Professional Documents
Culture Documents
CDP Katni English PDF
CDP Katni English PDF
CDP Katni English PDF
July 2011
Submitted by
On behalf of
There are three main objectives of this exercise: a) to assess existing demand-supply gaps in
service delivery and derive a comprehensive infrastructure improvement plan (including a Capital
Investment Plan) required, b) to identify revenue enhancement and financial improvement measures
and c) to develop a Financial and Operating Plan to implement a sustainable infrastructure
improvement plan.
Introduction
Katni city is a Municipal Corporation grade Urban Local Body located in the Katni district of Madhya
Pradesh. It was declared a Municipal Corporation in the year 1981 before which it used to be a
Municipality.
Katni, also known as Mudwara, is situated on the bank of two rivers, namely Katni and Simrar.
Administrative headquarters of Katni District is located in the Katni city. Katni is located in the
Mahakoshal Region of Central India. Katni has historically been under the influence of three different
cultures viz. Mahakausal, Bundelkhand, and Baghelkhand. Katni is the main transit point for several
places of historical importance. Some of them are Bahoriband, Tigavan, Vijaraghavgarh, Roopnath,
Bilhary, Jhinjhari, etc
Presently, Katni city is spread in an area of 69.93 Sq.km. The city is divided into 45 administrative
wards. As per Census 2001, the population of Katni is estimated to be 1.87 lakhs. Katni city is well
connected by Roads, with National Highway 7, National Highway 78, State Highway 10 and State
Highway 14 being the major connecting roads.
Strengths Opportunities
1. Locational advantage as Katni is well 1. Further exploring the possibility of developing
connected by Roads and Railways Katni as a Transportation and Logistics Hub
2. Located in the heart of rich Mineral and 2. Physical Infrastructure development in the old city
Agricultural Belt area.
3. Proximity to several tourist places 3. Development of an integrated SWD system for an
4. Proximity to a water source effective utilization of City’s natural drains
5. Katni boasts a strong natural drainage 4. Development of good Hospitality institutions
network supported by necessary promotional initiatives
can help in actualizing Katni’s Tourism potential
Weaknesses Threats
1. The areas where the initial settlements 1. Underdeveloped physical infrastructure in certain
were concentrated are now densely areas can have an adverse impact on service
City Profile
The population of Katni has grown by a tremendous margin in the past three decades. A snapshot of
Katni’s population growth trend is provided in Table below.
Despite a high decadal population growth rate Katni’s population growth rate has come down from
42.2 percent to 14.5 percent. This reduction in Population growth rate can be attributed to:
1. Saturation of basic services provided by Katni Municipal Corporation
2. Development of alternate urban centers in the vicinity of the town
3. Awareness generated from population control programmes
4. Migration from Katni to other towns equipped with better facilities and employment opportunities.
As per the Population Projections, the population of Katni is expected to reach a level of 2,19,705 by
year 2011 and 2,31,932, 2,65,560, and 3,04,063 by years 2015, 2025 and 2035 respectively.
Katni has a literacy rate of 82.4% and Sex-ratio of 912. A classification of various wards as per their
literacy rates is provided below.
II Satisfactory 85 - 90 % 5, 8, 10, 16, 17, 18, 25, 29, 32, 35, 37, 38, 40, 43
IV Poor < 80 % 1, 2, 3, 12, 14, 15, 28, 30, 31, 33, 34, 36 44, 45
Trends
Till 1867, Katni, erstwhile Mudwara, was just another village on the bank of River Katni. With the
commissioning of Jabalpur-Allahabad Railway line in 1867 and subsequent developments along the
th
Railway line, the settlement transformed itself from Mudwara village to Katni town. In the 19 century,
human settlements were mainly concentrated near Azad Chowk and Purani basti. Azad Cowk was
close to the Katni River and famous Jalapa Dev i Temple. Subsequently, in the initial decades of this
century, city began to grow towards Mission Chowk, Jhannda Chowk, Gol Bazaar and Ghantaghar.
Post independence, Katni saw huge inflow of migrants from other parts of the country. A majority of
these migrants settled in the area, now, known as Madhav Nagar. This gave a new direction to the
spatial growth of city’s limit. In the recent times, Katni has seen development of Nayi Basti, Shanti
nagar and other human settlements along the Jabalpur Railway line and National Highway 7.
Population Distribution
An important observation is that that the higher density wards are concentrated near the city centre
and Railway network. The lower density wards are mainly the peripheral wards. However, some of the
lower density wards are located near the railway lines and hence have a potential for future growth.
The low population density in these wards can be attributed to the presence of large open spaces and
vacant land. Most of the wards adjoining NH 7 and close to the city centre have comparatively higher
population densities. Also, some of the wards located in the South-Western part of the city have high
population densities. This can be attributed to their proximity to the mining areas of the Western part
of the city.
Land Use
The existing land use pattern of Katni shows that a major portion of the total area of the Municipal
Corporation and Planning Area is under agriculture. Agriculture constitutes about 65.71% of the
Planning area and only 12% of the Planning area is developed. Among all kinds of land use
categories, land under residential is around 40% of the developed area. Also a very high percentage
of the land under the Transportation land use category (30.28%) can be attributed to the dense rail
and road network.
In the Katni Master Plan, some of key proposals are Transport Nagar and augmentation of Industrial
estate in the north of the city. Hence, Ward No. 1, 2, 4, and 10 located in the north of the city can be
developed as the future residential areas.
2. CUR: Capital Utilization Ratio of Katni Municipal Corporation is 1.04 which is more than 1,
which indicates that Katni Municipal Corporation is utilising their revenue surplus in the capital
expenditure hence having a high utilization ratio.
4. Tax revenue accounts only 12% of the revenue income where as Non tax revenue accounts
17%, which indicates need for identification of new tax revenue streams.
5. Property Tax contribution low: Property tax as a revenue source accounts for only 10 % in
Katni Municipal Corporation which demands property tax rationalisation with improved
collection efficiency.
“An Eco-City with a sound socio-economic base, with special focus on transportation and
agro-based and mineral-based industries, ensuring adequate access to physical and social
infrastructure facilities to all sections of the society.”
To achieve the vision, certain Mission Statements are formulated on the basis of identified themes
which would be the various lines on which development should be concentrated. Based on
consultations with stakeholders and review of development plans of other cities, following Mission
Statements are being adopted to achieve the vision.
Sector Goals
1. Water Supply: “A City Level Water Supply Service covering 100 % of households providing
water of ensured quality at pre-defined service levels.”
2. Sewerage & Sanitation: “To develop Katni as a clean and hygienic city by providing
adequate safe sanitation facilities supported by an efficient collection and disposal of
municipal waste water.”
3. Solid Waste Management System: “To develop Katni as a Clean City by achieving 100%
collection and disposal of Municipal Solid Waste.”
4. Traffic and Transportation: “To link each and every part of the city with road network and
develop an efficient and environment-friendly transportation system with special focus on
pedestrian traffic and parking spaces.”
5. Storm Water Drainage System: “To ensure an expeditious disposal of storm water by
means of an efficient Storm Water Drainage System.”
Scenario 1: With reforms in Property Tax, Water Charges and Sewerage charges
This case assumes the reforms in property tax, Water and Sewerage have been implemented and
accordingly the investment capacity has increased by Rs. 12.88 crore above the base investment
capacity. These reforms will increase the total sustainable capacity to 36.2%.
From the above analysis, it is very clear that even with the grant support under UIDSSMT scheme
and reforms Katni Nagar Nigam will not be able to implement 100% of the projects identified under
the City Investment Plan (CIP). But implementation of these reforms will result in to substantial
increase in sustainable capacity of Nagar Nigam. So, to implement more projects it is recommended
that Nagar Nigam along with the support from UADD, GoMP should try to develop few projects at
PPP model and additional grant support from GoMP.
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Nagar Nigam level, GoMP should also provide
support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
After the assessment of the performance of the ULBs and their capacity for exploiting the above said
resources it was felt that such a plan is essential, not only for accessing GoI/GoMP funding but also
for providing a strategic framework for converging and co-coordinating various development inputs
towards positioning the city on a development path.
Therefore, the Madhya Pradesh Urban Services for the Poor (MPUSP) launched an initiative to
support 9 ULBs in the state in preparing City Development Plans (CDPs). This initiative aims to
provide a comprehensive Medium Term Strategy (Vision 2035) and a City Investment Plan (CIP) for
each Urban Local Body, based on which the concerned ULB will be able to access funds under
schemes of Government of India (GoI) and GoMP as well as from its own sources for implementation
of priority actions and projects, identified from this exercise. The document was also envisaged to
provide a Financial Operating Plan (FOP) to direct the ULBs for mobilizing various financial resources
to implement the identified projects, adhering to the JNNURM’s CDP preparation toolkit and keeping
in view the Master Plan (wherever exists) provisions as prepared by Town and Country Planning
Department. It is also expected that the CDP would provide Urban Reform Action Plan for the ULBs
as envisaged under JNNURM.
In this regard, MPUSP retained ICRA Management Consulting Services Limited (IMaCS) for
assistance in preparation of City Development Plan for Katni town.
Catalyses of a new thinking and provoking a debate through a consultative stakeholder driven
process.
Serving the requirements of the UIDSSMT and IHSDP programmes as well as JNNURM and
other development schemes.
Generating specific Priority Actions and Projects to mobilize funding from diverse sources.
Sharp focus on the Need and Expected Outcomes – CDP was visualized as a critical
intervention to provide a strategic framework for converging and co-ordinating various
development inputs in a holistic manner to facilitate engaging the city administration and
stakeholders towards crystallising vision, strategy, actions for taking the city on a development
path and as a means to enable an access to funds under various schemes/funding programs of
Government of India (GoI) and Government of Madhya Pradesh (GoMP).
Captured Insights from existing/ongoing initiatives – Insights were drawn from initiatives
underway and being undertaken including the overall spatial planning and policy framework of the
existing Master Plan, planning for reform and participatory slum improvement process put in place
under MPUSP, annual plans and proposals in District Plan for BRGF / Urban Renewal Action
Plans.
The consultative approach for this exercise involved consultations with stakeholders at various stages
to achieve following objectives:
Plan and target services at what people want, need and expect.
Generate ideas for developing or improving services
Prioritise services and make better use of limited resources.
Set performance standards relevant to users' needs - and monitor them.
Pinpoint problems more quickly, so things can be put right before they escalate.
The methods that were used for consultations can be classified in two categories:
1. Quantitative: These provided statistical information using samples of people. These answerd
"how many" or "what" type-questions. If the sample is drawn up using statistically reliable
methods, then the results can be extrapolated out to the population as a whole.
To get a broad understanding of town and its problems, a Questionnaire Survey was conducted
to gather the data related to ward-specific problems, town-specific problems, problems related to
various urban services and prioritization of immediate and long term needs. Additionally,
2. Qualitative: These were more interactive and were used to gain a more detailed understanding
of issues - answering "how" and "why" questions. These methods cannot provide statistically
reliable results although they help in better understanding of people's attitudes / opinions.
To achieve the aforementioned objectives, IMaCS team conducted Individual Interviews, and
Public Meetings.
The performance of Consultative Approach was enhanced by adopting a structured process for
various stakeholder consultations. The Consultations processes were structured and executed in such
a manner to achieve the objectives of Consultative Approach. The outcome of these consultative
processes is presented in Exhibit 1-1.
The outcomes of various consultations were synchronized to achieve the overall objective of adopting
consultative approach for this study. These consultations were held at the different stages of the
project, a description of which has been provided in Section 1.4.
a. To put in place institutional mechanisms including the formation of Steering Group for conduct
of the assignment in a structured consultative manner as envisaged
b. To engage with stakeholders and arrive at a shared understanding of the objectives and
expected outcomes of the study
i. Review and analyze the current status and unique features of the city with regard to
the state of its development, systems and procedures, as equally its institutional and
financial context.
ii. Identify the strengths and weaknesses in the city’s development and to develop an
understanding of what impedes infrastructure provision and service delivery and
management within the existing set-up and what contributes to better service
provision.
iii. Do a rapid assessment through interactions with stakeholders and initial data
collection to capture previous and ongoing development initiatives to factor the same
in the Consultations and Analysis module.
The broad activities and tasks under the Inception Stage included the following:
Introductory meetings with Elected Representatives, City officials and other Government
agencies.
Formation of city level Steering Group for the CDP and a shared understanding of the role and
expectations from this group.
Preliminary Data collection including base maps and available secondary data, master plan, other
reports on recent and ongoing development programs, budget documents and other information.
Identification and listing of stakeholders, in consultation with the ULB and the Steering Group, and
putting in place mechanisms for obtaining their views and inputs.
Field visits by our team to familiarize and get a grasp of the spatial and demographic patterns,
social and economic drivers and related issues.
Identify economic opportunities and bottlenecks and their implications for development.
This module culminated with conduct of a one-day kick-off workshop with stakeholders. The purpose
of the kick-off workshop was to build participative energy and commitment of stakeholders for the
study through articulation of the purpose, process, and expected outcomes of the CDP, and achieving
a shared understanding of the same. The kick-off workshop helped in deriving a consensus along with
the stakeholders firming the process and agreeing upon a structured programme to take the CDP
forward. Further the institutional structures including the Steering Group for the consultative process
were also spelt out during this workshop. Following the workshop, we submitted an Inception Report
and followed it up with a presentation to MPUSP and the ULB. Apart from capturing the outcomes and
points of discussion / action from the workshop, the Inception Report also proposed special papers on
probable topics and agreed during the course of the Workshop and Steering Committee Meeting.
This module started with the Situation Assessment covering Sector level analysis and development of
the City profile, moving on to formulation of a Vision for the City and translating them into Strategies,
Priority Projects and Reform Actions. While there were self contained sub-modules within this step,
we had clubbed them into Module II, given the highly consultative as well as data collection /
reconnaissance intensive nature of these steps and the iterative linkages between these steps.
Given the multiple and heterogeneous set of stakeholders involved, we used a range of instruments
to capture diverse inputs for the exercise as indicated below:
Public Meetings / Workshops – As suggested by MPUSP at the inception / culmination of
various stages
Individual interviews – City officials, Government Departments, Mayor, MLA/MPs, Members of
Municipal Council, representatives of Residential/Trade associations,
Limited quantitative surveys – to get a pulse of wider perceptions and priorities of the general
public.
In addition, we had a significant on-the-ground interaction effort through our research and support
staff to compile data and information from the city. From our experience in handling such studies, very
often it is critical to spend substantial time with ULB staff / do sample based field visits given the data
and information availability related limitations. Such interactions enabled us capture the qualitative
insights and serve to provide surrogate inputs to validate and overcome the generally faced limitations
of data availability (something that is also pointed in RFP issued by MPUSP). For instance, we tend to
collect budget documents at the beginning at the study and do the analysis of financials in parallel. A
time period wise analysis of revenue and costs along with their drivers enabled us to spot data
discrepancies in the initial stages and helped us to identify areas where greater time was required for
data collection / scrutiny. Similarly in the area of service levels benchmarking, we tend to do a
physical reconnaissance of municipal assets to validate reports made available to us. For instance,
we visited water distribution stations to assess the validity of the broader service level reports
generated.
We concurred with the activities and steps identified by MPUSP in the Terms of Reference in moving
from a Situation Assessment to formulate the City Vision and translating that to Sector strategies and
priority projects. Some specifics of our approach along each of these steps are described below:
Sector Analysis
The analysis of various sectors covered following steps.
a) Review the baseline status of the sector in terms of operational service level and financial
indicators vis-a-vis benchmarks/norms and desired levels of service to arrive at the normative
gaps.
c) Develop a sector strategy, targets for service level improvement and a list of potential
priority projects to be undertaken along with a expected levels of improvement in service
levels through implementation of these projects.
City Profile
In profiling the City and crystallizing its SWOT (Strengths, Weaknesses, Opportunities, Threats), we
looked at slightly wider issues beyond sectoral dimensions to cover the following:
As can be observed, the idea was to get an over-arching and a holistic idea of the city’s future growth
directions (both economic and spatial) to understand the implications for physical infrastructure and
administrative capacity building needed to support this growth.
The City Profile also drew from the Sector analysis and provided an assessment of the existing
situation in all the sectors, emerging issues, analysis and projection of the present gaps and future
requirements. This was done within the framework of parameters related to demography, economic
base, finance, physical and environmental issues, infrastructure, institutions and universalization of
services especially for the poor.
City Vision
Exhibit 1-3 presents an extract from the JNNURM Toolkit on the aspects to be considered in
developing a City’s Vision which we believe summarizes the key contours of a City level Vision
formulation quite succinctly.
The City Profile was presented to the Stakeholders and Steering Group followed with a discussion on
city perspective and city priorities as perceived by the stakeholders. With the background of City
Profile, perspective and priorities, the participants contributed in developing a collective and shared
vision for the city. Discussions were initiated on Strategies, Priorities and Major Actions that may be
required in the next five years to move towards the vision.
Developing a common vision requires a significant effort of consensus building in order to balance the competing
demands arising from different economic infrastructure sectors, as also from different interest groups within the city. In
order to achieve an understanding on a common vision, it is useful to choose “milestones” and targets such as provision
of a minimum level of services to all; public disclosure and transparency in the formulation of budget proposals;
introduction of a single window in matters of service delivery and management and the like. In developing the vision,
cities must choose a set of criteria that are directly relevant to the JNNURM components. It is important that when cities
define outcomes and milestones on the vision, they ensure that these are measurable and have a time frame.
While the Vision tends to capture a broader perspective of the citizen/stakeholder view on where the
city needs to go, strategies articulate what needs to be done.
For instance, an overall vision to provide universal coverage of water supply to all its citizens may
require strategies to a) Augment water availability, b) Reduce Distribution Losses and c) Differentiated
Tariff with subsidized lifeline supply for cost recovery.
Then we had a workshop with stakeholders to summarize the process and the building blocks around
which the CDP has been evolved and seek an endorsement from them. We also worked with the
stakeholders to develop procedures for performance monitoring and implementation of the actions
recommended in the CDP.
This was followed by a presentation to MPUSP and the ULB. Based on the inputs we are submitting
the final CDP to MPUSP and the ULB along with a summary of the CDP for publication and wider
dissemination by the MC.
A workshop was organized to familiarize the stakeholders with the purpose, process, and
expected outcomes of the CDP, and build enthusiasm, understanding and commitment to the
CDP. The kick off workshop helped in deriving a consensus along with the stakeholders firming
the process and agreeing upon a structured programme to take the CDP forward.
In this workshop, city profile was presented to the stakeholders followed by a discussion on city
perspectives and city priorities as perceived by the stakeholders. With the background of city
profile, perspective and priorities, a collective and shared vision was developed for the city. In
addition to the formulation of the vision and sector goals, the preliminary discussions were
carried out on strategies, priorities and major actions that would be required in the next five years
to move towards the vision 2035.
