CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
1 General Requirements
1.1 Mobilization / Demobilization 1 lot 28,736.26
1.2 Technical Supervision 1 lot 28,736.26
1.3 Overhead Manpower 1 lot 43,104.38
1.4 Testing and Commissioning 1 lot 19,157.50
Page 1 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
Unequal Tee 300mm(W) x 300mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.10 1 pc 689.67
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Unequal Tee 300mm(W) x 500mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.11 1 pc 689.67
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Unequal Cross 500mm(W) x 500mm(W) x 200mm(W) x 200mm(W) x 100mm(H) with Cover,
2.12 1 pc 689.67
Color Gray, Hot Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Inside / Internal Riser 450mm(W) x 450mm(W) x 100mm(H) with Cover, Color Gray, Hot Dipped
2.13 3 pcs 2,069.01
Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Straight Reducer 600mm(W) x 450mm(W) x 100mm(H) with Cover, Color Gray, Hot Dipped
2.14 3 pcs 2,069.01
Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Outside / External Riser 450mm(W) x 450mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.15 3 pcs 2,069.01
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Unequal Elbow 450mm(W) x 600mm(W) x 100mm(H) with Cover, Color Gray, Hot Dipped
2.16 3 pcs 2,069.01
Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Outside / External Riser 200mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.17 2 pcs 1,379.34
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Equal Tee 200mm(W) x 200mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.18 2 pcs 1,379.34
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
3 Roughing - Ins
3.1 Angle Bar 1 1/2" x 1 1/2" x 4mm x 6m 90 pcs 17,069.59
3.2 Stainless Bolt & Nut w/ Washer 1" x 3/8"Ø 2500 pairs 3,879.45
3.3 EMT Pipe 3/4"Ø 70 pcs 5,057.08
3.4 EMT Pipe 1"Ø 70 pcs 7,070.86
3.5 EMT Pipe 1 1/2"Ø 20 pcs 3,465.13
3.6 EMT Pipe 2"Ø 10 pcs 2,281.12
Page 2 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
5 Devices
5.1 Isolation Switch 20AT, 3P+G, 440V 59 sets 61,035.81
5.2 Isolation Switch 70AT, 3P+G, 440V 4 sets 4,138.02
5.3 Isolation Switch 100AT, 3P+G, 440V 4 sets 4,138.02
5.4 Isolation Switch 125AT, 3P+G, 440V 2 sets 2,069.01
5.5 Control Switch 69 sets 95,174.48
Prepared by : Noted by :
Page 4 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
Page 5 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
Page 6 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
Page 7 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
0.06% 10.00% 73.58 - 10.00% 73.58 90.00%
0.18% 10.00% 216.64 - 10.00% 216.64 90.00%
0.05% 10.00% 65.55 - 10.00% 65.55 90.00%
0.04% 10.00% 53.51 - 10.00% 53.51 90.00%
0.03% 10.00% 30.09 - 10.00% 30.09 90.00%
0.04% 10.00% 50.82 - 10.00% 50.82 90.00%
0.02% 10.00% 25.69 - 10.00% 25.69 90.00%
0.01% 10.00% 16.86 - 10.00% 16.86 90.00%
0.06% 10.00% 75.37 - 10.00% 75.37 90.00%
