Professional Documents
Culture Documents
BFR-15-Rincian Penawaran Pembuangan Sampah 2018 - Eauction
BFR-15-Rincian Penawaran Pembuangan Sampah 2018 - Eauction
I Tenaga Kerja
- Pengawas + Sopir 2 Orang x Rp 6,544,782.39 Rp
- Pelaksana 6 Orang x Rp 5,885,242.57 Rp
II Material
- BBM Kenderaan 2 Unit x 26 Hari x 20 Liter x Rp 6,300.00 Rp
12 Bulan x Rp 65,916,666.88 Rp
PEMBULATAN Rp
Aloysius Roni
Direktur
N SAMPAH
JUMLAH/BLN
13,089,564.78
35,311,455.44
6,552,000.00
10,400,000.00
32,500.00
11,666.67
40,000.00
13,333.33
30,000.00
9,480.00
346,666.67
26,666.67
53,333.33
65,916,666.88
791,000,002.62
791,000,000.00
Aloysius Roni
Direktur
UPAH KERJA PEKERJAAN JASA
PELESTARIAN LINGKUNGAN
PT. PUPUK KALIMANTAN TIMUR TAHUN 2019
1 Pengawas 3,350,000 330,000.00 330,000.00 4,010,000.00 445,375.72 134,000.00 292,790.00 334,166.67 668,333.33 100,250.00
2 Pelaksana 2,959,435 330,000.00 330,000.00 3,619,435.00 393,450.90 118,377.40 258,654.62 301,619.58 603,239.17 90,485.88
Grand Total
uang Cuti Over Head
Rp.
Rp. Rp.
K L M
( A/12 ) D x 7.0% D s/d L
ALOYSIUS RONI
Direktur