1- Civil Works

Rate Amount Rate Amount Rate Amount


Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
Schedule Items
1 Ch.13/32 WATER PROF COLOURED
(b) (P.89) PAINT ON EXTERNAL ALLS: 100.Sft 26,640 2,500 66,600,000 2,300 61,272,000 14,811,840
556
2 Ch.13/31 Plastic EMUTTION PAINT ON
(b) (P.89) WALLS AND CEILING 100.Sft 127,700 3,000 383,100,000 2,800 357,560,000 104,330,900
817
3 Ch.13/2 (b) REMOVAL OF EXUSTING
(P.85) PAINT AT DOOR AND 100.Sft 18,970 1,500 28,455,000 1,000 18,970,000 5,956,580
WINDOW 314
4 Ch.13/4 (b) PAINT AT DOOR AND
100.Sft 18,970 3,500 66,395,000 3,200 60,704,000 26,254,480
(P.85) WINDOW 1,384
5 Ch.13/32A( WEATHER SHIELD PAINT ON
b) (P.85) EXTERNAL WALL 100.Sft 25,890 3,200 82,848,000 3,000 77,670,000 56,983,890
2,201
6 Ch.12/47A( WINDOW GLASS 6MM THICK
Per Sft 225 1,600 360,000 1,200 270,000 27,000
b) (P.85) 120
7 Ch.25/47A( G.I WIRE MESHES FOR
Per Sft 225 1,500 337,500 1,200 270,000 16,200
b) (P.85) WINDOW OR DOORS 72
8 Ch.25/47A( BRICK MASONRY IN
100CFT 180 30,000 5,400,000 28,000 5,040,000 3,691,800
b) (P.85) BOUNDARY WALL 20,510
9 Ch.25/47A( BRICK MASONRY 100CFT 120 30,000 3,600,000 28,000 3,360,000 2,577,000
21,475
b) (P.85)
10 Ch.25/47A( P:C:C (1:4:8) 100CFT 300 19,100 5,730,000 17,600 5,280,000 5,270,400
b) (P.85) 17,568
11 Ch.25/47A( TUFF PAVERS Per Sft 500 95 47,500 83 41,500 50,500
b) (P.85) 101
12 Ch.25/47A( COMPACTION AND
Per Sft 500 15 7,500 10 5,000 1,000
b) (P.85) LEVELING 2
13 Ch.25/47A( PCC (1:4:8) IN PLINTH LEVEL
100 CFT 400 191 76,400 175 70,000 7,027,200
b) (P.85) 17,568
14 Ch.25/47A( MARBLE STRIP PER RFT 8,627 50 431,350 30 258,810 7 60,389
b) (P.85)
15 Ch.25/47A( REPAIRING RUBBING AND
b) (P.85) POLISHING OF FLOOR 100.SFT 26,460 7,000 185,220,000 6,000 158,760,000 43,288,560
1,636
16 Ch.25/47A( REMOVAL OF EXISTING
b) (P.85) FLOOR UOTO 2" THICK 100.SFT 3,000 7,500 22,500,000 5,000 15,000,000 4,017,000
1,339
17 Ch.25/47A( MOSAIC/TERRAZO
100.SFT 7,520 14,000 105,280,000 12,000 90,240,000 82,133,440
b) (P.85) FLOORING 10,922
18 Ch.25/47A( MOSAIC/TERRAZO
100.SFT 800 22,000 17,600,000 20,000 16,000,000 8,892,800
b) (P.85) SKIRTING 11,116
19 Ch.25/47A( REMOVAL OF WALL
100.SFT 8,000 1,800 14,400,000 1,500 12,000,000 2,088,000
b) (P.85) PLASTER 261
Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 2
1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
20 Ch.25/47A( PROVISION OF WALL
100.SFT 8,360 4,500 37,620,000 3,300 27,588,000 15,624,840
b) (P.85) PLASTERS 1,869
21 Ch.25/47A( DEODAR WOOD DOOR
b) (P.85) LEAF WITHOUT CHOWKAT PER SFT 25 2,200 55,000 1,950 48,750
665
16,625

