PRE-COMMISSIONING,
COMMISSIONING & START-UP
Deliver Excellence in Every Commissioning Phase
14 March 2016 — 17 March 2016
Kuala Lumpur, Malaysia
Supported By
EPC | PRE-COMMISSIONING, COMMISSIONING & START UP
Course Overview
Successful commissioning new or starting-up revised equipment
and systems requires meticulous planning, organizing and
controlling. Careful methodical, detailed planning – early – is the
key to the success of any commissioning.
This training program, Pre-Commissioning, Commissioning and Start Up, is developed for the
commissioning team people learn the thought, the logic and approach that leads to the plan
in order to increase the work speed and quality of work.
Customized Course Content
The course material relates specifically to the 9 key elements of successful plant
commissioning in the comprehensive sequences from strategies, tactics, task tools,
checklists, guidelines for specific equipment, procedures, manuals etc. in order to maximize
your learning benefits.
You will also benefit from successful portrayed and will learn from the failures presented too
so that success rate is maximized and failure is minimized.
2
EPC | PRE-COMMISSIONING, COMMISSIONING & START UP
Plant Engineers
ment
Factory
Contractors
Course Schedule
3
EPC | PRE-COMMISSIONING, COMMISSIONING & START UP
DAY 2
Elements of Successful Plant Commissioning
Strategic Planning and Management—Commissioning Planning Issues
Phases PART 2 Review Schedules, Protocols, Simulations, Document
Strategic Planning Control, Documents, Start-up Flow Sheets over and over.
Establish a Review Process for all elements of preparation
Purpose – To re-life Unit and its Equipment
and planning.
Mission
Document control is crucial and must have a process flow
Values and Beliefs that Drive Performance
chart with each document defined. Documents must be
Goals – Organization, Project, Team, Personal tracked, quality of information verified, and completeness
Measures of Success verified.
Establish equipment verification protocols and systems
Values validation protocols early and allow comment and
Communicate means pushing information to the lowest criticism before issuing the protocols.
level of people. Control systems are vital to systems validation. Review
Communicate means working at a level of detail where control system acceptance protocols and standards with
the lowest-level people are making the commitments and care to ensure all understand the expectation.
monitoring those commitments by reporting, tracking and Protocols address what is verified (mission), by what
measuring response. means (how), according to what standard (measure), by a
team of what people (who), according to what schedule
Leadership (when), and who signs as completed (authority).
Project engineering leads equipment acceptance
supported by process engineering, operations, Strategic Risk
maintenance and assisted by contractors, vendors. Failure to Complete
Process engineering leads system validation supported by Failure to Complete on Time
operations, maintenance assisted by vendors, Low Throughput - Capacity
contractors, and project engineering. Inconsistent Product Quality
Production start up is lead by operations and maintenance Causes
supported by process engineering and assisted by
vendors, contractors, project engineering. Risk Response
Unknowns
Knowns
4
EPC | PRE-COMMISSIONING, COMMISSIONING & START UP
DAY 3
Operation Planning and Phase Management Plant Start-Up, Re-Energizing, Initiating
Plan and Schedule Mechanical and Systems Completion Start Up Imperative
Execute Explosion
Accident
Schedule Mechanical and Systems Completion Product Contamination
Leadership Spills
Priority of Start-Up Production Systems Failure
Project Engineering Control Systems malfunction
Result Control Systems are not stable
Scope Faulty Procedures
Performance Faulty Sequence
Resources Construction is late completing
Construction Quality is Inadequate
Risk and Safety Management NDT results lost or misplaced
Mechanical and Systems Completion Changed Conditions
Equipment Verification Constructive Changes
Production System Validation Contractor Failures
Continuing Production Inspection Variation
Review—Practice makes Perfect
DAY 4
Motivation and Leadership
Commissioning, leadership & motivation for on time start The 21 Irrefutable Laws of Leadership (Continues)
-up The Law of the Inner Circle
The surprising truth about what motivates us The Law of Empowerment
Autonomy, mastery & purpose The Law of the Picture
Leadership definitions The Law of Buy-In
Leadership framework The Law of Victory
Four factors of leadership The Law of the Big Mo
Leadership – The commissioning manager The Law of Priorities
The Law of Sacrifice
The Law of Timing
The Law of Explosive Growth
Mini Workshop: “Leadership style assessment” The Law of Legacy
5
COURSE DETAILS COURSE CONSULTANT
Title : Pre-Commissioning, Commissioning & Start Up Name : Cay Aagen
Date : 14—17 March 2016 Email : registration@petrosync.com
Location : Kuala Lumpur, Malaysia Phone : +65 6415 4500
Fax : +65 6415 4322
INVESTMENT PACKAGES (Please Circle)
TERMS AND CONDITIONS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS DISCLAIMER
Please note that trainers and topics were confirmed at
Standard Price 11 March 2016 USD 3,595 the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
Early Bird Offer 12 February 2016 USD 3,395 the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
Enjoy 10% discount for substitutions or alterations will be updated on our web
Group Discount 11 March 2016 page as soon as possible.
groups of 3
DATA PROTECTION
Group Discount is based on Standard Price The information you provide will be safeguarded by
*To enjoy the promotion & discount offer, payment must be made before dateline PetroSync that may be used to keep you informed of
* For 7 or more delegates, please inquire for more attractive package. relevant products and services. As an international
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other group we may transfer your data on a global basis for
promotional offers. the purpose indicated above. If you do not want us to
* Important: Please note that registration without payment will incur a SGD 200 administration fee. share your information with other reputable
companies, please tick this box
DELEGATES DETAILS
CANCELLATION POLICY
1st Delegate Name: Mr Mrs Ms Dr Others You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
Direct Line Number: Email:
any cancellation received in writing not less than
Job Title: Department: fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
Head of Department: administration fee and any related bank or credit card
charges.
2nd Delegate Name: Mr Mrs Ms Dr Others Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
Direct Line Number: Email:
course, are liable to pay the full course fee and no
Job Title: Department: refunds will be granted.
In the event that PetroSync cancels or postpones an
Head of Department: event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
3rd Delegate Name: Mr Mrs Ms Dr Others receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
Direct Line Number: Email: PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
Job Title: Department: postponement.
Head of Department: PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
INVOICE DETAILS assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
Attention Invoice to: of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
Direct Line Number: Fax: or any other reason beyond management control.
Company: Industry:
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.