This workshop involved selection of strategies based on their contribution towards achieving the
city vision and sector goals. The selection of strategies was followed/supplemented by
prioritization of identified projects and immediate actions required to achieve the sector goals.
This workshop culminated in the consolidation of city vision, sector goals, strategies, priority
actions and projects
In this workshop, identified projects in different sectors were discussed with stakeholders. Then,
investment required for implementation of these projects was discussed. An Investment Plan
backed by an analysis of financing capacity and strategies to overcome the limitations of the
financials of the ULB was discussed in detail. Finally culmination of workshop was done with the
finalization of city development plan.
Katni, also known as Mudwara, is situated on the bank of two rivers, namely Katni and Simrar.
Administrative headquarters of Katni District is located in the Katni city. Katni is located in the
Mahakoshal Region of Central India. Katni has historically been under the influence of three different
cultures viz. Mahakausal, Bundelkhand, and Baghelkhand. Katni is the main transit point for several
places of historical importance. Some of them are Bahoriband, Tigavan, Vijaraghavgarh, Roopnath,
Bilhary, Jhinjhari, etc
Presently, Katni city is spread in an area of 69.93 Sq.km. The city is divided into 45 administrative
wards. As per Census 2001, the population of Katni is estimated to be 1.87 lakhs.
Katni is a conglomeration of culture from three different cultural states viz. Mahakausal, Bundelkhand,
and Baghelkhand. Katni has many historical places of immense importance in its vicinity. Some of
these are Bahoriband, Tigavan, Vijaraghavgarh, Roopnath, Bilhary and Jhinjhari. Details of these
places are provided in the Section 4.8.
Exhibit 2-1 provides the demographic details of Katni District. As evident from the Exhibit 2-1, Sex-
Ratio of Urban areas of Katni District is significantly skewed than that of rural areas & district as a
whole. The information presented in Exhibit 2-1 has been extracted from “Population Census
(3)
Abstract, Census of India, 2001 .”
Population
TArea Sex Ratio
Persons Males Females
Rural 8,38,906 4,30,308 4,08,598 950
Urban 2,25,261 1,18,060 1,07,201 908
Total 10,64,167 5,48,368 5,15,799 941
(3)
Source: Population Census Abstract, Census of India, 2001
Katni district shares boundary with the districts of Panna in the north-west, Satna in the north-east,
Umaria in the east, Jabalpur in the south and Damoh in the west. Katni district has three important
rivers, viz. Katni, Choti Mahanadi and Umdar. Katni city derives its name from the River Katni. Katni
district is famous for various minerals. Some of them are Lime stone, Dolomite, Fireclay, Latrite,
Bauxite, Soapstone, Quartz, Batrize, Colsite, Iron, etc. In the area of Agriculture, Wheat, Paddy, Gram
and Pulses are the major crops. Due to its vicinity to huge mineral reserves, Katni is also host to
many Mineral-based industries.
Katni city is well connected by Roads, with National Highway 7, National Highway 78, State Highway
10 and State Highway 14 being the major connecting roads. Earlier, National Highway 7 used to pass
through the middle of the Katni city but it has now been by-passed to avoid the traffic in the city.
National Highway-7 connects Katni with Jabalpur and Rewa. Katni is one of the prime junctions of
Indian Railways as it is the merging point of five different rail networks. Katni is frequently connected
to all parts of the country by Trains. Five different Rail lines from Katni are: Jabalpur line, Bina line,
Satna line, Bilaspur line and Singrauli line.
The rains usually break in the month of June, with the maximum number of rainy days experienced
during the months of July and August. Katni city receives an average rainfall of 200 mm per year.
Winds are controlled by the shifting of pressure belts. They are predominantly from south-west during
monsoon months. In the post-monsoon and winter, southern and south-easterly winds prevail in the
morning while in the afternoon winds blow from directions between east and north. In the summer
months, winds blow from directions between south-east and north-west through south and west.
Except during monsoon seasons, wind speed is generally light to moderate. In the monsoon months
winds are stronger and, on a few occasions, wind flows at 40 to 50 km per hour.
2.8 Conclusion
This chapter dealt with the physical features of the town which included topography, natural drainage,
climate, and wind direction. The chapter also provided information on its location and connectivity. In
addition to above, the chapter also discussed the Historical and Tourism importance of the city.
Census Population Area (sq.km) P.D. (Katni City) P.D. (Municipal Corps, M.P.)
1991 1,63,431 68.57 23.8 43.9
2001 1,87,029 68.57 27.3 54.1
(5)
Source: Town Directory, Census of India, 2001
Exhibit 3-2 shows an upward trend in the population density of Katni Municipal Corporation in the past
two decades. It indicates the rapid urbanization and pressure on the basic services provided by Katni
Municipal Corporation. Despite an increase in the Population density of Katni, it is significantly lower
than the average population density of all Municipal Corporations, taken together, of Madhya
Pradesh.
A critical look at Exhibit 3-3 reveals a higher percentage of women in the illiterate population. This can
be attributed to low importance attached to female education. A higher sex ratio in the SC and ST
categories suggests greater awareness in comparison to whole population. A starkly low sex ratio “0-
6 Years” age group needs immediate attention and should attract concerted actions to improve the
situation.
A detailed analysis of Literacy rate and Sex ratio is provided in Section 4.2. The Work Participation
rate has been discussed in detail in Section 4.5.
Ward No. Population Households Sex-ratio Literacy Rate (%) Work Participation Rate (%)
1 5986 1230 902 58.6 33.7
2 5725 1044 954 71.8 29.7
3 3770 792 853 74.7 34.7
Population projections
Method
2001 2011 2015 2025 2035
Arithmetic increase method 2,20,527 2,33,361 2,68,808 3,09,640
Incremental increase method 1,87,029 2,19,705 2,31,932 2,65,560 3,04,063
Geometrical progression method 2,37,795 2,61,770 3,32,824 4,23,164
Source: IMaCS’ Analysis
Population projection analysis revealed that Estimations using Incremental Increase method is
nearest to the actual population trend. The Population Projections obtained from Arithmetic Increase
and Incremental Increase Methods are close to each other but the Incremental Increase Method
improvises on Arithmetic Increase method by taking an extra degree of variation in consideration.
Hence, for all purposes in this report, Incremental Increase method has been considered for the
estimation of future populations.
Exhibit 3-6 shows that that the Population Density, in various city wards, varies from a minimum of 3.2
in Ward No. 45 to a maximum of 622 in Ward No. 6. Population densities of various wards have been
categorized in the five categories as per the degree of congestion of the ward. Exhibit 3-7 lists the
ward numbers as per their degree of congestion.
Exhibit 3-7 Categorisation of Population Densities
The high population growth rates (14.5% in 1991-2001, 32.9% in 1981-1991 and 42.2% in 1971-
1981) in recent times have led to the several problems related to infrastructure and service
delivery, as development of new infrastructure and maintenance of existing infratructure were
A higher proportion of female among the illiterates indicate lower attention paid to female
education.
3.8 Strategies
1. A healthy demography and quality of life in an area are dependent on each other. Hence, an
immediate attention should be paid to the development of new infrastructure to support the recent
increase in the population.
2. The population density in ward numbers 6(622), 8 (411.3), 9 (355.6), 21 (330), 24 (514.4), 32
(324.2), 33 (523.3) and 34 (334.3) are substantially high as compared to other wards. Initiatives
should be taken to decongest these wards.
3. Awareness generation activities should be carried out to address the issues of lower female
literacy rate (64.3 %) and lower sex ratio (911) with special focus on ST population.
4. Proper documentation, in coordination with Govt. Hospital, of birth and death rates would help in
tackling critical issues.
3.9 Conclusion
This chapter discussed population growth trend and population density of the town. It was followed by
the analysis of other demographic indicators and ward-wise populations. The chapter ended with
population projections for next 25 years.
The next chapter deals with the socio-economic profile of the town.
As shown in Exhibit 4-1, Katni’s literacy rate is comparatively higher than that of urban areas of state
taken together. But despite a higher literacy rate, sheer number of male and female illiterates is
alarming. Turning our attention to sex ratio, Katni’s overall sex ratio is lower with that of whole District
and M.P. State.
Exhibit 3-4 is reorganized in Exhibit 4-2 to identify the wards that need immediate attention in areas
like literacy rate and sex-ratio. Exhibit 4-1 tells us that Katni Municipal Corporation has an over-all sex
ratio of 912 and literacy rate of 82.4%. For both the indicators, Exhibit 4-2 classifies wards into two
categories i.e. wards which have a better value than the whole town and wards which have a lower
value lower than the r whole town.
Parameter Wards with Less than Town Average Wards with More than Town Average
Sex-Ratio 1, 3, 4, 5, 6, 8, 15, 16, 17, 18, 19, 22, 23, 2, 7, 9, 10, 11, 12, 13, 14, 20, 21, 26, 27,
24, 25, 29, 35, 36, 38, 44 28, 30, 31, 32, 33, 34,37, 38, 39, 40, 41,
42, 43, 45
Literacy 1, 2, 3, 11, 12, 14, 15, 28, 29, 30, 31, 33, 4, 5, 6, 7, 8, 9 ,10, 13, 16, 17, 18, 19, 20,
Rate 34, 36, 44, 45 21, 22, 23, 24, 25, 26, 27, 32, 35, 37, 38,
39, 40, 41, 42, 43,
Source: IMaCS’ Analysis
Literacy rate is one of the most important demographic indicators which sum up the existing literacy
level and capacity to actualize the developmental potential. All the wards are classified in four
different categories as per their existing level of literacy. This Classification is given in Exhibit 4-3.
Figure 2 shows the ward-wise literacy rates in the city. It can be seen from Figure 2 that most of the
peripheral wards have lower literacy rate whereas the wards in the central area of the city have high
literacy rates. It can also be seen that the wards having low literacy rate are mostly the slum wards.
In addition, a detailed gendered analysis of literacy has also been carried out for all the wards of Katni
city. This has been done in accordance to the classification criteria provided in Exhibit 4-3
The Average Household Size in Katni Municipal Corporation was 5.23 in the year 2001. Average
Household Size for Katni Municipal Corporation (5.23) was lower than that of urban areas of MP state
(5.5) in the year 2001.
Our preliminary assessment and review of reports of “Census of India, 2001” helped us consolidate
the data pertaining to import/export of commodities from Katni and information on manufacturing
industry of Katni. Exhibit 4-6 provides glimpses of three Most Important Commodities imported,
exported and manufactured in Katni.
Exhibit 4-6 Most Important Commodities Imported, Exported and Manufactured
Particular Most Important No.1 Most Important No.2 Most Important No. 3
Commodity Imported Cloths Machinery Cutlery
Commodity Exported Lime Limestone Pottery
Commodity Manufactured Lime Rice Pottery
(5)
Source: Town Directory, Census of India, 2001
As evident from Exhibit 4-6, the most important driver of Katni’s economy is processing and export of
Lime.
Main Workers: Those workers who had worked for the major part of the reference period (i.e. 6
months or more).
Marginal Workers: Those workers who had not worked for the major point of the reference period
(i.e. less than 6 months) are termed as Marginal Workers.
As a sub-classification, “Main and Marginal Workers” are again classified on the basis of nature of
work performed; Cultivators, Agricultural Labours, Household Industry Labours and Other Workers.
Agricultural Labours: A person who works on another person's land for wages in money or kind or
share is regarded as an agricultural labourer(S), he has no risk in the cultivation, but merely works on
another person's land for wages. An agricultural labourer has no right of lease or contract on land on
which (s) he works.
Other Workers: This includes all government servants, municipal employees, teachers, factory
workers, plantation workers, those engaged in trade, commerce, business, transport banking, mining,
construction, political or social work, priests, entertainment artists, etc. Exhibit 4-7 provides workforce
details of Katni city.
These Industries exists in two forms; Standalone industry and part of dedicated Industrial area.
Presently, there are 152 sanctioned plots in the Katni Industrial Area, out of which around 120 are
operational. Recently, Audyogik Kendra Vikas Nigam (AKVN) has proposed a Food Park in Katni
which will be host to 200 industrial units. In addition, a new industrial area is proposed at Lamtara,
which will accommodate 150 industrial units.
Stone Park
Stone Park is cluster of mineral based industries with primary attention to Marble Industry. It is
situated in Slimnabad around 25 km from katni Railway station. This park will cater to industries
related to Marble production & export. In this district 52 industries have been granted Mining-lease
Under ASID scheme of GOI, a fund of INR 3.26 Crores has been sanctioned for the development of
4.8 Tourism
Katni is the main transit point for several places of historical importance. Some of them are
Bahoriband, Tigavan, Vijaraghavgarh, Roopnath, Bilhary, Jhinjhari, etc
Bahoriband:
Tigavan
Located at about 30 km from Katni, Vijayraghavgarh was a major town during the reign of King
Prayagdas. It is famous for Vijaraghavgarh fort and a temple of lord Vijayraghav. Other attraction at
Vijayraghavgarh includes a Rangmahal.
Roopnath:
Bilhary
Jhinjhari
Jhinjhari is famous
for its coloured
painted rocks.
These paintings
date back to 10000
BC to 4000 BC.
Some of the
pictures belong to
the middle age - 700 BC to 200 BC.
Exhibit 4-6 reveals an enormous dependence of Katni’s economy on the Lime. Whereas this
potential can further be actualized, this dependence is also a possible threat to the Katni’s
economy. To achieve a sustainable growth rate, a more diversified economic base is of utmost
importance.
It is clearly visible that Katni is surrounded by several tourist places. Though some efforts have
been taken towards the actualizing the ancillary tourism potential of Katni town, concentrated
efforts are still lacking to develop Katni as a Transit hub for these places.
4.11 Strategies
1. Effective education programmes should be carried out to address the issues of male and
female illiteracy which impedes the overall development of the city.
2. Further, awareness generation activities should be carried out to address the issues of lower
awareness, poverty and lack of sufficient accessible education.
3. Generation of new employment avenues for Non-Workers for substantial reduction of
unemployed population.
4.12 Conclusion
This chapter dealt with various aspects of socio-economic profile of the town such as sex ratio,
literacy rate, average household size, work participation rate, socio-economic base and trade &
commerce. The discussion was then followed by the analysis of critical issues in this area.
The next chapter talks about physical planning and growth management in Katni city. It involves
discussions on spatial distribution of population, past growth trends, municipal and ward-level
mapping. The chapter also includes a discussion on Land-use pattern of Katni city.
A pictorial representation of Ward wise population densities is presented in Figure 6. As per the
Exhibit 3-7, the population density has been categorized into 4 types. Ward no 6, 8, 9, 21, 24, 32, 33
and 34 have higher density and are shown in the dark brown colour. Wards 5, 7, 20, 22, 23, 25, 26,
31 and 40 are in the density range of 100-300 pph and are shown in the light brown colour. The wards
1, 2, 3, 10, 13, 14, 15, 16, 17, 18, 28, 29, 35, 36, 38, 39, 43, 44 and 45 are the ones with least density
and shown in the light yellow colour. Rest of the wards have medium density in the range 50-100 pph
and are shown in the dark yellow colour.
An important observation is that that the higher density wards are concentrated near the city centre
and Railway network. The lower density wards are mainly the peripheral wards. However, some of the
lower density wards are located near the railway lines and hence have a potential for future growth.
The low population density in these wards can be attributed to the presence of large open spaces and
vacant land. A close look at Figure 6 reveals that most of the wards adjoining NH 7 and close to the
city centre have comparatively higher population densities. Also, some of the wards located in the
South-Western part of the city have high population densities. This can be attributed to their proximity
to the mining areas of the Western part of the city.
Figure 7 provides a snapshot of existing land-use pattern of Katni planning area. Figure 7 shows the
existing land use of the city. The land use has been categorized into 10 types; residential,
commercial, industrial, public/s. Public, recreational, transportation, water bodies, agricultural, hillocks
and the space for utilities. It can be seen that the predominant land use is agricultural. An important
observation is that that most of the commercial activities are taking place along the major roads near
the city centre. Also there is a mandi in the north west of the city.
The industrial estates, as shown in Figure 7, are present in the Southern and Western parts of the
city. A small industrial estate is also present in the Northern part of the city. The South-Western part
of the city boasts high concentration of Public/Semi-Public facilities. In addition, a small patch of the
Public/Semi-Public facilities exists near the Municipal Corporation office.
Other details of various land use categories are presented in Exhibit 5-1. It provides details
corresponding to 10 land-use categories; Residential, Commercial, Industrial, Public/Semi-Public,
Utilities & Services, Recreational, Transportation, Vacant land, Agricultural land and Water Bodies.
In order to gain a better understanding of Katni Master Plan, a comparative analysis of existing Land
Use pattern and proposed Land Use pattern has been carried out with the Land Use pattern
suggested in the UDPFI guidelines. As per the classification provided in UDPFI guidelines, Katni city
will be categorized as a medium city. A snapshot of these Land Use patterns is provided in Exhibit
5.2.
Exhibit 5-2 Comparative Analysis of Land Use Pattern of Katni with UDPFI
Existing Land Use Proposed Land Use (2021) Land Use as
S.No Land use Category % of Developed Area % of Developed Area (Ha) per UDPFI
land (Ha) land
1 Residential 40.08 615 49.06 1440 40-45
2 Commercial 3.45 53 7.22 211.8 2-3
3 Industrial 15.65 240 12.27 360 8-10
4 Public/S. Public 8.48 130.80 5.13 150.48 6-8
5 Utilities & Services 1.46 22.30 1.19 35.05
6 Recreational 0.6 9.3 5.79 170.05 12-14
7 Transportation 30.28 464.6 19.34 567.56 10-12
Total Developed Land 100 1535 100 2934.94
8 Vacant Land Not considered 2560 Not considered -
9 Agricultural Land as Developed 8466.7 as Developed - Balance
Water Bodies Land Land -
10 323.3
Source: Katni Master Plan (4) and UDPFI (7)
As per Exhibit 5.2, most of the components, except Industrial and Transportation, of existing land-use
pattern of Katni (Planning Area) are in tune with land-use suggested in UDPFI guidelines. In the land-
use pattern proposed for year 2021, the percentages of land under Residential, Commercial,
Industrial and Transportation uses exceeds that suggested in UDPFI guidelines. This eccentricity can
be attributed to the specific needs of Katni city, it being envisioned as an Industrial, Commercial and
Transportation centre of Central Madhya Pradesh. One of the shortfalls of Katni Master Plan is under-
allocation of land for Recreational use. Recreational amenities are important components of a city’s
5.9 Conclusion
This chapter discussed physical growth of Katni city. The chapter presented municipal boundary and
ward delineation maps. It also included the analysis of spatial growth trends and population densities.
An analysis of Katni’s housing scenario and Master Plan and its provision was also carried out in this
chapter.
The next chapter deals with the assessment of urban services. The assessment of existing situation is
followed by the demand-supply gap analysis, SWOT analysis and identification of critical issues in
each urban sector.
