DRAFT - Jan. 2020 Hoboken Yard Redevelopment Plan Amendment
DRAFT - Jan. 2020 Hoboken Yard Redevelopment Plan Amendment
iii
ACKNOWLEDGEMENTS (2020)
Community Development Businesses Focus Group (2014)
Hoboken Mayor
Christopher A. Brown, AICP, PP Greg DellAquila, Chamber of Commerce
The Honorable Mayor Ravinder Bhalla Director Representative
Hoboken City Council Paul Grygiel, Chamber of Commerce
Transportation and Parking Representative
Hon. Jennifer Giattino Council President Ryan Sharp, AICP, PP Dean Marchetto, Chamber of Commerce
6th Ward Director Representative
Hon. Phil Cohen Anastasia Kamper, Retailer
Councilman 5th Ward John Morgan, Rory Chadwick, Retailer
Former Director Joe Branco, Bar Representative
Hon. James Doyle Tara Whelan, Bar Representative
Council-at-Large Hoboken Rail Yards Task Force (2014) Eugene Flynn, Restaurant Representative
Hon. Emily Jabbour Douglas John Bowen Albert Silverman, Restaurant Representative
Council-at-Large John P. Carey Anna MacDairmid, Hotel Representative
Cindy Cray
Hon. Vanessa Falco Diana C. Davis Quality of Life Coalition Committee for a Green
Council-at-Large Stephen Kilnisan Hoboken (2014)
Hon. Michael DeFusco Claire Lukacs Helen Manogue, Coordinator
Councilman 1st Ward James A. Magenheimer Frances Jennings, Assistant Coordinator
Terrence J. Pranses Melissa Abernathy, Secretary (also Secretary of
Hon. Tiffanie Fisher Patricia Samperi Committee for a Green Hoboken)
Councilwoman 2nd Ward Sylvia Schwartz Eduardo Gonzalez, Treasurer
Hon. Michael Russo Tom Chartier, Chairman of Committee for a Green
Councilman 3rd Ward Artists Focus Group (2014) Hoboken
David Zimmerman, DeBaun Center for Performing Brad Miller, Vice Chairman of Committee for a
Hon. Ruben Ramos, Jr. Arts at Stevens & The Theater Co. Green Hoboken
Councilman 4th Ward Diana London, Hudson Theatre Ensemble Ines Garcia Keim
Council Subcommittee Florence Pape, Hudson Theatre Ensemble Paul Neshamkin
Tara Thurber, Paul Vincent Gallery
Hon. Michael DeFusco
James Mastro, Owner Guitar Bar and Musician
Subcommittee Chair
Justine Uva-Sgaramella, Urban Arts
Hon. Michael Russo Stefanie Ashby, Local Artist
Councilman Jim Stephenson, The Rotating Gallery
Hon. Ruben Ramos, Jr. Craig Dale, Local Artist
Councilman Howard Olah-Reiken, Producer
Geri Fallo, Hoboken Cultural Affairs Coordinator
Hon. Vanessa Falco
Councilwoman
iii
TABLE OF CONTENTS
ACKNOWLEDGEMENTS (2020) ............................................................................................................................................................................ iii
LIST OF FIGURES ................................................................................................................................................................................................... vi
EXECUTIVE SUMMARY .................................................................................................................................................................................................. 1
1. INTRODUCTION....................................................................................................................................................................................................11
1.1 Redevelopment Plan Purpose.......................................................................................................................................................................11
1.2 Description of the Redevelopment Area ......................................................................................................................................................12
1.3 Prior Planning Projects ..................................................................................................................................................................................13
2. BACKGROUND & EXISTING CONDITIONS ..........................................................................................................................................................19
2.1 Context .....................................................................................................................................................................................................19
2.2 Existing Conditions ..................................................................................................................................................................................23
2.3 Redevelopment Area Site Conditions & Constraints ............................................................................................................................24
2.4 Physical Constraints & Developable Areas ..................................................................................................................................................26
3. REDEVELOPMENT PLAN FRAMEWORK .............................................................................................................................................................31
3.1 Planning Process ...........................................................................................................................................................................................31
3.2 Planning & Design Principles ........................................................................................................................................................................32
3.3 Development Program Assumptions ............................................................................................................................................................33
4. REDEVELOPMENT PLAN .....................................................................................................................................................................................37
4.1 NJ TRANSIT Facilities & Operations ..............................................................................................................................................................38
4.2 Vision and Illustrative Concept .....................................................................................................................................................................38
4.3 Land Use & Development Program ..............................................................................................................................................................38
4.4 Bulk & Design Requirements ........................................................................................................................................................................46
4.5 Public Space & Pedestrian Plaza Requirements .........................................................................................................................................50
4.6 Circulation & Parking Requirements ............................................................................................................................................................51
4.7 Sustainable Design & Flood Resiliency ........................................................................................................................................................55
4.8 Infrastructure Requirements .........................................................................................................................................................................56
4.9 Affordable Housing ........................................................................................................................................................................................56
5. PLAN RELATIONSHIPS ........................................................................................................................................................................................59
5.1 Relationship to City of Hoboken Master Plan ..............................................................................................................................................59
5.2 2018 Master Plan Reexamination Report ...................................................................................................................................................62
5.3 Relationship to Hoboken Bicycle & Pedestrian Master Plan ......................................................................................................................64
5.4 Relationship to Master Plans of Contiguous Municipalities .......................................................................................................................64
iv
5.5 Relationship to Hudson County 2002 Master Plan & 2008 Reexamination Report ................................................................................65
5.6 Relationship to Current Hoboken Zoning Ordinance ...................................................................................................................................65
5.7 Relationship to Jersey City/Hoboken Connectivity Study ............................................................................................................................66
5.8 Relationship to 2001 State Development and Redevelopment Plan and DRAFT New Jersey State Strategic Plan ...............................66
6. IMPLEMENTATION ...............................................................................................................................................................................................69
6.1 Supersedes Existing Zoning ..........................................................................................................................................................................69
6.2 New Construction...........................................................................................................................................................................................69
6.3 Acquisition ......................................................................................................................................................................................................69
6.4 Other Actions ..................................................................................................................................................................................................69
6.5 Role of City .....................................................................................................................................................................................................69
6.6 City Designation of Redeveloper – Redevelopment Agreement .................................................................................................................70
6.7 Approvals Process..........................................................................................................................................................................................71
6.8 Severability .....................................................................................................................................................................................................72
6.9 Adverse Influences ........................................................................................................................................................................................72
6.10 Non-Discrimination Provisions ....................................................................................................................................................................72
6.11 Escrows ........................................................................................................................................................................................................73
6.12 Infrastructure ...............................................................................................................................................................................................73
6.13 Duration of the Plan ....................................................................................................................................................................................73
6.14 Procedure for Amending the Approved Plan ..............................................................................................................................................73
APPENDIX A: PLANNING PROCESS ............................................................................................................................................................................77
APPENDIX B: DESIGN ALTERNATIVES ........................................................................................................................................................................81
APPENDIX C: CIRCULATION ALTERNATIVES...............................................................................................................................................................93
APPENDIX D: RELATIONSHIPS SECTION OF 2014 REDEVELOPMENT PLAN ........................................................................................................ 103
APPENDIX E: KIMLEY HORN TRANSPORTATION REVIEW LETTER ......................................................................................................................... 109
APPENDIX F: RENDERINGS OF WARRINGTON PLAZA/FERRY TERMINAL ............................................................................................................ 121
Consultant Team ...................................................................................................................................................................................................... 125
v
LIST OF FIGURES
Figure 1: Redevelopment Area Boundaries 12
Figure 2: Existing Building Heights 19
Figure 3: Regional Transit Connections 20
Figure 4: Hoboken Redevelopment Areas 21
Figure 5: South Waterfront Redevelopment Area 22
Figure 6: Redevelopment Area Existing Buildings 23
Figure 7: Preliminary Base Flood Elevations (BFE) Map 24
Figure 8: Existing Circulation at Hudson Place 25
Figure 9: Opportunities and Constraints 27
Figure 10: Developable Areas and Parcels 28
Figure 11: Illustrative View Looking South at Hoboken Terminal 37
Figure 12: Aerial View of Redevelopment Area 39
Figure 13: Illustrative Rendering of Redevelopment Area and Surroundings 40
Figure 14: Illustrative Site Plan 41
Figure 15: Land Use Districts 42
Figure 16: Illustrative View showing Development Program 43
Figure 17: Warrington Plaza Illustrative Aerial 46
Figure 18: Development Sites 49
Figure 19: Pedestrian Plaza at Hudson Place / Warrington Plaza 53
Figure 20: City of Hoboken Bicycle & Pedestrian Plan Recommendations 64
Figure 21: City of Hoboken 2010 Reexamination Report Zoning Map 65
vi
prone to frequent flooding and was subject to record storm surge during
EXECUTIVE SUMMARY Hurricane Sandy in October 2012.
