A. Power layouts:
B. Lighting system:
1. Provide two double R45 socket (Tel and CATV) for living room areas instead
of two single.
2. Provide Video intercom systems and consider the following points:
• Accesses control system for the ground floor MIAN ENTRANCE lobby area
entrance through the video intercom system.
• Accesses control system for the basements floor MIAN ENTRANCE lobby
area entrance through the video intercom system.
• Passwords/accesses cards for the intercom panel to control the entrance
door.
• Push button for the lobby area, Magnetic lock.
• Buzzer with timer for the ground floor main entrance.
• Main Intercom panel locations W/P IP54 and update the schematic and
drawings accordingly.
• Provide video intercom station for watchman room.
3. Add the following comments to the CCTV drawings: CCTV system shall be as
per latest MOI (MCC) regulations.
4. Provide CMS system and schematic diagram as per Estidama requirements.
Elec Part 2
Description
1. Assure that the architects have considered the filling line and main supply
pipe for each APT. on their elevation.
2. Provide GAS switches for all apartments inside the lift lobby area with
cabinets for NG/SG systems.
3. Provide CDA approval.
Elec Speci
Description
6- The submitted summary sheet should indicate the sensible loads of selected units
7- Staircase pressurization calculation shall also take into consideration the required
air flow throw closed doors
LOM ELEC
Description
1. E21, E22: one of the proposed brand not equivalent to the other, provide
three or more available equivalent brand names for the light fittings and
match it with the design requirements Ex.: (Thorn / Europe, Philips/ Europe,
WhiteCroft/ Europe, Targetti / Europe, Ensto/ Europe, Sylvania Concord/
Europe, Etc…
2. E39: one of the proposed brand not equivalent to the other, revise and
provide three available equivalent brand names for central battery system.
3. E40: one of the proposed brand not equivalent to the other, revise and
provide three available equivalent brand names for Voice Alarm and
Evacuation system.
4. E43: one of the proposed brand not equivalent to the other, revise and
provide three available equivalent brand names for fire alarm system.
5. E44: one of the proposed brand not equivalent to the other, Emergency
lights brand names shall be the same of central battery brand names if
central battery system is applicable.
6. E45: one of the proposed brand not equivalent to the other, provide three
available equivalent brand names for CO system.
LOM MEC
Description
4- HVAC 29, 32 and 33 ensure that the proposed 3 vendors can supply black steel
seamless pipes and fittings
5- F1 Armstrong doesn’t have civil defence approval for vertical turbine pumps
6- Verify the fire fighting vendor list and provide valid 3 vendors for each item
Ventilation drawings
General
1- Lift pressurization duct to be omitted since the building is less than 90 m height,
supply at the top of the shaft is enough
2- Corridor Smoke management strategy to be revised, reversible fans to be
replaced by smoke extract and make up air fans in line with latest UAE code
3- All retails and GYM washrooms flow rates to consider the public use figure as
listed in ASHRAE 62.1
Basement 2
1- Update the notes related to ducts fire rating requirement, both extract and
supply air ducts in the car park shall be fire rated
2- Coordinate the route of car park ventilation supply and extract with AWMS pipe
and all other MEP services maintaining minimum 2400 mm FFL
4- Duct sizes , extract and supply grilles shall be sized at high speed, face velocity
through grilles to comply with UAE fire code
5- Update the text at grid (0,16) both ducts should be make up air ducts
Basement 1
1- Update the notes related to ducts fire rating requirement, both extract and
supply air ducts in the car park shall be fire rated
4- Extract rates from toilet shall consider the public toilet use 25 cfm is undersized
5- The route of treated fresh air and extract ducts in the ramp to be coordinated
with available height, otherwise alternative route to be proposed
Ground floor
1- Indicate the size of intake and exhaust louvers and the required free area
3- Shops washroom extract rates to follow ASHRAE 62.1 2007 for public toilets
4- For GYM VAV system, please clarify how the minimum
ventilation
Residential floor
2- Extract risers shall be combined in one common duct where possible for cost
saving, the use of two extract ducts adjacent to each other is not required
3- Corridor smoke management ducts shall not be routed inside the apartments,
relocate to the shafts located adjacent to corridors
4- Corridor smoke management shall be supply at low level and extract at high
level, reversible fans to be avoided
Roof
2- Coordinate the location of FAHU, please note such FAHU height can exceed 4 m.