SWOT Analysis
Sectors / Services identified for the analysis include: Water Supply, Sewerage & Sanitation, Solid
Waste Management, Drainage, Traffic & Transportation, Street Lighting & Fire Fighting, Urban Poor
and their Accessibility to Basic Services, Social Infrastructure, Environment, Heritage & Conservation,
and Existing Institutional Framework for Development. Sector-wise analysis is presented in
subsequent sub-sections. Demand-Supply Gap Analysis for various sectors has been done for short
and long term, i.e. 5 years and 25 years. Population projection for these timelines is provided in
Exhibit 6-2.
Exhibit 6-2 Population Projection for Demand-Supply Gap Analysis
In addition to the projected town population, a floating population of 10 % of the town population has
also been considered in the demand estimation in the sectors of Water Supply and Sanitation.
Existing Status
To extract the water from the Katni River, a Karry type Annicut, height 4 meters and length 30 meters,
has been constructed over the Katni River. It has a capacity of 6.22 Mcft which is sufficient to supply 9
MLD of water for a period 15-20 days, considering 30-40 % evaporation and infiltration losses. With
the help of an Intake Well, 7.5 meters high and 6 meters diameter, raw water is being pumped using
75 HP motors, having a suction and delivery head of 55 meters, to a treatment plant of 9 MLD
capacity. Raw Water Pumping Main has a 380 mm diameter steel hume pipe having length of 671
meters from Intake well to Water Treatment Plant.
The tariff structure has been fixed by Municipal Corporation (in co-ordination with State Government).
The current water tariff presented in Exhibit 6-4 was revised in year 2007, after which no revision has
taken place.
Water Charges
S. No. Type of Consumer Prior to 2007 After 2007
INR per month INR per month
1 Domestic (1.0 / 0.75 / 0.5) inch 110/85/60 120/95/70
2 Non Domestic (1.0 / 0.75 / 0.5) inch 160/120/85 170/130/95
(6)
Source: Katni Municipal Corporation
Exhibit 6-5 provides a snapshot of service level indicators of “Water Supply” service provided by Katni
Municipal Corporation.
For the Water Treatment infrastructure, it has been assumed that 100% of the supplied water will be
(7)
treated before its consumption. As per UDPFI norms, a city needs to maintain an Elevated Storage
Capacity equivalent to 33% of the quantity of water supplied daily. It has also been assumed from the
guidelines that city would need to increase its distribution network from 48% of city’s road network to
85 % of the same.
3 Elevated Storage capacity Elevated Storage capacity w.r.t Supply % 35 33 ML 5.4 10.7 5.3 14 3.3
4 Distribution Network Percentage of Road Length % 48 85 Km 106.5 233.7 127.2 365 131.3
Source: IMaCS Analysis
It is evident from Exhibit 6-6 that Katni needs a major revamping in “Water Supply” sector as current level of service, 72 lpcd, is substantially lower than
the prescribed norm of 135 lpcd. The huge gap in the water supply area at the end of year 2015 well underscores the above point. By the end of year
2035, Katni city would require 42 MLD of water for daily consumption. Katni city also falls behind in meeting the standards of UDPFI guidelines in the
area of Treatment capacity. In the area of Elevated Storage Capacity, Katni city, at present, meets the UDPFI standards but a gap of 5.3 MLD in short
term and additional 3.3 MLD in long term will have to be addressed. An addition of 127.2 kms and 131.3 kms will be required in the area of distribution
network by the year 2015 and 2035 respectively.
Ongoing/Proposed Projects
The ongoing project was designed under UIDSSMT scheme for fulfilling the water related needs of the Katni city for the year 2040. The augmentation
project has been designed for augmenting the water supply in Katni city to a level of 51 MLD, including 15 % of Transmission & Distribution losses. The
(8)
project is known as “Katni Water Supply Scheme .” The project includes following components:
Issues
1. A substantial part of population receives untreated water as the existing treatment plant treats
only 58 % of the supplied water;
2. Critical shortage of water during summer season due to lowering of water level in the Katni
River and Mines;
3. Around 5 wards are dependent on Hand-pumps for daily water supply;
4. Complete absence of metering system;
5. Upstream pollution of Katni River.
SWOT Analysis
Strengths Opportunities
1. Several Water Sources in the reachable 1. Metered connections could bring
distance. accountability in the water consumption and
2. With the completion of ongoing project, gaps can also increase the revenue of the
assessed in the various will be addressed Municipal corporation
3. People are well aware of the need to adopt 2. Service Levels could be improved by
best practices augmenting daily supply of water and storage
4. Stakeholders are enthusiastic about capacity.
increasing the coverage of Water Harvesting 3. Water quality can be improved by increasing
in the city the water treatment capacity.
4. Possibility of Private Participation can be
explored to address the capacity constraints
of Municipal Corporation
5. Rationalization of water charges
Weaknesses Threats
1. Current Service levels of water supply are 1. Excessive exploitation of Ground Water by
lower than level desired under the UDPFI Tube-wells could have long term implications
guidelines. on the Environment
2. Lack of adequate water treatment capacity 2. Failure of timely completion of ongoing “Katni
3. Unmetered water connections Water Supply Scheme” could lead to the
4. Five wards are dependent on Hand pumps worsening of the situation.
for the water 3. Failure to extend the distribution network to
5. Poor collection efficiency of water tariffs the uncovered parts of the city can have
serious socio-economic impacts
Around 61.5 % of households have an in-house sanitation facility whereas 38.5 % of households
either resort to open defecation or use Public Toilets.
Public Toilets
Katni Municipal Corporation has developed many Public Toilets/Conveniences which are located at
various key locations in the city. The primary purpose of these Public Toilets is to serve the Floating
Population. However, these Public Toilets are also used by members of those households which lack
an in-house Sanitation facility. But a significant portion of the households which lack an in-house
sanitation facility also resorts to open defecation.
At present, Katni Municipal Corporation provides Public Conveniences at 13 locations. Exhibit 6-8
summarizes the location and number of seats of each Public Convenience system.
The sanitation facilities have been analyzed in two categories; Household toilets and, Public Sanitary
Conveniences (PSC). For the purpose of future demand estimation, it has been targeted that all the
uncovered households will have to be provided with some kind of sanitation facilities (not necessarily
in-house) by year 2035. The primary objective of Public Sanitary Conveniences will be to serve the
1. The number of uncovered households increased with the annual population growth rate.
2. Every year, around 5% of uncovered households shifted to the in-house sanitation facility.
(7)
Considering the above assumptions and norms prescribed under UDPFI guidelines, the Demand-
Supply Gap Analysis was carried out. Results of this analysis are provided in Exhibit 6-9. Exhibit 6-9
also provides a snapshot of comparative analysis of existing level of service with level of service
desired under the Urban Development Plans Formulation & Implementation (UDPFI) guidelines.
As shown in Exhibit 6-9, Katni city would require a sewerage system to cater to around 60813 Households (as per UDPFI guidelines) by the end of year
2035. A treatment plant with an initial capacity of 26 MLD should be developed in the short term which should later be increased to 34 MLD by the end of
year 2035. Katni city would also have to provide sanitation facilities to around 12123 uncovered households by year 2015. To provide sanitation facilities
to the floating population, existing capacity of 160 would need to be augmented to 387 by year 2015 and 507 by year 2035.
Issues
1. Absence of sewerage system in the town – At present only few areas are connected to local septic tanks with major portion of the town lacking a
sewerage network, this portrays the lack of sewerage infrastructure in the town. Dumping of sullage and stagnation of water are visibly disturbing
which ultimately leads to a mosquito menace and other hygiene problems. This issue can only be addressed by development of a comprehensive
sewerage system in the city.
2. Need for greater coverage and better maintenance of Public conveniences - Given the significant proportion of slum population, there is a
need of additional public conveniences. The existing level of one seat per 135 persons is very less than the UDPFI norm of one seat per 60 persons
Generally, solid waste is heterogeneous in nature and a mixture of vegetables, food items, paper,
plastics, rags, glass etc. If solid waste is disposed off in open areas without any treatment, it will
cause a negative impact on the environment and ground water.
Existing Status
Katni Municipal Corporation is responsible for all kinds of collection i.e. primary, secondary and
tertiary which include street sweeping, collection, transportation and disposal of all solid wastes
generated in the town.
Municipal Corporation has a dedicated staff of around 500 sanitary workers supervised by 32 Sanitary
Supervisors. Sanitary Supervisors are headed by 5 Sanitary Inspectors. Solid Waste Management
service is headed by 2 Health Officers. Exhibit 6-10 provides details viz. quantity of waste generated /
collected, constituents of municipal waste, collection bins, frequency of waste collection and
population covered by door to door collection by ULB.
Data pertaining to “Number of Collection points” refers to major waste collection points i.e. points at
which waste collection is carried out at daily. As per the available information, some of the major
waste collection points are not equipped with dustbins. Hence, the number of dustbins, at waste
collection points, is less than the number of Major Waste Collection Points. The Actual number of
collection points is difficult to arrive at as the “number of collection points without dustbins” is not
available.
Exhibit 6-11 gives a snapshot of service level indicators of SWMS of Katni City.
Despite lacking a proper solid waste treatment setup, Katni Municipal Corporation carries out the
collection of waste generated in the city in an effective manner.
Figure 9 shows the location of the existing dumping site, which is located at the extreme south of the
city.
Vehicle Type Owned/ Rented No. Capacity (tons) Trips per day
Front End Loader Owned 2 - -
Dumper Placer Owned 1 - -
Truck Owned 2 4 4
Tractor Owned 4 2 4
(6)
Source: Katni Municipal Corporation
Ongoing Projects
(7)
As a proactive measure, Katni Municipal Corporation has prepared a “Detailed Project Report” to
upgrade its Solid Waste Management System to comply with the norms prescribed under “Municipal
(11)
Solid Waste (Management and Handling) Rules, 2000 .” The details of major components of
proposed project are provided in Exhibit 6-13.
Exhibit 6-13 Proposed Project for MSW Management in Katni Municipal Corporation
SNo Item Numbers
Primary Collection
1 Covered Bins for Households (15 litre capacity) 59682
2 Tricycles (4 bins @ 50 litre capacity) 142
3 Hand Carts (4 bins @ 30 litre capacity) 178
4 Wheel Barrows (100 litre capacity) 175
Secondary Collection
1 600 litre capacity RC bins 510
2 1100 litre capacity RC bins 73
Waste Transportation
3
1 Refuse Collector (8 m capacity) 6
2 Cattle Lifting Vehicle 1
Disposal
1 Composting Plant ( capacity 40 TPD) 1
2 Land-fill site (15.3 Acres for next 20 years) 1
(10)
Source: Detailed Project Report, Katni MSWM
The Primary Collection infrastructure has been analyzed with respect to Push-Carts, Tricycles and
Community Bins (primarily for Slum Areas). It was assumed that the city should have equal number of
Push-Carts and Tricycles to carry out the primary collection in an effective manner. It has been
observed that primary waste collection in slums does not reach 100% due to many constraints such
as poor connectivity, unclear demarcation of houses, etc. Hence, there should be a provision of
community bins in the slums to maximize the solid waste collection. In our analysis, we have
assumed that 50 % of slum areas will be provided with the community bins.
The Secondary Collection Infrastructure has been analyzed with respect to Collection Points and
carrying capacity of Transporting Vehicles. According to the “Manual on Municipal Solid Waste
(12)
Management ,” 1 collection point should be provided for an area of 0.25 sqkm (500mx500m). It was
also revealed from the discussion with staff of Municipal Corporation that Waste Transportation
vehicles operate at a rate of 4 trips per day to the Disposal Site. The total carrying capacity of
Transportation Vehicles should at least be equal to the 33% of the waste generation in the city. A
provision should be made for the standby capacity equivalent to 30% of the vehicle carrying capacity.
The adequacy and Demand-Supply Gap analysis of Waste Disposal was carried out for
Biodegradable and Non-Biodegradable wastes separately. It was assumed that Biodegradable
component of solid waste would be disposed in a Composting Plant whereas Non-Biodegradable
waste would be disposed at Landfill site. It was revealed from the “Detailed Project Report for Solid
(10)
Waste Management of Katni City ” that around 44% of Municipal Solid Waste at Katni is Bio-
degradable and 14 % is Recyclable. Hence, for the demand estimation, Bio-degradable waste has
been considered for disposal at composting plant and waste excluding bio-degradable and recyclable
for landfill site.
As per Exhibit 6-15, Katni City needs a major augmentation in the area of accessories that support Primary collection of solid waste. A total of 190
tricycles and 190 push-carts would be required by the year 2035 to carry out the primary waste collection in an effective manner. To carry out the primary
waste collection in those slum areas where primary collection by means of Push-carts and Tricycles is not possible, provision for 162 dustbins should be
made by the year 2015. To increase the vehicle carrying capacity of transportation vehicles from 20 % to 33 %, city would need to add vehicles of
cumulative capacity of 21 MT in its fleet by year 2015. Against an existing Trenching ground of 15.5 acres, a landfill site of 77.4 acres and a composting
plant of ultimate capacity of 49 metric ton would be required by the year 2035.
The city also lacks provisions for the separate waste collection of Bio-Medical waste, Industrial Waste and waste from Restaurants, Hotels, Slaughter
House etc.
Issues
1. No Segregation Practice at Source ;
2. Lack of proper Primary Collection System – There is no door-to-door collection system
established in the city;
3. Secondary Storage of waste is unorganized: Mostly open dumps are available for secondary
storage of solid waste;
4. Transportation of solid waste to the Trenching ground in open vehicles;
5. No Separate collection and disposal of construction waste;
6. Lack of proper management of biomedical waste;
7. Manual handling of solid waste: Lack of safety measures;
8. Lack of awareness among the town residents.
Type Length in km
Pucca 152
Kutcha 92
Total 224
(5) (6)
Source: Census of India, 2001 & Katni Municipal Corporation
Traffic Circulation
This section deals with the identification of major roads which carry significant city traffic. These roads
(4)
have been identified from the field surveys and review of “Master Plan, Katni .” These corridors are:
Mahatma Gandhi Road, Kamla Nehru Marg, Sardar Patel Marg, Tilak Marg, Barhi Marg and NH 7. In
addition to these, Ordinance Factory Marg, Jawahar Marg, Gurugovind Marg and Roads connecting
N.K.J and Madhav Nagar to the main city are also among the important roads of the city.
Katni city has many transport agencies. Generally, trucks are parked in front of their agencies which
cause obstructions to free flow of traffic.
Figure 10 provides a snapshot of Road Network of Katni city including the main congestion points.
The map attempts to provide a aerial view of; Existing road network including major roads and arterial
roads, Railway stations, Bus stops, etc.
National Highway-7 acts as the main arterial road for the city. National Highway-78 which connects
Katni to Barhi also carries a significant amount of city traffic. Subhash chowk and Mission chowk are
two major intersections of city. It can also be seen that most of the major congestion points fall on the
National Highways. The other critical congestion points are located near Railway crossing (faatak),
near Rest House No. 2, near Khireni Police Station, near Police Thana Tigadda, Azad Chowk,
Chandak Chowk and Bhataa Mohalla Tigadda.
Katni city also acts as a Railway hub and boasts a dense Railway network with a good connectivity
with rest of the state and other parts of the country. The Railway stations connect Katni with
Allahabad in the North, Jabalpur in the south, Beena in the west and Bilaspur in the south east. An
aerial view of city’s rail network is shown in Figure 10.
At present, there is no notified Truck terminal in the city. The lack of a notified Truck Terminus leads
to traffic congestion and accidental situations at many locations in the city. To counter these issues, a
Truck Terminus is proposed in the Pureni area of Katni city.
Parking
Almost all the important locations of city lack an organized parking facility. This can primarily be
attributed to the unavailability of space as these places are densely populated and average street
width in these areas is around 5 m. Lack of sufficient parking lots and organized on-street parking
facilities has resulted in haphazard and unorganized parking on most stretches of commercial roads
in the city.
Katni city would require an addition of 30.9 km in its existing road network by the year 2015 whereas in the next 20 years from year 2015, it would have
to be increased by 154.5 km. To achieve a target of 100% Pucca roads by the year 2015, city would need to upgrade 92 kms of Kutcha roads to the
Pucca roads.
Issues
1) Traffic congestion - Increase in the number of vehicles and lower road widths are the major causes for traffic congestion;
2) Inadequate parking facilities - Inadequate traffic management measures and inadequate parking facilities are major problems of the town;
3) At present, average width of roads is found to be 5m which is very less with respect to the city’s needs;
4) Encroachments along the roads - Presence of informal activities along the road margins, illegal encroachments of pedestrian areas and
footpaths are the other causes for traffic congestion in the town;
5) There is a human cry towards safety of non-motorized traffic and pedestrians on the main roads especially roads that are linked to major schools
and hospitals;
City Development Plan – Katni Municipal Corporation 60
6) Earthen roads are also a constant source of dust due to its poor binding properties. It leads to
environmental pollution, poor visibility and health related problems.
SWOT Analysis
Strengths Opportunities
1. Good Road density of 3.5 km per sqkm of city1. Development of alternate routes within the
2. Presence of various Under-bridges to promote city to improve the circulatory characteristics
the smooth flow of traffic 2. Development of Parking plots through Public
3. Presence of major transportation corridor in Private Partnership models
the city limits 3. Awareness generation programs for safe
4. General awareness towards the importance of driving practices and traffic rules
Road network for the overall development of 4. Introduction of Public Transport
5. Strict regulations over the polluting vehicles
the city.
to mitigate the health risk faced by citizens.
Weaknesses Threats
1. Absence of Over-bridge/Under-pass at some 1. Unregulated growth of encroachments
of the critical intersections 2. Degradation of surface of roads due to
2. Several incidences of encroachments have movement of heavy vehicles
reduced the effective width of city roads 3. Poor Drainage System leads to the flooding
3. Severe traffic jams due to narrow roads which impacts the general health of roads
4. Lack of pathways and bicycle tracks 4. Accidents due to heavy traffic movement,
5. Lack of organized parking lots narrow roads and negligent driving.
6.2.5 Drainage
Existing Status
The storm water drainage system of Katni city consists of three kinds of drains, i.e. Kutcha Open,
Pucca Open and Pucca Closed. The storm water drainage network of Katni city comprise 210 kms of
Kutcha, 60 kms of Pucca Open and 30 kms of Pucca Closed drains. As the town lacks an integrated
drainage system, the rain water finds its way to low lying areas. The stagnation of this storm water
results inti unhygienic conditions causing serious health impacts.
Figure 11 also shows some of the low lying areas of the city (in red colour) which generally get
affected with the stagnation of the Storm water.
With above assumptions, Current status analysis and Demand-Supply Gap analysis was carried out for the Drainage network. In addition to the
Demand-Supply Gaps, Exhibit 6-19 provides a snapshot of comparative analysis of existing level of service with level of service desired under the UDPFI
(7)
guidelines.
