Customization Overview
1
Build and Implementation phase of the MSRP Upgrade Project
The current customizations in UNHCR MSRP FSCM and TMS system are detailed below. The list should
be updated further by the development team based on the Fit-Gap sheets for various modules and the
system analysis report.
2
Build and Implementation phase of the MSRP Upgrade Project
3
Build and Implementation phase of the MSRP Upgrade Project
4
Build and Implementation phase of the MSRP Upgrade Project
581 Interface Receipt field in GRAY OUT the hyper link to the Receipt PU
the Receipt default is default.
grayed
601 Default to RFQ or RFP or When an RFP is issued, the title appears as PU
ITB depending on type of UNHCR Dispatched Request for Quote - title
tender doc should default to RFQ or RFP or ITB
whichever document is being sent.
601 Default to RFQ or RFP or When an RFP is issued, the title appears as PU
ITB depending on type of UNHCR Dispatched Request for Quote - title
tender doc should default to RFQ or RFP or ITB
whichever document is being sent.
614 PO cancel warnings are Warning messages regarding PO PU
unclear cancellations are unclear. Customization
done to correct it.
616 REQ and PO Budgetary allow Multiple BUs PU
Reports
Add "Include all Business Units" check-box in
the selection criteria
5
Build and Implementation phase of the MSRP Upgrade Project
6
Build and Implementation phase of the MSRP Upgrade Project
745 Enforce same BU on PO Users can dispatch POs across multiple BUs. PU
Dispatch
746 PO Performance issues Extremely slow system response related to: PU
c) PO to REQ finalization
757 Document Tolerance not When you do a change order on a PO that PU
checking after PO change has previously been doc tolerance valid, it
order will remain valid even if you double the
requisition amount (as per PO 2107 - Req
1902)
780 Report POY4020 & Report POY4020 & POY4021 generates PU
POY4021 generates wrong wrong results
results
798 Add message to matching As there is no message for matching rule PU
rule rule_R650 rule_R650, insert a new one.
1046 Custom version of Receipt No documentation found PU
Delivery Detail Report
(from 2005)
7
Build and Implementation phase of the MSRP Upgrade Project
8
Build and Implementation phase of the MSRP Upgrade Project
1194 PO Travel The Travel & Expense module in 8.4 has lots PU
of gaps when compared to the 8.9 version.
To reduce the customizations that have to
be done in 8.4 and to record, report the
expenses made in HCR travel and visa unit,
the purchasing module is re-designed to fit
and serve as Travel and Expense module.
1198 Set PO Status to Open for POs can be modified after approval. Set PO PU
approved PO if changed Status to Open for approved PO if Vendor,
quantity , amount, ship-to or any change
that affects the amount.
1200 New INCO Terms Introduce two new translate values in PU
('Delivery terms' ) 'Delivery terms' DAT and DAP in the field
'IST_DELIVERY_TRM1' in-activate the
existing translate value 'DDU'
1240 PO Date validation PO Date validation customization PU
1257 Query to list down all The objective of this procedure is to ensure PU
open PO?s that all services that have been received
before the end of the month have been
received in MSRP. This, in turn, ensures that
accruals are made for vouchered receipts, so
that expenses (assets) for the month are
recorded accurately.
1269 Validation of Item Validation of Item selected in Req/PO PU
selected in Req/PO
1298 PO Dispatch Options This change request is to ensure when the PU
Modification purchase order is dispatched, the 'Print
Copy' option is not available for the user,
1314 CR 174 Listing pending The objective of this change request is to PU
POs to receive ensure that all services/consumables and
STIs that have been received before the end
of the month have been received in MSRP.
1321 New Queries: PO and REQ Queries to list PO and requisitions for given PU
with LQDT AMT BU with their liquidated and remaining
amount.
1323 CR 148 Due Dt resets The objective of this procedure is to ensure PU
when Vendor Loc is that when the due date is present in the PO,
modified the system should not re-initialize it.
1334 CR 448 - PO Query The objective of this change request is to PU
cleanup ensure that all the PO queries in the
attached list is available only to SMS.
