1.
What is the best way of limiting exposure to toxic substances?
By always having the same person work with the toxic substance.
2.
The following is (are) used as safety device(s) in machines
Fail safe
Safety interlocks
Limit switches
PTW_BASIC SAFETY
1.
If work is done on overhead lines, they must be:
Deenergized
Grounded
Insulated
A and B Correct
2.
The safe exposure limits for noise levels for 08 hours of working/day is
90 dBA Correct
110 dBA
130 dBA
150 dBA
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 1/13
5/8/2019 Tech Man Gurukul
Assessments H2
CO2 Correct
Question Bank
N2 Incorrect
Projects
ARGON
Logout
PTW_BASIC SAFETY
1.
A mobile tower scaffold must not be used on
A paved pathway
An asphalt road
2.
One of the common signs of a heart attack is:
3.
The very first thing you should do if you are the first to witness or discover an accident on
the job site is to:
Go find at least one co-worker to help you so you can work as a team
Find and fill out the necessary forms to document the incident
4.
Testing of Lifts to be done in every
3 months
9 months
6 months Correct
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 2/13
5/8/2019 Tech Man Gurukul
Dashboard
5.
A place large enough that a person can physically enter with limited or restricted means for
Assessments
entry or exit, not designed for continuous employee occupancy (like tanks, vessels, silos,
storage bins, hoppers, vaults and pits). It can be any enclosed or partially enclosed space
Question Bank
where there is a risk of death or serious injury from hazardous substances or dangerous
conditions (e.g., lack of oxygen, toxic or combustible gases) may be present.
Projects
Permanent structure
Logout
Confined space Correct
Temporary structure
PTW_E&M Handbook
1.
On completion of job at gas pass except one door all doors should be closed. TheÂ?Â?Â?Â?.
Should personally checked the closing of the final access point. Announcement should be made
before closing of final door.
Authorized Person
Location manager
2.
Permit to work, Permit to work (ROMP) and Limited work certificate shall be received, cleared
and transferred only by a Â?Â?Â?Â?Â?Â?..
Authorized Person
Shift Incharge
3.
A person selected by Senior authorized person and provided with written instruction to assist
in ensuring the safe movement of vehicles or mobile equipments within a define area usage
calledÂ?Â?Â?.
Supervisor
Crane operator
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 3/13
5/8/2019 Tech Man Gurukul
PTW_E&M Handbook
Logout R RLI -SRINIAVS TALCHER
1.
Dashboard What voltage range is treated as medium voltage?
Projects 400-900 V
500-1100 V
Logout
2.
Running of conveyor or plant or cleaning should be done by a Â?Â?Â?Â?Â?Â?.. Only and should be
done with all safety precautions.
Contract worker
Housekeeping staff
Location incharge
3.
Above what volatge level is treated as high voltage?
1100V
765V
650V Correct
415V
4.
As per CEA Regulation the EOT cranes shall be provided for maintenance of TG cycle equipment
and CW pumps. These shall comply with the requirements of latest versions of relevant IS. The
crane capacity shall be taken as Â?Â?Â?.more than the single heaviest equipment to be lifted.
1.00% Correct
15.00% Incorrect
2.00%
25.00%
5.
Who will confirm all persons working under the permit to work have been withdrawn from the
plant/high voltage apparatus and warned not to continue the work.
Nominated Supervisor
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 4/13
5/8/2019 Tech Man Gurukul
p
Dashboard
PTW_E&M Handbook
Assessments
1.
Question Bank Â?Â?Â?Â?Â? can be a complicated document because it is designed to cover a variety of use for
work/testing on/near plant or HV apparatus that is not isolated; or work or testing of
isolated, partially isolated or live medium and low voltage apparatus.
Projects
Permit to work
2.
What is the safe distance to work from a live 400kV HV system?
2.5m
3.1 m Correct
3.8m
4.5m
3.
What is the safe distance for crane access to an exposed 132kV live line?
2.47m
3.12m
4.03m Correct
4.95m
4.
How much oxygen (percent) in air is needed for working in confined spaces?
25
21 Correct
19
23
5.
The environment of the vessel shall be examined by a selected person. If the selected person
needs to enter the confined space he must be issued with a Â?Â?Â?Â?Â?Â?...
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 5/13
5/8/2019 Tech Man Gurukul
Question Bank 6.
What is the safe distance for crane access to an exposed 400kV live line?
