Defect Flow Chart

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Revision :01 

DEFECT FLOW CHART Date : 10/01/2020

START

1st Invitation Letter by


Main Contractor

not required rectification 1ST


INSPECTION

required rectification

1st rectification done 2nd Invitation Letter


 Defect Site Memo by Main Contractor

not required rectification 2ND


INSPECTION

required rectification

2nd
Defect Site Memo
rectification done 3rd Invitation Letter by
Main Contractor

3RD
INSPECTION

Handover
to PVDSB

required rectification

FINISH