NHAI/PIU-GZB/DME-II, Ill & 1V/12021 ICON/2019/8-/ 42%, Dated: 18.07.2019
To,
(i) M/s Apco Chetak Ultraway Pvt. Ltd.,
B-9, Vibhuti Khand, Gomtinagar, Lucknow (U.P.).
(ii) M/s Apco Chetak Expressway Pvt. Ltd.
: Project Office: NH-24, Near Rama Medical College,
Village-Lakhan, District Hapur (UP)-245304
> (iv) M/s G.R. Infraprojects Ltd.
* Dasna - Meerut Expressway Project
, Km. 10 of ODR 148, WModinagar-Hapur Road,
Village Bhojpur, Tehsil-Modinagar, Ghaziabad (U.P.)
, Sub.: Development of Delhi-Meerut Expressway project in the State of Delhi and
Uttar Pradesh-reg.: Status Tracking for ETC & WIM system at NH Toll
> Plazas. f
Sir,
) Please refer to NHAI, HQ letter no. IHMCL/HETC/IMPL./2019/1014 dated
09.07.2019, which is self explanatory.
‘ 2. In this regard, it is requested to take necessary action into the matter and
submit compliance ‘report in prescribed format on subject cited above at the
earliest
Encl.: As above.
r (R.P. Singh)
? General Manager (T)/ Project Director
, Copy for information & necessary action to:
1. M/s GETINSA-Euro., S.L., Segmental Consulting & Infrastructure Advisory
, Pvt. Ltd., Mangalam: SK 111, Shashtri Nagar, Ghaziabad,
2. Ws LEA Associates South Asia Pvt. Ltd., 80-273, Avantika Colony, District
, Ghaziabad (U.P.)
) 3. Authority Engineer, M/s Centra de Estudios de Materiales y Control de
Obra, SA in association with Vaishnavi infratech Services Pvt. Ltd.
gamaa dhs Gd 6, Gace -10, area, 7 Pe-110075 gee : 011-2507 410074200
Head Office ; G-5 & 6, Sector - 10, Dwarka, New Delhi - 110075 Tel.; 011-2507 4100/4200
age @ aa, ere a Prater */Building a Nation, Not just Roads
Sect espeerinstenicinsttenaeref usta asrart feet
NATIONAL HIGHWAYS AUTHORITY OF INDIA
‘a toes ate Tat eT)
(uivistR¢ OF ROAD TRANSPORT &HIHHIAYS)
5 was, tae, wee, aE Reet i10078
0.580, S6TOR9, OWARKA, NEW DELMti0073
arate ere, antec.
weet a)
Asheesh Sharma, 13s.
‘Mambor (Finance)
ITol{O) 01. 25076830
[MU / Tl Ext. : 01 250741002001 820
Sra Fax ori.astsa842
ambecinance@nhal.or,mfinahal@amall son
rues Webel:
\eanunhaorg
THMCI/HETC/Imply2015/ J 14 July 09%, 2019
To,
AIICGM{(1}s of Tech, Divisions at HO
Sub; Status Tracking for BTC & WIM Systems at NH Toll Plazas
[As you are aware National Electronic Toll Collection (NETC) programme is a flagship
progcamme of MoRTH ancl a Key component of PMO’s Digital Indin Drive, To ensure Pest
EagTag users experience and convenience, iti essential that ETC Infrastructure i installed and
propery Funetinal at toll plazas. inorder to monitor the performance of ETC infrastrucke att
nz, fis essential that certain key parameters pertaining to ETC infrastructure of toll plazas
Packed and closely monitored at respective CGM(T}-Level. Accordingly, the following key
parameters have been identified which are requized to be regularly monitored by concemes
CGM(T)s head Tech. Divisions at HO:
{Implementation of Hybrid ETC (HETC) system-Completion of installation of Hybrid ETC
system comptising all equipment in each lane at toll plaza;
(it) Proper functioning of HETC System-Ensure proper functioning of critica! equipment of
Hybrid ETC system such as RFID readers, AVCC system, License plate capture camera aul
Incident capture camera in all lanes;
(ii Completion of prerequisite civil works - Ensure toll plaza readiness for instalation of
FIETC system and take needful action to complete any pending civil dependency work
affecting smooth Hybrid ETC system implereentation at toll plaza
(io) EASTag Express Lane-Ensure all toll plazas have atleest one dedicated lane "FASTag
Express/No Cash Lane” in exch direction and ake measures to ensure that no cash vehicles
are allowed in “FAST ag Express/No Cash Lane"
{o) Proper installation of REID Readers/Boom Barrier in "FASTag Expresy/No Cash Lane”
Ensure that boom barriers are properly installed before approach to toll booth (Le. stat of
‘median extension) in all "ASTag Express/No Cash Lane” and others are dizected to adjacent
Cash/Hiybrid Lanes.