Introduction This Redevelopment Plan, as amended in 2020, reflects the future
The purpose of the Hoboken Yard Redevelopment Plan is to determine the construction of a Rebuild by Design flood. The proposed alignment for the
appropriate program and intensity of development for the Hoboken Yard RBD flood wall, which at the time of this publication was in the final design
Redevelopment Area that is contextually sensitive to the City of Hoboken’s stages, will be constructed through the Plan Area, precipitating a need to
predominant land uses, building heights, and character. The Plan amend the 2014 Hoboken Yard Redevelopment Plan. This Amended Plan
establishes a transit oriented development (“TOD”) framework to create a provides for two (2) developable areas where no NJ TRANSIT rail tracks
distinct place while preserving and enhancing the quality of life in Hoboken. and/or historic buildings exist. These sites are situated immediately
adjacent to the Terminal, including approximately 1.8 acres at Hudson Place
The Plan includes a redevelopment vision and planning framework for the
and Hudson Street and 2.03 acres to the east of NJ TRANSIT’s Engine
Redevelopment Area with specific provisions for land use, building heights
House, along Observer Highway. The remainder of the Redevelopment Area,
and bulk, public space and pedestrian plazas, and circulation and parking
which runs along Observer Highway to Marin Boulevard, totals
requirements.
approximately 6.19 acres. This includes 4.28 acres between Garden and
Existing Conditions and Developable Areas Grand Streets along Observer Highway, which is considered unbuildable
The Redevelopment Area includes multiple structures owned and utilized by because of the location of a Rebuild by Design flood wall. The development
NJ TRANSIT and the Port Authority of New York and New Jersey (PATH). feasibility of the remaining 1.91 acres of potential development, situated at
Portions of the site contain rail lines and transit operation-related the corner of Marin Boulevard and Observer Highway, is unknown as the site
infrastructure, including the existing Terminal Shed and platform tracks near is currently encumbered by a NJ TRANSIT facility and final location of the
the Terminal shed. The existing infrastructure pose physical constraints to Rebuild by Design flood wall in this location.
development considered by this Plan.
Redevelopment Vision and Planning Framework
As a major hub of regional transportation, redevelopment of this area The purpose of the Plan is to build consensus around a vision for
provides opportunities to improve pedestrian conditions along Observer redevelopment that encourages transit ridership without infringing upon
Highway and at the entrance of the Hoboken Terminal at Hudson existing and future transit operations. The Plan envisions a transit oriented
Place/Warrington Plaza. Existing circulation problems include the unsafe mixed-use development to advance environmental, social, and economic
configuration of taxi cabs, jitney bus stops, vehicular drop off area and sustainability goals of the City and the region. Through extensive community
pedestrian crossings near the Terminal. Warrington Plaza is currently feedback, review of existing conditions and input from the City of Hoboken,
inaccessible to pedestrians and requires new investments to increase the following planning and design principles were identified to guide the
pedestrian safety near the Terminal. Redevelopment Plan.
A majority of the Redevelopment Area is also below sea level (as measured
by the average high tide), and within the 100 Year Floodplain. The area is
1 Executive Summary
Development Program and Uses: within the redevelopment with community and cultural facilities
• Provide office uses within a walking distance of the Terminal to grouped around them for active pedestrian use.
reduce parking need for office employees. • Redevelop and activate NJ TRANSIT’s Warrington Plaza and Ferry
• Encourage mixed-uses with substantial ground level activity to Terminal Building with proposed improvements to NJ TRANSIT
create a vibrant pedestrian and transit oriented development. infrastructure including its Bus Terminal, Warrington Plaza and the
• Create new public space and pedestrian plazas as focal points Ferry Terminal Building. 1 Activation of the waterfront will be
Illustrative rendering showing redevelopment vision compatible with character of Hoboken (Figure Source: 2014 Plan)
1 As part of the Master Development Agreement (MDA) with its selected Master Developer,
NJ TRANSIT requires the “interior redevelopment” of the of the entire Hoboken Terminal to
improve passenger convenience and operation efficiency and strategies to adaptively
reuse the Hoboken Terminal. This includes securing retail tenants for first and second
levels of the “Ferry Terminal Marketplace.” The MDA requires an overall Master
Development Plan (MDP) with plans for Sitewide infrastructure and for the provision of
open space, parks and recreation.
3 Executive Summary
View Corridor between Washington and Bloomfield Streets. The TD district serves as a
• Maintain views of the Rail Terminal Lackawanna Clocktower within gateway to Hoboken for residents, visitors, commuters, workers and
the existing and future right of way of Observer Highway. shoppers. The district will include office, transportation related uses,
• Provide a visual extension of Hoboken’s street grid southward into residential and ground floor retail uses in close proximity to the Terminal
the Rail Yards, to the greatest extent possible, given physical facility. Any reference in this Plan to residential use within Site 2 is
and/or infrastructure constraints. contingent on the results of a site feasibility study conducted by the City. In
the event that commercial/office use is deemed not feasible, mixed-use
Sustainable Development
residential may be considered, subject to the negotiation of a
• Maximize use of open space as an essential component of a
Redevelopment Agreement.
comprehensive green infrastructure system.
• Encourage construction of a minimum LEED Silver or equivalent The Commercial Mixed-Use District (C-MU) is located along Observer
standard for all major buildings in the redevelopment area. Highway between Marin Boulevard and Grand Street. C-MU is envisioned as
• Emphasize flood remediation features in green building design. a transit-oriented office and commercial development within walking
• Encourage the use of high-quality building materials to minimize distance of the Terminal building.
noise.
The RBD/NJT Constrained District (No-Build Zone) is an area of unbuildable
• Create grade A office spaces and less transient prone residential
land due to the proposed location of the RBD flood wall.
spaces.
Height and Bulk Requirements
Land Use and Development Program
The Redevelopment Plan provides building height and bulk requirements for
The Redevelopment Plan as adopted in 2014 called for three distinct land
all new structures within the Redevelopment Area. Height and bulk
use districts: the Hudson Place and Terminal District (TD), the Residential
requirements are arranged to avoid canyon effect along Observer Highway
Mixed-Use District (R-MU), and the Commercial Mixed-Use District (C-MU).
and Hudson Place with variation in building heights. Height and bulk
Due to the location of the Rebuild By Design (RBD) flood wall, which is going
requirements are provided for the two land use districts. The overall square
to create certain physical constraints that will impact the developable area
footage for development site within the Redevelopment Area is provided to
and building footprints, the Redevelopment Plan now calls for two districts-
maximize the site’s potential for mixed-use redevelopment and maintain an
the TD and C-MU Districts, and a third area defined as RBD/NJT Constrained
intensity of use that is consistent with the existing character and scale of
District (No-Build Zone). These land uses are also compatible with the
Hoboken.
existing development along Observer Highway and the Hoboken downtown
district. Public Space and Open Space Requirements
The Hudson Place and Terminal District (TD) includes the historic Terminal The Redevelopment Plan, as adopted in 2014 and amended in 2020,
and its facilities, the Hudson Place redevelopment site located at Hudson provides a public open space framework to increase the amount and quality
Street and Hudson Place, and a development site along Observer Highway of public space for existing and new residents of Hoboken. The Plan allows
the following types of public spaces within the Redevelopment Area:
5 Executive Summary
Illustrative Rendering of Residential Mixed-Use District along Observer Highway (Figure Source: 2014 Plan)
Amendments
The Hoboken Yard Redevelopment Plan was originally adopted by the City of
Hoboken in October 2014. In early 2020, the Redevelopment Plan was
amended (“2020 Amendment”) to provide for a revised development
configuration that responded to the proposed installation of the flood
Illustrative View looking West at Hudson Place, Site #8/Site #8A
(Figure Source: 2014 Plan) protection Resist barrier (“flood wall”) that would run through a considerable
7 Executive Summary
portion of the Redevelopment Plan Area, thereby impeding the development
originally envisioned by the 2014 Plan. The 2020 Amendments were
prepared by taking the original 2014 Plan and integrating changes to text,
graphics, figures, tables and maps throughout the document. This amended
Plan supersedes the 2014 Hoboken Yard Redevelopment Plan.