22 Ch.25/47A( DOOR SLIDING DOOR EACH 1 1,200 1,200 1,000 1,000 344
344
b) (P.85)
23 Ch.25/47A( ANTI TERMITE TREATMENT
100SFT 4,000 650 2,600,000 600 2,400,000 912,000
b) (P.85) 228
24 Ch.25/47A( SMALL IRON WORKS FOR
PER KG 100 200 20,000 150 15,000 7,200
b) (P.85) STEEL DOOR 72
25 Ch.25/47A( DISMENTLING OF PCC
100CFT 1,300 20,000 26,000,000 17,000 22,100,000 8,954,400
b) (P.85) FLOOR 6,888
26 Ch.25/47A( ALUMINIUM SHEET 150 MM
PER RFT 50 250 12,500 180 9,000 4,700
b) (P.85) THICK 94
27 Ch.25/47A( MS STAIR RAMP RAILING
PER RFT 45 1,500 67,500 1,200 54,000 44,190
b) (P.85) 982
28 Ch.25/47A( SAND FILLING UNDER
100 CFT 90 2,500 225,000 2,200 198,000 158,490
b) (P.85) FLOOR 1,761
29 Ch.25/47A( BRICK BLAST UNDER
100 CFT 90 4,000 360,000 3,500 315,000 399,960
b) (P.85) FLOOR 4,444
30 Ch.25/47A( EARTHEN WARE WATER
ECH 1 4,000 4,000 3,000 3,000 1,236
b) (P.85) CLOSET 1,236
31 Ch.25/47A( CHROMIUM PLATED BIB
ECH 2 1,500 3,000 1,000 2,000 672
b) (P.85) COCK 336
32 Ch.25/47A( WASH HAND BASIN
ECH 1 10,000 10,000 4,500 4,500 2,525
b) (P.85) 2,525
33 Ch.25/47A( TEE STOP COCK
ECH 1 1,500 1,500 1,000 1,000 456
b) (P.85) 456
34 Ch.25/47A( CHROMIUM PLATED PILLAR
ECH 1 2,000 2,000 1,500 1,500 546
b) (P.85) COCK 546
35 Ch.25/47A( PLASTER MADE FLUSHING
ECH 1 6,000 6,000 5,000 5,000 1,209
b) (P.85) CISTERN 1,209
36 Ch.25/47A( "P" TYPE TRAP GLAZED
ECH 1 550 550 400 400 144
b) (P.85) 144
37 PVC insulated copper
conductor cable 250/440 volts -
37(a) Ch.25/47A( 3/0.74MM (3/0.029")
PER RFT 2,000 10 20,000 8 16,000 24,000
b) (P.85) 12

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 3


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
37(b) Ch.25/47A( 7/0.74MM (7/0.029")
PER RFT 1,000 15 15,000 12 12,000 17,000
b) (P.85) 17
Total: Schedule Items 1,055,411,500 935,545,460 393,649,516

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 4


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

NO SCHEDULE ITEMS
38 NSI NEW MS SQUARE
BARS/TUBING PIPE FRAME
AND FIBER GLASS SHEET SFT 72 2,000 144,000 1,607 115,704 115,704
SHEDS 1,607
39 NSI FALSE CEILING WORKS SFT 250 170 42,500 160 40,000 160 40,000
40 NSI RESTORATION AND REPAIR
OF EXISTING WOODEN
DOORS AND WINDOW AT SFT 35 500 17,500 500 17,500 17,500
ANY FLOOR 500
41 NSI ROOF TREATMENT WITH
CEMENT SAND (1:3) SFT 7,000 262 1,834,000 45 315,000 315,000
GROUTING 45
42 NSI ELC WATER PUMP WITHOUT
BORE EACH 1 120,000 120,000 100,000 100,000 100,000
100,000
43 NSI BARBED WIRE 14 SWG RFT 1,000 1,000 1,000,000 750 750,000 750,000
750
44 NSI PVC DUCT FOR ELECTRIC
WIRES RFT 2,000 30 60,000 20 40,000 40,000
20

