1.
What is the best way of limiting exposure to toxic substances?

 By always having the same person work with the toxic substance.

 By using another, non-toxic substance.  Correct

 By training employees in working with toxic substances.  Incorrect

 All of the above

2.
The following is (are) used as safety device(s) in machines

 Fail safe

 Safety interlocks

 Limit switches

 All of the above  Correct

PTW_BASIC SAFETY

1.
If work is done on overhead lines, they must be:

 Deenergized

 Grounded

 Insulated

 A and B  Correct

2.
The safe exposure limits for noise levels for 08 hours of working/day is

 90 dBA  Correct

 110 dBA

 130 dBA

 150 dBA

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 1/13
5/8/2019 Tech Man Gurukul

3. Logout  R  RLI -SRINIAVS TALCHER


If the cylinders are painted with Black colour with white colour bond, the cylinders are
filled with which gas ?
 Dashboard

 Assessments  H2

 CO2  Correct
 Question Bank

 N2  Incorrect
 Projects

 ARGON
 Logout

PTW_BASIC SAFETY

1.
A mobile tower scaffold must not be used on

 A paved pathway

 Soft or uneven ground  Correct

 An asphalt road

 A smooth concrete path

2.
One of the common signs of a heart attack is:

 A sharp pain in the lower area of the spine

 Loss of bowel control

 A feeling of numbness in the legs

 Discomfort in the chest and/or upper body  Correct

3.
The very first thing you should do if you are the first to witness or discover an accident on
the job site is to:

 Go find at least one co-worker to help you so you can work as a team

 Go to the scene and help the person(s) injured

 Find and fill out the necessary forms to document the incident

 Activate the emergency response system  Correct

4.
Testing of Lifts to be done in every

 3 months

 9 months

 6 months  Correct

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 2/13
5/8/2019 Tech Man Gurukul

 12 months Logout  R  RLI -SRINIAVS TALCHER

 Dashboard
5.
A place large enough that a person can physically enter with limited or restricted means for
 Assessments
entry or exit, not designed for continuous employee occupancy (like tanks, vessels, silos,
storage bins, hoppers, vaults and pits). It can be any enclosed or partially enclosed space
 Question Bank
where there is a risk of death or serious injury from hazardous substances or dangerous
conditions (e.g., lack of oxygen, toxic or combustible gases) may be present.
 Projects

 Permanent structure
 Logout
 Confined space  Correct

 Temporary structure

 None of the above

PTW_E&M Handbook

1.
On completion of job at gas pass except one door all doors should be closed. TheÂ?Â?Â?Â?.
Should personally checked the closing of the final access point. Announcement should be made
before closing of final door.

 Person Incharge  Correct

 Authorized Person

 Senior Authorized Person

 Location manager

2.
Permit to work, Permit to work (ROMP) and Limited work certificate shall be received, cleared
and transferred only by a Â?Â?Â?Â?Â?Â?..

 Competent Person  Correct

 Senior Authorized Person

 Authorized Person

 Shift Incharge

3.
A person selected by Senior authorized person and provided with written instruction to assist
in ensuring the safe movement of vehicles or mobile equipments within a define area usage
calledÂ?Â?Â?.

 Nominated person  Incorrect

 Supervisor

 Crane operator

 Stand by man  Correct

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 3/13
5/8/2019 Tech Man Gurukul

PTW_E&M Handbook
Logout  R  RLI -SRINIAVS TALCHER

1.
 Dashboard What voltage range is treated as medium voltage?

 Assessments  250-650 V  Correct

 Question Bank  300-660 V

 Projects  400-900 V

 500-1100 V
 Logout

2.
Running of conveyor or plant or cleaning should be done by a Â?Â?Â?Â?Â?Â?.. Only and should be
done with all safety precautions.

 Contract worker

 Housekeeping staff

 Competent person  Correct

 Location incharge

3.
Above what volatge level is treated as high voltage?

 1100V

 765V

 650V  Correct

 415V

4.
As per CEA Regulation the EOT cranes shall be provided for maintenance of TG cycle equipment
and CW pumps. These shall comply with the requirements of latest versions of relevant IS. The
crane capacity shall be taken as Â?Â?Â?.more than the single heaviest equipment to be lifted.

 1.00%  Correct

 15.00%  Incorrect

 2.00%

 25.00%

5.
Who will confirm all persons working under the permit to work have been withdrawn from the
plant/high voltage apparatus and warned not to continue the work.

