - 0.00% -
Page 18 of 26
PROJECT All Home Cebu - Fire Protection Works DATE OF BILLING July 12, 2018
SUB-CONTRACTOR Cesar Apawan
LOCATION General Trias
CONTRACT AMT. PHP 5,200,000.00
P.O. NUMBER PO2018-007-SC
Ariel O. Basa
DEDUCTIONS
NET
REMARKS
10%RETENTION OTHERS COLLECTIBLE
- 4,992,000.00
PROJECT All Day Supermarket - Fire Protection DATE OF BILLING February 6, 2019
SUB-CONTRACTOR Cesar Apawan
LOCATION EVIA Lifestyle Center
CONTRACT AMT. PHP 1,000,000.00
P.O. NUMBER
Ariel O. Basa
DEDUCTIONS
NET
REMARKS
10%RETENTION OTHERS COLLECTIBLE
330,000.00 RPP#36853
100,000.00 570,000.00 RPP#46707
- 900,000.00
PROJECT All Home Cebu - Fire Protection Works DATE OF BILLING August 7, 2018
SUB-CONTRACTOR Cesar Apawan
LOCATION Talisay, Cebu
CONTRACT AMT. PHP 2,600,000.00
P.O. NUMBER PO2018-012-SC
Ariel O. Basa
DEDUCTIONS
NET
REMARKS
10%RETENTION OTHERS COLLECTIBLE
234,000.00 1,404,000.00
26,000.00 156,000.00 COLLECTIBLES
- 1,560,000.00
PROJECT All Home Tanza - Fire Protection Works DATE OF BILLING August 7, 2018
SUB-CONTRACTOR Cesar Apawan
LOCATION Tanza, Cavite
CONTRACT AMT. PHP 6,000,000.00
P.O. NUMBER PO2018-014-SC
Ariel O. Basa
DEDUCTIONS
NET
REMARKS
10%RETENTION OTHERS COLLECTIBLE
540,000.00 3,240,000.00
60,000.00 360,000.00 COLLECTIBLES
- 3,600,000.00