SDRF- Urgent repair work & renovation of VCB at Kalikkadavu in Kodom Belur Grama Panchayat
of Kanhangad LAC in Kasaragod District
(Cost Index Applied for this estimate is 32.04%)
1 60.8
Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including
cost of materials and labour charges etc complete
2 13.59 Irrigation
Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and
-do-
PRICE
second coat respectively.
2*1*2
2.600
2.500
2.200
2.200
11.441
22.000
3 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of
soil
1 60.8
Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including
cost of materials and labour charges etc complete
2 13.59
Irrigation
Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and
second coat respectively.
Main Vent
-do-
Regulating Vent
PRICE
1*1*2
2*1*2
1*1*2
2.600
2.500
1.400
2.200
2.200
2.200
11.441
22.000
6.160
1 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality
blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site
(1.1+0.50)
DR - Super Structure 1 36.000 2.000 57.600
/2
2 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not
exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m
and lift up to 1.5 m.
(0.60+0.50 (0.80+0.85
Back filling 1 36.000 16.335
)/2 )/2
1 2.6.1
Irrigation
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
soil
2 50.6.7.1
Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement
mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
3 50.6.7.2
Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement
mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour
charges etc.
DEDUCTION
4.651 cum
Rs 31278.35
4 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings,
balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor
five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement :
1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs,
DEDUCTION
6 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and
binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Steel
Main slab 1 3.800 3.500 0.120 80.0 127.680 @80Kg/m
3
Steel
Beam 1 2.000 0.200 0.300 50.0 6.000 @50Kg/m
Irrigation 3
0.000 kilogram
133.680 kilogram
7 10.6.1
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked
together through their entire length and jointed together at the end by end locks, mounted on specially
designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push
and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire
springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1
and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick
top cover
8 13.1.1
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Basement alround
1 12.100 0.650 7.865
including step
DEDUCTION
9 50.13.1
Irrigation
9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour
PRICE
charges etc complete
DEDUCTION
10 11.5
62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer
12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate,
6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per
manufactures specification. This includes cost of cement slurry, but excluding the cost of nosing of steps
etc. complete.
11 13.37.1
White washing with lime to give an even shade:New work (three or more coats)
Basement including
1 12.100 0.650 7.865
steps
Rolling shutter
PRICE
For wall roofing of slab
1
1
1.500
10.800
DEDUCTION
0.200
2.200 -3.300
-2.160
12 13.39.1
Colour washing such as green, blue or buff to give an even shade:New work ( two or more coats) with a
base coat of white washing with lime
DEDUCTION
Basement including
1 12.100 0.650 7.865
steps
13 13.62.1
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an
even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of
approved brand and manufacture .
8.438 sqm
Rs 1251.19
Sl No Description No L B D CF Quantity Remark
GST @ 12.0%
TOTAL Rs 590000.00
Irrigation
PRICE