Total: Non Schedule Items 3,218,000 1,378,204 1,378,204

Grand Total (Rs) 1,058,629,500 936,923,664 395,027,720

Total (Million) 1,058.63 936.92 395.03

Contractor Profit+Income Tax 238 211 89

Grand Total (Million) 1,297 1,148 484

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 5


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
Schedule Items
1 Ch.13/32 WATER PROF COLOURED
(b) (P.89) PAINT ON EXTERNAL ALLS: 100.Sft 25,000 2,500 62,500,000 2,300 57,500,000 13,900,000
556
2 Ch.13/31 Plastic EMUTTION PAINT ON
(b) (P.89) WALLS AND CEILING 100.Sft 70,000 3,000 210,000,000 2,800 196,000,000 57,190,000
817
3 Ch.13/2 (b) REMOVAL OF EXUSTING
(P.85) PAINT AT DOOR AND 100.Sft 8,500 1,500 12,750,000 1,000 8,500,000 2,669,000
WINDOW 314
4 Ch.13/4 (b) PAINT AT DOOR AND
100.Sft 8,500 3,500 29,750,000 3,200 27,200,000 11,764,000
(P.85) WINDOW 1,384
5 Ch.13/32A( WEATHER SHIELD PAINT ON
b) (P.85) EXTERNAL WALL 100.Sft 25,000 3,200 80,000,000 3,000 75,000,000 55,025,000
2,201
6 Ch.12/47A( WINDOW GLASS 6MM THICK
Per Sft 200 1,600 320,000 1,200 240,000 24,000
b) (P.85) 120
7 Ch.25/47A( G.I WIRE MESHES FOR
Per Sft 100 1,500 150,000 1,200 120,000 7,200
b) (P.85) WINDOW OR DOORS 72
8 BRICK MASONRY in
100CFT 200 30,000 6,000,000 28,000 5,600,000 4,102,000
Fondation 20,510
9 Ch.25/47A( BRICK MASONRY IN
100CFT 600 30,000 18,000,000 28,000 16,800,000 12,306,000
b) (P.85) BOUNDARY WALL 20,510
10 Ch.25/47A( BRICK MASONRY GF 100CFT 900 30,000 27,000,000 28,000 25,200,000 19,327,500
21,475
b) (P.85)
11 Ch.25/47A( P:C:C (1:4:8) 100CFT 550 19,100 10,505,000 17,600 9,680,000 9,662,400
b) (P.85) 17,568
12 Ch.25/47A( TUFF PAVERS Per Sft 300 95 28,500 83 24,900 30,300
b) (P.85) 101
13 Ch.25/47A( COMPACTION AND
Per Sft 300 15 4,500 10 3,000 600
b) (P.85) LEVELING 2
14 Ch.25/47A( PCC (1:4:8) IN PLINTH LEVEL
100 CFT 50 191 9,550 175 8,750 878,400
b) (P.85) 17,568
15 Ch.25/47A( MARBLE STRIP PER RFT 1,129 50 56,450 30 33,870 7 7,903
b) (P.85)
16 Ch.25/47A( REPAIRING RUBBING AND
b) (P.85) POLISHING OF FLOOR 100.SFT 500 7,000 3,500,000 6,000 3,000,000 818,000
1,636
17 Ch.25/47A( REMOVAL OF EXISTING
b) (P.85) FLOOR UOTO 2" THICK 100.SFT 1,000 7,500 7,500,000 5,000 5,000,000 1,339,000
1,339
18 Ch.25/47A( MOSAIC/TERRAZO
100.SFT 1,000 14,000 14,000,000 12,000 12,000,000 10,922,000
b) (P.85) FLOORING 10,922
19 Ch.25/47A( MOSAIC/TERRAZO
100.SFT 50 22,000 1,100,000 20,000 1,000,000 555,800
b) (P.85) SKIRTING 11,116
Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 2
1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
20 Ch.25/47A( REMOVAL OF WALL
100.SFT 2,200 1,800 3,960,000 1,500 3,300,000 574,200
b) (P.85) PLASTER 261

