Reliability Enhancement of AV-GU Chlorine Line

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

Reliability Enhancement

of AV-GU Chlorine Line

Prepared by :
Muhammad Saim Khan
Dated:7th Dec 2018
Introduction

Concern
Frequent leakages on non-
metallic piping.

Objective
Mitigation of Chlorine/hypo
leakages by finding a reliable &
better alternative to AV-GU

Scope
Scope of this project is to
evaluate and analyze
advanced/better substitutes to
AV-GU piping and come up with
the best suitable one
Agenda

Non-Metallic
Piping in Area 1 5 Failure Analysis

Service Fluid Substitutes to


Characteristics 2 6 AV-GU

AV-GU 3 7 Quality Controls

Current Condition
of Line
4 8 Action Plan
Leakage History
Non-Metallic
Piping

Sodium Hypo Hydrochloric


Chlorine Brine
Chlorite Acid

18

16
3
14

12
Chlorine
10

8 12 Hypo
6 0
4 HCl
5 1
2
3
2
0 1
0
AV-GU CPVC-FRP CPVC
Service Fluid Characteristics

Service
Wet Chlorine Gas

Carbon Di
Parameters Water
Oxide,
Vapours,
❑ Temperature: 87 c 14 % 0.11 %
❑ Pressure: 16kPa
Oxygen
❑ pH: 3.5-4 (Acidic) 0.18%

Chlorine,
85.71 %

Reaction
What are AV pipes?
 Composition:
❑ Base material
❑ External surface

 AV Types:
❑ SU Type

❑ GU Type

 Structure of AV-GU Pipe:


❑ Rigid (PVC Pipe)
❑ Surface-treated portion
❑ Special primer
❑ FRP Layer
❑ Finished surface layer
FEATURES OF ASAHI AV-GU Pipes

Excellent chemical resistance


1
Greater mechanical strength
2
Good external heat resistance
3
Light weight
4
Low coefficient of expansion
5
High Temperature Differential
6
Current condition of AV-GU Line

 Total Leakage Areas: 7


❑ PVC Box Installed : 5

Leakage Areas on AV-GU Chlorine Line


In-Adequacy

Improper Pipe Supports

Improper Routing of Pipe (A-1400 Entrance)


Failure Analysis
Operational
Reason 1
Variation
In-adequate Fabrication
Reason 2
Techniques

Reason 3 No Design Review

Improper Piping
Supports Reason 4
Dis Advantages of AV-GU

HIGHLY SKILLED
DEPENDABILITY
LABOR REQUIRED

MINIMAL MARGIN
LONGER LEAD TIME FOR ERROR WHILE
FABRICATION

LOW LIFE AFTER


DIFFICULT REPAIRING
BUILD-UP
Compatible materials with CGW
CPVC/UPVC-FRP
Composites
FRP

CS-PTFE

Lined Pipes CS-PVDF


Wet Chlorine Gas

CS-PP
Very Expensive
Titanium

Metals Tantalum

HASTELLOY® C-22
FRP Pipes
 Advantages:
❑ Economical(Cost Effective)
❑ Corrosion Resistant
❑ High Strength
❑ Lightweight
❑ Temperature Stable
❑ Excellent Flow Characteristics
❑ Size Variety
❑ Custom Manufactured
❑ Abrasion/erosion Resistant
CPVC/UPVC + FRP Pipes
 Advantages
❑ Long-term reliability
❑ Corrosion resistant
❑ Lightweight, easy to transport
❑ No flame used for joining
❑ Economical (UPVC > CPVC)
❑ High temperature differential
❑ Pressure rating (CPVC > UPVC)
❑ Mechanical strength (CPVC > UPVC)
❑ Widely used in Chlor Alkali Plants e.g. GE Industrial Plant
Evaluation of Alternatives
Alternative Weightage CPVC + UPVC + FRP AV-GU
FRP FRP
Leadtime 0.15 7 5 6 4

T&D 0.2 8 8 6 3

Repair & 0.175 8 8 9 4


Maintenance

Spares 0.15 9 9 8 4
Availability
Benchmarking 0.10 9 5 3 5

Reliability 0.125 8 4 5 9

Economical 0.10 7 8 9 4

Overall Score 1.00 8.0 6.9 6.7 4.525


Quotation (CPVC-FRP)
Potential Vendor : HENGSHUI JRAIN FRP CO. LTD

Unit Total
Item Description Qty
Price Price
Pipe 18'' .. Specification : SCH 80. Material : CPVC. ASTM F-441 Length: 06 Meter.
1 (including FRP outside) 13 $ 5630 $73,190
Elbow Pipe Fitting.. 18'' Specification: 90 Degree, SCH 80. Material: CPVC (including FRP
2 outside) 6 $ 2215 $13,290
Flange 18'' , Matl PVC, Grade CPVC, Conctype SW, Lap Joint, , Rating 150#, Stud ANSI
3 B16.5, ANSI B 16.5 (including FRP outside) 12 $4461 $53,553
4 Fitting - Socket - 18'' CPVC Sch. 80 (including FRP outside) 16 $915 $14,640
Elbow Pipe Fitting.. 18'' Specification : 45 Degree, SCH 80. Material : CPVC (including FRP
5 outside) 4 $2040 $8,160
6 Welding Rod 30KG $65 $1,680
7 Packing and Port Charge in China and Sea Freight to Karachi $3000
8 On site joining and FRP lamination service for the joints (around 1 month) $18000
9 Jrain team’s travelling charge $12000
Total Price $197,512
Benchmarking
Quality Controls
Workmanship skill
improvement

PVC-FRP
Material quality
Fabrication/Leak Test
verification
Standardization

Engineering Adequate pipe


Simulation & Supports
Analysis
Action Plan
Material Lead Time
Selection

04
Proposals review finalization
and strategy &
finalization as Budget Approval

03
per stress
analysis results Waiting for FAO
from AKCC for Pipe
fabrication and
3D Modelling for
Stress Analysis
and Pipe Routing 02 installation

01

You might also like