9
Build and Implementation phase of the MSRP Upgrade Project
10
Build and Implementation phase of the MSRP Upgrade Project
1.1.2 Inventory
11
Build and Implementation phase of the MSRP Upgrade Project
12
Build and Implementation phase of the MSRP Upgrade Project
13
Build and Implementation phase of the MSRP Upgrade Project
14
Build and Implementation phase of the MSRP Upgrade Project
15
Build and Implementation phase of the MSRP Upgrade Project
26 No asset ID's of "NEXT" UNHCR uses the tag number as the asset AM
id, therefore the user must be prevented
from entering NEXT and thus having the
system auto-generate an asset id.
28 Asset desc field look up The description field, on the Asset Basic AM
Add page, is delivered as a free form
field. UNHCR requires the Asset
description in to be the same as the
description on the Item tables. In order
to do achieve this, the description should
be a drop down search list prompting
against the item table, just as it is for
requisition and purchasing pages.
33 ASSET by PO Report This report displays the sum of the AM
number of assets, purchase price ,
current value for a given PO, category
and location sorted by category ID and
location ID
162 Asset by Custodian Report Crystal Report (Assets by Custodian per AM
Category / Location).
HCR_RMS687 - Enhance Run Control
Page & Report.
Enhance the report HCR assets by
custodian per category by location to
include an 'add' function and an 'all
countries' button.
164 LOCATION mandatory for Make LOCATION Field Mandatory on AM
Asset Asset Basic component
169 ASSETS BY ACQUISITION ASSETS BY ACQUISITION PRICE PER AM
PRICE PER LOCATION Report LOCATION.
No specifications available
173 HCR ASSETS DETAILS BY HCR ASSETS DETAILS BY SUBLOCATION. AM
SUBLOCATION Report No specification documentation available
175 HCR_AM4700 - HCR HCR DISPOSED ASSETS. AM
DISPOSED ASSETS No documented specifications
186 Prevent duplicate Asset ID, No specification documentation found AM
Serial IDs and Tag Numbers
190 HCR Asset Details by HCR Asset Details by Custodian Report. AM
Custodian Report To give the Supply Chain personnel a
report listing all assets assigned to a
particular custodian. Crystal was chosen
as the reporting tool because it was the
16
Build and Implementation phase of the MSRP Upgrade Project
17
Build and Implementation phase of the MSRP Upgrade Project
18
Build and Implementation phase of the MSRP Upgrade Project
19
Build and Implementation phase of the MSRP Upgrade Project
831 Default & Gray out values in Default and Gray out the following values AM
Basic ADD in Asset Management > Owned Assets >
Basic Add on AM Page "Asset Acquisition
Detail";
no specification available
1090 HCR ASSETS UNDER IP HCR ASSETS UNDER IP Report AM
Report
No specifications available
1185 Asset Data Conversion HCR_CH00100 - 23 Nov 2011. AM
This project is used to migrate the
temporary table used for data conversion
for increasing the threshold for STI's from
5,000 USD to 10,000 USD
20
Build and Implementation phase of the MSRP Upgrade Project
21
Build and Implementation phase of the MSRP Upgrade Project
22
Build and Implementation phase of the MSRP Upgrade Project
1.2 Financials
1.2.1 General Ledger
Customization Short Description Functional Description Module
ID
397 Budget Exchange Rate Load Page Budget Exchange Rate Load Page GL
397 Sync rates from FS to EP,TM,HR Sync rates from FS to EP,TM,HR GL
397 Create new exchange rates. Create new exchange rates. GL
407 Change Logos Add UNCHR MSRP to Crystal and SQR GL
logos.
416 Situation Rpts - Field Office’s Produce an SQR reporting process that GL
will be scheduled to run each month
end. The process will produce two
types of reports, CR1130? HQ
Commitments Incurred and CR1140?
HQ Disbursements Incurred without
Commitments, which will be sent to
each of the field CostCentres indicating
Commitment Control Activity.
417 Spending Authority Rprting VW In order to allow the business users to GL
match amounts spent to spending
authority a reporting view is required
to allow for appropriate grouping and
summing.
Business users are not able to build a
complex query such as this in
PS/Query. Creating a reporting view
will allow them to meet their objective.
