Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

RINCIAN PENAWARAN

PEKERJAAN : PENGADAAN JASA PEMBUANGAN SAMPAH

NO URAIAN PERHITUNGAN JUMLAH/BLN

I Tenaga Kerja
- Pengawas + Sopir 2 Orang x Rp 6,544,782.39 Rp
- Pelaksana 6 Orang x Rp 5,885,242.57 Rp

II Material
- BBM Kenderaan 2 Unit x 26 Hari x 20 Liter x Rp 6,300.00 Rp

III Peralatan & Perlengkapan


1 - Kenderaan Truck 2 Unit x Rp 5,200,000.00 Rp
6 Unit x Rp 65,000.00
2 - Sekop Rp
12 Bulan
2 Ea x Rp 70,000.00
3 - Cangkul Rp
12 Bulan
4 Ea x Rp 120,000.00
4 - Drum Potongan Rp
12 Bulan
2 Ea x Rp 80,000.00
5 - Jaring Pengaman Rp
12 Bulan
30 Ea x Rp 12,000.00
6 - Masker Rp
12 Bulan
30 Ea x Rp 3,792.00
7 - Sarung Tangan Rp
12 Bulan
16 Stel x Rp 260,000.00
8 - Seragam Rp
12 Bulan
8 Ea x Rp 40,000.00
9 - Helm Rp
12 Bulan
8 Psg x Rp 80,000.00
10 - Sepatu Karet Rp
12 Bulan

TOTAL BIAYA PERBULAN SEBELUM PPN 10% Rp

12 Bulan x Rp 65,916,666.88 Rp
PEMBULATAN Rp

Bontang, 08 Mei 201


CV. Berkat Farris

Aloysius Roni
Direktur
N SAMPAH

JUMLAH/BLN

13,089,564.78
35,311,455.44

6,552,000.00

10,400,000.00

32,500.00

11,666.67

40,000.00

13,333.33

30,000.00

9,480.00

346,666.67

26,666.67

53,333.33

65,916,666.88

791,000,002.62
791,000,000.00

Bontang, 08 Mei 2019


CV. Berkat Farris

Aloysius Roni
Direktur
UPAH KERJA PEKERJAAN JASA
PELESTARIAN LINGKUNGAN
PT. PUPUK KALIMANTAN TIMUR TAHUN 2019

DITERIMA KARYAWAN KOMPONEN TARIF JASA


Klasifikasi Lembur BPJS
No Per Tenaga Upah Tunjangan Tetap THR pesangon ganti Rugi
Take Home
Kerja Pokok Rp.
U. makan U. Tran sfort Pay Rp.
Rp. Rp. Rp. Rp.
Rp. Rp.
A B C D E F G H I J
(22xRp 15.000) (22xRp 15.000) (A+B+C) (A/173) x 23 A x 4% A X 8,74% (A+B+C)/12 (A+B+C)/12x2 (Hx15%)

1 Pengawas 3,350,000 330,000.00 330,000.00 4,010,000.00 445,375.72 134,000.00 292,790.00 334,166.67 668,333.33 100,250.00
2 Pelaksana 2,959,435 330,000.00 330,000.00 3,619,435.00 393,450.90 118,377.40 258,654.62 301,619.58 603,239.17 90,485.88
Grand Total
uang Cuti Over Head
Rp.
Rp. Rp.

K L M
( A/12 ) D x 7.0% D s/d L

279,166.67 280,700.00 6,544,782.39


246,619.58 253,360.45 5,885,242.57

Bontang, 18 April 2019


CV. BERKAT FARRIS

ALOYSIUS RONI
Direktur

You might also like