Conclusion
The Redevelopment Plan provides a framework to accommodate a mixed-
use development that is compatible with the character of Hoboken, provides
for significant investment in NJ TRANSIT and City infrastructure, and
respects existing development across Observer Highway and downtown
Hoboken.
11 Introduction
Figure 1: Redevelopment Area Boundaries
1980
1980 2000
2000 2005
2005 2006
2006
The Redevelopment Study for the
Hoboken Yard Property
The Hoboken Terminal Historical Report
conducted by the City of
and Master Plan was completed in
Hoboken in November 2006
1999, setting the stage for a three
declared the study area as an
phase rehabilitation of the historic
“area in need of redevelopment.”
Terminal Building and surrounding
structures.
13 Introduction
A DRAFT redevelopment plan was prepared by the City in
2008 using funds provided by NJ TRANSIT (NJT) and LCOR.
The 2008 plan included 9.25 million square feet of new
development including an estimated 3,200 apartments
and a line of 18-78 story buildings along Observer
Highway. The plan did not advance. The preparation of this
Redevelopment Plan included a review of the existing
conditions data and related information that was
completed in the 2008 and 2014 Redevelopment Plan
documents.
Source: U.S. Army photo by Spc. Joseph Davis/Released. Source: City of Hoboken, 2014 GATE
https://en.wikipedia.org/wiki/Effects_of_Hurricane_
Sandy_in_New_Jersey#/media/File:NJ_National_Guard_in_
Hoboken_during_Hurricane_Sandy.jpg
The City of Hoboken approved the Source: NJDEP
In October of 2012, Superstorm Hoboken City Council adopted a resolution
Hoboken Yard Redevelopment Plan
Sandy hit the Northeastern United supporting Alternative Design Options for the
in 2014. It provided a plan vision
States. Hoboken was severely Rebuild By Design Wall Alignment in
and framework for transit-oriented
affected, with much of the city April 2018. In May 2018, the Board of
development in the area adjacent
flooded and thousands of In July 2016, LCOR is designated Freeholders in the County of Hudson passed a
to the NJ TRANSIT Rail Yard.
residents left without electricity. as the Redeveloper of Hoboken resolution supporting Alternative Options for the
Yard by the City of Hoboken.
Rebuild By Design Wall Alignment.
15 Introduction
This page was intentionally left blank.
Map Courtesy of City of Hoboken, 2008 Draft Redevelopment Plan Prepared by FX Fowle, Updated by SOM (Figure Source: 2020 Plan Amendment)
Development Context Avenue and Bloomfield Street is the Observer Highway Redevelopment Area
(OBS). This area was designated as blighted in accordance with the
The Redevelopment Area abuts other existing designated redevelopment
areas within the City as shown in Figure 4. Directly across Observer Highway
from the Redevelopment Area between Park Avenue and Garden Street is
the Public Works Municipal Garage Redevelopment Area (DPW). The
redevelopment plan approved for the DPW area permits up to 240 multi-
family residential units with up to 10,000 to 15,000 SF of ground floor retail
along Observer Highway.
*Map provided for illustrative purposes only. The provisions of the City’s current Flood Damage Prevention Ordinance shall apply to new development. (Figure Source: FEMA 2015)
Hoboken Yard Redevelopment Plan 24
Environmental Conditions Infrastructure
Redeveloper will undertake any environmental assessment as may be Two large diameter stormwater outfall pipes run beneath the
required, and will cooperate with the City of Hoboken, NJ TRANSIT Redevelopment Area in a north-south direction and discharge into the Long
Corporation, the New Jersey Department of Environmental Protection and/or Slip Canal. A PATH tunnel runs beneath the Redevelopment Area in an east-
a Licensed Site Remediation Professional, as appropriate, in order to west direction at Hudson Place and a north-south direction between Garden
identify any environmental constraints and to recommend and implement and Bloomfield Streets. Future redevelopment will span the underlying
any environmental mitigation efforts as may be suitable to redevelop the infrastructure, including the PATH tunnel.
site.
Potential limits in the capacity of existing water and combined sewer
A preliminary Environmental Assessment (Phase I and Phase II Preliminary infrastructure presents the opportunity to incorporate gray water systems
Assessment), of the Redevelopment Area was conducted in 2008 as part of into the development in order to reduce sewer demand. A range of best
the 2008 Redevelopment Plan. The 2008 Plan document mentions a need practices, such as storm water recycling for irrigation, and green roofs to
to conduct a Final Environmental Assessment to recommend environmental reduce the discharge of stormwater runoff and improve water quality will
mitigation measures suitable to redevelop the site. also be desirable.
Mixed-Use Development
Public Space and Pedestrian Plazas The following improvements are not dependent on the development density
and mix of the development program required as part of the Redevelopment
Plan. These improvements can occur regardless of redevelopment and are
33 Redevelopment Plan Framework
not required as part of the Redevelopment Plan. They include:
37 Redevelopment Plan
The Redevelopment Plan provides a framework to accommodate a mixed-
use development that is compatible with the character of Hoboken and
4.3 Land Use & Development Program
The three (3) distinct land use districts (Figure 15) for this Redevelopment
complements existing development across Observer Highway and downtown
Plan are the:
Hoboken. The development framework provides flexibility to incorporate
• Hudson Place and Terminal District (TD),
transit-related improvements planned by NJ TRANSIT independent of the
• Commercial Mixed-Use District (C-MU), and
Redevelopment Plan.
• RBD/NJT Constrained Area—No Build Zone.
4.1 NJ TRANSIT Facilities & Operations This section describes the permitted uses in the first two districts. The new
A significant portion of the property within the Redevelopment Area is uses prescribed in the Redevelopment Area follow the purpose, intent, and
currently owned by NJ TRANSIT, an agency of the State which is ultimately planning and design principles of the Redevelopment Plan. These land uses
responsible for the administration of New Jersey’s public transportation are also compatible with the existing development along Observer Highway
services, and Hoboken acknowledges NJ TRANSIT’s authority in that regard. and the Hoboken downtown district. It should be noted that maximum
Accordingly, Hoboken intends to implement the Redevelopment Plan in a square footage is defined by district. The Redevelopment Plan adheres to
manner which promotes Hoboken’s legitimate local interests under the the overall square footage of land use development as defined within Figure
Redevelopment Law while affording due deference to NJ TRANSIT as to that 16 of this Redevelopment Plan.
agency’s core transit functions. To that end, this Redevelopment Plan does
not purport to independently authorize or prevent any improvements to any Feasibility Study
transit facilities owned or operated by NJ TRANSIT, including Hoboken Any reference in this Plan to residential use within Site 2, as described
Terminal, or any other such improvements which would directly infringe below, is contingent on the results of a site feasibility study, which would
upon NJ TRANSIT’s core transportation functions. need to be conducted by the City. In the event that a feasibility study
determines that commercial/office use is not feasible on this site, mixed-
use residential may be considered, subject to the negotiation of a
4.2 Vision and Illustrative Concept Redevelopment Agreement. The feasibility study shall consider in its
The Redevelopment Plan provides a long-term vision and a development
assumptions that adjacent Site 1 will contain a successful Class A office
framework that is contextually sensitive to the City of Hoboken’s land uses,
building and that the Ferry Terminal Building will be operational with a mix of
building heights, and character (Figure 13). The Redevelopment Plan
commercial uses. Further, as the City of Hoboken desires the TD District to
envisions a mixed-use development that reflects the planning and design
be a regional commercial hub, the feasibility study must consider creative
principles developed as part of the planning process. The Redevelopment
development options that would help effectuate commercial development,
Plan allows flexibility for accommodating changing economic and market
such as building or cantilevering over the RBD resist feature as a way to
conditions.
increase the size of a building floorplate.