418 nVision Drilldown Support Definition, creation, development, and GL
centralization of reporting related
items and processes to support nVision
from a web perspective. Includes
standardization of parameters,
file/output options (server & file
folders & names), and procedures
23
Build and Implementation phase of the MSRP Upgrade Project
424 PRD Enhance #45 - Jrnl Search Modify Journal Entry Search. Change GL
search capability on the Journal Entry
page to include LEDGER_GROUP and
TRANS_REF_NUM.
no Specification documentation found
434 NVISION-FUNDING PROJECTIONS HCR-CR570-RS-5FEB2004-FUNDING GL
PROJECTIONS,
439 GL JEDIT Performance Improve Performance of the GL_JEDIT GL
program. Inefficient SQL in the
delivered FS_EVENTGEN App Engine
Program (Journal Edit).
24
Build and Implementation phase of the MSRP Upgrade Project
443 Remove Vanilla Crystals from Remove Vanilla Crystals from RunCTL GL
RunCTL pages leaving HCR version pages leaving HCR version
25
Build and Implementation phase of the MSRP Upgrade Project
Records: OPEN_ITEM_GL
453 Change SOURCE field on Change SOURCE on GL
JRNL_GEN_DEFAULTS Page JRNL_GEN_DEFAULTS page from a list
box to an edit box with prompt
26
Build and Implementation phase of the MSRP Upgrade Project
as it is delivered.
454 Security on GL/KK Journal Edit and Security on GL/KK Journal Edit and Post GL
Post
There is a need to separate out which
users can edit GL/KK Journals and
those that can edit and post.
27
Build and Implementation phase of the MSRP Upgrade Project
28
Build and Implementation phase of the MSRP Upgrade Project
HCR_RMS1116
HCR_RMS3014
29
Build and Implementation phase of the MSRP Upgrade Project
into csv
* Requirements
* TDD (technical design document)
* examples of XLS and CSV files
498 Approval Rule Sets to INT Assorted rule sets GL
ECR Approval
EM_APPROVAL_RULE_SET_1
Item Approval
JOURNAL_ENTRY_APPROVAL
PO Amount Approval
PO ChartField Approval
PV_REQ_AMOUNT_APPROVAL
PV_REQ_CHARTFIELD_APPROVAL
PV_REQ_COMM_APPROVAL
TEST1
30
Build and Implementation phase of the MSRP Upgrade Project
WF-1
558 Change SOURCE field Change SOURCE on GL
JRNL_GEN_DEFAULTS page from a list
box to an edit box with prompt
31
Build and Implementation phase of the MSRP Upgrade Project
upload purposes.
591 Audit to Open Item GL Record Need Audit Log turned on for Open GL
Item changes. Also, need management
report or query to review PS_AUDIT
changes related to Open Item Updates.
625 Cross/ Reciprocal Rate Calc Reciprocal Rate Calculation - to enable GL
automatically cross rates update of the
missing currencies based on the
exchange rate load.
32
Build and Implementation phase of the MSRP Upgrade Project
33
Build and Implementation phase of the MSRP Upgrade Project
by addition of an index
735 Check for missing scenario Modify budget import program to not GL
allow blank scenarios. Program should
error out if scenario is blank.
34
Build and Implementation phase of the MSRP Upgrade Project
35
Build and Implementation phase of the MSRP Upgrade Project
1272 Journal Entry, Added Open Item Journal Entry, Added Open Item GL
Prompt for Employees - Display Prompt for Employees - Display
warning message for OLD values.
Incident 166960
1273 Custom process to close open GL
item balances
1282 Open Item (HCR_OPENI_AE) to App Engine on Open Item GL
include Reconcile number (HCR_OPENI_AE) needs to be fixed to
ensure:
36
Build and Implementation phase of the MSRP Upgrade Project
1311 CR 146 Disable some fields on Pay This change request requires a change GL
Cycle page for some users. to Limit Access to Accounting Date and
Payment date
1319 Fetch data from HR to FS, to be This project is created to fetch the data GL
used by Cognos. from HR database for record
PS_HCR_DESSSTAF_VW. The view will
be used by cognos. Sibling project is
UCR_SC111.
1386 Closed Open Items Reopened In case of Open item closing, close id GL
each time the value of 999999 is
reached, the counter is reset to zero.
37
Build and Implementation phase of the MSRP Upgrade Project
38
Build and Implementation phase of the MSRP Upgrade Project
39
Build and Implementation phase of the MSRP Upgrade Project
742 Add Audit to Voucher Voucher audit does not include the UserId of the AP
Delete Action Voucher Delete action.