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 3


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
21 Ch.25/47A( PROVISION OF WALL
100.SFT 4,500 4,500 20,250,000 3,300 14,850,000 8,410,500
b) (P.85) PLASTERS 1,869
22 Cement Sand Pointing 100.SFT 500 4,500 2,250,000 3,300 1,650,000 1,869 934,500
23 Ch.25/47A( DEODAR WOOD DOOR
b) (P.85) LEAF WITHOUT CHOWKAT PER SFT 30 2,200 66,000 1,950 58,500
665
19,950

24 Ch.25/47A( DOOR SLIDING DOOR EACH 1 1,200 1,200 1,000 1,000 344
b) (P.85) 344
25 Ch.25/47A( ANTI TERMITE TREATMENT
100SFT 15,000 650 9,750,000 600 9,000,000 3,420,000
b) (P.85) 228
26 Ch.25/47A(SMALL IRON WORKS FOR
Kg 300 200 60,000 150 45,000 21,600
b) (P.85)STEEL DOOR 72
27 Levling Dressing and Making
100SFT 13,750 200 2,750,000 150 2,062,500 990,000
Lawn 72
28 Ch.25/47A( ALUMINIUM SHEET 150 MM
PER RFT 300 250 75,000 180 54,000 28,200
b) (P.85) THICK 94
29 Ch.25/47A( MS STAIR RAMP RAILING
PER RFT 150 1,500 225,000 1,200 180,000 147,300
b) (P.85) 982
30 Ch.25/47A( SAND FILLING UNDER
100 CFT 120 2,500 300,000 2,200 264,000 211,320
b) (P.85) FLOOR 1,761
31 Ch.25/47A( BRICK BLAST UNDER
100 CFT 120 4,000 480,000 3,500 420,000 533,280
b) (P.85) FLOOR 4,444
32 Ch.25/47A( EARTHEN WARE WATER
ECH 3 3,000 9,000 2,500 7,500 3,708
b) (P.85) CLOSET 1,236
33 Ch.25/47A( CHROMIUM PLATED BIB
ECH 19 6,000 114,000 3,000 57,000 6,384
b) (P.85) COCK 336
34 Ch.25/47A( WASH HAND BASIN
ECH 11 10,000 110,000 3,500 38,500 27,775
b) (P.85) 2,525
35 Ch.25/47A( TEE STOP COCK
ECH 13 4,500 58,500 3,000 39,000 5,928
b) (P.85) 456
36 Ch.25/47A( CHROMIUM PLATED PILLAR
ECH 11 4,500 49,500 3,000 33,000 6,006
b) (P.85) COCK 546
37 Ch.25/47A( PLASTIC MADE FLUSHING
ECH 2 10,000 20,000 2,000 4,000 2,418
b) (P.85) CISTERN 1,209
38 Ch.25/47A( "P" TYPE TRAP GLAZED
ECH 11 2,000 22,000 1,600 17,600 1,584
b) (P.85) 144
39
PVC insulated copper conductor cable 250/440 volts -
Ch.25/47A( 3/0.74MM (3/0.029")
Rft 3,000 15 45,000 12 36,000 36,000
b) (P.85) 12

