MAIN LOCATION Head Tace Tunnel Sub Location RD 2140 to RD 4100 APPROVED BY HSE Manager FOREMAN Rakesh
MAIN ACTIVITY Undercut Removal DESCRIPTION OF ACTIVITY Removal of Undercut from Tunnel for tunnel lining purpose
SUB ACTIVITIES
Sub Activity 1 Drilling holes for explosives Sub Activity 2 Transporting explosives Sub Activity-3 Removing spoil from tunnel Sub Activity-4
1) Before blasting all the persons and machinery to be shifted from the
blasting zone to a safe place at least 500 meters/juction of tunnel
Serious Injury /
away from the location.
10-30% Permanent Disability
5 Blasting = Chances of flying of rock and tunnel vibration. 2 1-10% Low 4 3 - 6 Weeks, High 8 B 5 2) Blow the siren before the blast to caution the persons. 3 4 12 A
Medium / Long Term Health
3) Flagmen at all accessible points to prohibit entry into blasting area.
Effect, High
4) Ensure blasting warning board with timing detail at entry points is
kept..
MAIN LOCATION Head Tace Tunnel Sub Location RD 2140 to RD 4100 APPROVED BY HSE Manager FOREMAN Rakesh
MAIN ACTIVITY Undercut Removal DESCRIPTION OF ACTIVITY Removal of Undercut from Tunnel for tunnel lining purpose
SUB ACTIVITIES
Sub Activity 1 Drilling holes for explosives Sub Activity 2 Transporting explosives Sub Activity-3 Removing spoil from tunnel Sub Activity-4
After the blasting, remaining explosives and other materials will be Serious Injury without
Completion of blasting = Unauthorized handling of explosive 1 - 3 Weeks, checked and balance will be recorded & signed by the RHPPL, TPGPL <1% Very Permanent Disability,
7 2 1-10% Low 3 6 B 7 1 3 3 C
Medium representatives or blaster. Low Medium Term Health
Engineer Effect
1. The blasting material should be transported in a in licensed
explosive van. Serious Injury /
2. Detonator and explosives should not transported simultaneously in <1% Very Permanent Disability
8 Transportation and handling of explosive = Mishandling, explosion 3 10-30% Medium 4 3 - 6 Weeks, High 12 A 8 1 4 4 C
a single van/cabin. Low / Long Term Health
3. Combustible materials like grass, papers, dry wood etc should be Effect, High
cleared from vicinity of the explosive being handled.
1. loader oprator to have look before starting mucking , should scale
down if any handing rock found Serious Injury /
Removal of Muck from blast area = 1) falling of Rock for tunnel
2. All manpower like operator, truck drivers , labours should wear nose <1% Very Permanent Disability
8 2) Truck pollution 2 1-10% Low 4 3 - 6 Weeks, High 8 B 8 1 4 4 C
mask Low / Long Term Health
3) Accident during transportation
3. Reflective tapes and sign board to be used at high risk points Effect, High
4. Professional Drivers should be hired for it