Activate field level auditing to keep track of voucher
deletion & to create query off PSAUDIT that returns
deleted vouchers.
764 AP Voucher Load Upload an excel spreadsheet into AP using the AP
Voucher Upload functionality within AP. PeopleSoft
delivers the staging tables and CI (component
interface) required to bring the data into AP from an
excel spreadsheet. The uploaded voucher will be
pre-approved, and once in AP, can be captured in
the PayCycle.
778 Vendor Pay To Page Additional info on Voucher Summary page AP
Add a Vendor PayTo details page to Voucher
Approval component
Also add additional fields to Voucher Vendor Banks
Pay To Details
779 Vchr Appr/Entry V2 WF: prohibit updates when accessed from menu AP
pages via WL For all Voucher Workflow users (V2), do not allow
updates when voucher entry/approval pages are
accessed directly from the menu, thus forcing these
users to use work list.
from: Remove menu navigation for V2 workflow
users
to: Prohibit updates when pages are accessed via
menu
782 Schedule Worklist Create custom component, run control record, AE AP
Cleanup process to handle Vendor & Voucher work list
cleanup process and schedule
785 New notifs and chgs This RMS will cover only the notifications that are AP
to current notifs- part of current workflow (technical approval,
Voucher WF payment approval)
1. Voucher Workflow (all messages to be sent by
Groupwise without active links)
1.1 New Notification: Technical Approval
1.2 Change to Current Notification: Payment
Approval
789 Additional fields on When the Voucher Preparer goes to select the Pay AP
lookup Seq Nbr To Bank under Vendor Banks, this screen should
show the Descr: field from the from the various
Vendor Bank accounts. Otherwise, they don’t know
which is which currency. (Showing account currency
40
Build and Implementation phase of the MSRP Upgrade Project
is also good.)
805 fix for Vndr Bnk Info Voucher: "Pay To" lookup must follow effdt AP
in vchrs "Pay To" lookup displays all accounts regardless of
effective date
Fix for the incorrect vendor bank information in AP
vouchers
810 Enable Budget Error Top page of the voucher entry component is AP
link from Voucher disabled for NPO vouchers after voucher is
Entry approved but budget checking happens only after
approval. The budget error hyperlink (if it appears)
should thus be enabled.
When the latest workflow changes went in last
week, users lost their ability to click the Budget
Error button on approved vouchers with Budget
Errors. Was this an oversight? Maybe we should put
something in the news about how to review voucher
budget errors from another page?
817 Enable Hyperlinks for Cannot access hyperlinks (- Go to Transaction AP
budget exceptions on Exceptions
Vouchers - Go To Activity Log) to see budget exception details.
When a voucher has a budget error, the user should
click on the budget error icon to review the errors
and to click to the following hyperlinks :
- Go to Transaction Exceptions
- Go To Activity Log
820 Budget check run 'Attach' Budget check process to the save button in AP
when save/delete the voucher delete
voucher run budget check automatically after vchr delete is
confirmed.
This customization is only for new vouchers; for
previously deleted and not budget checked
vouchers, a separate script needs to be run. Alan R.
wants to run the budget check for old transactions
in 2007.
Option 2 has been proposed since this will
ultimately automate how PeopleSoft designed
Budget Checking to work with Deletion (and also
covers option 1).
1163 Prevent AP to AM RMS Number: 3064 AP
interface for Paper Description: IPSAS Delivery Principle Opt 9 - Hold AP
Receipts to AM & CM Interfaces for vouchers matched
41
Build and Implementation phase of the MSRP Upgrade Project
42
Build and Implementation phase of the MSRP Upgrade Project
1279 Exclude Zero CR 122 requires changes to the MSRP pay cycle AP
Payment from Pay process to automatically exclude vouchers with
Cycle ZERO net payment from the selected results.
This change should simulate the `manual? exclusion
of payments from selected transactions prior to
executing the pay cycle creation. This change should
be applied to:
1. Payment Selection
2. Payment Selection and Creation
1.1.1. Pay Cycle Selection
Requirement: As part of (at the end of) the payment
selection process, zero payments should
automatically be excluded.