The Illustrative Site Plan (Figure 14) shows the north-south streets going
through to, and connecting with, the building sites. The Concept Plan shows
development blocks that will be designated as separate tax parcels.
39 Redevelopment Plan
Figure 13: Illustrative Rendering of Redevelopment Area and Surroundings
* Disclaimer: Location of Rebuild By Design Flood Wall is for illustrative purposes only and is subject to change. Exact location of development on Site 1 will be determined by the location of RBD Wall and Port Authority PATH below-grade infrastructure. All
building locations are for illustrative purposes only and will be determined in the Site Planning phase of the project. It is mutually understood and agreed that the information contained herein is preliminary in nature and is subject to further review and
verification by other experts. Accordingly, and to the fullest extent permitted by law, Skidmore, Owings, & Merrill LLP and it partners, officers, and consultants shall have no liability with the information provided herein.
41 Redevelopment Plan
Figure 15: Land Use Districts
Hudson Place & Terminal District (TD) Seasonal pop-up uses, outdoor market and cultural uses are encouraged to
take place within the Warrington Plaza area (Figure 17) to enhance the
The TD District includes Warrington Plaza, a portion of Lackawanna
quality of the pedestrian oriented transit plaza. The Ferry Terminal Building
Terminal, and two development sites:
shall be reactivated to include a mix of uses such as retail/restaurant,
Site 1, located at Hudson Street and Hudson Place; and,
public space, office, and/or tech incubator space. This Plan relies on the
Site 2, located along Observer Highway between Hudson Street
assumption that the renovation and enhancement of the Ferry Terminal
and Garden Street.
Building and Warrington Plaza are components required by the Master
The TD district serves as a gateway to Hoboken for residents, visitors, Development Agreement (“MDA”) between NJ TRANSIT and the Agency’s
commuters, workers and shoppers.
43 Redevelopment Plan
designated Master Developer. The following categories of uses are • Bicycle storage
permitted within the TD District to take advantage of proximity to transit: • Off street loading
Permitted Uses (Group A) • Off street parking facilities
• Civic/institutional Uses Subject to Review (Group A)
• Day care • Multi-family residential (Site 2 only), provided that:
• Educational/schools o A site feasibility study must determine that commercial/office
• Entertainment use would not be feasible for Site 2 (See feasibility study
discussion above); and
• Hotel
o Residential square footage, number of residential units and
• Office/Accelerator space
unit sizes (density) are negotiated through a Redevelopment
• Parks and plazas
Agreement; and
• Transportation related uses
o Any Certificate of Occupancy (CO) for residential use may not
Permitted Ground Floor Uses (Group B) be issued until a CO is issued for office development on Site 1.
• Artists galleries, studios and workshops • Additional Use Regulations
• Bars
• Uses within the first-floor spaces of all buildings in the TD District
• Business services shall be limited to those listed in Group B above, except for lobbies
• Farmers markets and entryways.
• Food court • Group B uses may also be permitted on the second floor, top floor,
• Health clubs and rooftop.
• Indoor public space • Off street parking facilities are not permitted on the first floor;
• Maritime however, bicycle parking and storage may be located on the ground
floor.
• Performing art venues
• Up to 30,000 SF of space may be included as commercial
• Restaurants
accelerator space within the Redevelopment Area.
• Retail or commercial Uses
• Sidewalk kiosks Commercial Mixed-Use District (C-MU)
• Spaces for cultural activities and civic uses The Commercial Mixed-Use District (C-MU) is located along Observer
• Supermarkets/grocery store Highway at the corner of Marin Boulevard (Site 3). C-MU is envisioned as a
transit-oriented development within a walking distance of the Terminal
Accessory Permitted Uses
building. As defined in 1994 by NJ TRANSIT in Planning for Transit-Friendly
• Bicycle shower facilities
Land Use: A Handbook for New Jersey Communities, a reasonable walking
Permitted Uses (Group A) • Uses within the first-floor spaces of all buildings in the C-MU District
shall be limited to those listed in Group A and B above, except for
• Civic/institutional
lobbies and entryways.
• Day care
• Off street parking facilities are not permitted on the first floor
• Educational/schools
fronting Observer Highway.
• Entertainment
• Redeveloper must build and provide space/location for indoor
• Hotel public space, that may include a variety of uses such as
• Indoor public space performance space, public meeting rooms, and other civic uses to
• Office/accelerator space be determined by the City, within the C-MU District. Design of such
• Parks and plazas space is to be addressed in Redevelopment Agreement. The
• Transportation related uses operation of the indoor public space is not a requirement of the
redeveloper.
Permitted Ground Floor Uses (Group B)
• Artists galleries, studios and workshops RBD/NJT Constrained District (No-Build Zone)
• Bars The RBD/NJT Constrained District is located along Observer Highway in the
• Business services area between the TD and C-MU Districts. The District starts just east of
Garden Street and extends to the west of Willow Avenue in the
• Farmers markets
Redevelopment Area. The development potential of this site is restricted
• Health clubs
due to the proposed location of the RBD flood wall and the presence of
• Indoor public space existing NJ TRANSIT infrastructure. As of the time of this Amendment, the
• Movie theatres portion of the land remaining after the construction of the flood wall will not
• Performing art venues be of a sufficient in size to accommodate building development. As such, it
• Restaurants is recommended that uses for this site (formerly part of Site 2, and Sites 3,
• Retail or commercial uses 4, 5, and 6 as per the 2014 Plan), in any redevelopment be limited to open
space type uses (active or passive park, walking trails, public art space,
• Spaces for cultural activities and civic uses
etc.), while also not impacting NJ TRANSIT’s continued uses and operations.
Accessory Permitted Uses
45 Redevelopment Plan
Figure 17: Warrington Plaza Illustrative Aerial
4.4 Bulk & Design Requirements • Contextual development, including existing development along the
northern side of Observer Highway and Hudson Place.
The Redevelopment Plan provides maximum building height and bulk
requirements for structures within the Redevelopment Area. As part of the • Height and bulk of the redevelopment approved by the City for the
2014 Redevelopment Plan planning process, height and bulk requirements Public Works Garage Redevelopment Plan (north side of Observer
were derived from the following: Highway across from Redevelopment Area).
47 Redevelopment Plan
Mid-Level Provisions Upper Level Provisions
Parking needs for building at Site 1 may be met by providing shared parking • Parking areas and structures shall be incorporated into the site
on Site 2. plan and architecture to limit their impact on the public realm.
View Corridors • Any podium parking adjacent to a roadway shall be screened and
incorporated into the architecture of the structure.
Site development shall be designed to maintain existing views of
Lackawanna Clock Tower from Observer Highway right-of-way east of Marin View Corridors
Boulevard.
• Visual connections within the Redevelopment Area shall be
Commercial Mixed-Use District (C-MU) maintained to preserve the character of the adjacent
Site 3 neighborhoods and limit prolonged periods of shadow along
Observer Highway. To meet this goal, breaks in the skyline following
Due to the current use of NJ TRANSIT’s infrastructure and the potential for
sight lines from the existing street grid called View Corridors must
the final alignment of the RBD floodwall to span this site, the potential for
be established.
redevelopment at Site 3 is uncertain and not likely to take place in the
immediate future. As such, the required land uses and maximum intensities • View corridors shall be maintained at Washington, Bloomfield and
set by this Redevelopment Plan for Site 3 are preliminary in nature; any Garden Streets to allow winter solstice light at the edge of the
future redevelopment of Site 3 would require a separate traffic impact study sidewalk along the north side of Observer Highway.
be conducted at the time a redevelopment project is proposed. • A shadow study showing conditions at various times per year must
• Maximum height for Site 3 shall not exceed 145 feet. be submitted and approved by the City as part of a Redevelopment
Agreement, which will be evaluated by the City.
• Maximum square footage shall be 350,000 sf.
• One or more upper-story step-backs may be provided as negotiated Signs and Signage
through a Redevelopment Agreement. A signage plan shall be submitted for each District at time of Site Plan
• Mechanical equipment must be effectively screened from view or approval in accordance with the City’s sign regulations.
integrated into the architectural character of building within Site 3.
Street level Provisions
• No off-street loading areas are permitted along Observer Highway
in the C-MU District.