0.07% 10.00% 85.30 - 10.00% 85.30 90.00%
0.05% 10.00% 58.80 - 10.00% 58.80 90.00%
0.05% 10.00% 54.86 - 10.00% 54.86 90.00%
0.12% 10.00% 138.50 - 10.00% 138.50 90.00%
0.21% 10.00% 250.32 - 10.00% 250.32 90.00%
0.11% 10.00% 126.94 - 10.00% 126.94 90.00%
0.09% 10.00% 111.32 - 10.00% 111.32 90.00%
0.11% 10.00% 127.39 - 10.00% 127.39 90.00%
0.10% 10.00% 118.71 - 10.00% 118.71 90.00%
0.04% 10.00% 44.85 - 10.00% 44.85 90.00%
0.06% 10.00% 71.23 - 10.00% 71.23 90.00%
0.17% 10.00% 205.52 - 10.00% 205.52 90.00%
0.16% 10.00% 191.47 - 10.00% 191.47 90.00%
0.42% 10.00% 503.06 - 10.00% 503.06 90.00%
0.02% 10.00% 19.44 - 10.00% 19.44 90.00%
0.04% 10.00% 46.98 - 10.00% 46.98 90.00%
Page 8 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
4.48% - - 0.00% - 100.00%
1.83% - - 0.00% - 100.00%
18.57% - - 0.00% - 100.00%
10.67% - - 0.00% - 100.00%
0.60% - - 0.00% - 100.00%
1.14% - - 0.00% - 100.00%
0.38% - - 0.00% - 100.00%
Page 9 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
1 General Requirements
1.1 Mobilization / Demobilization 1 lot 28,736.26
1.2 Technical Supervision 1 lot 28,736.26
1.3 Overhead Manpower 1 lot 43,104.38
1.4 Testing and Commissioning 1 lot 19,157.50
Page 10 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
Unequal Tee 300mm(W) x 300mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.10 1 pc 689.67
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Unequal Tee 300mm(W) x 500mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.11 1 pc 689.67
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Unequal Cross 500mm(W) x 500mm(W) x 200mm(W) x 200mm(W) x 100mm(H) with Cover,
2.12 1 pc 689.67
Color Gray, Hot Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Inside / Internal Riser 450mm(W) x 450mm(W) x 100mm(H) with Cover, Color Gray, Hot Dipped
2.13 3 pcs 2,069.01
Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Straight Reducer 600mm(W) x 450mm(W) x 100mm(H) with Cover, Color Gray, Hot Dipped
2.14 3 pcs 2,069.01
Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Outside / External Riser 450mm(W) x 450mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.15 3 pcs 2,069.01
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Unequal Elbow 450mm(W) x 600mm(W) x 100mm(H) with Cover, Color Gray, Hot Dipped
2.16 3 pcs 2,069.01
Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Outside / External Riser 200mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.17 2 pcs 1,379.34
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
Equal Tee 200mm(W) x 200mm(W) x 200mm(W) x 100mm(H) with Cover, Color Gray, Hot
2.18 2 pcs 1,379.34
Dipped Galvanized, Connectors, Carriage Bolts, Nuts and Washer
3 Roughing - Ins
3.1 Angle Bar 1 1/2" x 1 1/2" x 4mm x 6m 90 pcs 17,069.59
3.2 Stainless Bolt & Nut w/ Washer 1" x 3/8"Ø 2500 pairs 3,879.45
3.3 EMT Pipe 3/4"Ø 70 pcs 5,057.08
3.4 EMT Pipe 1"Ø 70 pcs 7,070.86
3.5 EMT Pipe 1 1/2"Ø 20 pcs 3,465.13
3.6 EMT Pipe 2"Ø 10 pcs 2,281.12
Page 11 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
