Preparing Bar Schedule Manualy - Basic Civil Engineering
Preparing Bar Schedule Manualy - Basic Civil Engineering
MACHINERY
Home & EQUIPMENT
Discussion (forum) Q&A Privacy Policy About Contact Us
HYDRALIC
REINFORCEMENT (R/f)
OPEN
Introduction
SPONSORED SEARCHES
BOQ MACHINERY AND EQUIPMENT STRUCTURES DISCUSSION (FORUM) Q&A
bar bending schedule
HYDRALIC
civil engineering construction
What is cr
of reinforc
steel reinforcement drawings explained
Column an
Indication of Reinforcement in Drawings
system in
constructi
Engineering drawings is a language to communicate with details.
Therefore there is a standard to indicate reinforcement in drawing
such as, Methods o
quantities
5Y10- 001- 150:-Which means 5 Number of Tor steel, 10mm Explanatio
Diameter, Bar mark 001, At 150mm CRS. At solved pro
bottom face.
Chemical
Bar location can be vary as follows: System - E
Adhesives
Notation for Slab-
There is a steel yard in the site for storing, cutting and bending of Like Page
bars. Reinforcement bars are cut into required lengths and bent into
Be the first of your friends to like this
required shapes shown on the bar schedule either manually or by
means of machinery.
In manual operations, laborers used the bar bending bench on
Search the site
HOME
which strong STRUCTURES
nails are xed and DISCUSSION (FORUM)
GI pipes with Q&A
suitable lengths QUANTITY
to SURVEYING
bend the bars. That is used for smaller diameter bars. For bending of
larger diameter bars, bar bending machine is used. After bending all Search
MACHINERY & EQUIPMENT
reinforcement bars were bundled and clearly numbered according
to the bar mark so that steel xers will not face any di culty when
xing them.
BOQ MACHINERY AND EQUIPMENT STRUCTURES DISCUSSION (FORUM) Q&A
Preparing Bar
schedule manualy
R10 0.610
MACHINERY & EQUIPMENT
T10 0.617
T12 0.888
BOQ MACHINERY AND EQUIPMENT STRUCTURES DISCUSSION (FORUM) Q&A
T16 1.580
T20 2.469
QUANTITY SURVEYING SOIL MECHANICS SURVEYING CEMENT DRAWINGS
T25 3.858
In the site several steps were adopted for that purpose. Those are,
Use of 12m long r/f bars rather than using shorter bars. For example
6m bars o cuts of 12m bars were used to prepare stools, separators
etc.
Lapping
Binding Wires
MACHINERY & EQUIPMENT
R/f bars are jointed with using wires which is called “binding wires”.
Hackers are used to bind these wires.
BOQ MACHINERY AND EQUIPMENT STRUCTURES DISCUSSION (FORUM) Q&A
Cover Blocks
Cover to Reinforcement
QUANTITY
In caseSURVEYING
of ground resting SOIL
oor MECHANICS SURVEYING
slab (Top surface) and retaining CEMENT DRAWINGS
walls the cover is 50m.
HYDRALIC
Stirrups
These stirrups are usually one piece of steel that is bent into a
rectangular shape. The stirrup typically wraps around the bottom
and top bars of the beams. A designer should specify the size,
spacing and location along the length of the beam where the
stirrups are required. In my site specify the stirrup dimensions in our
section drawings, so that the stirrup can be manufactured prior to
installation. The installer should be careful to fabricate the stirrup
from one piece of steel and adequately overlap each end.
Stools
Stools are used to separate the top reinforcement mesh and bottom
reinforcement
HOME mesh. Dimension of
STRUCTURES the Stools could
DISCUSSION be change
(FORUM) Q&A as QUANTITY SURVEYING
requirement. Those should be strength enough to bear the loads
without changing the gap of two layers. 12 mm or 16 mm bars are
used to make
MACHINERY the stools.
& EQUIPMENT
HYDRALIC
Fig 5: Stools
Column Reinforcement
Stirrup spacing
According to the Column reinforcement details drawing the
HOME STRUCTURES
reinforcement detail for a typicalDISCUSSION (FORUM)
internal Column, fromQ&A QUANTITY SURVEYING
to basement
to ground oor is as follows.
Column
MACHINERY stirrups were tightened up to beam bottom level and
& EQUIPMENT
rest is tightened once beam reinforcement is fabricated. So Bar
benders was instructed how to provide the stirrups. Mark the stirrup
spacing from
BOQ the basement
MACHINERY oor level in the Column
AND EQUIPMENT main bars withDISCUSSION (FORUM) Q&A
STRUCTURES
a chalk as follow the detail drawing.