• Development shall be accessible by pedestrians at grade from
Observer Highway.
• Street-level building facades must include architectural
articulation, windows, entryways, etc. Blank street walls are
prohibited in the C-MU District.
49 Redevelopment Plan
4.5 Public Space & Pedestrian Plaza
Requirements
The Redevelopment Plan provides a public space and pedestrian plaza
framework to increase the amount and quality of public space for existing
and new residents of Hoboken. This chapter governs all public space within
the Redevelopment Area. Public space may include:
• Pedestrian Plaza at Hudson Place / Warrington Plaza
• Indoor Public Space Pedestrian Plaza (Figure Source: 2014 Shared Spaces (Figure Source: 2014
• Piazza
• Street Plazas / Shared Spaces
• Marin Boulevard/Henderson Gateway
• Green Roofs
General Provisions
The Redevelopment Plan requires a minimum of approximately 1.45 acres
of outdoor public space and pedestrian plazas within the Warrington Plaza Boulevard
Piazza (Figure Source: 2014 Plan)
area of the Redevelopment Plan. The Plan also depicts public open space in
the form of the pedestrian plaza at Hudson Place located just outside of the
Redevelopment Area in the area of the transportation hub. The public space Pedestrian Plaza at Hudson Place / Warrington
shall be publicly accessible at street level with public amenities including Plaza
street furnishings such as lighting, landscaping, seating, and public art. A pedestrian plaza is required at Hudson Place from River Street to
Public open spaces within the Redevelopment Area shall also function to Warrington Plaza, envisioned as a public open space and intermodal
provide green infrastructure and enhance storm water management, where gateway to Hoboken. Construction of this pedestrian plaza may require the
possible. Indoor public space shall be provided within the development area re-configuration of existing taxi stands, jitney bus drop off and pick up areas,
that may accommodate a variety of uses such as performance or exhibit and vehicular drop off areas. Final plans for the plaza shall include the
space, public meeting rooms, and other civic uses to be determined by the provision of a safe pedestrian zone that connects with various modes of
City. The provision of public space shall be subject to negotiations and terms transit, bicycle lanes and bicycle storage and/or shower facilities.
of the Redevelopment Agreement. Improvements to Hudson Place and Warrington Plaza shall be coordinated
with the timing of development of Site 1 (Hudson Place site). Hudson Place
shall be a multi-purpose plaza allowing access to pedestrians, cyclists,
scooters, NJ TRANSIT vehicles, delivery trucks for retail and office tenants in
51 Redevelopment Plan
Pedestrian Plaza at Hudson Place / Warrington Agreement, which ensures all vehicles, including NJ TRANSIT,
emergency services, delivery trucks, etc., can safely and efficiently
Plaza
enter and exit the Hudson Place to Warring Plaza corridor, as well
The pedestrian plaza at Hudson Place/Warrington Plaza is envisioned to be
as the Hoboken Terminal and Ferry Building. This will include
a safe pedestrian zone within a multi-modal hub of activity. Specific
exploration of a limited access road extension that would connect
requirements for the pedestrian plaza include:
Hudson Pl. to Sinatra Dr. to accommodate emergency vehicles,
• Redesign of Hudson Plaza and Warrington Plaza as a pedestrian
which under current conditions, must execute a K-turn on Hudson
oriented plaza minimizing pedestrian and vehicular conflicts.
Place.
• Closing of Hudson Place between River Street and Warrington Plaza
These improvements to Hudson Place and Warrington Plaza are required as
for vehicular through traffic.
a part of this Redevelopment Plan and shall be set forth in the
• Integration of dedicated bike lanes within the plaza.
Redevelopment Agreement (Figure 19).
• Reconfiguration of the pick-up, drop-off, and layover locations
including locations for jitney buses and taxi stand. Bicycle & Pedestrian Environment
• Provision of bicycle storage and shower facilities. In addition to the bicycle and pedestrian related improvements mentioned
• Provision of way-finding signage for pedestrians. above, provision of integrated bicycle lanes and supporting facilities
including bicycle storage and shower facilities are recommended throughout
• Provision of a shared surface that puts pedestrian and auto space
the Redevelopment Area. These improvements shall be consistent with the
on the same level (and eliminates the continuous curb) using
Hoboken Bicycle and Pedestrian Master Plan (2010). Bike lanes will be
paving materials, colors and textures to guide the various users
required as part of this Redevelopment Plan and shall be set forth at time of
(pedestrian, auto, bicyclist).
Redevelopment Agreement.
• Design that maintains a cleared pathway for vehicles and
pedestrians. Bike lanes will need to be located in such a way as to minimize conflicts with
• Provision of design elements, outdoor furnishings and landscaping other modes of transportation. Examples of the possible placement of bike
that are located outside of the clear pathway and are movable to lanes to avoid such conflicts are included in the Appendix C: Circulation
ensure limited vehicle access. Alternatives.
53 Redevelopment Plan
is anticipated to be from Marin Boulevard. Use of mechanical parking and/or to address turning radius considerations with respect to spaces
garages may be permitted to increase space efficiencies, if negotiated as located on aisle end-caps. Aisles in ninety-degree (90) parking fields shall be
part of a redevelopment agreement. The parking ratios are related to a a minimum of twenty-four feet (24’) in width. Diagonal parking fields are
transit-oriented development. To keep parking requirements to a minimum permitted, provided that the spaces shall have an angle of not less than
without impacting street parking elsewhere, options include prohibiting on- sixty (60) degrees, and the aisles shall be one-way and not less than
street residential parking permits for residents in these buildings, providing eighteen feet (18’) in width. On street parallel parking spaces shall be
access to car sharing and bike sharing in the project, provide pick up/drop seven feet (7’) in width by twenty feet (20’) in length.
off area for ride sharing vehicles, or a combination thereof.
Parking requirements for various uses within the new development are
recommended to complement the use of shared parking, as well as ride
share provisions and proximity to mass transit options.
They include:
• Corporate or Professional Offices: Maximum of 0.25 parking spaces
for each 1,000 GSF
• Residential: Maximum of 0.25 parking spaces for each dwelling unit
• Mechanized and stacked parking are permitted.
• Parking area shall not be not included in Gross Square Footage
(GSF) calculations.
All ninety (90) degree parking spaces in surface lots shall be a minimum of
nine feet (9’) in width by eighteen feet (18’) in depth, provided that up to ten
percent (10%) of required parking spaces may be compact spaces
measuring eight feet six inches (8’6”) in width by seventeen feet (17’) in
depth. All ninety (90) degree parking spaces in multi-level parking garages
shall be a minimum of eight feet six inches (8’6”) in width by eighteen feet
(18’) in depth, provided that up to ten percent (10%) of required parking
spaces may be compact spaces, interspersed throughout the garage and
not concentrated in adjacent bays, measuring eight feet (8’) in width by
sixteen feet (16’) in depth. Compact spaces may be located in parking
garages only where physical obstructions or anomalies (such as structural
components, utility lines or equipment, geometric irregularities, stairwells,
elevator lobbies, pedestrian walkways) make full-size spaces impracticable,
Rain Garden
Flood Resiliency
To further protect Hoboken’s residents from flooding challenges, the
following flood resiliency measures are required as part of the
redevelopment.
• Sanitary sewer and storm sewer for the site will be separated.
• Stormwater and sanitary sewer pumps to serve this property will be
Photovoltaic Panels installed by the redeveloper.
Green Roof
• All elements of the project, including but not limited to building and
4.7 Sustainable Design & Flood Resiliency mechanical elevations, shall be in compliance with the City of Hoboken
59 Plan Relationships
• The Site Plan for the Redevelopment Area requires buildings Terminal and on to Jersey City, as well as a new “Green Circuit” along
fronting the street and framing a high-quality, livable public realm Hudson Place and Observer Highway that would allow complete pedestrian
with a streetscape that includes new trees, and pedestrian and circumvention along the city limits of Hoboken. This Redevelopment Plan is
bicycle amenities. compatible with these proposals and serves to move the city toward these
overall open space goals.
• Maximize park and recreation opportunities for residents.
• The Redevelopment Plan includes new public space in addition to
creating a new connection along the Hudson River waterfront.
• Create a green circuit in the City to link recreational and other
amenities.