ensure the same is coordinated with architect
Description
Air conditioning
General comments
2- Verify the diffusers sizes and ensure acceptable pressure drop, noise level while
selecting
3- Add note to all drawings, volume control damper shall be provided for every
diffuser
4- Shops cooling and ventilation provisions shall consider restaurants and cafeterias
use
5- Fire dampers shall be provided on supply and return grilles and diffusers not only
on supply for all fire rated walls ( telephone, CCTV, electrical rooms …etc)
6- Omit the schedules provided for diffusers, the pressure drop in some occasions is
under estimated to avoid and contractual obligations. Add note that contractor to
select all diffusers based on acceptable pressure drop, air velocity and noise levels
and in coordination with architectural approved false ceiling layout
Basement
1- Verify the diffusers sizes 275X275 diffuser cannot handle 200 cfm
2- Electrical and service room to be served by a dedicated FCU with fully ducted
return, having the return to an unconditioned space will not work, more over the
lobby is fire rated compartment and civil defence will not allow to have permanent
opening as well as the humidity issues associated with having such openings
3- ETS room size and configuration to be approved by tabreed. Clarify the location
of MCC panels/room and ensure that Tabreed approves locating them inside the
ETS
6- Chilled water pipe sizes shall be sized at maximum pressure drop of 250 Pa/m
Ground floor
1- Indicate the location of swimming pool heat pump and coordinate with architect
and electrical all the requirement and provisions
2- Balance the AC and extract air flows for shops washrooms to maintain negative
pressure. Note that no return is allowed from washroom back to FCU
3- There is part of ground floor plan missing, clarify if there is any requirement for
AC or ventilations (swimming pool area)
4- Clarify the need of using circulating AHU with VAV boxes in the gym, since the
RCP layout is all removable ceiling tiles we believe FCU will be easier option in terms
of controls, moreover, ensure that with the VAV system the minimum requirement
of ventilation is met at part load
5- Coordinate the ceiling height and accessibility of circulating AHU above the
bathrooms and ensure adequate maintenance space is allowed ( could not be
verified since RCP drawings have no levels indicated)
8- Indicate size and air flows for GYM diffusers and ensure acceptable quantity and
sizing
9- Balance the AC supply and extract rate in all bathrooms and maintain negative
pressure
11- Provide motorized fire dampers on supply and return ducts serving HV and LV
rooms, interfaced with clean agent control panel
12- Size and number of slot diffusers in main entrance to be verified the pressure
drop will be high
Residential floors
1- Slot diffusers in the lobby are undersized resulted pressure drop is around 36 pa
2- Add note on drawings all diffusers to be provided with volume control damper
3- BTU meter shall be installed outside the apartment in a fully accessible area
4- PICV is not required at the main branch of each floor and it should only be
installed on FCU. Replace with gate valve
5- The AC distribution and control in three bedroom is not accepted. VAV boxed to
be cancelled. Individual fan coil unit to be provided for each bed room. Maid room,
kitchen and living room to be served by one FCU. Update drawings and schedules
accordingly
6- Fan coil units to be removed from staircases as it is not accepted anymore by civil
defence
7- The size of Chilled water main branch and sub branches is undersized and
resulting high pressure drop
Roof
5- Provide drip tray insulated from the bottom side below the FCU installed in the
telephone room. Installing the unit inside the room is subject to electrical engineer
and authorities approval
4- Verify the FCU branch size ( all FCU’s has 25mm size regardless to flow)
Control schematic
1- Mention clearly that thermostat and PICV actuators are modulating type
3- Add BTU metering central billing system this system shall be stand alone and not
combined with central monitoring system related to Estidama requirement
Equipment schedule
2- Remove the note related to valve authority from FCU schedule, 0.5 authority is
not accepted since PICV is utilized
3- Add off coil dry and wet bulb temperature for fan coil units schedule and
maintain maximum 13°C off coil for better dehumidification
4- The cooling capacities, chilled water and air flows were not verified due to
missing HAP calculations
5- Add not clearly stating that all thermostats shall be modulating type
6- The temperatures used for horse shoe heat pipes are not achievable 10 degress C
drop cannot be maintained we thus in inlet temperature for the cooling coil shall be
higher and cooling capacity of FAHU to be revised
7- Reversible smoke management fans to be omitted, comply with UAE fire code
requirement and provide corridor smoke management with supply from low level
and extract from high level at fire floor
8- The drawings indicates VAV boxes but it is not shown in equipment schedule,
however, refer to comments on drawing and check if VAV schedule will be required
or not
Standard details
Description
3- Fire hose cabinet shall not exceed six meters from staircase door
WS
Description
3- GRP basement tank shall be provided with partition all pipe configuration to be
adjusted
4- The water tank shall be vented outside the pump room to avoid excess humidity
8- Swimming pool area water supply (if any) is not provided, no drawings submitted
for this area
DR
Description
Drainage
Basement 2
1- Since the pipes are buried replace all catch basins in the lower basement with
manholes with covers. Every change in direction or connection between pipes must
be via new manhole. Store drainage to be updated, floor clean out to be omitted.
Manholes to be used
2- All catch basins shall be replaced with manholes with heavy duty gratings
3- The angle between the manhole inlet pipe and the outlet pipe should not be less
than 90°
4- Provide floor drain in the service room and connect to the waste water system,
dedicated sump pit to be omitted
Basement 1
5- The drainage of swimming pool area is missing no drawings provided for that
area
Residential floors
1- The routing of balcony drainage inside the apartments is not accepted. Dedicated
shafts to be used, moreover, balcony drains shall be connected to storm water
system
2- The routing of balcony drain stack inside the columns is not accepted
3- Provide dedicated drainage shafts for kitchens. Long pipe routes to be avoided
MEC SPECI
Description
1- Mechanical specifications shall comply with CSI format division 15 for numbering
and index the proposed numbering and aragraoh are wring and in many occasions
have the wrong content
2- 15010, Internal Design Conditions, Design criteria for indoor and outdoor
conditions is not matching the drawings, calculations and equipment schedule
3- 15010: Mention clearly that –Warranties for all mechanical equipment shall
comply with ADCE standard construction contract schedule 9”
4- 15010 Include noise criteria for the critical compartments (Bedrooms, living
rooms, lift lobby, stores, and plant rooms).
