DMRC Contract No.

BC21 – Part Design and Construction of Elevated Viaduct and Structural Work of Five Elevated Stations (Garden Estate, Sikanderpur, DT City Centre,
IFFCO Chowk and Sushant Lok) on Qutab Minar – Gurgaon of Delhi MRTS
Client : Delhi Metro Rail Corporation Ltd
ITD - ITD Cem JV
Risk Assessment
Site: BC21/ DMRC System/Activity : Assessment Date:28.04.08
Group of Assessors : Kushal POT-PTFE BEARING INSTALLATION Revision No : R1
Roychoudhury,Nikhil Datir Reviewed By:
Reviewed On:

Sr. Task/Activity R/ Risk Rating Residual Risk


No. NR Score Rating Score
Hazard Hazard Effect Additional Control Measures
N S L RRS N S L RRS
1 Handling of NR slip of materials,hit to other Injury to person 1 5 5 25 Skilled worker to be engaged 1 5 1 5
POT-PTFE person and structure
bearing and Manual handling training to all workman before
other materials performing the job
Work should be done under closed supervision
Safe access and egress to work front
Job specific PPE's to be used
Care to be taken during handling of bearing by
hydra/crane
Handle the shear key bars very carefully after
greasing
2 Cleaning of NR Cleaning materials may Eye and hand injury 1 5 5 25 Hand gloves and goggles is must during the 1 5 1 5
recess holes cause injury work
and apply of During handling of any chemical precaution to
chemicals be taken as per manufacturers instruction

3 Grouting R Splacing of grouting Eye and skin injury 1 5 5 25 Grouting should be done as per the approved 1 5 1 5
materials methodology
Failure of grouting hose Injury to people Grouting should be done only by competent
and experienced personnel
4 Scaffolding Hit by vehicle Injury to people 1 5 5 25 Site is properly barricated till work is finished 1 5 1 5