• The streetscape and waterfront plans within the Redevelopment
Area are compatible with the creation of the proposed green
circuit and waterfront walkway.
Sinatra Drive / Hudson River Waterfront Walkway Circulation & Parking Element
The Hoboken Terminal Area is a central component of an integrated
intermodal, interstate transportation system, including the Terminal itself,
which serves an estimated 50,000 passengers daily. This Redevelopment
Plan is intended to enhance the overall function of the Redevelopment Area
as a regional resource and leverage the value of the Terminal as an asset to
the residents of Hoboken.
• Enhance walkability throughout the city.
• The walkability of the Redevelopment Area will be enhanced by
ensuring an appropriate mix of uses within the vicinity of the
Maxwell Place Park Terminal transportation hub, as well as enhancing safety across
transportation modes, including pedestrians.
Open Space, Recreation & Conservation Element
• Reduce pedestrian conflicts with vehicular traffic in the Hoboken
The Open Space, Recreation and Conservation Element recognizes the
Terminal Area.
Lackawanna Plaza as the only existing Parks and Recreation space within
• The circulation plan for the Redevelopment Area aims to minimize
the Redevelopment Area. The existing Open Space Map also indicates an
conflict between all modes of transportation, including
existing “Waterfront Walkway” that currently terminates at the northern
pedestrian, bicycle, vehicle and transit.
border of the Redevelopment Area. The Open Space Concept of the Master
• Provide additional bicycle storage at Hoboken Terminal and other
Plan proposes a continuation of the “Waterfront Walkway” through the
transit stations.
Hoboken Yard Redevelopment Plan 60
• Expand the use of existing shuttle systems.
• The plans for the Redevelopment Area at Hoboken Terminal are
compatible with the provision of additional bicycle storage, as well
as expanded shuttle and jitney bus systems.
61 Plan Relationships
Encourage the continued use of historic and/or noteworthy buildings, team and NJDEP regarding the location of the flood wall. The re-examination
structures, objects, and sites and facilitate their appropriate reuse. notes that, “(A)s the owner of the Terminal building, train yard, and all of the
land in the Hoboken Yard Redevelopment Plan Area, NJ TRANSIT has
Housing Element indicated that the means of financing the much needed improvements to
New development within the Redevelopment Area will include a mix of the Terminal building, transit facilities, and Warrington Plaza, would need to
housing types and a range of affordable housing options. It is the goal of the come from the private redeveloper and the profits realized from the
Redevelopment Plan to assure that the Project provides for an appropriate redevelopment.”
amount of affordable housing, in accordance with applicable law. This
Redevelopment Plan requires that twenty percent (20%) of all residential
units within a building site shall be affordable. This requirement, as well as A Complete Neighborhood
the overall Plan, move the city toward their goal of a “home for everyone”, 1.D/ 7 Work with NJ TRANSIT to improve outdoor public spaces around
specifically aiming to effectuate the city’s following goals; the Hoboken Terminal. Return Warrington Plaza to use as a public open
• Provide diversity in types of housing. space and work with the designated redeveloper to incorporate parks,
• The Redevelopment Plan includes a range in housing types and plazas and green space as required in the Hoboken Yard Redevelopment
prices. Plan. Improve the pedestrian experience with new paver materials,
• Provide additional affordable units in new residential developments. landscaping, seating, public art, food trucks, and regular events.
• The Redevelopment Plan requires that twenty percent (20%) of
new residential units be affordable.
Shared Prosperity
5.2 2018 Master Plan Reexamination 2.A/ 8 Create space for business incubators and accelerators in other
Permitted uses in the I-2 zone include food processing and distribution;
manufacturing, processing and fabricating operations in fully enclosed
buildings and pursuant to ordinance performance standards; retail
businesses; public uses; parks and playgrounds. Permitted conditional uses
include manufacturing and processing operations pursuant to ordinance
performance standards (with no requirement to be in fully enclosed
buildings); automotive sales, service stations, garages; and public parking
facilities and accessory uses not located on the same lot as the principal
(Figure Source: 2014 Plan)
65 Plan Relationships
use. Accessory uses include off-street parking and loading; uses customarily yet been adopted, this Redevelopment Plan remains consistent with the
incidental to principal permitted uses on the same tract; signs; and wireless proposed goals of targeted economic growth, effective planning,
telecommunications. preservation, and tactical alignment of government resources. The
Redevelopment Plan support’s the Strategic Plan’s vision statement that
Bulk standards in the I-2 zone for non-residential uses require a minimum
“New Jersey will be the national leader in coordinated private and public
lot area of 5,000 square feet, minimum lot width of 50 feet and minimum
investment which supports sustainable communities that attract and
lot depth of 100 feet. The required minimum front setback is 5 feet, the
provide strong economic opportunities, preserve out State’s natural
minimum rear setback is 15 feet, and the minimum side yard setbacks are
resources, and create healthier communities to work, reside and recreate.”
5 feet for each side. The maximum building height is 2 stories or 40 feet.
Mixed use and mixed modality are central to the Redevelopment Plan and
Maximum lot coverage is 60% and the maximum FAR is 1.25.
move the City of Hoboken in a direction consistent with the new Strategic
5.7 Relationship to Jersey City/Hoboken Plan for New Jersey.
Connectivity Study In addition, the Redevelopment Plan serves to implement the State Planning
(Sub-regional Transportation Study conducted by North Jersey Goals (N.J.S.A 52:18A-196, et seq) of encouraging development,
Transportation Planning Authority and Hudson County) redevelopment and economic growth in locations that are well situated with
A sub-regional transportation study was completed in June 2011 for the respect to present or anticipated public services or facilities. The
southwestern section of the Hoboken and Jersey City that includes the Redevelopment Plan for the Hoboken Rail Yard is generally consistent with
portion of the Redevelopment Area. The study recommended street network The State Development and Redevelopment Plan Goals, particularly
connectivity improvements between Jersey City and Hoboken for all including;
vehicular, pedestrian and bicycle modes of travel with future traffic Goal 1: Revitalize the State’s Cities and Towns by protecting, preserving,
projections set to year 2025. Short term recommendations enhance and developing the valuable human and economic assets in cities, towns,
pedestrian and bicycle travel through the area. Medium term improvements and other urban areas.
were recommended to the Observer Highway – Marin Boulevard intersection
Goal 2: Conserve the state’s natural resources and systems as capital
as illustrated in the adjoining graphic. The Plan recommendations are
assets of the public by promoting ecologically sound development and
consistent with the recommendations of the Sub-regional Transportation
redevelopment in the Metropolitan and Suburban Planning areas.
Study.
Goal 3: Promote socially and ecologically beneficial economic growth,
5.8 Relationship to 2001 State development and renewal and improve both the quality of life and the
Development and Redevelopment Plan and standard of living of New Jersey residents.
DRAFT New Jersey State Strategic Plan Goal 7: Preserve and Enhance Areas with Historic, Cultural, Scenic, Open
The Draft New Jersey State Strategic Plan was proposed by the Christie Space and Recreational Value by collaborative planning, design, investment
administration in October of 2011 as an update to the 2001 State and management techniques.