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 4


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
Ch.25/47A( 7/0.74MM (7/0.029")
Rft 2,000 20 40,000 18 36,000 34,000
b) (P.85) 17
Construction of Additional Class Room (25'x16') Along with Verandah
40 Ch.25/47A( Earth Work
1000 Cft 1,550 20 31,000 18 27,900 26,350
b) (P.85) 17
41 Ch.25/47A( PCC (1:6:12) IN PLINTH
100 Cft 302 20 6,040 18 5,436 5,134
b) (P.85) LEVEL 17
42 Ch.25/47A( Dry Rammed brick or stone
100 Cft 180 20 3,600 18 3,240 3,060
b) (P.85) Ballast 17
43 Ch.25/47A( Brick work in foundation
100 Cft 1,275 20 25,500 18 22,950 21,675
b) (P.85) 17
44 Ch.25/47A( Horizental DPC Concrete 1-2-
100 Sft 260 20 5,200 18 4,680 4,420
b) (P.85) 4 17
45 Ch.25/47A( Vertical DPC Plaster 1:3
100 Sft 120 20 2,400 18 2,160 2,040
b) (P.85) 17
46 Ch.25/47A( Surplus Earth filling under floor
1000 cft 850 20 17,000 18 15,300 14,450
b) (P.85) 17
47 Ch.25/47A( New Earth filling under floor
1000 cft 500 20 10,000 18 9,000 8,500
b) (P.85) 17
48 Ch.25/47A( PCC 1:4:8
100 Cft 260 20 5,200 18 4,680 4,420
b) (P.85) 17
49 Ch.25/47A( Brick work inf GF (1:5)
100 Cft 1,100 20 22,000 18 19,800 18,700
b) (P.85) 17
50 Ch.25/47A( Brick work inf GF (1:4)
100 Cft 130 20 2,600 18 2,340 2,210
b) (P.85) 17
51 Ch.25/47A( RCC (1:2:4)
Cft 525 20 10,500 18 9,450 8,925
b) (P.85) 17
52 Ch.25/47A( Steel
Kg 1,750 20 35,000 18 31,500 29,750
b) (P.85) 17
53 Ch.25/47A( Provision of ceilling plaster 100 Sft 800 20 16,000 18 14,400 17 13,600
b) (P.85)
54 Ch.25/47A( Provision of Wall plaster
100 Sft 1,050 20 21,000 18 18,900 17,850
b) (P.85) 17
55 Ch.25/47A( Roof Treatment
100 Sft 780 20 15,600 18 14,040 13,260
b) (P.85) 17
56 Ch.25/47A( PCC khuras
EACH 2 20 40 18 36 34
b) (P.85) 17
57 Ch.25/47A( PVC Pipes
Rft 27 20 540 18 486 459
b) (P.85) 17

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 5


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
58 Ch.25/47A( PVC Bends
EACH 4 20 80 18 72 68
b) (P.85) 17
59 Ch.25/47A( PVC Tee
EACH 1 20 20 18 18 17
b) (P.85) 17
60 Ch.25/47A( SAND FILLING UNDER
100 Cft 290 20 5,800 18 5,220 4,930
b) (P.85) FLOOR 17
61 Ch.25/47A( Brick Ballast under Floor
100 Cft 290 20 5,800 18 5,220 4,930
b) (P.85) 17
62 Ch.25/47A( Teerazo Flooring
100 Sft 605 20 12,100 18 10,890 10,285
b) (P.85) 17
63 Ch.25/47A( Teerazo Skirting
100 Sft 66 20 1,320 18 1,188 1,122
b) (P.85) 17
64 Ch.25/47A( MARBLE STRIP
Rft 540 20 10,800 18 9,720 9,180
b) (P.85) 17
65 Ch.25/47A( DEODAR WOOD DOOR
100 Sft 49 20 980 18 882 833
b) (P.85) 17
66 Ch.25/47A( Lock for Door
EACH 2 20 40 18 36 34
b) (P.85) 17
67 Ch.25/47A( MS Window
Sft 80 20 1,600 18 1,440 1,360
b) (P.85) 17
68 Ch.25/47A( Drip Course under Slab edges
Rft 119 20 2,380 18 2,142 2,023
b) (P.85) 17
69 Ch.25/47A( Cement Sand Pointing
100 Sft 1,175 20 23,500 18 21,150 19,975
b) (P.85) 17
70 Ch.25/47A( WATER PROF COLOURED
b) (P.85) PAINT ON EXTERNAL ALLS: 100.Sft 1,175 2,500 2,937,500 2,300 2,702,500
556
653,300

71 Ch.25/47A( Plastic EMUTTION PAINT ON


100.Sft 1,850 3,000 5,550,000 2,800 5,180,000 1,511,450
b) (P.85) WALLS AND CEILING 817
72 Ch.25/47A( PAINT AT DOOR AND
100.Sft 260 3,500 910,000 3,200 832,000 359,840
b) (P.85) WINDOW 1,384
73 Ch.25/47A( WEATHER SHIELD PAINT ON
100.Sft 500 3,200 1,600,000 3,000 1,500,000 1,100,500
b) (P.85) EXTERNAL WALL 2,201
E.I Portion
74 Ch.25/47A( PVC Pipes 20mm
Rft 105 20 2,100 18 1,890 1,785
b) (P.85) 17
Ch.25/47A( 25mm
Rft 265 20 5,300 18 4,770 4,505
b) (P.85) 17

