High-lift grouting for

high-volume jobs
With a pump, grout a one-story height in 1 day

this allows the masons to install the Holes are knocked into the bottom

F
illing masonry walls or columns
with grout provides additional vertical steel after the wall is laid (but course of masonry to clean out the
strength. It enables load-bearing before it’s grouted). This means the cores that contain rebar. Before the
masonry walls to be used for high-rise masons can lay block without obstruc- cores are grouted, these openings are
structures and in areas of severe earth- tions. They don’t have to thread block covered with plywood forms.
quakes. For instance, grouting the col- over the tops of projecting rebar.
lar joint of a cavity wall and the verti- Workers also can place a large
cal cells of hollow block or pilaster amount of grout at one time. A grout
units increases a wall’s compressive pump (which is expensive) is required, have a maximum coarse aggregate size
and flexural strengths. When vertical but it reduces labor cost and can be less than 3/8 inch.
steel reinforcement is specified, the used again on different jobs. One crew
grout transfers the load from the ma- trained for grout placement can move Inspection is crucial
sonry units to the steel. the pump from site to site, enabling A perfect grouting operation may be
higher productivity and more consis- useless if the masonry wall is not prop-
Two basic methods tent workmanship. erly constructed. So before you start
There are two ways to place grout: grouting be sure the wall construction
low-lift grouting and high-lift grout- The grout crew has been inspected. Some building of-
ing. In low-lift grouting, usually no A typical crew for a high-lift grout- ficials don’t allow grout placement un-
more than a 4-foot height of wall is ing operation using a grout pump has til a government inspector has ap-
grouted in 1 day and no cleanouts are four workers. One handles the pump proved the construction. If this is not
used. Small amounts of grout are hose, directing the grout into position; required in your area, you should per-
placed by hand with buckets. In high- another helps move the hose and pre- form the inspection. Make sure all the
lift grouting, cleanouts are used and up vents it from getting snagged. A third, following are completed:
to a full story height is poured in 1 day working next to the hose, uses a pud- • Cleanouts are provided for each
using a grout pump. dling stick or vibrator to consolidate pour in the bottom course of un-
Which method is better depends on the grout. The fourth worker operates grouted masonry.
the type of masonry, the project size, the pump, directs the ready mix truck
the equipment available, and your ex- traffic, and maintains consistent, uni- • All debris and mortar are removed
perience. One masonry contractor says form flow of grout through the hose. from cores using the access provid-
it’s not economical to set up a pump For high-lift grouting, grout with a ed by the cleanouts.
and have a ready mix truck deliver slump between 5 and 7 inches is de- • Vertical cells have an unobstructed
grout if the job requires less than 6 cu- livered to the project in ready mix vertical alignment of not less than
bic yards of grout. trucks. Water and approved admix- 2x3 inches.
tures may be added at the site to obtain
High-lift grouting advantages the desired fluidity before pumping. • All vertical and horizontal rein-
Waiting to grout until the wall is laid Most specifications require the grout forcement is properly positioned
up to a full story height has advan- to obtain a 28-day compressive and secured in place before grout-
tages. In many areas of the country, strength in excess of 2000 psi and to ing.
ment and absorption of excess water hours for concrete block and 3 days for
by masonry units. Also, because the double-wythe walls). Cold or dry
grout is stiffening, the hydrostatic weather may extend this curing period
pressure of the grout on the masonry to 48 hours for core grouting and 5
unit decreases. This reduces the possi- days for collar joint grouting.
bility of a mortar joint blowout. Obstructions in the collar joint or
After the waiting period, but while block cores usually are caused by ex-
the grout is still plastic, pour and then cess mortar droppings or trash that has
vibrate the next lift. Extend the vibra- fallen inside them. If excess mortar to-
tor through the new lift and into the gether with the vertical steel obstructs
top 12 to 18 inches of the preceding the opening, creating a void in the
lift. Penetrating the preceding lift grout core, the strength of the wall will
bonds the two lifts and reconsolidates be reduced at this section.
the grout, closing plastic shrinkage High-pressure water jetting used
cracks and spaces between rebar or twice daily can remove mortar drop-
Ready mix trucks discharge grout into units. ping and other unwanted debris in
a trailer-mounted grout pump that For the top lift, reconsolidate after open collar joints. But be sure water
transports it to the hoseman on the the necessary waiting period and fill coming out the cleanouts is channeled
wall. any open space left by settlement away so it doesn’t stain floors or walls.
shrinkage with grout. Keep the mason- Careful workmanship followed by
ry work and top of the grout pour cov- hand-cleaning can keep block cores
ered and damp to prevent too rapid open.
drying during hot or dry weather and Horizontal construction joints in the
• When grouting collar joints vertical
drying winds. grout are desirable only at the full sto-
grout barriers or dams are provided
ry height. Because of delays in receiv-
and located no more than 30 feet Precautions ing grout or breakdowns in equipment,
apart.
High-lift grouting can be quite eco- joints may be unavoidable at other lo-
• Cleanouts are closed with face shell nomical. There are problems, howev- cations. If the grouting is to be stopped
plugs or covered with forms. er, that contractors should avoid: for 1 hour or longer, form the horizon-
• Blowouts tal construction joint by stopping the
• For cavity wall construction, ties grout 1 1/2 inches below a masonry
(made from at least #4 wire) are laid • Vertical cell obstructions unit. Also, use a vibrator to reconsoli-
at no more than 24 inches on center
• Construction joints in the grout date the lift as soon as settlement
horizontally and 16 inches on center shrinkage occurs.
vertically. A blowout occurs when the hydro- With a trained crew, a pre-grouting
static grout pressure is greater than inspection, and a few simple precau-
• To gain sufficient strength before
what the mortar joint can resist. This tions, your high-lift grouting operation
grouting, double-wythe masonry is
can be caused by not providing the re- will consistently keep money in your
cured for 3 days and single-wythe
quired curing period for the mortar (24 pocket.
masonry for 24 hours.

The grouting procedure —by Bruce Suprenant


Grout for high-lift grouting usually
is supplied by ready mix trucks and
pumped into place. The grout pump
used should quickly transport the grout
to the point of deposit without segre-
gation of the mix. Try not to splatter
the grout on flashing, masonry units,
and other items. Discard the grout if
it’s not in place within 2 1/2 hours af-
ter water is first added.
For economical placement, pump a
uniform height of grout not to exceed a
4-foot lift. Immediately after place-
ment, consolidate the grout by vibra-
tion. Construction specifications usu-
ally require the lift to be vibrated
within 10 minutes after pouring.
Don’t place the next grout lift right After every 4-foot grout lift is poured,
away. Wait 30 to 60 minutes. This workers vibrate the grout, being sure to PUBLICATION #M880060
waiting period allows about 5% initial extend the vibrator into the top 12 to Copyright © 1988, The Aberdeen Group
consolidation of grout due to settle- 18 inches of the previous lift. All rights reserved