CAMLOCK GENERAL MAINT. & CONTRACTING SERVICES EST | P.

O Box –
8596 | M-09 – ABU DHABI, UAE | Web: www.camlockservices.com |

________________________________________________________________________________

Technical Proposal
Date of Quote 04/09/2017 Quote # CAM #20012

To: Abu Dhabi Ship Building P.J.SC. From: CAMLOCK GEN. MAINT. & CONT.
SERVICES
P.O.Box :8922
M-9, MUSAFFAH, IND, ABUDHABI ,
Abu Dhabi ,UAE P.O BOX: 8596
Email:admin@camlockservcies.com
E-Mail: Phone:

Thank you very much for your kind enquiry, We have pleasure submit our best proposal follows.
We always prefer to use Quality Services to ensure a high quality of finish.

Description of Work QTY UNIT Remarks

Repair of Side Transfer Pit concrete floor. 1000.00 M2

 Inspection of the site in order to carry out the


appropriate works.

Scope of Works:

 Opening the crack by chiselling a Square cut, to


a depth where the crack visually seems to stop;
however the maximum depth of chiselling is
75mm or above.
 Fill the crack up with water and observe
whether or not the crack continuous by looking
air bubbles in the water due to air escaping out
the crack.
 Removal of all the loose concrete until a solid
substrate is achieved.
 An approved low viscosity resin shall be poured
in to the crack. ( Nitobond EP, Nitoseal MS 600.
 Removal of Exisiting damaged Rebars & Install
new Rebar as same as existing.
 Sealing the square cut of the crack with
shrinkage controlled structural grade
cementitious repair mortar system.

Equipment:

 Disc cutter
 Electric hammer and chisel
 Wire Brush
 Measuring Jug
 Slow Speed Drill
 Mixing paddle
 Suitably sized mixing vessel
 Trowel
 Wooden Float
 Hand Held angle grinders.

This quote is electronically generated does not require any signature


CAMLOCK GENERAL MAINT. & CONTRACTING SERVICES EST | P.O Box –
8596 | M-09 – ABU DHABI, UAE | Web: www.camlockservices.com |

________________________________________________________________________________

Repair of Concrete floor:

 Repairing and restoring the structural integrity


of the load bearing floor of VRF workshop.
 Opening the crack by chiselling a Square cut, to
a depth of 15cm where the crack visually
seems to stop.

This quotation is valid for a period of 07 days from the date of quoting.
Any extra work other than that quoted above will be charged accordingly.

Period of Start and Completion: Start: As per Confirmation

Signed for and on behalf of the Customer:


I have read, understood and agree with quotation details.
Name: Abu Dhabi Ship Building P.J.S.C Date: 04/09/2017
Signature:

Signed for and on behalf of the Contractor:

Name: Mohammed Shah 056 979 4141 Date: 04/09/2017

Signature:

End of Quotation.