Professional Documents
Culture Documents
Ensyse SCM100
Ensyse SCM100
1. Rules
Here are the rules to note in the work of exercise:
1. Exercise have to be completed at lab work hours respectively and be sent
individually.
2. Plagiarism is strictly prohibited. If you do the plagiarism, then your Exercise is 0.
3. Exercise have to be sent in pdf format.
4. Email File and Subject Name:
WEEK-1_SCM100_NAME_SID_FRI-XXX_DAY/SHIFT_ASSTCODE
Example:
WEEK-1_SCM100_NUR AINA_1201181234_FRI-000_MONDAY/1_JED
xxx.ensyselab@gmail.com
for example:
JED.ensyselab@gmail.com
8. The worksheet format for exercise should not be empty, if it is blank then it is
considered as not doing the exercise, then your exercise = 0.
Example:
1. Data Flow Diagram Level 0
(Fullscreenshoot/Printscreen)
LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia
UNIT 2
Exercise 1: Material Master Data
Task 1 : Display Material Master for pump R-F*1##
1. Show steps you choose to display material master for pump R-F1## in plant 1000
(Full Screenshoot/Print Screen)
2. Show the name of the material “Pump” at Basic Data 1 view tab
(Full Screenshoot/Print Screen)
LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia
3. Show that the material is produced in-house at MRP 1 tab (procurement type E)
(Full Screenshoot/Print Screen)
4. Show at MRP 4 tab that a production vendor has not been defined.
(Full Screenshoot/Print Screen)
LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia
UNIT 3
Exercise 3: Executing Sales and Operations Planning
Task : Change Planning for Material transaction
1. Show that the stock level of minus 730 PC is displayed
(Full Screenshoot/Print Screen)
LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia
2. Insert target stock level of 20 PC for the current month +8 and current month +9
(Full Screenshoot/Print Screen)
3. Insert the production plan in accordance with the target stock level
(Full Screenshoot/Print Screen)
LABORATORIUM ENTERPRISE SYSTEM ENGINEERING
FAKULTAS REKAYASA INDUSTRI
UNIVERSITAS TELKOM
Gedung C-207 Jl. Telekomunikasi No. 1, Terusan Buah Batu
Bandung 40257 Indonesia
4. Save your work. Make sure the stock level are not minus.
(Full Screenshoot/Print Screen)
1. Show the Transfer Material to Demand Mangement before choosing transfer now
(Full Screenshoot/Print Screen)