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 6


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
75 Ch.25/47A( PVC Copper Conductor
b) (P.85)
Ch.25/47A( 3/0.74MM (3/0.029")
Rft 800 15 12,000 12 9,600 9,600
b) (P.85) 12
7/0.74MM (7/0.029") Rft 250 20 5,000 18 4,500 17 4,250
76 Ch.25/47A( MS Sheet Box 16SWG
b) (P.85)
Ch.25/47A( 17.5x10cm (7"x4")
EACH 1 15 15 12 12 12
b) (P.85) 12
Ch.25/47A( 20x25cm (8"x10")
EACH 2 15 30 12 24 24
b) (P.85) 12
77 Ch.25/47A( Switches 5Amp Piano
EACH 18 15 270 12 216 216
b) (P.85) 12
78 Ch.25/47A( 3 pin 5 amp socket
EACH 3 15 45 12 36 36
b) (P.85) 12
79 Ch.25/47A( button holder bakelite large
EACH 8 15 120 12 96 96
b) (P.85) size 12
80 Ch.25/47A( ceilling rose bakelite
EACH 10 15 150 12 120 120
b) (P.85) 12
81 Ch.25/47A( Ms bar Fan Hook
EACH 4 15 60 12 48 48
b) (P.85) 12
82 Ch.25/47A( Regulator of ceilling fan
EACH 4 15 60 12 48 48
b) (P.85) 12
83 Ch.25/47A( 3 pin switch and plug
EACH 1 15 15 12 12 12
b) (P.85) 12
84 Ch.25/47A( 3 pin switch and plug
EACH 1 15 15 12 12 12
b) (P.85) 12
85 Ch.25/47A( Cable wire7/1.12mm (7/44)
Rft 120 15 1,800 12 1,440 1,440
b) (P.85) 12
86 Ch.25/47A( wall type ploe type bracket
EACH 1 15 15 12 12 12
b) (P.85) 12
87 Ch.25/47A( Earthing of iron clad
EACH 1 15 15 12 12 12
b) (P.85) 12
Total: Schedule Items 535,127,350 485,565,744 219,841,012

Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 7


1- Civil Works
Rate Amount Rate Amount Rate Amount
Sr. # Item # Description Unit Qty
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

NO SCHEDULE ITEMS - - -

87 NSI MDF sheet for white board


SFT 32 2,000 64,000 1,607 51,424 51,424
1,607
88 NSI DB
EACH 1 2,000 2,000 1,607 1,607 1,607
1,607
89 NSI PVC ceilling fan Box
EACH 4 2,000 8,000 1,607 6,428 6,428
1,607
90 NSI NEW MS SQUARE
BARS/TUBING PIPE FRAME
AND FIBER GLASS SHEET SFT 1,200 2,000 2,400,000 1,607 1,928,400 1,928,400
SHEDS 1,607
91 NSI RESTORATION AND REPAIR
OF EXISTING WOODEN
DOORS AND WINDOW AT SFT 50 500 25,000 500 25,000 25,000
ANY FLOOR 500
92 NSI New Sewer Line with
Excavation and Back filling

NSI 6" dia Upvc pipe


Rft 30 250,000 7,500,000 200,000 6,000,000 6,000,000
200,000
NSI 12" dia Rcc pipe
Rft 100 250,000 25,000,000 200,000 20,000,000 20,000,000
200,000
93 NSI BARBED WIRE 14 SWG RFT 600 1,000 600,000 750 450,000 450,000
750
94 NSI PVC DUCT FOR ELECTRIC
WIRES RFT 3,000 40 120,000 21 63,000 63,000
21

Total: Non Schedule Items 35,719,000 28,525,859 28,525,859

Grand Total (Rs) 570,846,350 514,091,603 248,366,871

Total (Million) 570.85 514.09 248.37

Contractor Profit+Income Tax 128 116 56

Grand Total (Million) 699 630 304


Business Hub BuildingPriced Bill of QuantitesDHA Lahore 1- Grey Structure Works 8