Project 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

30.

5 '
TOWER
D2 D1
WINCH U2 U1
A
TEST SECTION

CALIB TANK
BY PASS OF THE SYSTEM

- SEPARATOR

WORKING LEGEND
SHACK
GATE VALVE
1/2"
1/2"

3/4"
3/4"
.742"

2"

CHECK VALVE
2" RUN
2" RUN

LIQUID
FILTER
ACTUATED BALL VALVE

OIL
MOTOR VALV
ROTAMETER
AIR SUPPLY

ORIFICE METER
W
OIL FILTER
TURBINE METER
OIL WATER
HOLDUP SENSOR
STORAGE STORAGE
TANK TANK
WATER U1' U 2 UPHILL PRESSURE TAPS
PUMP
Heat Exchangers
D1' D 2 DOWNHILL PRESSURE TAPS
OIL
WATER
AT CONSTANT TEMPRATURE
TO Drain
PUMP PRESSURE GAUCE
CENTRIFUGAL PUMP
SNAP-ON JOINT

You might also like