Projects
6m Correct
Logout
5m
7m
8m
7.
Maximum voltage that can be allowed inside confined space?
50
24 Correct
125
110
PTW SYSTEM
1.
Who is authorised to issue and cancel the Work Permit ?
Authorised person
Competent person
Control Person
2.
When Restoration of Motive power is required during work on a plant or high voltage equipment,
the safety document issued is :
LWC
PTW
ROMP Correct
HWP
3.
Which permit is to be taken for working inside main oil tank?
LWC
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 6/13
5/8/2019 Tech Man Gurukul
Dashboard ROMP
Projects 1.
........... is a risk assessment document regarding the task to be performed; breaking it down
to individual task steps, identifying potential hazards, and methods to control those hazards
Logout
with a particular task needs
LWC
PTW
JSA Correct
2.
WHY DO WE USE THE WORKÂ PERMIT SYSTEM
To renew certificates.
To log incidents.
3.
WHAT IS LISTED ON AÂ WORK PERMIT
4.
If mechanical and electrical group are working in the same equipment in restricted  area?
5.
WHY DO WE USE WORKÂ PERMITS IN HAZARDOUS AREAS
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 7/13
5/8/2019 Tech Man Gurukul
To identify receivers.
Dashboard
1.
Logout
A person authorized by HOP, trained to carryout duties like preparation, issue and
cancellation of Safety documents is
Competent Person
Authorised Person
Control Persons
2.
In a confined space entry what is the most important things to  do
3.
Work at height permit is being given by Operation only after approval of
Safety
EIC
MTP
4.
220V DC battery bank permit shall be issued by
Competent Person
Authorised Person
Control Persons
5.
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 8/13
5/8/2019 Tech Man Gurukul
For defect identification and attending breakdown of Motorized Actuators we need to .........
Logout R RLI -SRINIAVS TALCHER
6.
Logout
An LWC, PTW, PTW(ROMP) are prepared and issued by
AP
SAP Correct
CP
7.
CP will allow cutting set in his area only when
PTW_COAL OPERATION
1.
What is the normal moisture level is to be maintained in MOT ? (in ppm)
10
50 Correct
100 Incorrect
150
2.
APH basket drying to be ensured by running draft fans for at least how many hours after basket
cleaning ?
1
2 Incorrect
3
4 Correct
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 9/13
5/8/2019 Tech Man Gurukul
3.
Logoutspark R
During oil gun firing, if ignition does not takes place with proper RLI -SRINIAVS
immediately TALCHER
after
opening the oil supply valve, Minimum time in minutes to be ensured between two consecutive
Dashboard start commands is?
Assessments 0
Question Bank 2
Projects 5 Correct
10
Logout
PTW_COAL OPERATION
1.
What is the role of chemistry during taking make up in generator stator water tank in 500MW
units?
Measurement of pH
2.
Which is done first for boiler after overhaulling?
Hydrotest Correct
3.
Which type of isolation need to be carried out first?
Electrical Correct
Mechanical
4.
Which step comes first in PTW issue in ERP?
Issue of PTW
Printing of PTW
Revoking of isolations
5.
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 10/13
5/8/2019 Tech Man Gurukul
Projects 6.
Which is the correct procedure for isolation of electrically operated valves?
Logout
Valve is kept closed
7.
At what value of Boiler pH, unit shut down to be done immediately ?
less than 8
PTW_COAL OPERATION
1.
What action we should take to attend VFD controller of ID fan in-operative?
Fan to be stopped
2.
What action can be taken if we find wall soot blower puppet valve is passing?
3.
What precautions we should take before isolating for attending internal problems in an Air pre
heater?
Question Bank
4.
Projects What action we should take before attending lube oil line leak in coal mill?
5.
What precautions we should take before issuing permit on Electromatic relief valve in HRH
line?
6.
What precautions we should take before issuing permit on Electromatic relief valve in MS line?
7.
During CEP mechanical normalisation, when suction valve is to be opened?
8.
In a lube oil system, what checks should be done by AP before preparing PTW on one pump ?
Equipment to be stopped
https://assessment.pmintpc.in/admin/dashboard/candidate/1177/assessment/6232 12/13
5/8/2019 Tech Man Gurukul
Question Bank 9.
Normally DMCW is used in following locations
Projects
Generator
10.
During normalisation of CEP after return of CEP strainer permit, what precaution AP should
take before opening CEP suction valve?