E.g.:
QUANTITY SURVEYING SOIL MECHANICS SURVEYING CEMENT DRAWINGS
HYDRALIC
E.g-
Footing
HOME STRUCTURES DISCUSSION (FORUM) Q&A QUANTITY SURVEYING
Size – 1000 x 1000 x 250
HYDRALIC
Beam Reinforcement
Learn
trimar-construction-…
more
First the top most reinforcement bars are hung over the beam
formwork and then the stirrups are placed and bound at correct
positions. Thereafter the bottom reinforcement bars are placed and
bound to the stirrups. After that the rest of the reinforcement bars
and tension bars are inserted into the cage according to structural
drawings. Then
HOME cover blocksDISCUSSION
STRUCTURES are xed to bottom
(FORUM) Q&A and sideQUANTITY SURVEYING
reinforcements before placing the concrete.
Consideration for
MACHINERY give lap length
& EQUIPMENT
HYDRALIC
Top reinforcement of the beam shall be lapped at the middle of
the span of between two supports. Bottom reinforcement of the
beam shall be lapped at the end of the span of the two supports.
Considering the region where the maximum bending movement is
existing.
Lapping is did the place which the tension is didn’t act. Normally
2/3 of the length is choosing for lapping. When lapping top &
bottom re-bar, it is better to follow the following method.Otherwise,
it might cause to reduce the concrete covering thickness of the
topmost& bottom most slab reinforcement.
Because the actual bond stress varies along the length of a bar
anchored in a zone of tension. The main requirement for safety
against bond failure is to provide a su cient extension of the length
of the bar beyond the point where the steel is required to develop
its yield stress and this length must be at least equal to its
development length. However, if the actual available length is
inadequate for full development, special anchorages must be
provided, such as bends, hooks.
HYDRALIC
= 72.5mm
= 827.5 mm
First step of the xing of slab reinforcement was placed the bottom
most R/F (B1) of the slab. Before placing the re-bar, correct spacing
given in the detailing drawing were marked by using piece of choke
on the slab formwork. After placed the (B1) R/F then placed the (B2)
R/F and bound both R/F layers together by using binding wire. Then
cover blocks for bottom most R/F were xed. Finally, Top R/F (T2),
Topmost R/F (T1)& distribution bars were placed according to the
drawing and xed together by using binding wire. Then Stools were
xed to separate the both top & bottom R/F net as ful lled the
thickness.
Bar crank
Bar cranking is the process of bending up the bottom steel bars in
HOME STRUCTURES
upward direction. DISCUSSION
It is mainly to prevent upward(FORUM)
bendingQ&A
moment QUANTITY SURVEYING
near the joint. Also useful for attaching stirrup bar e ectively.
Cranking is also used in two way slabs.
MACHINERY & EQUIPMENT
HYDRALIC
HYDRALIC
Bar schedule for Sti ener column, Sill beam and Lintel beam
HOME STRUCTURES DISCUSSION (FORUM) Q&A QUANTITY SURVEYING
Table 5: Bar schedule for Sti ener column, Sill beam and Lintel beam
HYDRALIC
Like
Save
COMMENTS
comments
25 Comments Sort by Top
HOME STRUCTURES DISCUSSION (FORUM) Q&A QUANTITY SURVEYING
Add a comment...
MACHINERY & EQUIPMENT
Mirza Waqas
BOQ MACHINERY
thanks ANDfor
its very helpfull EQUIPMENT
me... STRUCTURES DISCUSSION (FORUM) Q&A
Like · Reply · Mark as spam · 2 · 3y
Sutharsan Vaithiyanathan
QUANTITY SURVEYING SOIL MECHANICS SURVEYING CEMENT DRAWINGS
Thank you
Like · Reply · Mark as spam · 2y
HYDRALICAbdulkuddhus Kms
Excellent Answer
Like · Reply · Mark as spam · 1 · 3y
Sutharsan Vaithiyanathan
Thank you
Like · Reply · Mark as spam · 2y
Tahir Mahmood
thanks brother
Like · Reply · Mark as spam · 1 · 3y
Sutharsan Vaithiyanathan
Sutharsan Vaithiyanathan
Thank you
Like · Reply · Mark as spam · 2y
HYDRALIC
Related Posts