5- Section 15050- Item 2.8: U values shall comply with ESTIDAMA requirement and
architectural drawings
6- 15070, Mention that all adhesives and lining should be non-flammable and fire
proof comply with BS 476-7 and local civil defence requirement
7- 15080, Mention clearly the density, thickness and thermal conductivity for
internal and external ducts and pipes
8- 15080, mention clearly that canvas and coating shall be provided for internal and
external pipes and ducts regardless to the insulation type
9- 15080, we donêt recommend the use of rubber insulation for chilled water pipes,
however, if rubber insulation is to be adopted it should be with factory applied
aluminum foil and shall be further protected with canvas and coating for internal
and external chilled water pipes, the same shall be clearly reflected on standard
details
10- 15080, Mention that all adhesives and lining should be non-flammable and fire
proof comply with BS 476-7.
11- 15105 add section for PEX pipes for hot and cold water supply embedded in the
walls
12- 15105 provide summary schedule for pipes specified in the project
13- 15110- we recommend the use of fixed orifice double regulating valve for
chilled water balancing
14- 15110- we highly recommend the use of pressure independent control valve
instead of double regulating valves and two way control valves for higher valve
authority and better thermal comfort
15- 15130 The specification is showing constant speed pump and the detail drawing
is showing two way control valves on the FCU and FAHU so define the system used
and give a brief system description. Chilled water pumps shall be variable speed
16- 15130, the specification asks for horizontal split case pump while the equipment
schedule indicate end suction pumps, please update as necessary
17- 15130, pump motor shall be TEFC
18- 15130, pump efficiency shall not be less than 75%
19- 15315- fire pump type is not applicable to the project, update to vertical turbine
type
20- 15315, Fire pump Electric motor shall be TEFC
21- 15350-2.2.4 sprinklers in residential application shall be rated to 68çC refer to
UAE code and comply with temperature rating for each space ( office, apartment,
kitchen and basement) rating temperature shall vary according to the space
22- 15360 add section for pre-action system as it will be used in lift machine room
23- 15360 (Pre-engineered fire suppression system), add section for automatic
clean agent system, Foam extinguishing system, water mist system, water spray
system Äto match the drawings
24- 15440, All water supply pumps motors shall be TEFC
25- 15440, add section for sump pump
26- 15440, add section for circulating pump
27- 15440, add section for filtration pumps
28- 15440, all pumps shall be arranged in duty + standby configuration with
provision for automatic changeover in normal operation to minimize running hours
and in case of failure of duty pump
29- 15440 specify clearly the required construction of pumpsê components
including but not limited to pump casing, impeller, shaft, bearing, mechanical seal
and motors
30- 15620, each chiller shall be subject to a factory performance test simulating site
conditions at full and part load
31- 15620- Compressor shall be provided with discharge service shutoff valve
32- 15620- Compressor shall be provided with factory applied acoustic enclosure
33- 15620- capacity control of chiller shall not be limited to solenoid valve control,
alternative option such as variable speed compressors shall also be accepted
34- 15620- cooler shall be cladded
35- 15620-MCHX condenser coils shall be provided with factory applied coating
suitable for installation in coastal environment
36- 15620- 10 years warranty on condenser coating to be provided
37- 15720 specify clearly in the description all components of the FAHU (intake
dampers and louvers, het recovery wheel, horse shoe heat pipes, supply and extract
fans, cooling coil Äetc)
38- 15720- FAHU shall be constant speed and should not be provided with VFD
39- Section 15720: Dual fan motors arranged as 1 Duty + 1 Standby shall be
provided at Exhaust and Fresh air supply sides
40- 15720, Specify clearly the sheet thickness of internal and external skin
41- 15720, Fresh air handling units shall be Eurovent certified
42- 15760, Specify clearly the thickness of FCU sheets
43- 15760, cooling coil shall be 4 rows 2 pipes for concealed ducted FCUês and 3
rows minimum for decorative FCU
44- 15810 Omit any specification for duct insulation and add reference to section
15080, to avoid confusion
45- 15810, add section for fire rated ducts
46- 15810, mention clearly that car park ventilation ducts and smoke management
ducts shall be fire rated or shall be 1.2 mm thick regardless to duct size
47- Section 15830: Mention clearly specification for pressurization fans, smoke
extract fans and car park fans
48- 15830, mention clearly that all carpark ventilation fans and smoke management
fans shall be rated at 400 _C for 2 hours
49- 15395 BMS is not applicable
50- Add section for BTU metering and centralized billing system
51- Add to contractor scope emergency operation contract (EOM) for the swimming
pool specialist during the DLP
52- Add to the conract scope emergency operation contract (EOM) for the natural
gas specialist