1.1.2. Pay Cycle Selection and Creation
Requirement: As part of the payment selection and
creation process, zero payments should
automatically be excluded from the final created
payments.
1286 Validation on Verify if finalization check box has been checked at AP
finalization of voucher header, invoice line or at distribution line
voucher distribution level and if associated PO has budget check status
lines not valid.
And Show an error message if voucher is finalized
keeping its PO in budget check not valid status.
1287 Limit access to 'Dist Gray out the 'Distributed By' field on voucher AP
By' Fld distribution line if it is a PO voucher and If user is
not authorized user to access /change.
1289 CH00140? History Approvers need a facility to help them reviewing the AP
Page on Vendor Vendor data before approval. The implementation
Approval page of Vendor History page along with the Vendor
Approval functionality will help Approvers to track
the changes done on key information for specific
vendors. This will eliminate the risk of fraud due to
unreported change of vendor data.
43
Build and Implementation phase of the MSRP Upgrade Project
44
Build and Implementation phase of the MSRP Upgrade Project
45
Build and Implementation phase of the MSRP Upgrade Project
46
Build and Implementation phase of the MSRP Upgrade Project
47
Build and Implementation phase of the MSRP Upgrade Project
353 Audit trace for The requirements for #AR515 are as follows: AR
deletion of pending Creation of table AUDIT_GRP_CNTL to store
items GROUP_CONTROL deletions
Creation of table AUDIT_PEND_ITEM to store
PENDING_ITEM deletions
Creation of trigger GROUP_CONTROL_TR which runs
on GROUP_CONTROL deletions
Creation of trigger PENDING_ITEM _TR which runs on
PENDING_ITEM deletions
Creation of query
HAR515_DELETION_GRP_CTL_PERIOD which draws
data from AUDIT_GRP_CNTL based on the audit
timestamp (limited within a prompted range)
Creation of query
HAR515_DELETION_GRP_CTL_PREVMM which draws
the prior months (based on the system date) data
from AUDIT_GRP_CNTL. This query is to be scheduled
and the results sent to ALVAREZ, JOHNSONL and
GHEBREME
Creation of query
HAR515_DELETION_PEND_IT_PERIOD which draws
data from AUDIT_PEND_ITEM based on the audit
timestamp (limited within a prompted range)
Creation of query
HAR515_DELETION_PEND_IT_PREVMM which draws
the prior months (based on the system date) data
from AUDIT_PEND_ITEM. This query is to be
scheduled and the results sent to ALVAREZT,
JOHNSONL and GHEBREMEPending items are deleted
by SQL statements, thus avoiding PS-delivered
auditing procedures. Database-level auditing (i.e.
audit tables and corresponding delete triggers need
to be created) need to be implemented to trap
pending item deletions.
354 Contribution Advice Below is a list which outlines the requirements for AR
Form Report #AR560
48
Build and Implementation phase of the MSRP Upgrade Project
49
Build and Implementation phase of the MSRP Upgrade Project
50
Build and Implementation phase of the MSRP Upgrade Project
HGL100IP,HGL101IP,HGL100ST,HGL101ST,HGL102ST,
HGL103ST,HGL104ST,HGL105ST,HGL106ST,HGL108ST
New versions of nVision routines (HNAR103,
HNAR105, HNAR109 are implemented Apr 2010)
694 Change look-up bank The bank acct Look-Up field is too short. It needs to AR
acc field look-up HCR_DESCR instead of DESCR.Modify the
bank account related display on the page
PAYMENT_DATA1 to use HCR's custom bank account
field.
720 Extra-budgetary in- Adjust system so that Extra-budgetary in-kind AR
kind change donations are Not posted in GL. This may entail
modification to existing reports.
724 Include Budg.In-Kind HAR108 nvision report (Auditable AR report) AR
contribs in HAR108 currently excludes Budgetary in-Kind contributions. It
nvision should be modified so that Budgetary in-Kind
contributions are included in the report.
725 AR rounding When a part payment is received for an AR Item with AR
51
Build and Implementation phase of the MSRP Upgrade Project
- accounting date
- donor
- Amounts: Local and USD, and exchange rate,
Currency- Program
1225 Enable use of new RMS 2923 - Part A - PSFR - EPM Contributions - AR
Account Codes Contribution Source Details - Urgent request - to
enable use of new Account Codes
1280 Status of To develop new report HIDR515 detailing all AR
Contributions by outstanding pledges based upon existing UNSAS
Donor Report reports HDR515 and HDR515_N.