Development and Redevelopment Plan. Although the Strategic Plan has not
Hoboken Yard Redevelopment Plan 66
67 Plan Relationships
6 Implementation
The ultimate phasing of Hoboken Yard, including the development of Sites 1 6.5 Role of City
and 2; rehabilitation and activation of the Ferry Terminal Building and The City of Hoboken acting as the Redevelopment Entity will be solely
Warrington Plaza; redevelopment of NJ TRANSIT’s Hoboken Bus Terminal; responsible for the implementation of this Redevelopment Plan as set forth
improvements along Hudson Place; and broader circulation improvements, below.
will be the first phase of construction with a temporary activation of
Warrington Plaza in the interim, all of which will be detailed in the
69 Implementation
schedule, including estimated pre-construction time period to
6.6 City Designation of Redeveloper – secure permits and approvals.
Redevelopment Agreement • Documentation evidencing the financial responsibility and capability
Only redevelopers designated by the City may proceed to implement the of the proposed redeveloper with respect to carrying out the
redevelopment projects set forth in this Redevelopment Plan. In order to proposed redevelopment including but not limited to: type of
assure that the vision of this Redevelopment Plan will be successfully company or partnership, disclosure of ownership interest, list of
implemented in an effective, comprehensive and timely way, and in order to comparable projects successfully completed, list of references with
promptly achieve the public purpose goals of the Plan, the City, acting as the name, address and phone information, list of any general or limited
Redevelopment Entity, will select the redeveloper(s) in all areas governed by partners, financing plan, and financial profile of the redeveloper
this Redevelopment Plan. This Redevelopment Plan does not prohibit any entity and its parent, if applicable.
owner or contract-purchaser of property situated within the Redevelopment
• Any prospective redeveloper seeking designation by the City as a
Area from seeking designation by the City, in accordance with this chapter,
redeveloper of any property which is included in this
as a redeveloper of said property. All designated redeveloper(s) will be
Redevelopment Plan and which is owned by NJ TRANSIT must have
required to execute a Redevelopment Agreement satisfactory to and
entered into, and provided the City with a complete copy of, a
authorized by the City. The procedural standards described here will guide
binding acquisition agreement between the prospective
redeveloper selection. The City, acting as the Redevelopment Entity may, at
redeveloper and NJ TRANSIT for the subject property, which
any time, proactively solicit potential redevelopers by utilizing appropriate
acquisition agreement shall govern the coordination and
methods of advertisement and other forms of communication, or may, in its
implementation of site preparation, relocation, demolition and
discretion entertain unsolicited proposal(s) from a prospective
construction on the subject property in accordance with this
redeveloper(s) for redevelopment of one or more redevelopment parcels.
Redevelopment Plan. If at the time of application, the subject
A prospective redeveloper will be required to submit materials to the City property is not owned by NJ TRANSIT, but is the site of NJ TRANSIT
that specify their qualifications, financial resources, experience and design facilities or operations, then the prospective redeveloper must have
approach to the proposed redevelopment project. The selection process will entered into, and provided the City with a complete copy of, a
likely include the submission of some or all of the following materials binding agreement between the prospective redeveloper and NJ
(additional submission materials may be requested by the City as deemed TRANSIT governing the coordination and implementation of site
appropriate to the particular project sites.): preparation, relocation, demolition and construction on the subject
• Conceptual plans and elevations sufficient in scope to demonstrate property in accordance with this Redevelopment Plan.
that the design approach, architectural concepts, number and type The following provisions regarding redevelopment are hereby included in
of dwelling units, retail and or commercial uses, parking, traffic connection with the implementation of this Redevelopment Plan and the
circulation, flood mitigation, landscaping, recreation space and selection of a redeveloper(s) for any property or properties included in the
other elements are consistent with the objectives and standards of Redevelopment Plan and shall apply notwithstanding the provisions of any
this Redevelopment Plan as well as anticipated construction zoning or building ordinance or other regulations to the contrary:
71 Implementation
subcommittee that it may designate for such purpose, stating that the Approvals by Other Agencies
application is consistent with the Redevelopment Plan and Redevelopment
The redeveloper shall be required to provide the City with copies of all
Agreement.
permit applications made to federal, state and county agencies upon filing
Variances Not to be Considered such applications, as will be required by the Redevelopment Agreement to
be executed between the redeveloper and the City.
Neither the Planning Board nor the Zoning Board of Adjustment shall grant
any deviations from the terms and requirements of this Redevelopment
Plan, including Certificate of Completion & Compliance
the granting of any “c” or “d” variances. Any proposed changes to the Upon the inspection, verification and approval by the City Council that the
Redevelopment Plan shall be in the form of an amendment to the redevelopment of a parcel subject to the Redevelopment Agreement has
Redevelopment Plan adopted by the City Council in accordance with the been completed and that all obligations of the Redevelopment Agreement
procedures set forth in the Local Redevelopment and Housing Law, N.J.5.A. have been satisfied, a Certificate of Completion and Compliance will be
40A:12A-1 et seq. issued to the redeveloper and such parcel will be deemed no longer in need
of redevelopment.
Easements
No building shall be constructed over a public easement in the 6.8 Severability
Redevelopment Area without prior written approval of the City of Hoboken. The provisions of this Redevelopment Plan are subject to approval by
Ordinance. If a Court of competent jurisdiction finds any word, phrase,
Site Plan & Subdivision Review clause, section, or provision of this Redevelopment Plan to be invalid, illegal,
Site Plans must be submitted to the City Council (as redevelopment agency) or unconstitutional, the word, phrase, clause, section, or provision shall be
for approval prior to review and approval by the Planning Board. Prior to deemed severable, and the remainder of the Redevelopment Plan and
commencement of construction, Site Plans for the construction and/or implementing Ordinance shall remain in full force and effect.
rehabilitation of improvements within the Redevelopment Area, prepared in
accordance with the requirements of the Municipal Land Use Law (N.J.S.A 6.9 Adverse Influences
40:55D-1 et seq.), shall be submitted by the applicants for review and No use or reuse shall be permitted which, when conducted under proper
approval by the Hoboken Planning Board. Any subdivision of lots and parcels and adequate conditions and safeguards, will produce corrosive, toxic or
of land within the Redevelopment Area shall be in accordance with the noxious fumes, glare, electromagnetic disturbance, radiation, smoke,
requirements of this Redevelopment Plan, the Redevelopment Agreement, cinders, odors, dust or waste, undue noise or vibration, or other
and the subdivision ordinance of the City of Hoboken, except that where this objectionable features so as to be detrimental to the public health, safety or
Redevelopment Plan contains provisions that differ from those in the general welfare.
subdivision ordinance, this Plan shall prevail.
6.10 Non-Discrimination Provisions
No covenant, lease, conveyance or other instrument shall be affected or
73 Implementation
This page was intentionally left blank.
77 Appendix A
Infrastructure and Sustainable Design • Include arts display area and a large public theatre or meeting
The focus groups expressed concerns regarding the capacity of the city’s space
existing infrastructure to accommodate additional development within the • Concerns regarding the access to transit and distance of
area, and general suggestions were made that the Redevelopment Plan offices at the west end of the site
should maintain a sustainable design focus.
Results of the Community Surveys • Concerns about sustaining retail and office tenants into the
The city received feedback from 59 individuals through the community future
survey process regarding the Hoboken Terminal and Rail Yard and its Parking and Transportation Concerns
redevelopment potential. The majority of respondents (78%) indicated that • Connection problems if the bus terminal were to be moved
they judged redeveloping the Hoboken Terminal and Rail Yard property as away from the train station
very important to the future of Hoboken. • Aesthetics and service would be improved if bus terminal were
The survey respondents were asked how the City should be involved in to be enclosed
the redevelopment effort and 52.8% indicated that the City should enter
into a joint agreement with NJ TRANSIT to ensure that the development • A traffic and parking assessment was suggested for specific
achieved the community goals in accordance with the Redevelopment Plan. buildings
The responses were divided among community goals for the area, but the • Warrington plaza should remain a pedestrian and cyclist
highest responses included the creation of a new employment center for the friendly area
area, an expanded tax base for the city, a new gateway, transportation • Suggest review of roundabout for the junction of Marin and
improvements, and a sustainable, world class design. Concerns from Observer Boulevards
respondents regarding a redevelopment plan for the area were also evenly
divided, and included the potential increase in traffic, demand for parking, • Trolley service suggested to reduce the number of cars on the
pedestrian safety, building heights, infrastructure capacity, and lack of open streets in the area
space and pedestrian amenities. The results of the surveys helped to inform • Concerns about taxi stand in front of 77 River Street Building
the design principles used to develop the Redevelopment Plan. Building heights and Massing Concerns
Summary of Response to Alternatives • Avoid a “canyon effect” along Observer Blvd.