Katni city needs a major revamping of Storm Water Drainage System. This includes an addition of 57 km of new drains and up-gradation of 210 km of
Kutcha Open drain to Pucca Open and Pucca Closed drains by year 2015. 58 km and 152 km of Kutcha Drains should be upgraded to the Pucca open
and Pucca Closed respectively. After year 2015, 66 km of Pucca open and 134 km of Pucca closed should be constructed in a phased manner in a
period of 20 years to maintain the prescribed level of service.
City is vulnerable to floods and stagnation of water due to lack of an integrated drainage
system and proper disposal mechanism of storm water.
A significant portion of city’s drainage system is formed by Kutcha open drains.
Clogging of existing drains due to negligent practices of some of the citizens related to the
dumping of waste in the drains.
Field surveys and public consultations have revealed that that the silting of natural drains is a
major problem and leads to the improper disposal of storm water which often leads to the
overflowing of storm water.
Encroachment on the open drains is a major cause of concern
SWOT Analysis
Strengths Opportunities
Weaknesses Threats
1. High percentage of Kutcha drains 1. Improper and untimely de-silting of natural drains
2. Encroachments of natural drains can weaken the city’s drainage system
3. Mixing of Waste water and Storm Water
2. Negligent practices by citizens towards disposal
of Waste water and dumping of Solid waste into
Storm water drains.
Street Lights
Katni has a good coverage of the roads with street lights. Exhibit 6-20 below provides details of
Katni’s Street light network and its composition.
Type No %
Tube lights 2505 49.9
Sodium Lamps 2506 49.98
High Mast lamps 06 0.12
Total 5017 100
(6)
Source: Katni Municipal Corporation
Fire Service
Presently, Katni Municipal Corporation has 2 Operational Water Tenders, namely TATA 709 and
TATA 1210, of 2700 and 3600 litres capacity. In additional of these water tenders, Fire Fighting
Department of Katni Municipal Corporation also operates a makeshift Water Tender comprising of a
4500 litres water tanker and 5 HP diesel pump. Due to lack of this facility in nearby areas, Water
Tenders are often sent to the areas which are outside the jurisdiction of Katni Municipal Corporation.
Also, the sanctioned number of staff has not been posted which causes technical problem in running
the service efficiently. Presently, this department employs 1 Head Fireman, 6 Drivers and 9 Firemen.
Katni, at present, is suffering from shortage of electricity with duration of power cuts reaching up to 6-
8 hrs during summer. Katni, at present, does not receive electricity from any other source, leaving
apart a few solar energy panels. The electricity wires crisscross the city’s skyline and pose a potential
threat to citizens and their properties.
Exhibit 6-22 summarizes the current status and Demand-Supply Gap analysis for Street Lighting and Fire-fighting facilities in the town.
Exhibit 6-22 Street Lighting and Fire Fighting: Demand - Supply Gap Analysis
Issues
Street Lighting
Average spacing between two lamp-poles is 49 m which is higher than the prescibed norm of 30 m
At present around 49% of the street lighting system comprises of Halogen lamps resulting into a
higher energy consumption.
Although an average spacing of 49 m between two lamposts indicate a decent street light
coverage of road network, it fails to take the difference in concentration of street lights along some
particular roads into account.
As the responsibility of laying lamp-poles and their electrification lies with M.P. State Electricty
Board, there exists an institutional gap between the planning and implentation of installation of new
street lights.
Fire-Fighting
A huge infrastructural gap to cater the population of city and that of surrounding villages.
Inadequate safety equippments with the firemen
Lack of logistics to support High Speed communication
Power
Long electricity cuts especially during summer.
Open electricity wires posing a threat to citizens and their properties
Lack of alternate power sources
SWOT Analysis
Street Lighting
Strengths Opportunities
1. A satisfactory street light coverage of roads 1. Existing base can be utilized to provide a
2. A diversified Street Lighting infrastructure uniform coverage throughout the city.
2. Halogen lamps can be replaced by Tube-
lights to reduce the electricity consumption
3. New installations can be supported by
underground cabling to improve the skyline of
the city
Weaknesses Threats
1. High percentage of halogen lamps and tube 1. Lack of maintenance can degrade the
lights results in the high energy consumption existing infrastructure
2. Concentration of street lights along major 2. Illegal connections would result into higher
corridors expenditure of Municipal Corporation
3. Lack of vigilance resulting illegal domestic
and commercial connections from street lights
Weaknesses Threats
1. Only 1 Fire station that caters to entire Tehsil 1. Failure to increase the number of Fire-
(Sub-District) stations and improve infrastructure can result
2. Dilapidated Fire Station in high casualty rate
3. Inadequate infrastructure and capacity
Katni city has experienced a steady growth in population in the last three decades. The city’s
population grew at decadal growth rates ranging from 42 to 14 percent in past three decades. Along
with this, the housing needs of the city also grew. These could not be satisfied by the formal housing
market. Several immigrated households who could not avail of the formal housing market satisfied
their needs by occupying vacant land; this led to a simultaneous increase in slum population. The
concentration of employment opportunities in Katni urban area attracts several migrant laborers to the
city. Such migrants, due to their low levels of income, are unable to afford pucca houses and end up
occupying vacant government/private land.
The Madhya Pradesh Slum Area (Improvement and Relocation) Act, 1976, specifies that where the
competent authority is satisfied in respect of building in an area “that the buildings in that area are in
any respect unfit for human habitation; or are by reason of dilapidation, overcrowding, faulty
arrangement of streets, lack of ventilation, light or sanitation facilities, or any combination of these
factors, are detrimental to safety, health or morals – it may, by notification, such area to be a slum
area.” Further, to specify that a building is unfit for human habitation, the criteria to be considered are
“repair, stability, freedom from damp, natural light and air, water supply, drainage and sanitary
conveniences, facilities for storage, preparation and cooking of food and for the disposal of the waste
water.”
In total, there are around 8646 beneficiaries who will be provided with 2182 housing units. In addition
to the Housing units, necessary provisions are also proposed in the area of basic infrastructure
facilities. The total cost of proposed project is Rs 2921 Lakhs.
SWOT Analysis
It was revealed from the stakeholder consultations that, in slums, the level of service for almost all
urban services is lower than that in the rest of the city. SWOT analysis of services in the slums would
be similar to the individual SWOT analysis carried out under the sections various sections of this
chapter. The Strengths and Opportunities for basic services in slum areas are almost similar to those
in rest of the city. Some of the major weaknesses of Slum areas are:
1. Inadequate financial capacity to translate the meager awareness on Health and Education
into actions to improve the general social conditions related to hygiene and literacy.
Issues
1. Growth in Slum Population: Around 30% of city’s population lives in Slum areas which are spread
all over the city on the vacant lands and along the river bank. A sound industrial base has resulted
into the increase in number of slums and slum dwellers.
2. Concentration of slums along sensitive locations: The majority of the slums in the town have taken
refuge on the available locations such as along the Railway lines, periphery of Municipal Area,
Exhibit 6-26 presents a Demand estimation analysis of Health infrastructure for Katni city.
Demand
Indicator Population per Institution Unit
Year 2015 Year 2035
Bed Capacity 250000 No. of Beds 464 608
Poly-Clinic 75000 No. of facilities 3 4
Dispensary 15000 No. of facilities 15 20
Source: IMaCS Analysis
In addition to augmenting city’s bed capacity, special attention should be paid to the provision of
tertiary care health facilities in the city. A high concentration of mineral dust in the nearby areas
requires a tertiary care unit for the respiratory diseases and cancer. To reduce dependence on
medical facilities of Jabalpur, a trauma centre should also be developed in the Katni.
Issues
1. Government Hospital which receives maximum number of patients suffers from inadequate
infrastructure and poor maintenance of buildings and other assets.
2. Inadequate tertiary care units
3. Utilization of existing facilities at Government Hospital is severely constrained due to power cuts.
4. Lack of sufficient facilities for the people accompanying the patient
5. Lack of sufficient government health facilities leads to expensive healthcare for the Poor.
SWOT Analysis
Strengths Opportunities
1. Sound existing base of primary health facilities 1. Meeting of Infrastructural Gaps can develop
(in terms of numbers) Katni as a healthcare hub for the region
2. Substantial awareness for the improvement 2. Development of new health facilities supported
Health Infrastructure by an up-gradation/improvement of existing
3. Vicinity to major cities for the specialized health facilities will help in an overall
treatments development of the region.
Weaknesses Threats
1. Inadequate number of Intermediate hospitals 1. Failure to improve the Health Infrastructure of
and Poly-Clinics city can have long lasting impacts on all the
2. Quality of physical infrastructure of this sector aspects of city and its development
demands major revamping 2. Lack of funds can derail the much needed up-
3. Frequent power cuts hinder a continuous gradation and addition of capacity to the
supply of services existing fleet.
4. Absence of alternate power supply in the 3. Lack of maintenance can degrade the existing
existing health facilities infrastructure.
6.4.2 Education
Existing Status
Educational Institutions in Katni city are owned and run by various organizations, namely Department
of Education, M.P., Katni Municipal Corporation, Central Government and Private Players (Aided by
Government and Unaided). There are seven kinds of schools in Katni city, namely Primary only
(Class I to V), Upper Primary only (Class VI to VIII), High School only (Class X to XI), Senior
Secondary only (Class XI to XII), Schools with Primary and Upper Primary (Class I to VIII), Schools
Issues
1. Lack of sufficient infrastructure like furniture, laboratries and buildings, in schools;
2. Absence of boundary walls and gates in many schools;
3. Most of the schools are running at over capacity;
4. Poor electrical fittings in the schools leading to several accidents;
5. Shortage of teachers;
6. Engagement of teachers with other works;
SWOT Analysis
Strengths Opportunities
1. A good existing base of primary education 1. Meeting of Infrastructural Gaps can develop
facilities (in terms of numbers). Katni as an educational hub of the region
2. Substantial awareness for the improvement of 2. Development of new educational facilities
these facilities. supported by an up-gradation/improvement of
3. Initiatives towards developing new educational existing facilities will help in an overall
facilities development of the region.
Weaknesses Threats
1. Lack of boundary walls in the schools 1. Lack of maintenance can degrade the existing
2. Lack of integrated schools and school for infrastructure.
handicapped 2. Frequent power cuts hinder a continuous
3. Quality of physical infrastructure supply of services.
4. Absence of alternate power supply in the 3. Lack of boundaries to the schools could result
existing educational facilities of encroachments
4. Movement of heavy vehicular traffic near
schools could result in a higher rate accidents.
Type Number
Community Hall 7
Parks 4
Swimming Pool 1
Sports Stadium 1
The details of the parks in the city is provided in Exhibit 6-30 mentioning the areas in which they are
present in the city
SNo. Location
1 Katay Ghat
2 Vishwakarma Park – Laxmi Bai ward
3 Adarsh Colony Park
4 Nagar Nigam Ward
Ongoing/Proposed Projects
In addition to the facilities listed in Exhibit 6-29, a sports complex and an auditorium is also proposed
in the city.
Issues
1. Starkly low number of Community halls;
2. Use of existing community halls for other purposes;
3. Lack of sufficient parks or green spaces in genera;l
4. Lack of maintenance of Libraries;
5. Use of Sports stadium for non-sport use.
SWOT Analysis
Strengths Opportunities
1. Initiatives towards developing socio-cultural 5. Development of new facilities supported by
facilities an up-gradation/improvement of existing
2. A general awareness among the stakeholders facilities will help in an overall development of
on the need of quality social infrastructure the region.
6. Could be developed as a main revenue
stream
Weaknesses Threats
1. Lack of proper maintenance of existing 1. Absence of quality social infrastructure leads
facilities to the overall degradation of quality of life .
2. Use of most of the socio-cultural facilities for 2. Lack of maintenance can degrade the
other purposes renders them unusable for existing and proposed infrastructure.
significant period of the year.
(5)
Reports of “Census of India, 2001 ” were reviewed to consolidate the data pertaining to
import/export of commodities from Katni and information on manufacturing industry of Katni. Exhibit
6-32 provides glimpses of three Most Important Commodities imported, exported and manufactured in
Katni.
Exhibit 6-32 Most Important Commodities Imported, Exported and Manufactured
Particular Most Important No.1 Most Important No.2 Most Important No. 3
Commodity Imported Cloths Machinery Cutlery
Commodity Exported Lime Limestone Pottery
Commodity Manufactured Lime Rice Pottery
(5)
Source: Town Directory, Census of India, 2001
As evident from Exhibit 4-6, the most important driver of Katni’s economy is processing and export of
Lime. In addition to above, Katni’s Industrial Activities, Trade & Commerce and Tourism have already
been discussed in detail in Sections 4.6, 4.7 and 4.8 respectively.
Issues
1. Most of the commercial markets are located in the interior of the city which has a poor
connectivity.
2. Underdeveloped facilities for tourists heading to Tourist places located around Katni
5. Exhibit 4-6 reveals a high dependence of Katni’s economy on the Lime. Whereas this
potential can further be expored, this dependence is also a possible threat to the Katni’s
economy. To achieve a sustainable growth rate, a more diversified economic base is of
utmost importance.
6. A high percentage of non-workers suggests that a significant proportion of population remains
unemployed for a substantial part of the year.
Weaknesses Threats
1. Under-developed markets with poor 1. Development of alternate markets in the other big
connectivity. cities of the region
2. Restricted Heavy Vehicle entry in the city 2. Failure to act can lead to the stagnation of the
3. Poor logistical infrastructure economy
4. Inadequate number of Hawkers’ zone. 3. Failure to develop logistical infrastructure will
5. Underdeveloped infrastructure for tourists restrict Katni status as a minor Transportation hub
Existing Status
Municipality’s inability to collect 100% generated waste leads to scattering of waste which ultimately
find its way to drains, open lands and other sources of water. This leads to the pollution of land by
improper disposal of harmful waste, ground water pollution by leachate and surface water pollution by
mixing of waste with water. In addition to these, solid waste clogging the drains leads to stagnation of
water which ultimately leads to the unhygienic milieu.
Under-developed drainage network and undeveloped waste water conveyance system leads to the
stagnation of storm water and waste water in various parts of the city leading to unhygienic conditions
which poses severe threat to the health of the citizens.
Heavy vehicular traffic on NH 7, Railways and mining in the town’s vicinity are constant source of dust
and other particulate matters which pollutes city’s urban space and causes various kinds of
respiratory problems to the citizens.
It was revealed from the consultations with the officials of Regional office of Pollution Control Board
(PCB) that the major air pollutant in Katni city is Suspended Particulate Matter (SPM). Its
3
concentration has been found to be more than 200 micrograms/m . This exceeds the prescribed limit
3
of 200 micrograms/m for the residential areas. The possible reasons for this could be the excavation
works in the vicinity of the city and a significant percentage of Kutcha roads in the city. The
concentration of SO2 was found to be in the limits prescribed for the residential areas. In case of
Issues
1. A major institutional gap between the monitoring of vehicle pollution and enforcement of
penalties on the polluting vehicles. The task of monitoring the pollution is carried out by the PCB
whereas the penalties or other actions have to be taken by the Regional Transport Officer (RTO).
2. Leakages in Solid Waste Collection System leading to water and land pollution.
3. Clogging of drains and improper handling of wastewater leads to unhygienic conditions
4. Impact of vehicular traffic, railways and mining on the air quality of the city
5. Lack of adequate green cover in the city.
6. Open defecation by a portion of population, which lacks an in-house sanitation facility.
SWOT Analysis
Strengths Opportunities
1. Vicinity to the dense forests 1. Development of infrastructure related to the handling
2. Presence of good water sources of solid waste, waste water and storm water can
3. Awareness among the citizens towards improve the city’s environment
the need of better environment 2. Conservation of Ground water and water bodies.
3. Environmental Impact Assessment of all
developmental works in the region
Weaknesses Threats
1. Shortage of land to develop green areas 1. Failure to integrate the issue of urban environment
2. Improper disposal of Solid waste and with infrastructure development projects
Wastewater. 2. Failure to conserve water bodies and ground water
3. Mining Activities in the vicinity of city can have severe impact on the city’s environment
leads to high pollution levels of
dangerous particulate matters
6.6.2 Heritage
Heritage Structures in the Town
A long history has embellished Katni city with many Heritage structures. Some of the key heritage
structures in the town are Kamaniya Gate, Sadhuram School, Ghantaghar, Laxmi Narayan Mandir,
Jalpa Devi Mandir, Shahid Dwar, Gandhi Dwar, Gate of Municipal Corporation Office, Rai Bada,
Jhanda Bazaar, etc. A brief description of these structures is provided below:
Issues
1. Many of the Heritage sites such as Kamaniya Gate, Ghantaghar, Shahid Dwar have been
struggling with encroachments.
2. Almost all of the heritage structures, except those of religious importance, have been neglected by
citizens and city authorities. These structures, urgently, demand restoration works for their
conservation.
SWOT Analysis
Strengths Opportunities
1. Many Heritage Structures 1. Preservation of heritage structures
2. A good combination of cultural 2. Improving the brand image of Katni city
and historical significance. 3. Can improve in-town tourism potential.
Weaknesses Threats
1. Lack of proper maintenance. 1. This area may lose focus as the immediate needs of citizens
2. Lack of awareness among the are related to the basic infrastructure facilities.
citizens 2. Failure to conserve these structure may lead to the complete
loss of heritage
The agencies involved in urban management and development in Madhya Pradesh (and in Katni) are:
The Municipal Corporation is headed by a Municipal Commisionner, who is appointed by UADD and
is entrusted with the responsibility of all municipal affairs. The Municipal Corporation also has an
elected council headed by a Mayor. Municipal Council in Katni has 45 elected members from 45
administrative wards headed by a Mayor. Municipal council is responsible for the approval of all major
works by Municipal Corporation.
The UADD is responsible for implementation of the following Acts in the state:
Madhya Pradesh Municipal Corporation Act, 1956;
Madhya Pradesh Municipal Council Act, 1961;
Cruelty to Animals Act, 1971 (provisions applicable to urban areas);
Vidisha (Bhelsa) Ramlila Act, 1956;
Simhastha Mela Act;
Slaughter of Animals Act (provisions applicable to urban areas);
Madhya Pradesh Slum Area (Development and Irradiation) Act, 1976; and
Madhya Pradesh Cycle Rickshaw (Regulation of License) Act, 1984.
The UADD is also responsible for implementation of various public welfare schemes sponsored by the
Central and State Governments. Some such schemes include Conversion of Dry Latrine Program,
Swarna Jayanti Urban Employment Scheme, National Slum Development Program, Social Security
Group Insurance Scheme, Janashri Insurance Scheme etc. These schemes are implemented through
the District Urban Development Agency.
The State Government, as per provisions of the Rules declares a region including major urban areas
and its surrounding settlements as a planning area, and orders the preparation of a development plan
for the region. The Director of the TCPD, with the assistance of the administrative setup provided to
him, carries out the following activities:
The key functions of MPHB, as per its governing Act and rules include:
To acquire land from the Government, private parties and/or other departments for
construction of properties;
To design, plan, construct, supervise and sell residential flats and commercial complexes;
To undertake deposit works for Government departments like Education,
Welfare, Tribal Welfare Departments, etc. for construction of schools, hostels, etc.; and
To undertake repair and reconstruction work of old structures.