5 Devices
5.1 Isolation Switch 20AT, 3P+G, 440V 59 sets 61,035.81
5.2 Isolation Switch 70AT, 3P+G, 440V 4 sets 4,138.02
5.3 Isolation Switch 100AT, 3P+G, 440V 4 sets 4,138.02
5.4 Isolation Switch 125AT, 3P+G, 440V 2 sets 2,069.01
5.5 Control Switch 69 sets 95,174.48
Prepared by : Noted by :
Page 13 of 22
Project Packhouse, Loading/Unloading Area, Cement SILO (Part1)
& Packing MCC Room Trench Cable Ladder
Location Porac, Pampanga
SUB-CONT Edgar Garcia
Subject : Progress Billing #1
Date : February 6, 2017
CONTRACT
ITEM NO. DESCRIPTION OF WORK QTY UNIT
AMOUNT
Page 14 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
Page 15 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
Page 16 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
0.06% 10.00% 73.58 - 10.00% 73.58 90.00%
0.18% 10.00% 216.64 - 10.00% 216.64 90.00%
0.05% 10.00% 65.55 - 10.00% 65.55 90.00%
0.04% 10.00% 53.51 - 10.00% 53.51 90.00%
0.03% 10.00% 30.09 - 10.00% 30.09 90.00%
0.04% 10.00% 50.82 - 10.00% 50.82 90.00%
0.02% 10.00% 25.69 - 10.00% 25.69 90.00%
0.01% 10.00% 16.86 - 10.00% 16.86 90.00%
0.06% 10.00% 75.37 - 10.00% 75.37 90.00%
0.07% 10.00% 85.30 - 10.00% 85.30 90.00%
0.05% 10.00% 58.80 - 10.00% 58.80 90.00%
0.05% 10.00% 54.86 - 10.00% 54.86 90.00%
0.12% 10.00% 138.50 - 10.00% 138.50 90.00%
0.21% 10.00% 250.32 - 10.00% 250.32 90.00%
0.11% 10.00% 126.94 - 10.00% 126.94 90.00%
0.09% 10.00% 111.32 - 10.00% 111.32 90.00%
0.11% 10.00% 127.39 - 10.00% 127.39 90.00%
0.10% 10.00% 118.71 - 10.00% 118.71 90.00%
0.04% 10.00% 44.85 - 10.00% 44.85 90.00%
0.06% 10.00% 71.23 - 10.00% 71.23 90.00%
0.17% 10.00% 205.52 - 10.00% 205.52 90.00%
0.16% 10.00% 191.47 - 10.00% 191.47 90.00%
0.42% 10.00% 503.06 - 10.00% 503.06 90.00%
0.02% 10.00% 19.44 - 10.00% 19.44 90.00%
0.04% 10.00% 46.98 - 10.00% 46.98 90.00%
Page 17 of 22
PREVIOUS ACCOMPLISHMENT THIS PERIOD PRESENT ACCOMPLISHMENT
% WT % BALANCE
% AMOUNT % AMOUNT % AMOUNT
4.48% - - 0.00% - 100.00%
1.83% - - 0.00% - 100.00%
18.57% - - 0.00% - 100.00%
10.67% - - 0.00% - 100.00%
0.60% - - 0.00% - 100.00%
1.14% - - 0.00% - 100.00%
0.38% - - 0.00% - 100.00%
Page 18 of 22
PROJECT ALL HOME CDO DATE OF BILLING
SUB-CONTRACTOR Edgar Garcia
LOCATION CAGAYAN DE ORO
CONTRACT AMT. PHP 1,900,000.00
P.O. NUMBER 2018-003-SC
570,000.00
June 7, 2018 1 40.00% 40.000% 760,000.00 1,900,000.00 228,000.00
July 2, 2018 2 40.00% 80.000% 760,000.00 1,900,000.00 228,000.00
July 19, 2018 3 15.00% 95.00% 285,000.00 1,900,000.00 85,500.00
August 8, 2018 4 5.00% 100.00% 95,000.00 1,900,000.00 28,500.00
Ariel O. Basa
July 19, 2018
DEDUCTIONS
NET
REMARKS
10%RETENTION OTHERS COLLECTIBLE
76,000.00 456,000.00
76,000.00 456,000.00
28,500.00 171,000.00
9,500.00 57,000.00 COLLECTIBLES
1,140,000.00
PROJECT ALL HOME CDO - ADDL ELECTRICAL WORKS DATE OF BILLING
SUB-CONTRACTOR Edgar Garcia
LOCATION CAGAYAN DE ORO
CONTRACT AMT. PHP 350,000.00
P.O. NUMBER 2018-019-SC
Ariel O. Basa
August 20, 2018
DEDUCTIONS
NET
REMARKS
10%RETENTION OTHERS COLLECTIBLE
350,000.00