Description Length (m) Depth (m) Width (m) Volume (m3) Remark

Volume of 2 x 200mm 0.800 0.500 1.000 0.400

Volume of 2 x 150mm 0.700 0.450 1.000 0.315

%age decrease 78.75%

Schedule of Rate breakdown

Description Labour Plant Material Basic Rate OH &P Total


10% 20% 50% 80% 20% 100%

BOQ Rate 18.91 37.82 94.56 151.29 37.82 189.11

New Rate 14.89 29.78 25.47 70.14 17.54 87.68

Material price
Annual Leave
From To D/ce
Saturday, May 18, 2019 Thursday, May 30, 2019 13

Thursday, May 16, 2019 Thursday, May 30, 2019 15

Monday, November 25, 2019 Thursday, December 12, 2019 18


Size 1 900 600
Size 2 1600 2160 A2/A1 6.4

15% 10% 55% 80% 20% 100%

D1-4C/19D 620.55 413.70 2,275.35 3,309.60 827.40 4,137.00

New 3,971.52 2,647.68 10,800.00 17,419.20 4,354.80 21,774.00