3. Education from pre- primary to higher secondary school. ( in Non Trible areas only)
4. Arrangement of Non formal Education.
5. Grant -in-Aid to Private schools.
6. Arrangement for the training of teachers.
7. To improve quality in teaching and teacher training
8. Innovation in education and researches.
9. To arrange facilities of physical education and sports.
10. Prescription of syllabus in school classes.
11. Arrangement of printing and distribution of text books.
12. To conduct Examinations
13. Removal of illiteracy in age group 15-35
MPPCB is also responsible for implementation of the Municipal Solid Waste (Management and
Handling) Rules, 2000 of CPCB, which spell out responsibilities of the state pollution control boards
and the urban local bodies. MPPCB is the monitoring authority with respect to ground water, ambient
air, and compost quality in urban areas. The Board is also required to monitor processing and
disposal facilities for municipal waste, with the approval of the State Urban Development Department,
Town and Country Planning Department, and Ground Water Board. According to the Rules, the ULB
is responsible for implementation of the provisions and infrastructure development for collection,
storage, segregation, transport and processing of solid waste in the town.
The major areas of concern of MPPCB with regards to ULB functions are:
Social Welfare: This department is entrusted with the responsibilities of providing services
related to Social Justice, promoting NGOs and ensuring public participation in various
governmental programmes. Various Programmes under this department undertakes:
SC & ST Welfare
o Policy, planning and implementation of programmes relating to social and economic
empowerment of Scheduled Castes
Land Revenue
All the matters related to Land Revenue are handled by the District Collector (DC), Katni. The area
within the limits of Katni Municipal Corporation falls under the jurisdiction of Collectoratte, Katni which
falls under the Commissioneratte, Jabalpur zone, headquartered at Jabalpur.
2. MP Police: The functions pertaining to the road traffic management are performed by the
Traffic Police branch of MP Police.
Municipal
Corporation
and UADD
MP State
Depts of
Electricity
Education
Board
MP Dept. of
Urban
Housing Public
Board Governance Health
MP
Pollution
Railways
Control
Board Town and
Country
Planning
4. In case of street lighting, responsibility of installation of electricity poles and their electrification
lies with MPSEB. Any failure in the coordination between Municipal Corporation and MPSEB
results in poor urban governance.
5. A substantial stretch of city land lies with Railways and any coordination issue between Railways
and Municipal corporation results in achieving the efficient service delivery of urban services.
Indian railways should be involved in the city planning at the initial stage itself to result in the
implementable plans.
6. MPPCB should be regularly contacted to keep a check on urban environment and curb pollution.
7. Municipal Corporation should maintain a healthy interaction for effective and comprehensive city
planning.
8. The Departments of Health and Education should be provided with necessary assistance in the
implementation of their plans and day-to-day activities.
9. MP Housing Board should consult Municipal Corporation at the planning stage to avoid any
issues later at the time of transfer of housing stocks to Municipal Corporation. Municipal
Corporation should consult MP Housing Board during the preparation of DPRs for various urban
services.
10. Meetings at regular intervals should be organized between various governing organizations for
effective urban governance.
Though the Special Papers are still under preparation, the objectives, expected impacts, approach &
methodology, proposed scope & limitations and an illustrative bibliography for these thematic papers
are provided below:
Expected Impacts
1. To address the broader environmental issues of River rejuvenation and depletion of Ground
Water Table;
2. To provide a quality recreational infrastructure and actualize the tourism potential of the city.
2. Explain conceptual approaches to study Water Front characteristics including the following
7. Suggesting a Conceptual River Front Development plan and roadmap for project
development covering steps involved and preliminary Implementation Arrangements
The scope of this thematic paper will be limited to developing a Conceptual level River Front Plan.
Bibliography of Resources
Papers
“Community Participation in Riverfront Development” by Henry Sanoff, 2005
Rules/Regulations/Acts/Policies
1. Indian River Act, 1956 and Amendments;
2. MP State Environmental Policy, 1999 and amendments;
3. Other Relevant National and State Rules/Regulations/Acts/Policies related to Environment,
Water Resources, etc.
Case Studies
1. Sabarmati River Front Development, Ahmadabad
2. Godavari River Front Development, Nanded\
3. Pre-Feasibility study for Water Front Development in Karnataka
4. “Central Riverfront Urban Design Master Plan” by Urban design Associates, 2000
5. Riverfront Development works on the banks of James river
Conceptual Development
Expected outputs
1. Strategy for developing Katni as a Logistics Hub and a conceptual plan to implement the
strategy;
2. Suggesting a Conceptual plan for the Logistics Hub and possible options for project
development;
3. Preliminary Implementation Arrangements;
4. Framework for assessing Socio-Environmental impacts.
The data collection will be carried out by secondary sources and personal interviews.
Literature Review
Bibliography of Resources
1. “People’s Republic of China: Logistics Development and Capacity Building in Xinjiang Uygur
Autonomous Region”, ADB, 2006
2. “Germany: Europe’s Logistics Hub”, Invest in Germany, 2005
3. “Intermodal Freight Transport & Logistics Best Practices”, European Intermodal Association
4. “Logistics Hubs: An Integration of Transport Infrastructure”, M Botha and H Ittmann
5. “Guidelines for Developing Logistics Centres in Ports”
6. “Issues and Methods for selecting locations for logistics hubs”, Central Asia Regional
Economic Cooperation (CAREC)
7. “Development of Agri-Logistics Hub in Various Regions of Karnataka”, iDeCK, 2009
8. “Pre-Feasibility Study for (Storage & Distribution) Logistics Architecture in Karnataka, iDeCK,
2010
6.9 Conclusion
This chapter dealt with the current status of various components of city infrastructure and services
provided by the Katni Municipal Corporation. Sectors/Services which were analyzed in the areas of
existing status, demand-supply gap, critical issues and SWOT are physical Infrastructure (Water
Supply, Sewerage & Sanitation, Solid Waste Management, Drainage, Traffic & Transportation and
Street Lighting, Fire Fighting & Power), Social Infrastructure (Health, Education, Other Social
Infrastructure – recreational), Economic Development, Environment and Tourism (Urban
Environment, Heritage and Tourism), Urban Poor and Accessibility to Basic Services, Urban
Governance and Institutional Framework.
The Revenue account comprises of revenue income and revenue expenditure. The revenue income
of Katni Municipal Corporation has grown by around 1.5
times in four years from Rs. 1582.4 Lakhs in FY 2005- KMC - Revenue Account
06 to Rs. 2434.1 Lakhs in FY 2008-09. For the present 2009-10
FY 2009-10 the budgeted revenue income of Katni 2008-09
2007-08
Municipal Corporation is about Rs.3620.8 Lakhs,
2006-07
registering a CAGR of 23 percent. In case of revenue
2005-06
expenditure, Katni Municipal Corporation has registered
a CAGR of 15 percent which is only two third to the 0 1000 2000 3000 4000
Rs. lakhs.
revenue income growth rate. Revenue Expenditure Revenue Income
Capital income of Katni Municipal Corporation comprises own sources and from Grants and
Contributions. Over the last few years, Katni
KMC - Capital Account has received various grants for some special
2009-10 projects and grant under IHSDP leading to a
2008-09 sudden increase in the capital income and
2007-08 expenditure of the Katni Municipal Corporation.
2006-07
The BRGF scheme as well as grants from the
2005-06
state government for provision of basic
0 2000 4000 6000 8000 amenities has also been the significant
Rs. lakhs. contributors to the capital income and
Capital Income Capital Expenditure
expenditure, causing them to grow with a high
CAGR of 24% and 28% respectively. The capital income is expected to grow to a level of Rs.6360.5
lakhs in FY 2009-10 from Rs.481.7 lakhs in FY 2005-06, while capital expenditure is expected to
increase to Rs. 7587.7 lakhs from Rs. 527.1 lakhs in same time. The steep rise in the estimated
capital income and expenditure is due to provision of some of the grants such as the grants under
MPUSP-DFID, UIDSSMT and IHSDP and the state government grants for Road Maintenance and
Basic amenities.
The financial status of Katni Municipal Corporation is presented in Exhibit 7-1. It presents financial
figures for Revenue and Capital accounts for FY 2005-06 to FY 2009-10.
Own Sources
Own source income includes income from Tax revenue and non-tax revenue. Own source of income
has been grown with a CAGR of 75% over the last five years. Own source of revenue has expected
to increase to Rs.1333.8 lakhs in FY 2010 from Rs. 544.5 lakhs in FY2005,
Tax Revenue
Tax revenue accounts only for about 12% of the total revenue income. Details of major components
are provided in Exhibit 7-3.
Non-Tax Revenue
Non tax revenue account almost half the percentage of own sources and accounts for about 17% of
the total revenue income. Their contribution to the own sources is estimated to increase almost three
times by the FY 2009-10. Exhibit 7-4 provides details of Non Tax Revenues of Katni Municipal
Corporation.
Exhibit 7-4 Non Tax Revenue
Grants /Contributions
Income from Grants and contributions accounts for only about 20% of the total revenue income. Katni
Municipal Corporation is getting revenue grants from the central government and the state
government for Mid-day meal programme, National Family Welfare Schemes, etc. Major constituents
of the State Grants are grants for social security and Basic amenities. Details of various state and
central grants are provided in Exhibit 7-6
Extraordinary Income
Incomes from deposits from contractors, loan recoveries from employees and advances are merged
as an extraordinary income to Katni Municipal Corporation; this income is ranging from Rs. 66.49
lakhs in FY2005 to Rs. 25.87 lakhs in FY 2007 and it is expected to rise be 20 lakhs in FY 2009. As
this income is not fixed or continuous in nature of income, so it will be kept aside while analysing the
financial position of Katni Municipal Corporation.
“Salaries/wages and allowances” expense include salary of Katni Municipal Corporation employees,
Wages to the temporary staff, pension to staff etc, which has been increasing with a CAGR of 20%
during the analysis period.
In case of O&M cost, major expenditure is towards water works. Water works includes majorly
repairing and maintenance of OHTs, pipe line and treatment. During the last four years total O&M
cost has increased with CAGR of 17%.
Program expenses include Election expenses and Corporations’ programme, where corporations’
programme accounts the prominence in each year of the study. Program expenses accounts for only
1.2% of Revenue expenditure and has registered a negative CAGR of 99%
Observations:
1. Katni Municipal Corporation has Surplus Revenue: The operating ratio of the Katni Municipal
Corporation is 0.85 which is greater than 1, indicating that Katni’s revenue expenditure levels
are lesser than the revenue income generated.
2. CUR: Capital Utilization Ratio of Katni Municipal Corporation is 1.04 which is more than 1,
which indicates that Katni Municipal Corporation is utilising their revenue surplus in the capital
expenditure hence having a high utilization ratio.
3. Katni Municipal Corporation found to be less dependent on the Revenue Grants and other
revenue sources as grants accounts for 20% of their revenue income.
4. Tax revenue accounts only 12% of the revenue income where as Non tax revenue accounts
17%, which indicates need for identification of new tax revenue streams.
5. Property Tax contribution low: Property tax as a revenue source accounts for only 10 % in
Katni Municipal Corporation which demands property tax rationalisation with improved
collection efficiency.
7.6 Conclusion
This chapter presented analysis of Municipal Budgets for year 2005-06 to 2009-10. The financial
analysis included review of financial statements for last four years, from 2005-06 to 2009-10. The
analysis was carried out in four areas, Revenue Income, Revenue Expenditure, Capital Income and
Capital Expenditure. The analysis was then used to calculate various indicators to assess the
financial health of the Municipal Corporation.
The consultations held so far were concluded with a visioning workshop with stakeholders. Municipal
Corporation officials and other stakeholders together carried out the visioning exercise at this
workshop. The workshop started with a plenary session in which the current status and gaps in
various services were presented to the stakeholders. It was followed by the mission statements and
the perceived needs of the stakeholders. The comparison also served to identify additional priorities
not mentioned by the Municipal Corporation officials as well as discrepancies between the services
provided by Municipal Corporation and the stakeholders’ perception of such services.
The Presentation by IMaCS team was followed by a questionnaire survey which aimed at eliciting
stakeholders’ perception of city, city’s infrastructure, major issues and where they want their city to be
in the future. This was followed by the ward-wise detailing of ward-specific problems and potentials
that can be harnessed for the development of ward and city.
Overall development, Green Katni, Clean Katni, Basic Amenities, Pollution Free
Clean Katni, Adequate supply of water, Better Education and Health facilities
A prosperous city with equity among different sections of community. Better employment
opportunities to the youths of the city.
Hence, an apt vision statement, which captures the perspectives of stakeholders and would promote
a sense of ownership among the stakeholders in city’s development, was formulated as:
“An Eco-City with a sound socio-economic base, with special focus on transportation and
agro-based and mineral-based industries, ensuring adequate access to physical and social
In addition to the outlining of a vision for the city, discussions were also carried out on the
identification of major themes which would serve as the watchwords for initiatives and actions to
achieve the vision. Some of the major themes that came out of workshop and consultations with
stakeholders are as follows:
The city should attain a key position in Agro-based and Mineral-based industries.
The city should be developed as a major intermodal transportation hub
The city should be developed in self-sufficient zones
Promote education, health institutions and a safe environment for the citizens.
8.1.4 Mission Statements for Katni’s tryst with its vision
To achieve the vision, certain Mission Statements are formulated on the basis of identified themes
which would be the various lines on which development should be concentrated. Based on
consultations with stakeholders and review of development plans of other cities, following Mission
Statements are being adopted to achieve the vision.
All basic infrastructure facilities, viz. Water Supply, Sewerage & Sanitation, Storm Water
Drainage, Solid Waste Management, Roads & Transportation and Street Lighting & Fire
2. To actualize the city’s existing economic potential and generate new opportunities for
the prosperity in all sections of the community.
An economic development plan should be devised for the harnessing of city’s economic
potential. It should concentrate on the diversification of economic base of the city so as to
reduce dependence on any particular factor.
3. To uplift the urban poor and bring them at par with other sections of the community
Preparation of a financial and operating plan that addresses the resource requirement for
implementation and maintenance of the “City Development Plan” and “Master Plan”
proposals.
These Mission Statements would serve the purposes of aligning/initiating development works with the
formulated vision, guidance during the policy formulations to achieve the goal and framework for the
coordination among the various stakeholder agencies.
The Strategies are being devised after discussing them on different platforms. The discussion on
strategies was initiated during the 2nd Stakeholder Consultation Workshop to orient them in the
direction of City Vision and Sector Goals. Subsequently, the strategies were finalized during 3rd
Stakeholder Consultation Workshop and a set of projects were identified in each sector. The
Strategies and Identified Projects were then presented to the Steering Committee.
The Projects in each sector have been identified by juxtaposing Gaps (Demand-Supply) and
Strategies to achieve the Sector Goal. While finalizing the list of projects (to be recommended under
CDP), due consideration was given to the ongoing projects and their contribution in meeting the
Gaps. The projects under CDP have been identified for the remaining Gaps after contribution from
Ongoing Projects have been accounted. Only those projects which have received approval from the
State Government are considered as Ongoing. A project for which only a proposal has been
submitted is not considered as Ongoing. The projects have been identified for two horizons, “Horizon-
The subsequent sections of this chapter deal with Sector Goals and Strategies which are presented
under six heads:
1. Physical Infrastructure
a. Water Supply
b. Sewerage and Sanitation
c. Solid Waste Management System
d. Traffic and Transportation
e. Storm Water Drainage System
f. Street Lighting, Fire Fighting And Power
2. Social Infrastructure
a. Health
b. Education
c. Socio-Cultural Facilities
3. Local Economy
a. Environment
b. Heritage & Tourism
5. Urban Poor
Strategies
1. Augmenting water supply source
2. Strengthening of water supply distribution system
3. Augmenting the Treatment Capacity
4. Improving Efficiency, Accountability and Transparency in the system
5. Exploring possibility of Private sector participation
Identified Projects
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-2. The
list of identified projects recommended under CDP, is preceded by a list of Ongoing Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of Ongoing Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 and
Horizon-2.
A Ongoing Projects
Katni Water Supply Scheme (KWSS) Status: Under Construction
Implementing Agency: Katni Municipal Corporation
Being designed for year 2040. Aimed at increasing the daily water supply to 51 MLD
Project Components:
1. Construction of a Barrage and an Intake Well to draw water from Katni River
2. Treatment Plant: 31.5 MLD
3. Distribution Network: 38 Km
4. Elevated Water Storage Tanks (3 numbers): Capacity of 8.5 ML
KWSS will address Gaps in Daily Water Supply, Treatment Capacity, and Elevated
Storage Capacity
B Projects for Horizon-1 (Identified under CDP) Projects for Horizon-2 (Identified under CDP)
Distribution Network: 90 Km Distribution Network: 130 Km
Installation of around 49,000 Water Meters
a. Phase I (2015 - 2025) : 27,000
b. Phase II (2025 - 2035) : 22,000
C Specific Projects (Identified during Consultations)
Distribution Network:
1. Tilak Ward
2. Shastri Ward
3. Kidwai Ward
4. Ramkrishna Paramhans Ward
5. Mukharji Ward (Chaparwah and Bilgawan Area)
6. Maharana Pratap Ward (Amkuhi Area)
Implementation UFW reduction measures in all parts of the city as an immediate measure by
conducting leak detection studies, rehabilitation of old pipe lines etc.
By legitimizing illegal connections, KMC can achieve a reduction in revenue loss in a short
term.
High head pumping to provide water supply to the city leads to high power costs. A detailed
energy audit of all the water supply pumping and distribution system to address the problems
associated with energy should be carried out.
The existing water analysis can be upgraded in phases. Latest equipments to upgrade the
existing laboratories should be procured for the analysis of chemicals and heavy metals. In
further phase, water quality equipment may be installed online at storage reservoirs.
Widespread investments in the water supply sector without sufficient attention to human
resource development results in poor sustainability of system. Recognizing the urgent need
for capacity building at different levels in water supply sector, KMC should develop human
resources in their organization.
Currently KMC is responsible for policy, service provision and regulation of water supply, and
sewerage, which makes it difficult to regulate the quality of service provision. The need of a
10. Develop a comprehensive watershed management plan for the City including details of
groundwater availability, use, potential and develop a policy and legal framework to use and
replenish groundwater. Make land reservations for zones that are good for water recharge
and water conservation.
Strategies
1. Effective Waste Water collection and treatment plant;
2. Provision of safe Sanitation facilities to floating population and households that lack in-house
sanitation facilities;
3. Exploring possibility of Private sector participation.
A Ongoing Projects
At present, no project has been approved in this sector. However, a Detailed Project Report
(DPR) was prepared by Katni Municipal Corporation to develop a Sewerage System in Katni city.