New processes are to be placed in folderMain Menu
> Accounts Receivable> HCR Donor reporting as of
2012 > Status of contributions as of 2012
1284 Enable links in This Project is also associated with TP incident AR
voucher page 188187. Its purpose is to enable some links even if
the page is read only for specific users:
52
Build and Implementation phase of the MSRP Upgrade Project
1422 Modifications for We need to modify the search criteria for Query AR
Query HIAR_EPAR_RECON_ALL. Currently the only search
HIAR_EPAR_RECON_ criterion is Budget Year for the query
ALL HIAR_EPAR_RECON_ALL. Now the business requests
to add From - To Accounting date and From - To
Budget Year. For the above changes we need to
modify the SQL Views behind the query
HIAR_EPAR_RECON_ALL.
53
Build and Implementation phase of the MSRP Upgrade Project
609 Enable notes button for bank RMS1066 - enable notes button TM
recon approvers
655 Outbound DTA Interface TR0001 Outbound DTA Intfce TM
655 Outbound DTA Interface Correct 2-char Country Lookup TM
696 Changes to Manual Changes to Manual Reconce Page TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual Bank to book page error fix TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual Bank Reconciliation - Phase II TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual Bank Reconciliation - Phase 3 TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual Incorrect deposit ID on recon TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual Refine Manual Recon pages TM
Reconciliation Page-Bank
Balance / Manual
696 Changes to Manual Enhancement to Bank Recon TM
Reconciliation Page-Bank
Balance / Manual
753 Payroll to CM Interface Payroll to CM structure change TM
753 Payroll to CM Interface Payroll to CM - Reconciliation TM
753 Payroll to CM Interface RMS 613 - Mapping Tables TM
753 Payroll to CM Interface Payroll Load Cleanup TM
753 Payroll to CM Interface Payroll to CM - Source Defn TM
761 Take Ordering Party Info from Synch HCR_BANK_BU TM to FS TM
bank's BU
761 Take Ordering Party Info from EFT/Pmnt Advice,Ordering Party TM
bank's BU
762 Bank Reconciliation - Phase II Bank Reconciliation - Phase II TM
763 Bank Reconciliation - Phase 3 Bank Reconciliation - Phase 3 TM
768 Manual Bank Recon, Funding: TM
incorrect amount
54
Build and Implementation phase of the MSRP Upgrade Project
55
Build and Implementation phase of the MSRP Upgrade Project
56
Build and Implementation phase of the MSRP Upgrade Project
Customization Assessment
57
Build and Implementation phase of the MSRP Upgrade Project
IB Queue 11 11 9 5 2 3
Component Interface 10 2 0 2 0
Approval Rule Set 8 1
XMLP Data Src Definition 8
XMLP Report Definition 8
XMLP Template Definition 8
Application Package PeopleCode 5 8 15 5 1 6
Application Package1 5 15 0 1 1
Business Process 5 3 0
Message Node 5 9 5 16 5 9
Images 3 1 0 1 1 1
Connected Queries 2
HTML 2 0 1
Server Definition 2 2 0 1 1
Style Definition 1 1 0 1 0
Analytic Model 52 33
Analytic Type Definition 52 32
Menu PeopleCode 1
Process Type Definition 2 0 1
Schema 697
WSDL 1
58
Build and Implementation phase of the MSRP Upgrade Project
Any delta objects (for .e.g.) queries which are not listed here are either customer bolt-ons or module
name is not defined at the object level
Graphical Module wise customization report for FSCM84 instance is given below
59
Build and Implementation phase of the MSRP Upgrade Project
Graphical Module wise customization report for Treasury 90 instance is given below
(While the customization report shows objects which belong to other modules such as Project and Program Management modules which are
not being used by UNHCR, they were not considered as a part of customization analysis. The objects in other modules were found to be due
to some project carried forward or objects were opened by user and just saved by them.)
60
Build and Implementation phase of the MSRP Upgrade Project
Graphical Module wise customization detail for EPM 89 instance is given below
61