 Competent Person  Correct

 Senior Authorized Person

 Nominated Supervisor
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 4/13
5/8/2019 Tech Man Gurukul
p

Logout  R  RLI -SRINIAVS TALCHER


 Authorized Person

 Dashboard
PTW_E&M Handbook
 Assessments
1.
 Question Bank Â?Â?Â?Â?Â? can be a complicated document because it is designed to cover a variety of use for
work/testing on/near plant or HV apparatus that is not isolated; or work or testing of
isolated, partially isolated or live medium and low voltage apparatus.
 Projects

 Sanction for test


 Logout
 PTW with ROMP

 Limited work certificate  Correct

 Permit to work

2.
What is the safe distance to work from a live 400kV HV system?

 2.5m

 3.1 m  Correct

 3.8m

 4.5m

3.
What is the safe distance for crane access to an exposed 132kV live line?

 2.47m

 3.12m

 4.03m  Correct

 4.95m

4.
How much oxygen (percent) in air is needed for working in confined spaces?

 25

 21  Correct

 19

 23

5.
The environment of the vessel shall be examined by a selected person. If the selected person
needs to enter the confined space he must be issued with a Â?Â?Â?Â?Â?Â?...

 Sanction for test

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 5/13
5/8/2019 Tech Man Gurukul

 PTW with ROMP


Logout  R  RLI -SRINIAVS TALCHER

 Limited work certificate


 Dashboard
 Permit to work  Correct
 Assessments

 Question Bank 6.
What is the safe distance for crane access to an exposed 400kV live line?
 Projects
 6m  Correct

 Logout
 5m

 7m

 8m

7.
Maximum voltage that can be allowed inside confined space?

 50

 24  Correct

 125

 110

PTW SYSTEM

1.
Who is authorised to issue and cancel the Work Permit ?

 Authorised person

 Competent person

 Senior authorised person  Correct

 Control Person

2.
When Restoration of Motive power is required during work on a plant or high voltage equipment,
the safety document issued is :

 LWC

 PTW

 ROMP  Correct

 HWP

3.
Which permit is to be taken for working inside main oil tank?

 LWC
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 6/13
5/8/2019 Tech Man Gurukul

 Confined Space Permit  Correct Logout  R  RLI -SRINIAVS TALCHER

 Dashboard  ROMP

 Assessments  Sanction for Test

 Question Bank PTW SYSTEM

 Projects 1.
........... is a risk assessment document regarding the task to be performed; breaking it down
to individual task steps, identifying potential hazards, and methods to control those hazards
 Logout
with a particular task needs

 LWC

 PTW

 JSA  Correct

 None of the above

2.
WHY DO WE USE THE WORKÂ PERMIT SYSTEM

 To monitor contractor work hours.

 To renew certificates.

 To prevent incidents.  Correct

 To log incidents.

3.
WHAT IS LISTED ON AÂ WORK PERMIT

 OSHA safety  precautions.

 Minimum safety precaution.  Correct

 Maximum safety precaution.

 Government safety precaution.

4.
If mechanical and electrical group are working in the same equipment in restricted  area?

 They will use only one PTW

 Each group must have separate PTW  Correct

 If operation agrees, one PTW is enough

 Maintenance person can work without permit

5.
WHY DO WE USE WORKÂ PERMITS IN HAZARDOUS AREAS

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 7/13
5/8/2019 Tech Man Gurukul

 To identify a designated representative. Logout  R  RLI -SRINIAVS TALCHER

 To identify receivers.
 Dashboard

 To identify hazards and precautions.  Correct


 Assessments

 To check expired certification


 Question Bank

 Projects PTW SYSTEM

1.
 Logout
A person authorized by HOP, trained to carryout duties like preparation, issue and
cancellation of Safety documents is

 Competent Person

 Authorised Person

 Senior Authorised Person  Correct

 Control Persons

2.
In a confined space entry what is the most important things to  do

 Only hot permit can be done

 Insure that the space is isolated

 Non sparking tools will be used  Incorrect

 Gas release can be made safely  Correct

3.
Work at height permit is being given by Operation only after approval of

 Safety

 Cross Functional Team  Correct

 EIC

 MTP

4.
220V DC battery bank permit shall be issued by

 Competent Person

 Authorised Person

 Senior Authorised Person  Correct

 Control Persons

5.