This DPR was not approved by the concerned authority.
Sewerage:
To achieve the desired 100% sewerage coverage, the city should adopt a mixture of technical
options, including:
Sanitation:
A. Public Sanitary Conveniences (Number of Seats) 227 120
B. Sanitation Facilities for Uncovered Households
1. Community Sanitary Conveniences (Number of Seats) 231 -
2. Pit Latrine (To be provided in Houses) 14563 -
At present, there are around 15,449 households which lack an in-house sanitation facility and
this number is expected to increase to 16,181 by year 2015-16. Hence, to meet the aim of
providing safe sanitation facilities to all, we have adopted a multipronged approach by
juxtaposing the current/future needs, optimum utilization of available resources and constructed
Priority Actions
1. Sewerage Quality Studies and Monitoring
There shall be a system in place for assessing the existing sewerage quality. Latest
equipments shall be purchased to upgrade the existing laboratories for analysis of chemicals
and heavy metals.
Improve and ensure access to sanitary facilities for the urban poor and slum dwellers.
Encourage pay & use category of public conveniences with community involvement in the
maintenance of the same.
Strategies
1. Strengthening of Primary and Secondary Waste Collection and Waste Transportation System.
2. Appropriate disposal of different constituents of Municipal Solid Waste (MSW)
3. Special attention to the waste collection system in Slums by means of community bins
4. Generate public awareness of benefits of segregation of solid waste at source
Achievement Targets in Key Areas
To achieve the Goal decided for the sector, City would require focusing on the areas mentioned in
Exhibit 8-5. Exhibit 8-5 also provides tentative achievement targets in each of the areas that city
would require to achieve in a stipulated timeframe.
Identified Projects
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-6. The
list of identified projects recommended under CDP, is preceded by a list of Ongoing Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of Ongoing Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 and
Horizon-2.
A Ongoing Projects
Katni Municipal Corporation has prepared a DPR for Solid Waste Management in the city. This
DPR is under-consideration of concerned authorities. The major components of this projects are:
The projects in this sector have been identified considering an End to End approach. The factors
considered have been a sound Primary collection mechanism, a clean and sufficient Secondary
Collection (storage) infrastructure, an efficient and leak-proof Waste Transportation system and a
comprehensive Waste Disposal infrastructure (having independent waste disposal mechanisms
for Bio-degradable and Non-Biodegradable wastes and waste component that could be
incinerated).
Horizon-1 Horizon-2
Primary Collection
Waste Transportation
Waste Disposal
At present, an area of 15.5 Acres has been designated for Solid Waste Disposal. As per the
estimations under CDP, 9.3 Acres of land is required for Horizon-1. This includes 2 Acres of land
for Composting Plant and 7.3 Acres of land for Landfill (equipped with all infrastructure). For
Horizon-2, additional land of 25.2 Acres would be required for the expansion of Landfill
Infrastructure.
Priority Actions
1. Institutional:
2. Primary Collection
Implementing door to door waste collection system and source segregation
Institutionalise rag-pickers association and integrate them into the system in primary
collection activities
Separate Bio-medical waste collection
3. Waste Transportation
Proper documentation of statistics related to Vehicle Deployment and Movement.
Ensure optimum utilization of existing fleet.
4. Waste Disposal
Strategies
1. Improving the internal road network and connectivity between various parts of the city;
2. Ensure free flow of traffic through junction improvement, signalization, and traffic control and
management measures;
3. To provide alternate routes, parallel roads, Over-bridges/Under-Passes for decongesting the
traffic on the major traffic corridors in the city;
4. Provide adequate parking lots to help use the capacity of the current network;
5. Awareness generation and enforcement of traffic rules.
Exhibit 8-8. The list of identified projects recommended under CDP, is preceded by a list of Ongoing
Projects. In addition to the estimated Gaps (Demand-Supply), the contribution of Ongoing Projects in
addressing the expected demand has also been considered while identifying the projects for Horizon-
1 and Horizon-2.
A Ongoing Projects
At present, no project has been approved in this sector. However, a Detailed Project Report
(DPR) was prepared by Katni Municipal Corporation to upgrade 22.5 Km of Municipal Roads in
Katni city. This DPR has not been approved by the concerned authority.
A. New Roads
2. Railway Over-bridges/Flyovers
a. Over-bridge at Sagar Pulia
b. Upgradation of Under-Bridge(Andheri Pulia) leading to NKJ
c. Sector Road No. 6 near Sigri River
d. Near Madhav Nagar Railway Station
e. Jhara Tikuria Village
f. Near old Mudwara Railway station office
g. New Bridge at Katni River
3. Junctions to be improved
a. Mission Chowk
b. Chandak Chowk
c. Subhash Chowk
d. Barhi Road, near Police Station
e. Near Rest House No. 2
f. Azad Chowk
4. Parking Space
a. on Government Land near Petrol Pump, Mission Chowk
b. in front of Union Bank near Azad Chowk
c. near Shankar Talkies
d. near Ghantaghar
e. on Government Land near Bus-Stand
f. near Lallu Bhaiya ki Taliyya
2. Institutional Framework: Constitution of a Committee which should be entrusted with all the
responsibilities related to the city’s Traffic and Transportation System. This Committee should
include members from Municipal Corporation, District Collectoratte, Police & Traffic Police,
Indian Railways, Transporters’ Association, Regional Transport Office and others as needed.
This committee should also include People’s Representatives.
Strategies
1. Development of an Integrated and Comprehensive Storm Water Drainage Network with well
defined disposal points;
3. To ensure all Roads are provided with Storm Water Drains to complement the efforts made
towards addressing the problems related to stagnation of water in low lying areas and
degradation of bitumen roads;
4. Awareness generation among citizens about the functions of City’s Drainage Network.
Discouraging the use of Drains for disposing Wastewater and Solid Waste.
A Projects for Horizon-1 (Identified under CDP) Projects for Horizon-2 (Identified under CDP)
New Formation New Formation
Pucca Open: - Pucca Open: 66 Km
Pucca Closed: 57 Km Pucca Closed: 134 Km
Up-gradation Up-gradation
Kutcha to Pucca Open: 58 Km Kutcha to Pucca Open: -
Kutcha to Pucca Closed: 152 Km Kutcha to Pucca Closed: -
The areas where Storm Water Drainage system should be developed on priority are:
Priority Actions
1. Comprehensive Drainage Study to study the drainage pattern and identify flood prone areas
3. Public Campaigns to generate awareness about the distinction between storm water and
waste water
4. Rehabilitation of ecosystems
Monitoring of water quality parameters would be conducted on a regular basis. KMC should
take up the responsibility of monitoring the parameters in the water bodies within its
jurisdiction and should take preventive measures, if the results were above the permissible
limits.
6. Regulatory Framework
Efforts should be directed at enforcing appropriate water pollution- related laws, ordinances,
regulations, and corresponding enforcement responsibilities and procedures at the local level.
Strategies
Street Lighting:
1. To augment the street light coverage of city roads with special focus on backward and slum
areas.
2. To reduce the Operation & Maintenance expenses by using energy efficient lights.
Fire Fighting:
1. To develop a Fire Fighting infrastructure to cater the needs of whole Tehsil (Sub-district).
2. To ensure the safety of Firemen by providing necessary safety equipments.
Power:
1. To explore the possibility of power generation with renewable sources, municipal wastes, etc.
2. Active coordination with State agencies to ensure the adequate availability of electricity.
Exhibit 8-11 Achievement Target for Street Lighting, Fire Fighting and Power
Sector Components 2015 2025 2035
Street Lighting One pole per 30 m of One pole per 30 m One pole per 30 m
Coverage Road of Road of Road
Street
Lighting Energy savings by
adopting a mix of 75:25 75:25 75:25
CFLs and Halogens
Fire Fire safety coverage 100% 100% 100%
Fighting Fire Station Fully equipped Fully equipped Fully equipped
24/7 Electricity To be ensured in To be ensured in To be ensured in
Supply and 100 % close coordination close coordination close coordination
Coverage with state govt with state govt with state govt
Power
Yes ( Municipal Yes ( Municipal
Alternative Power
Yes (Solar) waste, biogas, waste, biogas, solar,
Sources
solar, etc) etc)
Identified Projects
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-12. The
list of identified projects recommended under CDP, is preceded by a list of Ongoing Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of Ongoing Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 and
Horizon-2.
Priority Actions
Street Lighting:
Fire Fighting:
1. Strengthening the Communication system for an efficient and expeditious reporting of Fire
outbreaks. At present, there is no proper communication system in place for these
complaints.
2. Awareness generation to discourage the Hoax calls.
Power:
Strategies
1. Provision of basic services in slum area and improving the overall housing scenario
Adequate street
Yes Yes Yes
lighting facilities
Identified Projects
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-14. The
list of identified projects recommended under CDP, is preceded by a list of Ongoing Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of Ongoing Projects in addressing
A Ongoing Projects
Current Status
In the First phase of the project identified in IHSDP report, construction of 462 housing units is
ongoing. Also, tenders have been invited for the remaining 1720 housing units.
Out of Housing Shortage of 5426, 2182 Housing Stocks have been considered under IHSDP.
We propose that 50% of remaining 3244 Households should also be constructed in Horizon-1.
Priority Actions
1. Comprehensive Mapping of Slum Areas and their existing status;
2. Ensuring urban services in the slum areas with pre-defined service levels;;
3. Skill development programmes for urban poor;
4. Improve housing conditions by financial assistance or other measures;
5. Community Organization and Community Participation.
To promote higher-level medical facilities, KMC must provide a conducive environment to other
government agencies and private developers in the form of support infrastructure, incentives, etc.
However, the strategies that should be adopted for to meet the sector goal are:
1. Ensuring a good primary healthcare infrastructure and promoting a conducive environment for
higher level of health infrastructure
2. Reduction of health risks and practices leading to chronic and infectious diseases
through effective implementation of sanitary programmes, combined with regular
inspection of food joints.
3. Awareness on pre and post-natal care, and unhealthy practices leading to still-births
and infant mortality shall be created through door-to-door education campaigns and with the
help of the media.
Exhibit 8-16 presents a list of projects and required land area in this sector for Horizon-1 and Horizon-
2.
Priority Actions
1. Institutional Framework: Constitution of a Committee involving members from Municipal
Corporation, District Hospital, District Collectoratte, Office of Chief Medical Officer, Katni,
City’s Hospitals & Doctors, and Department of Social Welfare, People’s representatives,
Hotels/Restaurants/Food-Joints, Agriculture/Horticulture Department, NGOs and others as
needed. This Committee should extend support to Health Institutions in the city, monitor
quality of food delivered at various Food Joints, etc.
2. Awareness generation on importance of safe sanitation, hygiene and low cost measure to
achieve the same.
3. To link primary healthcare facilities with secondary and tertiary care facilities through a proper
channel for an effective utilization of available resources.
5. Regular checks on adulteration of food served at several eating joints in the city.
8.5.2 Education
Sector Goal
“To eradicate illiteracy and make citizens socially, culturally and environmentally developing a
quality education infrastructure with special focus on catering the needs of local industries
and agriculture.”
Strategies
In case of Education infrastructure, role of Municipal Corporation is limited to the primary level
services. To promote higher-level educational facilities, KMC must provide a conducive environment
for other government agencies and private developers in the form of support infrastructure, incentives,
etc.
1. Emphasis on pre-primary education and good quality primary education for all, especially for
the residents of slum localities. Support from various sections of the society and voluntary
organizations for involvement in literacy programmes shall be encouraged.
Priority Actions
1. Constitution of a Committee comprising members from Education Department, M.P.,
Municipal Corporation, Department of Social Welfare, Police, and NGOs and as needed.
2. Provision of basic services at all educational institutions including adequate staff and
teachers.
Strategies
1. Creation of open/green spaces in the city;
2. Developing new Sports infrastructure and upgrading/maintaining the existing Sports facilities;
3. Developing and maintaining adequate Community Halls.
Identified Projects
In this sector, five kinds of facilities have been are proposed. Exhibit 8-20 presents number of facilities
and total area (in acres) of land required for each kind of facility.
Figure 14 shows a few locations where possibility of developing Parks can be explored. The locations
are shown with Green circles.
Strategies
1. Promoting resource based balanced development in the areas of Agriculture, Tourism,
Transportation and Services
4. Improving of Services sector in the city: Health, eco tourism, Entertainment, Hotels in all
ranges and Sports.
6. Provide for safe and secure low cost housing, night shelters, working women’s hostels and
the like.
Identified Projects
1. Development of Hawkers Zone: The Hawkers zone would dedicate space to the hawkers and
hence reducing congestion on the city roads, making waste collection easier and making it
easier for customers to shop.
2. Organization of Trade Fairs and Other Exhibitions: With an objective of attracting private
investments, Promotional activities including Trade Fairs and other exhibitions should be
organized at regular intervals. This would serve the multiple purposes of showcasing Katni’s
potential, rejuvenating the stagnated hospitality institutions and employment generation. This
should be done in coordination with the District Industries Centre and various Industrial
Associations.
Priority Actions
1. A detailed Feasibility study of developing Katni as a Logistics Hub. This has been dealt in
detail in one of the Special Papers.
Strategies
1. Development of a Regional Environment Plan for a balanced relationship between the main
city and surrounding regions.
2. Adoption of an integrated approach towards curbing Air, Water, Soil and Noise Pollution.
4. Conservation of Natural Drains and other Water Bodies, and Ground water.
5. Enhancing the Green cover of City by a multi-pronged approach involving Avenue Plantation,
Riverbank Plantation, Dedicated Green Zones and Parks.
Identified Projects
Exhibit 8-22 provides key projects identified in consonance with Sector Goals and Strategies.
Strategies
1. Ensure that the unique qualities and Conservation Values are understood and are
sustained in the future whilst maintaining and promoting Katni as a living and working
city which benefits from Heritage Conservation and Management
2. Revitalize and conserve key heritage elements, including the river Katni in Katni
Municipal Corporation to develop a master plan for the development of the riverfront in Katni
city so as to restore its functional relevance and scenic beauty
3. Improve physical access and interpretation, encouraging all people to enjoy and
understand the Historic area
Identified Projects
1. Riverfront Development in Katni
The most of important rivers of Katni city are Katni River, Simrar River, Jalgaar River,
Bhamral River, Jagaar River, Mai River and Kohari River. Out of 70 km of cumulative
Riverfront in Katni, around 5 Km has significant potential for development.
Along with this section where development of facilities at River banks has mainly been
considered, the Section 8.3.5 (on Storm Water Drainage) dealt with the strengthening of River
banks. Though, this has been dealt in detail in one of the Special Papers, a quick
snapshot of this project is presented below. For the development of abovementioned
components of Riverfront development, a total investment of Rs 22,50,00,000 has been
envisaged. This would cover both banks of around 5 Km of River stretch.
2. Development of Station Road from Subhash Chowk to Railway Station via Kamaniya Gate.
Being one of the most important roads of Katni city, the 300 m stretch of Station Road from
Subhash Chowk to Railway Station via Kamaniya Gate should be developed as a Special
4. Ghantaghar Renovation
Priority Actions
1. Devise an institutional and management framework for heritage identification,
development and conservation for:
The Tourism Plan should aim at developing a strategy to improve the connectivity of Tourist
places with Katni by means of better roads and modes of transport, improve the Hospitality
institutions in Katni, developing Tourist Information Centers at various locations and
developing other recreational infrastructure. Another focus area of this Tourism plan should
be to devise strategies to increase tourist inflows. This could be approached by Promotional
activities, collaborating with District Industries Centre, Katni, Various Industrial Associations,
and Indian Railways. The Industrial Associations should be taken on board to make the
Investors/Delegates aware of the nearby Tourist places.
Strategies
1. Institutional Strengthening and Capacity building.
2. Training to enhance capacity building.
3. People’s Participation in Governance.
4. Creation of Geographical Information System.
5. Collective action especially in programmes for solid waste management, water resource
management, and slum Up-gradation.
Identified Projects
1. Electronic Items for Computerization: Katni Municipal Corporation should expedite the
process of computerization in its administration. Computerization will benefit most of its
functions ranging from Municipal Accounting to Tax Management. The introduction of E-
Governance will help in improving the efficiency of various processes. For this purpose, an
investment of Rs 30,00,000 is proposed in Horizon-1. This investment should be used for
procuring electronic items for Computerization.
2. Capacity Building: The procurement of electronic items should be supplemented with Human
Resource Development. This should involve improving competencies of existing staff and
recruiting new staff. For the purpose of training of Staff, an investment of Rs 15,00,000 is
proposed in Horizon-1.
3. GIS Mapping: A GIS mapping of all Properties of the city will be helpful in the provision of
efficient services to the citizens. For this purpose, an investment of Rs 30,00,000 is proposed.
Priority Actions
1. Identify the training needs of the staff (HR, Administration, Financial Management, Urban
Governance, Service Delivery, Citizens Communication, IT).
2. Communicating with the public and within the organization to build popular support for the
reform initiatives.
The strategies adopted primarily have three dimensions; improving the service delivery by efficiency
measures, improving service delivery by creating infrastructure assets and improving the governance
aspects of Katni Nagar Nigam. This section summarizes the capital investments required for creating
infrastructure assets and various strategic interventions required in the implementation of such
projects; these strategies are both investments oriented and administrative oriented.
City growth and infrastructure needs (to be carried out once every five years);
Scheduling of investments of ongoing projects due to cost and/ or time overruns;
Assigning of priorities within the constraints of available financial resources.
In Katni, Katni Nagar Nigam has the primary responsibility of delivering municipal services. So the
CDP proposals will have to be implemented by the Nagar Nigam. The projects, prioritization,
investment phasing, strategies and action plan are framed accordingly.
The CIP involved the identification of public facilities to cater demand of the city populace in the years
2015 and 2035. The projects have been identified through a demand-gap analysis for various urban
services. Identification of projects was followed by their prioritization based on the stakeholder’s
consultation. The projects identified are aimed at ensuring the optimal and efficient utilisation of
existing infrastructure systems and enhancing the capacity of the systems/services to cater to the
demands of future population. In addition to the projects which are related to major urban services,
CIP also includes developmental projects like greenery development, parking spaces, system
modernisation etc.
The planning horizon for the projects has been considered on the basis of demand generation in
various decades and degree of initial capital investment. Hence, some of the sectors have been
planned for the short term as well as the long term whereas some sectors have been divided into
various sub-parts in which some of the sub-parts have been planned for the long term only whereas
rest of the sub-parts have been planned for short term and long term.
The phasing of the identified projects and investments is based on the following principles.
Priority needs, with developed areas receiving priority over future development area;
Inter and intra-service linkages, viz. water supply investments shall be complemented by
corresponding sewerage/ sanitation improvements;
Size and duration of the requirements, including preparation and implementation period.
Exhibit 9-1 presents the summary of sector-wise total investment need, investments up to 2015-16,
proportions of investments required in various sectors w.r.t total investments in different horizons.