Alternative development and circulation scenarios for the Hoboken Yard • Need variation and smart use of set-backs
Redevelopment Area were presented to the community at a public meeting
in November of 2011. The discussion of these development options • Suggested height between 4 to 16 stories
prompted several suggestions and elicited a range of concerns from • Phase I site building height should not exceed height of other
community members regarding land uses, parking and transportation, buildings at Hudson Place
building heights and massing, and Public Space and Pedestrian Plazas • Focal point, tall building facing Washington and Bloomfield
within the Redevelopment Area. These concerns include: Streets (14-16 stories)
Land Use Concerns Public Space and Pedestrian Plazas Concerns
• Maximize commercial uses • Increase park space on a per-resident basis
• Include high end and service oriented retail • Create large open space as a “magnet” lined with retail,
• Include day care restaurants and cafes
• Concerns about the compatibility of residential uses adjacent • Put a major park further west
to train tracks • Provide European style squares to encourage connections and
• Public space is needed for theater ensemble rehearsals retail use
Alternative A: Hudson Place (Figure Source: 2014 Plan) Alternative B: Hudson Place (Figure Source: 2014 Plan) Alternative C: Hudson Place (Figure Source: 2014 Plan)
81 Appendix B
Proposed Observer Boulevard Typical Section (Figure Source: 2014 Plan)
83 Appendix B
Alternative A Illustrative Site Plan
85 Appendix B
Alternative B Illustrative Site
Plan
87 Appendix B
Alternative C Illustrative Site
Plan
Alternative C Building
Heights
Revisions to
Alternative B
Revisions to
Alternative C
89 Appendix B
Revisions to the Alternatives
A number of revisions were made to the original alternatives based on the
feedback received from the City, stakeholders, focus groups, and public input
from the second community meeting on November 10th. Adjoining figures
show revisions to the alternatives. These revisions included:
93 Appendix C
Figure C1: Circulation Option A
0 100’ 200’
0 100’ 200’
95 Appendix C
Circulation Option C Plan
0 100’ 200’
0 100’ 200’
97 Appendix C
Figure C4: Circulation Option D1 Plan
0 100’ 200’
0 100’ 200’
99 Appendix C
This page was intentionally left blank.
103 Appendix D
• The walkability of the Redevelopment Area will be enhanced by
ensuring an appropriate mixing uses within the vicinity of the
Terminal transportation hub, as well as enhancing safety across
transportation modes, including pedestrians.
• Reduce pedestrian conflicts with vehicular traffic in the Hoboken
Terminal Area.
• The circulation plan for the Redevelopment Area aims to minimize
conflict between all modes of transportation, including pedestrian,
bicycle, vehicle and transit.
• Provide additional bicycle storage at Hoboken Terminal and other
transit stations.
Sinatra Drive / Hudson River Waterfront Walkway, Hoboken • Explore the creation of a jitney bus system.
• Expand the use of existing shuttle systems.
• The plans for the Redevelopment Area at Hoboken Terminal are
compatible with the provision of additional bicycle storage, as well
as expanded shuttle and jitney bus systems.
Economic Development Element
The Hoboken Master Plan recognizes the economic significance of the
Terminal, and the potential to develop the area into more of a
destination than it currently is. This Redevelopment Plan proposes to
tap in to the current commuter market for new business and attraction
to the area and enhance the City’s existing retail core areas.
• Encourage additional office space in appropriate locations.
Maxwell Place Park, Hoboken
• The Redevelopment Plan is consistent with the Master Plan
• Create a green circuit in the City to link recreational and other amenities.
recommendation for larger “prime” office space around Hoboken
• The streetscape and waterfront plans within the Redevelopment Area are
Terminal.
compatible with the creation of the proposed green circuit and waterfront • Encourage a mix of uses in new developments to provide supporting
walkway. services to workers and residents.
Circulation and Parking Element • Give Preference to small-scale businesses in Hoboken Terminal
The Hoboken Terminal Area is a central component of an integrated intermodal, retail space.
interstate transportation system, including the Terminal itself, which serves an • Promote overnight accommodations.
estimated 50,000 passengers daily. This Redevelopment Plan is intended to • Create opportunities for more gathering places.
enhance the overall function of the Redevelopment Area as a regional resource and • This Redevelopment Plan includes a mix of uses at a variety of
leverage the value of the Terminal as an asset to the residents of Hoboken. scales to serve a range of existing and new residents and users
of the area. The Plan is compatible with the Master Plan’s
• Enhance walkability throughout the city.
recommendations to give preference to small-scale businesses in
developed retail space, as well as new opportunities for overnight
accommodation.
105 Appendix D
the Terminal. The reexamination report indicates that the taxi stand has Garden Mews in Hoboken), a recreation facility (like Chelsea Piers), a
been moved; however no re-design has been completed. This catering hall or a conference/convention center.
Redevelopment Plan addresses this issue and the goal of improving • Ensure that each ferry and light rail stop will have service amenities to
traffic flow, pedestrian movement, and operations. create “places”.
Parks: • Promote ground floor retail around light rail transit stops; encourage
Increase acreage to 60 acres and showcase the best that landscape additional office space in appropriate locations; encourage a mix of uses
architecture and park programming can offer. in new developments; promote a better mix of retail uses.
• Complete the waterfront walkway and line with parks and piers designed Land Use:
for both active and passive recreation. Create a balance of uses so that Hoboken is not just a residential enclave, but
• Encourage water-dependent and water-oriented recreational uses on the continues to be a true urban village.
waterfront; limit commercial uses in waterfront areas to support activities. • Complete the waterfront with one continuous park and many upland
• Limit development on piers. connections (learning from places like Battery Park City).
Economic Development: Design:
Encourage development that will add to the City’s tax base but will not create Require high-quality design that will build the historic districts of the future.
a bedroom community. • Protect the historic character and grandeur of the Terminal’s ferry
• Ensure that the southeast corner of the City has modestly scaled office concourse and other areas; improve and expand the existing outdoor
buildings located near Hoboken Terminal; provide additional open space public spaces around the Terminal; relocate the outdoor markets and
and community facilities. According to the Reexamination Report; “in events to Terminal Plaza.
2005, the City attempted to amend the zoning map and zoning ordinance Zoning and Redevelopment Planning
to adopt the B-3 zoning district recommended in the 2004 Master Plan • Encourage appropriate redevelopment of key underutilized sites;
with 12-story mixed-use buildings; it was withdrawn in favor of a encourage hotels in the area near the Terminal.
redevelopment plan approach which initially included the City-owned In addition to maintaining consistency with these goals, this Redevelopment
Department of Public Works Site and the Neumann Leather complex; the Plan supports the Reexamination Report’s elimination of the previous
City subsequently separated off the Neumann Leather site so the City recommendation to rezone the Hoboken Terminal. The report recognizes that
could move ahead with the Department of Public Works Site. The the area has been designated in need of redevelopment and will be subject to
Department of Public Works site was found in need of redevelopment and the provisions of this Redevelopment Plan. The 2004 Master Plan Goals of
a plan was adopted in 2006; the Plan was amended to allow a primarily historic reuse, limited scale, public use and economic development are still
residential development with various heights ranging up to 12-stories. In valid. Relative to historic preservation, the Redevelopment Plan is consistent
2007, the redevelopment plan put forward by New Jersey Transit for the with the reexamination report’s recommendation that the City encourage
entire train yards south of Observer Highway and east of Henderson contemporary building designs for new construction that complement
Street proposed colossal sized residential and office buildings; the City Hoboken’s historic buildings without mimicking them.
rejected the proposal and is pursuing a significantly reduced scale plan.”
• Provide adaptive reuse of the historic Terminal’s ferry concourse to create
a new magnet for the City—perhaps a public market (like Pikes Market in
Seattle or
109 Appendix E
Hoboken Yard Redevelopment Plan 110
111 Appendix E
Hoboken Yard Redevelopment Plan 112
113 Appendix E
Hoboken Yard Redevelopment Plan 114
115 Appendix E
Hoboken Yard Redevelopment Plan 116
117 Appendix E
Hoboken Yard Redevelopment Plan 118
119 Appendix E
Appendix F: Renderings of
Warrington Plaza/Ferry Terminal
121 Appendix F
Hoboken Yard Redevelopment Plan 122
123 Appendix F
Hoboken Yard Redevelopment Plan 124
Consultant Team
2014 Redevelopment Plan
WRT Maraziti Falcon, LLP
Redevelopment and Environmental Law &
Planning, Urban Design, Architecture, Litigation www.mfhlaw.com
Landscape Architecture www.wrtdesign.com
Joseph J. Maraziti, Jr., Esq.
Nando Micale, FAIA, AICP, PP Partner
Principal
Christopher D. Miller, Esq.
Yogesh Saoji, AIA, AICP, LEED AP BD+C Partner
Senior Associate / Project Manager