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 8/13
5/8/2019 Tech Man Gurukul

For defect identification and attending breakdown of Motorized Actuators we need to .........
Logout  R  RLI -SRINIAVS TALCHER

 Disconnection of power & control cable


 Dashboard
 Restoration of system back to normal operation
 Assessments
 Removal of actuator from foundation if required
 Question Bank
 Any or all the above  Correct
 Projects

6.
 Logout
An LWC, PTW, PTW(ROMP) are prepared and issued by

 AP

 SAP  Correct

 CP

 Nonel of the above

7.
CP will allow cutting set in his area only when

 Regulator and pressure gauge in gas Cylinder

 Flashback arrester at Cylinder and torch

 Any joints in gas pipe chould be clamped properly

 All of above  Correct

PTW_COAL OPERATION

1.
What is the normal moisture level is to be maintained in MOT ? (in ppm)

 10

 50  Correct

 100  Incorrect

 150

2.
APH basket drying to be ensured by running draft fans for at least how many hours after basket
cleaning ?

1

2  Incorrect

3

4  Correct

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 9/13
5/8/2019 Tech Man Gurukul

3.
Logoutspark  R 
During oil gun firing, if ignition does not takes place with proper RLI -SRINIAVS
immediately TALCHER
after
opening the oil supply valve, Minimum time in minutes to be ensured between two consecutive
 Dashboard start commands is?

 Assessments 0

 Question Bank 2

 Projects 5  Correct

 10
 Logout

PTW_COAL OPERATION

1.
What is the role of chemistry during taking make up in generator stator water tank in 500MW
units?

 Measurement of air purity

 Measurement of air dewpoint

 Measurement of water DO  Correct

 Measurement of pH

2.
Which is done first for boiler after overhaulling?

 Hydrotest  Correct

 Furnace air tightness test

 Order does not matter

3.
Which type of isolation need to be carried out first?

 Electrical  Correct

 Mechanical

 Any of the above

4.
Which step comes first in PTW issue in ERP?

 Issue of PTW

 Tagging of isolations  Correct

 Printing of PTW

 Revoking of isolations

5.
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 10/13
5/8/2019 Tech Man Gurukul

During recommisioning of CW system, what activity should be done first?


Logout  R  RLI -SRINIAVS TALCHER

 Condenser flood test  Correct


 Dashboard
 CW duct charging
 Assessments
 Order does not matter
 Question Bank

 Projects 6.
Which is the correct procedure for isolation of electrically operated valves?

 Logout
 Valve is kept closed

 Valve electric supply is isolated

 Both of the above  Correct

7.
At what value of Boiler pH, unit shut down to be done immediately ?

 less than 7  Correct

 less than 7.5

 less than 8

 less than 8.5  Incorrect

PTW_COAL OPERATION

1.
What action we should take to attend VFD controller of ID fan in-operative?

 Fan to be stopped

 VFD supply electrical isolation

 Load reduction as per capability

 All of the above  Correct

2.
What action can be taken if we find wall soot blower puppet valve is passing?

 Stop soot blowing

 Isolate steam supply

 Electrically isolate the faulty blower

 All of the above  Correct

3.
What precautions we should take before isolating for attending internal problems in an Air pre
heater?

 Minimising flue gas exit temperature


https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 11/13
5/8/2019 Tech Man Gurukul

Logout  R  RLI -SRINIAVS TALCHER


 Avoid cold air entry to boiler

 Dashboard  Reduce unit load as per capability

 Assessments  All of the above  Correct

 Question Bank
4.
 Projects What action we should take before attending lube oil line leak in coal mill?

 Mill change over required if minimum number of mills are in service


 Logout

 Stop mill and attend leakage

 Isolate lube oil sytem and attend leakage

 All of the above  Correct

5.
What precautions we should take before issuing permit on Electromatic relief valve in HRH
line?

 Steam isolating valves closed

 Steam isolating valves electrically isolated

 Both A and B  Correct

 None of the above

6.
What precautions we should take before issuing permit on Electromatic relief valve in MS line?

 Steam isolating valves closed

 Steam isolating valves electrically isolated

 Both A and B  Correct

 None of the above

7.
During CEP mechanical normalisation, when suction valve is to be opened?

 First open suction valve

 Suction valve open after opeing seal water valve

 Suction valve open after opening evacuation valve

 Last step is suction valve opening  Correct

8.
In a lube oil system, what checks should be done by AP before preparing PTW on one pump ?

 Equipment to be stopped

https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 12/13
5/8/2019 Tech Man Gurukul

 Running pump parameters healthy Logout  R  RLI -SRINIAVS TALCHER

 Both A and B  Correct


 Dashboard
 None of the above
 Assessments

 Question Bank 9.
Normally DMCW is used in following locations
 Projects

 Lube oil cooler


 Logout
 BFP

 Generator

 All of the above  Correct

10.
During normalisation of CEP after return of CEP strainer permit, what precaution AP should
take before opening CEP suction valve?

 Maintain hot well level

 Maintain condensate flow

 Maintain condenser vacuum  Incorrect

 Maintain normal CEP suction pressure  Correct