Exhibit 9-1 Summary of Investments required
Investment by 2015 Total Investment % of
% w.r.t. % w.r.t. Investment till
Sector
(Rs. lakhs) total till (Rs. lakhs) total till 2015 w.r.t
2015 2035 2035
1 Water Supply 5,886.75 13.7% 7,462.65 10.5% 79%
2 Sewerage & Sanitation 4,461.42 10.4% 5,109.15 7.2% 87%
3 Roads & Urban Transport 8,593.30 20.0% 19,251.53 27.2% 45%
4 Storm Water Drains 3,894.69 9.1% 7,626.03 10.8% 51%
5 Street Lights 403.32 0.9% 937.94 1.3% 43%
6 Fire Fighting 245.00 0.6% 465.00 0.7% 53%
7 Solid Waste Management 1,009.78 2.4% 2,510.10 3.5% 40%
8 Urban Poor/ Slums 5,460.40 12.7% 5,460.40 7.7% 100%
9 Health Infrastructure 2,894.50 6.7% 5,726.00 8.1% 51%
10 Education 5,205.00 12.1% 7,664.00 10.8% 68%
11 Socio-Cultural Facilities 345.00 0.8% 550.00 0.8% 63%
12 Economy 55.00 0.1% 150.00 0.2% 37%
13 Heritage and Tourism 1,800.00 4.2% 2,700.00 3.8% 67%
14 Urban Environment 2,570.00 6.0% 5,120.00 7.2% 50%
15 Urban Governance 75.00 0.2% 105.00 0.2% 71%
16 Other Projects - 0.0% - 0.0% 0%
Total Investment 42,899.16 100.0% 70,837.81 100.0% 61%
Source: IMaCS Analysis
Subsequent sections provide an investment snapshot for each of the sectors followed by the detailing
for Priority needs and Long Term needs. Discussion on Investment is followed by an Action plan for
the implementation of projects in the short term i.e. for a period of five years from year 2011-12 to
2015-16.
Investments in different time-periods for various sectors are provided in subsequent sections. The
investments have been estimated for three terms, namely:
Investment Snapshot
A sector wise investment plan was devised for the Water Supply considering the demand arising in
the short, medium and long terms. The short term is being defined as a planning horizon of 5 years
from year 2011 to 2015 whereas medium term and long term are being considered as 10 years from
year 2015 to 2025 and year 2025 to 2035 respectively. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-2.
Water sector needs a total investment of Rs 7,462.65 Lakhs in three phases by year 2035. In the
short term, this sector would require an investment of Rs 5,886.75 Lakhs whereas in the medium term
and long term, investments totaling to Rs 787.95 Lakhs and Rs 787.95 Lakhs would be required.
The Action Plan, as shown in Exhibit 9-3, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Investment Snapshot
A sector wise investment plan was devised for the Sewerage & Sanitation considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-4.
Sewerage & Sanitation sector needs a total investment of Rs 5,109.15 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 4,351.02 Lakhs whereas in the
medium term and long term, investments totaling to Rs 351.97 Lakhs and Rs 406.16 Lakhs would be
required.
Investment Snapshot
A sector wise investment plan was devised for the Solid Waste Management sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-6.
9.4.4 Drainage
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 7,626 Lakhs i.e. around 10.8 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Storm Water Drainage sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-8.
Storm Water Drainage sector needs a total investment of Rs 7,626 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 3,895 Lakhs whereas in the
Drains Upgradation
Capital Drains New Formation
Facilities Desilting & Strengthening of
Primary Drains
Action Preparation of DPR for augmentation of storm water system in the town
Measures Isolate sewerage system from drinking water and storm water lines
Identify, delineate, sanitize and protect the natural drainage system of the city
Sector Improve drainage network on a priority basis in flood prone areas
Notes All new roads to be designed shall have adequate provision for storm water
drains.
Constructing new drains shall be integrated with the new roads development
Performance Drainage network should 130% of road length
Monitoring All divided roads to have drains on either side and undivided roads on at least
Indicators one side
Drains to be cleaned before and after monsoon for better functioning
Investment Snapshot
A sector wise investment plan was devised for the Solid Waste Management sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-10.
Traffic & Transportation sector needs a total investment of Rs 19,251 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 8,593 Lakhs whereas in the
medium term and long term, investments totaling to Rs 4,785 Lakhs and Rs 5,873 Lakhs would be
required.
The Action Plan, as shown in Exhibit 9-11, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Investment Snapshot
A sector wise investment plan was devised for the Street Lighting & Fire Fighting sector considering
the demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-12.
Street Lighting & Fire Fighting sector needs a total investment of Rs 1,403 Lakhs in three phases by
year 2035. In the short term, this sector would require an investment of Rs 648.32 Lakhs whereas in
the medium term and long term, investments totaling to Rs 373 Lakhs and Rs 381 Lakhs would be
required.
Investment Snapshot
A sector wise investment plan was devised for the Health Infrastructure sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-14.
Health Infrastructure sectors needs a total investment of Rs 5,726 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 2,895 Lakhs whereas in the
medium term and long term, investments totaling to Rs 1,324 Lakhs and Rs 1,507 Lakhs would be
required.
Action Augmentation of Bed Capacity of the city by either developing new facilities or
Measures upgrading the existing ones
Development of Nursing home and Dispensaries
Generating awareness about safe sanitation
Sector Provisions should be made for the optimal utilization of health infrastructure by
Notes tackling obstacles like shortage of power, medical staff, etc
Primary care should be given due importance
Hospital waste should be properly disposed
Investment Snapshot
A sector wise investment plan was devised for the Education Infrastructure sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-16.
Education Infrastructure sectors needs a total investment of Rs 7,664 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 5,205 Lakhs whereas in the
medium term and long term, investments totaling to Rs 897 Lakhs and Rs 1,562 Lakhs would be
required.
Capital Primary
Facilities Secondary
Integrated without Hostel
College
Investment Snapshot
A sector wise investment plan was devised for the Socio-Cultural Infrastructure considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-18.
Socio-Cultural Infrastructure needs a total investment of Rs 550 Lakhs in three phases by year 2035.
In the short term, this sector would require an investment of Rs 345 Lakhs whereas in the medium
term and long term, investments totaling to Rs 145 Lakhs and Rs 60 Lakhs would be required.
Investment Snapshot
An investment plan was devised for the rejuvenation of Local Economy considering the future
prospects in the short, medium and long terms. The initiatives have been classified under various
tasks as shown in Exhibit 9-20.
Local Economy needs a total investment of Rs 150 Lakhs in three phases by year 2035. In the short
term, this sector would require an investment of Rs 55 Lakhs whereas in the medium term and long
term, investments totaling to Rs 60 Lakhs and Rs 35 Lakhs would be required.
Investment Snapshot
An investment plan was devised for the improvement of urban environment considering the future
threats in the short, medium and long terms. The initiatives have been classified under various tasks
as shown in Exhibit 9-22.
Investment Snapshot
An investment plan was devised for the improvement of urban environment considering the future
threats in the short, medium and long terms. The initiatives have been classified under various tasks
as shown in Exhibit 9-24.
Heritage and Tourism sector needs a total investment of Rs 2,700 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 1,800 Lakhs whereas in the
medium term investments of Rs 900 Lakhs would be required.
Action Tasks related to river conservation should be carried out in tandem with the
Measures River front development
Ancillary tourism potential can be actualized by providing some kind of
recreation alternative to tourists and well managed waiting rooms
Investment Snapshot
An investment plan was devised in line with the IHSDP scheme for the provision of basic services to
the urban poor. The investment anticipated for various tasks is shown in Exhibit 9-26.
Provision of basic services to the Urban Poor needs a total investment of Rs 5,460 Lakhs. It has been
assumed that identified projects will be carried out in the short term with the aim of providing quick
respite to the urban poor.
Investment Snapshot
A sector wise investment plan was devised for the Urban Infrastructure considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-28.
Urban Infrastructure needs a total investment of Rs 115 Lakhs in three phases by year 2035. In the
short term, this sector would require an investment of Rs 75 Lakhs whereas in the medium term and
long term, investments totaling to Rs 15 Lakhs and Rs 15 Lakhs would be required.
Flowing section details about the existing plan under which this investments can be considered.
Urban Renewal
Water Supply
Sewerage and Sanitation
Solid Waste Management
Construction and improvement of drains/storm water drains
Construction/Upgradation of roads, highways/expressways
Parking lots/spaces on Public Private Partnership basis
Development of heritage areas
Preservation of water bodies.
Inadmissible component for the town included in the CDP includes health and education institutes,
power and telecommunication, urban transport, rolling stocks like buses and trams.
A minimum 12% beneficiary contribution with bank loan should be stipulated under the scheme (10%
in case of SC/ST/BC/OBC/PH and other weaker sections. Funds from MPLAD and MLALAD could be
channelised towards project cost. However, these funds would not substitute beneficiary contribution.
The project funding structure comprises funds from three different sources. These are grants, mainly
under UIDSSMT, loans and internal resources. Investment sustainability has been determined by an
iterative process so as to arrive at the optimal value for the municipal accounts (in terms of
surplus/deficit), opening balance, and Debt-Service Coverage Ratio (DSCR). The objective of these
iterations was maximization of sustainability i.e. investment sustainable by Katni Nagar Nigam by its
own revenue resources. The methodology involves simultaneous optimization of DSCR, opening
balance and surplus/deficit such that DSCR is close to 1.25.
The main items of income and expenditure, classified into the revenue account and the capital
account, are projected in the FOP under the following categories.
Scenario 1: With reforms in Property Tax, Water Charges and Sewerage charges
This case assumes the reforms in property tax, Water and Sewerage have been implemented and
accordingly the investment capacity has increased by Rs. 12.88 crore above the base investment
capacity. These reforms will increase the total sustainable capacity to 36.2%.
The impact of the different scenario on the investment sustainability of Katni Nagar Nigam is shown
below in Exhibit 10-3.
Base Investment
Capacity, (113.10)
% of Total
S. No Mode of Funding Source Amount (Rs. Crore)
Investment
Katni Nagar Nigam
Total Identified Investment till 2015 (current price) 518.77
Investment by Nagar Nigam (current price) 421.19 100
Sustainable Investment till 2015 (constant price) 225.50 64.8
Sustainable Investment (current) 272.93
1 Grants UIDSSMT 244.75 90
2 Loans Open Market/ FIs 5.06 2
3 Own sources Nagar Nigam 23.12 8
From the above analysis, it is very clear that ULB alone even with the grant support under UIDSSMT
scheme and reforms will not be able to implement 100% of the projects identified under the City
Investment Plan (CIP). But they can substantially increase their sustainable capacity with these
reforms. So, it is recommended that ULB along the support from UADD, GoMP should try to develop
few projects at PPP model and additional grant support from GoMP.
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Nagar Nigam level, GoMP should also provide
support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
Financial Year ------> 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Figures in Rs. Lakhs Projection
SUMMARY
i Opening balance 431.4 908.4 854.4 562.5 306.5 16.4 100.9 229.8 409.4 656.8
ii Revenue Receipts 3,264.8 3,779.7 4,265.7 4,719.9 5,207.2 5,759.4 6,310.3 6,912.3 7,579.3 8,320.2
iii Revenue Expenditure 2,476.2 3,079.1 3,973.0 4,604.9 5,207.1 5,674.9 6,181.4 6,732.7 7,331.8 7,989.3
iv Municipal receipts 5,876.5 10,108.7 11,976.3 9,571.2 8,685.6 5,759.4 6,310.3 6,912.3 7,579.3 8,320.2
v Municipal expenditure 5,399.5 10,162.7 12,268.1 9,827.2 8,975.7 5,674.9 6,181.4 6,732.7 7,331.8 7,989.3
New Debt Servicing Exp. - - 20.0 32.8 40.5 53.7 62.1 67.2 67.2 67.2
New O&M Exp. 146.2 507.6 947.8 1,256.3 1,507.5 1,582.9 1,662.1 1,745.2 1,832.4 1,924.1
vi Revenue Surplus/ Deficit for the year 788.58 700.53 292.75 115.00 0.14 84.56 128.87 179.54 247.49 330.94
vii Municipal Surplus/ Deficit for the year 477.0 (54.0) (291.9) (256.0) (290.1) 84.6 128.9 179.5 247.5 330.9
viii Closing balance 908.36 854.39 562.52 306.49 16.38 100.94 229.81 409.35 656.84 987.78
Performance Indicators
DSCR - - 15.6 4.5 1.0 2.6 3.1 3.7 4.7 5.9
DSR - - 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
PT Collection Performance 0.6 0.7 0.7 0.8 0.9 0.9 0.9 0.9 0.9 0.9
10.6 Conclusion
This chapter discussed the Investment sustainability of Katni Nagar Nigam. The discussion on assumptions for various financial projections was followed by
detailing of investment capacity of ULB. The investment capacity was analyzed for four scenarios; Base case, PT improvements & Sector Reforms, UIDSSMT
Grants & Reforms and Debt Funding & Reforms. The investment capacity analysis was followed by a discussion on the funding requirement of the city.
The next chapter deals with the urban reforms. The chapter discussed the objective and status of various reforms mandated under UIDSSMT.
The main thrust of the revised strategy of urban renewal is to ensure improvement in urban
governance so that Urban Local Bodies (ULBs) and para-statal agencies become financially sound
with enhanced credit rating and ability to access market capital for undertaking new programmes and
expansion of services. In this improved environment, public-private participation models for
provisioning of various services would also become feasible.
Among various schemes aimed at the urban renewal, the most important schemes are Jawaharlal
Nehru National Urban Renewal Mission (JNNURM) and Urban Infrastructure Development Scheme
for Small & Medium Towns (UIDSSMT). Whereas JNNURM has its own selection criteria for the cities
which can receive funding under it, UIDSSMT expands the ambit of beneficiaries to cover all
cities/towns as per 2001 census excepting cities/towns covered under JNNURM.
UIDSSMT aims at improvement in urban infrastructure in towns and cities in a planned manner. To
achieve this objective, State Governments, Urban Local Bodies and para-statal agencies are required
to accept implementation of an agenda of reforms as funding under UIDSSMT has been linked with
the ULBs performance towards the implementation of anticipated reforms.
The proposed reforms at various level of governance have been categorized into:
Current Status
1. The State Government has implemented 1) constitution of municipalities, 2) composition of
municipal councils, 3) reservation of seats for women, SCs & STs, 4) constitution of district
planning committees and, 5) incorporation of schedule 12 into the state municipal act. The
requirement of constitution of metropolitan planning committee has not been met as there is
no notified metropolitan area in the state.
3. The SFC has been constituted and recommendations have been submitted by the same.
Current Status
GoMP has issued instructions to ULBs to disclose as much information as possible through different
means such as web sites, notice board, etc.
2. The state government has agreed to undertake all required reforms related to financial
statements in a stipulated time frame.
Current Status
Existing Stamp duty rates in Madhya Pradesh stands at 7.5% of the Market value. The
computerization of whole system is also in the progress.
Current Status
The Draft of the new Act that will replace the existing Madhya Pradesh Accommodation Control Act is
ready with the Housing and Environment Department. It was revised in the light of suggestions of
Finance/Law Dept. The State Cabinet in its meeting held on 27/06/2007 resolved to enact a new
Madhya Pradesh Accommodation Control Act.
Despite its efforts, GoMP has not been able to carry out reforms related to revision of guidance values
and dispute resolution mechanism.
Current Status
Completed – Mohalla samiti are constituted as the third tier.
Current Status
In this area, all reforms have been achieved with the transfer of powers related to the provisioning of
water supply & sewerage, public transport and solid waste management. This has been supported by
the association of ULB with city planning functions. This has been achieved by the active participation
of ULB in the preparation of city development plans.
Current Status
1. At present, Double Entry Cash Base system of accounting is being followed in KMC.
2. Double Entry Accrual Base accounting system is being adopted.
3. State has drafted its own accounting manual which has been revised as per the provision of
NMAM.
4. State has not modified its current laws and regulations to be in compliance with the double
entry accrual based accounting.
5. A resolution has been passed by Government expressing commitment to establish modern
municipal accounting system.
11.3.2 E-Governance
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in E-Governance, with the
objective of having a transparent administration, quick service delivery, effective MIS, and general
improvement in the service delivery link.
Current Status
At present, MC levies user charges only for Water supply. Municipality charges Rs 750 as connection
fee for every new connection irrespective of type of consumer. The tariff structure for the same is
provided in Exhibit 6-4.
Current Status
The municipality attempts to universalize the coverage of services such as water supply, sanitation,
solid waste management and other infrastructure facilities but has not achieved any break through
due to the location disadvantage of these areas and inadequacy of funds available. MC has also been
coordinating with other agencies for the unversalization of services like health and education.
Current Status
State has identified all Urban Below-Poverty-Line families using financial and non financial criteria.
While financial criterion uses monthly income as the parameter, non financial criterion attempts to
cover social factors such as housing, water & hygiene, education, literacy, employment,
Current Status
Currently, KMC levies property tax on residential, commercial and industrial properties. The property
tax is being calculated on the basis of Unit Area method.
4 Earmarking at least 20-25% of developed land in all housing projects Work in Progress
(both Public and Private Agencies) for EWS/LIG category with a system of
cross subsidization.
As per the development plan of Katni, the addition of the new villages will increase the Municipal area
to about 58.92 Sq.km. List of villages along with their areas is given below:
As per Census 2001, Katni Municipality has a population of 1, 87,029, which will be increased by
additional population of extended area.
For the existing Municipal Area and population the detailed analysis and recommendation are already
discussed in the Chapter 3, 6, and 8 etc. So recommendation in this section will be limited to the
additional area and additional population. It should be read along with the recommendation suggested
for existing areas.
Population Projections
The present growth rate of these villages is very less, therefore while projecting the future population
of this area we have assumed the growth rate as 2.7% which is same as the growth rate of the urban
area in Katni. As Katni is growing at a very fast pace due to the growth of various economic activities
in the area therefore it is expected that the surrounding area would also grow at the same growth rate.
The infrastructural facilities for the extended area have been proposed for the extended area.
Infrastructural Facilities
Physical Infrastructure
Water Supply: The existing source of water supply in the extended area is tube wells. But
once this area will become part of Katni Municipality, the water supply will be administered by
Katni Municipality. All the areas will have to connect by network of ESR & GSRs with
distribution network. As the additional villages are very sparsely populated. We recommend
that water supply distribution network should be developed in phased manner.
Sewerage System: As the extended area is very sparsely populated there is no sewerage
system prevailing in the area. We recommend that septic tanks should be proposed to cater
the needs of the existing population; this system can be upgraded as soon as it comes under
the jurisdictions of the municipality.
Solid Waste Management: Currently the extended area does not face any serious problems
related to solid waste management because it is very sparsely populated. ULB will be
responsible for managing the solid waste in the extended area when it will be included in the
municipal limits.
