Jim Finlayson Eureka Tower Foundation PDF
Jim Finlayson Eureka Tower Foundation PDF
Melbourne
Jim Finlayson
1
Overview of talk
Background to project
Initial studies on site
Comparison of rock socket design methods in use
Eureka Tower investigations
Adopted footing solution
Construction, including Statnamic test piling
2
Locality Plan
3
Eureka Tower
Melbourne
4
5
Background to Project
Originally an industrial area, on reclaimed land
1990:- No 1 Riverside Quay - (30 level commercial)
Extensive geotechnical investigations, project abandoned
1997:- Waterford Tower - (40 level residential)
Further investigations, project abandoned
2000:- Eureka Tower - (world’s tallest residential)
2001:- Further extensive investigations
2001/02:- Foundations constructed
Completed 2006
6
Site Geology
7
1985 Studies in Area
8
Inferred Stratigraphy:- 1985
9
No 1 Riverside Quay
Initial Investigations
10
Inferred Stratigraphy
Section DD
11
No 1 Riverside Quay
Initial Investigations
12
No 1 Riverside Quay
Detailed Investigations
Proposed piles
Eureka
Tower site
Existing
data
New bores
13
Inferred Stratigraphy
Section FF
Upper basalt
26 m
Lower basalt
37 m
Siltstone
14
Inferred Stratigraphy
Section DD
Upper basalt
25m
Lower basalt
35 m
Siltstone
15
No 1 Riverside Quay
Design Issues
16
No 1 Riverside Quay
Pile Design
Historically, design for siltstone based on friction fs= 0.1qb
For fresh rock, qb = 5 MPa
Minimum socket length of 2 dia.
Pile working loads of 15 MN to 53 MN, dia. = 1.2 m to 1.8 m
Conventional wisdom seemed excessively conservative
For basalt adopted fs= 1 MPa, qb = 10 MPa
Work at Monash (Williams et al) suggested more rational
settlement based design method, and qb = 5UCS (ult)
In siltstone, program SOCKET used to assess socket lengths
for < 1%
17
No 1 Riverside Quay
Pile Design (con’t)
BUT:-!
18
The Age, 4 December, 1991
19
Waterford Tower
1997 Investigations
20
Eureka Tower Project
A real project at last!
21
Eureka Tower
Limit of upper basalt
22
Eureka Tower
Limit of lower basalt
5m 0m
10 m
23
Eureka Tower
Pile layout , after additional investigation
24
Moisture Content :- Siltstone
Moisture Content (%)
0 2 4 6 8 10
-25
1991
-35 1997
2001
Design Line
-40
-45
Line assumed
for analysis
-50
25
Pressuremeter Test Results:- Siltstone
Ei (MPa)
0 2500 5000 7500 10000 12500 15000
-25
-30
1991
Chiu
Reduced Level (m AHD)
-35
-45
-50
26
UCS Test Results:-Siltstone
UCS (MPa)
0 10 20 30 40 50 60 70 80
-25
-30
1991
1997
2001
Chiu
Reduced Level (m AHD)
-35
-40
-50
27
Eureka Tower
Siltstone Core
28
UCS Test Results:- Lower Basalt
UCS (MPa)
0 50 100 150 200 250 300
-25
-27.5
1991
Reduced Level (m AHD)
-30
-32.5
-35
29
Eureka Tower
Basalt Core
30
Eureka Tower
Adopted Bored Pile Solution
Ignore upper basalt (group effects)
For basalt adopt end bearing only, with fb = 20 MPa
(essentially intact rock)
Adopt minimum socket of 0.8 m in lower basalt
For siltstone, design using ROCKET, and limit design top
of socket settlement to 6 mm (compatibility with basalt)
In siltstone adopt 4.5 m long sockets (upper metre or so is
more jointed)
For siltstone piles, structural load based on up to 25 MPa
concrete stress
70 MPa concrete
31
Eureka Tower
The Bored Pile Dilemma
Tenders called
Construction time required for adopted solution
incompatible with Builder’s program
Considerable machinations
Vibropile/Franki joint venture propose use of CFA piles
founding on the basalt in lieu of the more conventional
bored pile solution proposed
Had appealing cost and time implications
32
Eureka Tower
The CFA Alternative
Test pile
locations
35
Statnamic Testing Device
Gravel container
Gravel
Reaction Mass
Reaction Mass
Silencer
Piston
Laser
Load Cell
Pile
36
Statnamic Testing
Load-Displacement Curve
37
Statnamic Test
Piston
38
Statnamic Test
Silencer
39
Statnamic Test
Gravel container
40
Statnamic Test
Reaction Weights
41
Statnamic Test
Adding the gravel
42
Statnamic Test
Laser Displacement Measurement
43
Statnamic Test
Data Capture
44
Statnamic Test
The Firing!
45
Statnamic Test
The gravel works, dust settles
46
Statnamic Test
Load - Displacement:- Pile No 1
47
Statnamic Test
Load - Time
Dynamic Test, 4 ms
48
Statnamic Test
Displacement- Time
49
Eureka Tower
Statnamic Tests
Pile 1 Pile 2
50
Dynamic Load Test
20 tonne hammer assembly
51
Dynamic Load Test
20 tonne hammer
52
Dynamic Load Test
20 tonne hammer assembly
53
CFA Test Piles
CAPWAP vs Statnamic
54
Eureka Tower
Dynamic Testing of Production Piles
55
Eureka Tower
CFA Piling
56
CFA Piling Rig
57
CFA Piling:- Auger tip
58
CFA Piling:- drilling in clay
59
CFA Piling:- drilling in clay
60
CFA Piling:- Auger Change
61
CFA Piling:- 70 MPa concrete
62
Eureka Tower
Bored Pile Construction
Large crane mounted rigs needed
Excavated under bentonite fluid, tremie poured
Tungsten carbide tipped core barrels needed in rock,
sometimes in combination with chisels
Base cleanliness a priority
Base check with SID inconclusive, refined tools and
methods
Sockets roughened prior to final cleaning (needed special
tools due to overlying basalt)
All rock recovered logged to confirm design assumptions,
and cleaning and roughening observed
63
Eureka Tower
Bored Pile Construction
64
Bored Pile Construction
65
Congested Site
66
Soil and weak rock drilling bucket
67
1200 dia. core barrel
68
Rock core recovered
69
Core Removal
70
Success! - not so easy in basalt
71
Siltstone core:- note grouted borehole!
72
Rock Chisel
73
Base mill and cleaning pot tool
74
Socket roughening tool
75
Final mechanical cleaning tool
76
Submersible Pump for Final Clean &
Preliminary Desand
77
Final Base Clean
78
A Good Day’s Work!
79
Eureka Tower
Concluding Remarks
80
Construction almost complete (Jan 2006)
81
Eureka Tower
The Foundations!
82