Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Maintenance Daily Report

Date: 06-Jan-2019 Day: Sunday Elect Maintenance Signature:


Weather: Sunny Temperature: 36/18 °C Inghon
■ Today's Activity ■Weekly Schedulle
o Check Cooling Fan Main Transformer ( Setting Overload : 0.6 Amp ) ○ Finallization of all Unit Test
Nominal Current on Nameplate : 0.5 Amp o Monthly Inspection
o Print out of Drawing and accessories : Hoist Crane Grip, MTR, Aux Trafo ○ Relevant Training ( Part Of Plant )
o Inspection Day : Control Room o 2nd preparation of Tool List
o SOP

■ Pictures
ntenance Daily Report
Signature:

Relevant Training ( Part Of Plant )

You might also like