Roads: At present the connectivity in the extended area is very poor. Several roads have
been proposed for better connectivity in the the extended area/planning area as per the
Master Plan 2021. Therefore the ULB should provide better linkages by connecting the rural
areas with the major state and national highway passing from the city.
Social Infrastructure
Health Facilities: At present the health facilities in the region are very poor. The rural
population has to visit Katni or even Jabalpur for getting Medical facilities. Therefore it is
important to provide medical facilities at different levels in order to reduce the burden from the
medical infrastructure in Katni. We also recommend that the medical facilities should be
located on major junctions and major roads which can be easily accessible for all parts of the
extended area requirement.
Educational Facilities: The status of educational infrastructure is very similar to the health
infrastructure. There are no schools, colleges catering to the needs of the people. The rural
population generally goes to Katni and even Jabalpur for higher education which increases
Residential
At present these villages are very sparsely populated, so there is very little chance of development in
the distant areas. We also recommend on the same line of the Master Plan recommendation that
development will be more in surrounding areas of existing Municipal area. The probable residential
area is shown the map below.
Commercial
The present commercial sector of Katni is currently located in the central city on the major roads. This
leads to the traffic congestion due to excessive parking on the streets. Therefore in order to reduce
the excessive burden from the infrastructure of the core city, major commercial centres would be
located in the extended area
Major interventions
Development of logistic Hub for Transshipment, Storage, Collection and Distribution of goods.
Riverfront development.
Recreational
As the Katni city is very congested it is expected to face enormous pressure on the infrastructure due
to increase in population which will cause traffic problems and also lead to environmental degradation
due to industrial pollution. Therefore it is very important to develop a green belt within the city in order
to control the environmental degradation.
Major interventions
Development of 100 m Green belt along Katni River and 15m green belt along all the nallahs
in the city
Development of buffer zone by tree plantation along the railway line which would also act as a
continuity of open spaces
Stadium and swimming pool for encouraging sport related activities in the city.
Participants
The workshop was attended by stakeholders from various sections of the society and given that over
60 people attended the workshop, the detailed affiliations and designations of all attendees could not
be captured, due to some coordination issues. In addition to the stakeholders, as given in Table 2,
following members of our company were present for the Consultation Workshop:
The presentation by IMaCS familiarized the stakeholders with the purpose, process, and expected
outcomes of the CDP study. Members were then requested for their views and suggestions in
formulating the City Development Plan with key stress on following areas:
b. Projects to be undertaken
Sector-wise Suggestions
Table 3: Sector-wise Suggestions from Stakeholders
Sector Suggestions
Persons present
The workshop was attended by around 100 stakeholders from various sections of the society. The
attendees were mainly affiliated to Municipal Council, Katni Municipal Corporation, Press, People
Representative, Private Contractors, Social Institutions, Political Parties, etc. In addition to these
organizations, many citizens also attended the workshop. The detailed affiliations and designations of
attendees are provided in Table 2.
All the participants were provided with a workshop kit during the registration. The workshop kit
consisted of a Note on CDP, an introduction of IMaCS, a Questionnaire, a schedule of workshop and
a Pen.
The detailed description of these stages is provided in subsequent part of this section. Along with a
brief description, information is also provided on the main contributors to the stage.
IMaCS explained the basics of a City Development Plan and the need for a long-term plan for Katni
and role of IMaCS, with support from Stakeholders, in preparing the City Development Plan. The
presentation stressed on the need of primary focus on improving overall quality of living of the citizens
in addition to the physical and social infrastructure of the town. The presentation is attached as “Part 1
of Annexure A.”
The introduction to the CDP process and background from the Inception workshop laid the way for the
presentation of the assessment of the existing situation of the urban services.
IMaCS started with presenting a SWOT analysis to the stakeholders. It was followed by Demographic
and Socio-Economic profile of the town. The presentation of city profile was followed by the
presentation of Sector Analysis involving Existing Situation and Future Gaps, Critical Issues and
Needs of the sector. The Sector analysis was presented in the following categories.
Physical Infrastructure
Urban Poor
Social Infrastructure
Developmental Planning
Urban Environment
Urban Governance
The presentation is attached as “Part 2 of Annexure A.” The presentation of the detailed assessment
of various areas provided stakeholders with a platform to voice their perspectives and priorities for
city.
This stage started with a brief on “City Planning: Importance and Approach” by the IMaCS team. This
was followed by the discussion by stakeholders on various lines. Some of the important lines of
discussions are:
Katni City
Physical Infrastructure
Traffic and Transportation
Social Infrastructure
Local Economic Development
Slums and Urban Poor
Land Use and Housing
Urban Environment
Urban Governance
In each line of discussion, IMaCS provided stakeholders with key aspects that can be discussed
upon, to make the discussion focused and fruitful. The key aspects were related to the relevance of
the area with city planning and development, existing situation and development prospects, critical
issues, etc. The presentation is attached as “Part 3 of Annexure A.”
Stage 4 was one of the important stages of this workshop. This stage involved briefing stakeholders
about the Visioning Process, presenting IMaCS’ vision for the city to the stakeholders, Questionnaire
survey and development of a shared vision. The presentation is attached as “Part 4 of Annexure A.”
IMaCS explained what a vision statement is and how should it be developed. Describing Visioning
process was followed by the presentation of a few examples of the vision statement for the city. This
presentation was followed by a Questionnaire survey to elicit the views of participants on the
strengths, weaknesses, opportunities, critical issues related to the city. The questionnaire used in the
Questionnaire survey is attached as Annexure C. In addition to the questionnaire, 2 filled
questionnaires have also been annexed.
Achievement of the development of a shared vision for the city was followed by discussion on sector
goals to achieve the formulated vision.
This stage was concerned with finalization of the sector goals. It also involved the initiation of the
discussions on the strategies to achieve the sector goals. The stakeholders were also asked for the
major actions that are required in each of the sectors.
The goals, strategies and major actions were discussed for various sectors under following
categories:
Physical Infrastructure
Traffic and Transportation
Social Infrastructure
Local Economic Development
Slums and Urban Poor
Land Use and Housing
Urban Environment
Urban Governance
The presentation is attached as “Part 5 of Annexure A.”
Stage 6 (Conclusion)
Contributor: IMaCS Team
This stage marked the completion of the workshop. It involved summarization of the workshop
process and objectives achieved during the workshop. This stage was concluded with a discussion on
the future steps of the study.
Discussion Themes
Followed by the registration of the participants, IMaCS made an inaugural address in which
background to the study was explained. The workshop was carried out in four stages. The main
presentation/discussion points of these stages are provided Table 2.
Discussion Themes
Followed by the registration of the participants, IMaCS made an inaugural address in which
background to the study was explained. The workshop was carried out in three stages. The main
presentation/discussion points of these stages are provided Table 2.
In this stage, things done before were briefed out. It focused on sectoral analysis.
After the introductory stage, sector-wise discussion on identified projects was done. It mainly included
sector goals, stratagies, Priority projects, Long term projects. Further, sector-wise investment required
for the implementation of the projects was discussed. Vision of Special Paper I & II were discussed.
Finally at the end of this stage, an Investment plan backed by an analysis of financing capacity and
strategies to overcome the limitations of the financials of the ULB was discussed in detail.
Stage 4 (Conclusion)
Contributor: IMaCS Team
This stage marked the completion of the workshop. It involved summarization of the workshop
process and objectives achieved during the workshop. This stage was concluded with the finalization
of city development plan.
Participants
The workshop was attended by around 50 stakeholders from various sections of the society. The
attendees were mainly affiliated to Municipal Council, Katni Municipal Corporation, Press, People
Representative, Social Institutions, Political Parties, etc. In addition to these organizations, many
citizens also attended the workshop.
Questionnaire
The questionnaire was divided into two parts; one corresponding to the entire city and the second part
corresponding to the ward specific issues.
In the first part of the questionnaire, questions pertaining to the whole city were included such as
important aspects of the city, economic drivers, physical & social infrastructure, etc. The respondents
were asked to rank the criticality of the issues on a scale of 1 to 9 with 1 being most critical and 9
being the least. The guidelines to decide the criticality included importance of a particular sector in
city’s development and existing status of the sector. These sectors were further divided into various
components and respondents were again asked to rank the criticality of these components. This
provided the information corresponding to the adequacy of the supporting infrastructure and facilities
related to these sectors. The sectors included in the questionnaire were: Road network, Road surface
condition, Water Supply, Sewerage facility, Storm water drainage, Solid waste management, Health
facilities, Education facilities, and Greenery and adequacy of open space e.g. adequacy of parks,
lawns in the city etc.
In the second part of the questionnaire, a detailed survey of ward-wise infrastructure facilities was
carried out. The approach and methodology adopted in this part was same as that followed in the first
part of the questionnaire. Each respondent was asked to respond with respect to the ward he/she
belongs to.
The data collected through the questionnaire survey was analyzed to prioritize various
sectors/services of the city according to their criticality. In addition to this, various components of each
sector were also prioritized in order to identify the critical areas of all urban sectors/services. The data
set included 30 responses for each question of the questionnaire.
4. Agriculture Markets
A basic analysis which includes percentage of respondents who have ranked various infrastructure
sectors on a scale of 1 to 9 is given in Table 1. So, the value corresponding to Rank 1 and Road
Network is the percentage of respondents who think that Road network is the most critical sector in
Rank 1 2 3 4 5 6 7 8 9
Road Network 16% 20% 12% 12% 4% 0% 8% 12% 16%
Road surface Condition 0% 28% 20% 12% 0% 20% 8% 8% 4%
Availability of water 52% 8% 8% 16% 8% 4% 0% 0% 4%
Sewerage facility 4% 20% 8% 24% 24% 0% 8% 8% 4%
Storm Water Drainage 8% 12% 12% 8% 24% 20% 4% 8% 4%
Solid Waste 4% 0% 8% 4% 20% 12% 24% 8% 20%
Health Facility 16% 4% 8% 12% 0% 32% 16% 12% 0%
Education Facility 0% 8% 16% 8% 12% 8% 28% 16% 4%
Parks 0% 0% 8% 4% 8% 8% 4% 24% 44%
Source:IMaCS Analysis
In addition to a preliminary analysis, an overall rank for each sector was derived out of cumulative
perception in terms of its criticality. A decreasing rank order of various infrastructure facilities is given
in Table 2.
The ranking thus obtained lays down a path for prioritization of development works in the city. It would
also help to synchronize the usage of developmental funds and the priorities of the city. It should be
kept in mind that Table 2 is only an indicator of relative criticality of various sectors/services with
respect to each other.
A detailed analysis was carried out for each sector in order to identify the most critical problem within
each sector. The findings of this analysis will be useful while devising City Investment Plan, Annual
Action Plan and Prioritization of projects within each sector. Table 3 lists most critical problems in
some of the urban sectors.
For the social infrastructure, stakeholders were asked to rank their perception on a scale of 1 to 4 with
1 being Good, 2 being Satisfactory, 3 being Poor and 4 being Very Poor. Table 4 quantifies the
stakeholders’ perception in terms percentage of responses that allotted every facility a particular rank.
Table 4 indicates that the city in-general suffers from poor social infrastructure which includes parks,
proper markets & parking space, recreational activities, and good education and health care.
Social Infrastructure 1 2 3 4
Parks 0% 6% 44% 50%
Market 0% 11% 22% 67%
Movie Hall 0% 6% 35% 59%
Hotel/Restaurants 0% 11% 50% 39%
Street Shops 5% 10% 30% 55%
Playground/Stadium 5% 10% 35% 50%
Source:IMaCS Analysis
1 Superintendent of Police Traffic: a. As per records of past 3 years, 40% of law &
(Katni) order problems has happened due to Accidents, b. Lack of
Civic Sense, c. Systemization of Traffic
A ten- fold increase in the number of vehicles from 4500 to
45000 in past years
Traffic of heavy vehicles
High Floating Population
Awareness generation
Parking space
Over bridges,
Social Awareness against the consumption of Liquor
WATER SUPPLY
Project 1
Title: 24x7 Water supply project for Nagpur city (Pench IV & Leak Detection and Water Audit)
Project 2
Title: Operation and Maintenance Practices in Water Supply System in Surat
Town profile:
Other details:
Nagpur Surat
Strategy Reforms in water sector Standardization of all operations /
Adopted: functions of water supply with the help of
Investment support from Quality Management System.
JNNURM
Delegation of responsibilities in the area
Implementation through PPP of production, engineering and
mode maintenance (Electrical and
Mechanical), water quality control,
quality control engineering,
instrumentation and control,
administration and housekeeping,
design and development etc.
Formulation and execution of various
check points for raw water, in-process
water quality control and finished /
treated water quality control.
Formulation and execution of routine,
breakdown, preventive and predictive
maintenance schedules for Electrical
and Mechanical machineries.
Formulation of annual disinfections
program.
Implementation: Pench IV:
Following precautionary measures to ensure
Part-1: Lifting Water at Pench
effective operation and maintenance of
Project 2
Title: Development of Sewerage System, Barmer
Town profile:
Other details:
Project 2
Title: Mechanized SWM but with private investment in Ambernath
Town profile:
Other details:
Amritsar Ambernath
Roles and obligations of all the Municipal Council of Ambernath
Strategy
stakeholders have been defined in has given contract for door-to-
Adopted: the agreement. door waste collection,
It is the responsibility of the segregation and transportation
Contractor to ensure source for all the 41 wards of the city
segregation of waste and transport since August 2004 for a period of
the same to processing facility. 3 years.
The Contractor was asked to provide The contractor has deployed his
adequate number of vehicles, own vehicles like mini door
infrastructure, materials, services tempos, tractors and trucks to
and manpower to carry SWM collect the waste from the
operations efficiently. households and transport it to the
The MCA monitors/ supervises the municipal site. All the vehicles
day to day operations of the are closed type and have two
Contractor who has provided a compartments to store the dry
DRAINAGE
Project 1
Title: Storm Water Drainage Scheme in Chandernagar Municipal Corporation Area
Project 2
Title: Trans-municipal drainage scheme, Municipal areas under KMDA
Town profile:
vi Revenue Surplus/ Deficit for the year 788.58 700.53 292.75 115.00 0.14 84.56 128.87 179.54 247.49 330.94
vii Municipal Surplus/ Deficit for the year 477.0 (54.0) (291.9) (256.0) (290.1) 84.6 128.9 179.5 247.5 330.9
viii Closing balance 908.36 854.39 562.52 306.49 16.38 100.94 229.81 409.35 656.84 987.78
ix Performance Indicators
DSCR - - 15.6 4.5 1.0 2.6 3.1 3.7 4.7 5.9
DSR - - 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
PT Collection Performance 0.6 0.7 0.7 0.8 0.9 0.9 0.9 0.9 0.9 0.9
B REVENUE ACCOUNT
RECEIPTS
I Own Sources
Tax Revenue
1 Property Tax 509.1 662.1 735.1 737.3 702.8 730.2 746.9 762.1 777.5 793.1
2 Export Tax 55.7 60.1 65.0 70.1 75.8 81.8 88.4 95.4 103.1 111.3
3 Other Taxes and cess 6.2 6.7 7.2 7.8 8.4 9.1 9.8 10.6 11.4 12.3
Non Tax
1 Rental Income from Municipal Properties 79.6 86.0 92.9 100.3 108.3 117.0 126.3 136.4 147.4 159.1
2 Water Charges 247.7 321.9 380.1 424.3 478.1 515.0 535.0 552.9 570.9 589.4
3 Sewerage Charges - - 33.9 83.1 150.9 192.1 207.4 219.0 230.6 242.5
4 Fees and User Charges 112.2 125.7 140.8 157.7 176.6 197.8 221.5 248.1 277.8 311.2
5 Sale and Hire Charges 15.3 16.5 17.8 19.3 20.8 22.5 24.3 26.2 28.3 30.6
6 Others 243.5 272.7 305.4 342.1 383.1 429.1 480.6 538.3 602.8 675.2
Sub Total Own Revenue 1,269.3 1,551.7 1,778.0 1,941.9 2,104.8 2,294.5 2,440.1 2,589.1 2,749.8 2,924.6
Total Revenue Receipts 3,264.8 3,779.7 4,265.7 4,719.9 5,207.2 5,759.4 6,310.3 6,912.3 7,579.3 8,320.2
EXPENDITURE
I Salaries/ Wages & Allowances 1,524.0 1,668.7 1,994.1 2,183.4 2,390.7 2,617.8 2,866.3 3,138.5 3,436.5 3,762.9
II Administrative Expenses 98.0 109.8 123.0 137.7 154.3 172.8 193.5 216.7 242.7 271.9
III Operation & Maintenance
1 Existing O&M 379.6 425.1 476.2 533.3 597.3 669.0 749.2 839.2 939.8 1,052.6
2 New O&M 146.2 507.6 947.8 1,256.3 1,507.5 1,582.9 1,662.1 1,745.2 1,832.4 1,924.1
C CAPITAL ACCOUNT
RECEIPTS
I Loans - - 250.6 159.0 96.8 - - - - -
II Income from Connection Fee (Water & Sewerage) 4.0 49.1 111.4 131.9 162.9 90.7 32.9 34.0 35.2 36.4
III Grants & Contributions
New Grants 2,611.7 6,329.0 7,460.0 4,692.3 3,381.7 - - - - -
Sub Total Grants 2,611.7 6,329.0 7,460.0 4,692.3 3,381.7 - - - - -
VI Other Capital income - - - - - - - - - -
Total Capital Receipts 2,611.7 6,329.0 7,710.5 4,851.3 3,478.4 - - - - -
EXPENDITURE
IV CAPEX 2,923.3 7,083.5 8,295.2 5,222.3 3,768.7 - - - - -
5. Centre for Research, Documentation & Training, Institiute of Town Planners, India. Urban
Development Plans, Formulation & Implementation Guidelines..
6. Vastushilpi Projects & Consultants Pvt. Ltd. Detailed Project Report for Water Supply..
7. Ministry of Home Affairs. Houses, Household Amenities and Assets, Census of India, 2001..
8. Regional Centre for Urban & Environmental Studies (RCUES). Detailed Project Report for MSWM
for Nagar Nigam, Katni..
9. Ministry of Environment and Forests, Government of Inda. Municipal Solid Waste (Management &
Handling) Rules 2000..
11. Katni Municipal Corporation. Integrated Housing and Slum Development Programme (IHSDP)..
12. Madhya Pradesh Urban Services for Poor. Request for Proposals for Nine Cities in MP. 2009..
14. Organization for Economic Co-operation and Development (OECD). Health Data..
15. Financial Express. Financial Express Website. [Online]. Available from: HYPERLINK
"http://www.financialexpress.com/news/indias-patient-hospital-bed-ratio-not-in-pink-of-
health/518361/%20" http://www.financialexpress.com/news/indias-patient-hospital-bed-ratio-not-
in-pink-of-health/518361/.
16. Ministry of Urban Development and Ministry of Urban Employment and Poverty Alleviation.
Formulation of a City Development Plan: JNNURM Toolkit..