(00 Installation of Overhead Sign Boards - Bach lane at toll plaza should have Overhead sign
boards for “FASTag Express/No Cash", “FASTag/Cash” and “Cash Only” lanes as per
NHAIs Ciscular No. NHAI/CO/2019 dated 09.01.2019;
(vif) FASTag/ETC Traffic Penetration - Monitoring of ETC taffic penetration of ench toll plazas
giving out ETC Traffic Count vs. Total Traffic & ETC Revenue generated vs. Total Revenue;
and
(iti) Availability of Point-of-Sale (POS) for FASTag Issuance - Each Toll Plaza should have at
Teast 1 Point of Sale for FASTag issuance through issuer bank uncer NETC prograznme.
yo ‘q___ The format for monitoring of above parameter is enclosed at Annex.
oo
ae UL
wm Lg
% bea yet yl4
YK wet
”
uy: C Ne a
ohh)
Contd...2-2. (rset ned apy ft: na 200208 CO Don ect
‘nbee) to install Median Speed Weigiin-tion (SWIM) Systems using tending ste
teciology tall dedicated fiybrid ETC Lanes and one Static Weigh Brig (SWB) In exch
Girton ata all laas. ROs were also instucted to ssue COS to the Contacors/
Conessionaie, frei. Howavey has come to otc thatobolte ecole (ike oad
cell based) whch equine exieeive Gil werks an protnged ane closures ae ail use. Also,
the WIM Syste isnot integrated with the Tol ManageneatSafwace thereby retulting in nat
propery capturing the numer of overtoaded vehises crossing the toll Pasa. Hsce, the
information on nsallavon and frctoning of WIM Stems all play nas to e obsited
from PDs inte fllowig format and monitored by concermed CGM aaa
S [Type oT Coto [Bate at Ay Waar Waar WI
No | ples Gist | inttation | fstalied at Toll | weed by WIst| Syaem
{Concessions Work in fot Wint | Placa coud Cell | Sytem feos per | integrated
Public Funded cos bseiy ‘Bending | aotdcton ak | Toll
Polebawd) | 16072018 & % | Meragenent
Eidos eta Toad | Sottmare
Const teed | expt sa pe
‘Ebtensures Dep | 25083018,
ee oo WIM staied |
3. A presentation on the above-mentioned key parameters of ETC and WIM Systems at NHL
toll plazas shall forin pat of review by Executive Committe of NHA in evety 28 EC Meeting of
cn Teton eects pry Cem (D
Secretariat, NHAL
4 _In view of above, you are raquasted to take necessary actioh and ensure that the above
‘mentioned parameters are monitored of the toll plazas under your jurisdiction which will enbance
the performance of ETC System and the satisfaction of FASTag users besides controlling the
overloading.
Encl. As above. : gj
(ASKecoh Shams)
Member (Fin CMD, IHMCL
wage
it! ARO gat te inspection por of PDs cory woth ah formats ed to CGMCT)
or.
(2 AULPDs-tingpct ETHAN fasten eae Tl Paz every month & subi part
Roe
in Coo.tinact
enptinaLien tall Le duderantal i EC Healing
a ebevt. The sl ce
ea aoja(e-30pm) «PL pratida tytn Hp yon der My
Canreslidslid snrenetion Aeqre EC
Ievor.asings CGM (C9) pee Atri :
GS sferlis
AMA CG@IN(7) Aaainng UR Tech Bie iS
car co) Fe purse & get daisy rem Teer dee/car(r)
” ~
coo, CANCEKey Parameters toMonitor ETCinfra at Toll Plazas
id ETC (HETC) Implementation Status
‘Type of Toll Plaza Number of Toll plazas live on ETC | Number of Toll plazas not live on ETC
Concessionaire
Public Funded
Total
{8) Functioning status of ETC Equipments Lee Se
License Plate Capture | Incident Capture
AFIO Reader Avec System jack ‘ene
sno, | TYPEOtTol
fecal Total Total Total Total Total Total Total Total
Instatied | Functioning | Installed | Functioning | Installed | Functioning | Installed | Functioning
1 | Concessionaire
2. | Public Funded
Total
{C Givi Dependencies at Tol Plaxes
ame of on | ,_ We ofall Plaza mae
sno, | NameotToll | iconcessionsire/Publi era Status on completion of Civil Dependency
Funded) pee
7
z
Total
__{D) FASTag Express Lane Status i
Number of Toll Plaza with FASTag | Number of Toll Plaza with no FASTA,
S.No. I Plaza
Ayes ot Tol tl Express Lane Express Lane a
a Concessionaire
2 Public Funded
Total
- (6) Boom Barrier Status in all L way
S.No. Type of Tol Plaza bepress Lane where boom barriers | Express ane where boom barirs
are ahead are not ahead
7 ‘concessionaire
2 Public Funded [
Totalsrhead Signage Board Status in all Lanes
7 | Number of Toil plazas with FASTag | Number of Toll plazas withFASTag |
> ‘Type of Toll Plaza | Express Lanehaving FASTag Signage Express Lanehaving noFASTag
: Beards inal nes Signage Soards in alles
7 coneeiarae
fi 2 Public Funded
, / a
(G) ETC Penetration Z
> a
Toualpizes [Totals | TotlPlzas | Toll Plnas | Tol Pass
3D | gyo,| Tweotton | whereete | whereerc | whereerc | whereete | where ere
Maza | Teaflepenctation | Tffereneratin | Trafterentration | TaePenetatin | Tathhenstrson
> 0%-10% 10%-20% 20%-309%6 30%-40% 40%-50%
> a [eee
[abraded
> Total
3 fs i
LH Pintot Ste (POs) seta statue
['sno. | Tottnumber of otpias | _Mumberof tps with POS | Number of tol plaza with no POS
> 1 Concessionaire ae |
9 Ce rae ranaed
Tosa |
: i
>
5
>