Project 2: Geological, Chemical and Physical Evaluation of concrete Raw Materials Used in the

Critical Philippine Infrastructures


Activity: Aggregates Pick-Up
Date: September 09, 2019 | 6:00 am-2:30 pm
Location: Amittera Aggregate Corporation, San Isidro, Rodriguez, Rizal
Remarks: Service vehicle Toyota Hilux; ZLT 633, Driver Gerald Quina

Participants:
1) Maria Elizabeth Laus, EMS UP-NIGS
2) Lucky Velasco, EMS UP-NIGS
3) Gerald Quina, UP-NIGS

Highlights:
1. Arrival at San Isidro, Rodriguez Rizal, 8:45 AM
Assembly time: 6:00 AM at NIGS. Travel to site Amittera Aggregate Corporation for
almost 2 hours. Waited the contact person until 11:00 AM.

2. Lunch Break, 12:00 P.M.

3. Loading of Aggregates, -12:30 PM to 1:00 P.M.


 10 bags of sacks were prepared, each having a capacity of 50kgs. A personnel from
the Ammittera assisted and help us to gather the aggregates.
 Four Types of aggregates were collected S1, 3/4, 3/8, and G1.
 Estimated Quantities for each Aggregates:
S1: 40 kg
3/4: 40 kg
3/8: 40 kg
G1: 90 kg

4. Done transferring of cement at 1:00 PM


 The team had picture taking for documentation.

5. The team went back to NIGS and arrived at 2:30 PM.

Prepared by: Engr. Lucky A. Velasco


Research Assistant
PRC NO. 0167816
September 4, 2019