1. INTRODUCTION 1
The main objectives of this procedure is to ensure all the equipment’s, hand tools, electrical
tools, firefighting equipment’s, machineries etc. are inspected, tagged & color coded.
2. SCOPE
This procedure is applicable for all the activities in construction sites ofat Laffan Aluminum
Factory.
3. PURPOSE
To ensure the safety of the workers working under the Laffan Aluminum Factory
4. RESPONSIBILITIES
General Manager
Make sure all violations/ reports shall be fixed immediately or timely manner.
Attend the monthly safety walk through and give full support to his crew for closure of
findings.
HSE Representatives
Shall conduct daily site inspection using – Safety Daily Inspection Checklist (LAF-
HSE-FM-023), issue his observation, follow up & close.
Organize regular inspection on lifting equipment’s, machineries, electrical tools/ hand
tools etc. And tag defined color code on them.
Participating monthly site safety walk through.
Prepare reports based on the findings from the monthly site safety walk through,
follow up, closure and send the report to the General Manager.
5. PROCEDURE
5.1 Daily Site Safety Inspection
HSE Representative conducts daily site safety inspections in every location of activities
using Safety Daily Inspection Checklist (LAF-HSE-FM-023). And give his observations
related to activities through same form to the responsible person to take immediate
action.
HSE Representative shall follow up & shall close the daily inspection form at the end of
the day and maintain the records properly. In case if don’t get immediate response from
Laffan Aluminum Factory shall follow the color coding systems of Qatar Building
Company shall be as defined in here the below table:
RED Rejected
6. REFERENCE