Professional Documents
Culture Documents
Project 2
Project 2
Project 2
5 '
TOWER
D2 D1
WINCH U2 U1
A
TEST SECTION
CALIB TANK
BY PASS OF THE SYSTEM
- SEPARATOR
WORKING LEGEND
SHACK
GATE VALVE
1/2"
1/2"
3/4"
3/4"
.742"
2"
CHECK VALVE
2" RUN
2" RUN
LIQUID
FILTER
ACTUATED BALL VALVE
OIL
MOTOR VALV
ROTAMETER
AIR SUPPLY
ORIFICE METER
W
OIL FILTER
TURBINE METER
OIL WATER
HOLDUP SENSOR
STORAGE STORAGE
TANK TANK
WATER U1' U 2 UPHILL PRESSURE TAPS
PUMP
Heat Exchangers
D1' D 2 DOWNHILL PRESSURE TAPS
OIL
WATER
AT CONSTANT TEMPRATURE
TO Drain
PUMP PRESSURE GAUCE
CENTRIFUGAL PUMP
SNAP-ON JOINT