Professional Documents
Culture Documents
Sscaf
Sscaf
DFMEA and
potential special Type ONLY in Yellow Boxes
characteristics
Characteristic Description
1 Material Type/Flammability
Impact Bolster presence / poke yoke with adjacent compo
3
Gloss level
5
Parting Line Height (High visibility and touch zones areas)
Sink Marks
7
Loose Fasteners (screws, pal-nuts)
10
Heat Stakes / welds
11
12
Armrest Softness
13
20
Ambient Lighting, FLOD and NLI continuity testing
21
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Special C
1A. PFMEA & Special
Type ONLY in
ype ONLY in Yellow Boxes Characteristics Green Boxes
Agreement
JL7B-7823942-**W
Part Number:
JL7B-7823943-**W
From PFMEA:
Sev 9,10. Potential CC. CC Sev 9,10 (Part). Critical Characteristic.
SC
Sev 5-8. Potential SC. OS Sev 9,10 (Process). Operator Safety.
HI
Not Applicable Not applicable
YS CC
27 2
s, screws, clips)
ded
ded
Not applicable
OS SC HI
0 11 0
CC
nce)
ENERAL REQUIREMENTS FOR
RIOR MATERIAL REG20 SDS
sent on part and located correctly
YC CC
Other
AR boundary sample +/- 0.5 YS
YS
Other
YS
YS
YS
Other
range for Armrest Softness
e - see worksheet)
per drawing YS SC
h location
h location
YS SC
YS SC
YS SC
YS SC
ny SCs cannot be greater than or
confirmed by tolerance analysis) YS SC
sion
ar YS Other
OD, NLI and Map pocket YS
esent,
p pocket/Panel Other
sence check at all lighted locations
ct with no damage.
ance
YS SC
YS SC
ex 90)
YS SC
YS Other
ck
center file JL7B-FP-FDT YS Other
nd Tolerances
nd Agreement
Special Characteristics for:
Name e-mail
Katia Burlingame kburlin1@ford.com
Name e-mail
Fayaz Alamat falamat@ford.com
Name e-mail
Jeff Colliau jeffrey.colliau@faurecia.com
Date
m
Date
2/2/16
Date
recia.com
d by <PA>.
Stage 1A. PFMEA
rk.
nsor. Traceability of bolster via serial number
e.
ction per Master sample, Color - Visually check part in Macbeth booth
d or Southview-AAR equivalent approved appearance master (verified
ophotometer.
uence.
t inspection is taking place).
ess or color change.
stomer approval process. Follow first piece approval process.
Measurement in comparison to gloss specifications.
uence. .
uence.
of inspection is required.
boundary sample checks, and last piece inspection process.
pection to boundary plaque or Saline-AAR equivalent approved
Term
uence.
uence.
uence.
Term
ol plan.
e.
Term
ol plan.
e.
Term
ol plan.
e.
Term
ol plan.
e.
Term
ol plan.
e.
Term
ol plan.
e.
Term
ol plan.
e.
y foam tear and Instron test required for 1pc per part per day for 30 days.
vised according to data.
ive foam tear (Ford to provide location) and Tensile test machine tear strength
& VO approval, 3. Rework/sort parts as required
Term
uring assembly process.
Faurecia will notify Ford STA/PVT and review the data to establish the scope
be pulled and approved to allow shipment until issue is resolved.
s post PPAP.
nto silo for overhead delivery to
uring parameters
ets FMVSS 302 requirements. Faurecia
s at Ford request.
Inspeccion visual
steners.
g Parameters)
Visual y plantilla
N/A
No hay producción
No hay producción
Se evalua colo
Graba
imperfeccion
visual de piezas arrug
ntra master del No hay master Firmado picadu
nte Raya
estri
cicatri
visual de piezas Opaci
ntra master del No hay master Firmado ton
nte
roducción N/A
piel y vinil vs
ster
plantilla
/A
roducción
roducción
Caracteristica
on plantilla y
erentes zonas
on plantilla y
erentes zonas
on plantilla y
erentes zonas
aster (bundary
ok)
on Ismael
e evalua color vs master
Grabado
mperfecciones en piel
arrugas
picaduras
Rayas
estrias
cicatrises
Opacidad
tono