PVSYST V6.

70 07/01/20 Page 1/3

Grid-Connected System: Simulation parameters


Project : New Project
Geographical Site New Delhi Country India
Situation Latitude 28.58° N Longitude 77.20° E
Time defined as Legal Time Time zone UT+5.5 Altitude 219 m
Albedo 0.20
Meteo data: New Delhi Meteonorm 7.1 (2001-2010) - Synthetic

PVsyst TRIAL
Simulation variant :

Simulation parameters
Collector Plane Orientation
New simulation variant
Simulation date

System type
Tilt
07/01/20 22h11

No 3D scene defined
30° Azimuth 0°
Models used Transposition Perez Diffuse Perez, Meteonorm
Horizon Free Horizon
Near Shadings No Shadings

PV Array Characteristics
PV module Si-mono Model CS3U-380MS

PVsyst TRIAL
Original PVsyst database Manufacturer Canadian Solar Inc.
Number of PV modules In series 18 modules In parallel 15 strings
Total number of PV modules Nb. modules 270 Unit Nom. Power 380 Wp
Array global power Nominal (STC) 103 kWp At operating cond. 93.1 kWp (50°C)
Array operating characteristics (50°C) U mpp 650 V I mpp 143 A
Total area Module area 536 m² Cell area 475 m²

Inverter Model Solar Inverter M80H (480 VAC)


Original PVsyst database Manufacturer Delta Energy
Characteristics Operating Voltage 200-800 V Unit Nom. Power 80 kWac
Max. power (=>35°C) 88 kWac
Inverter pack Nb. of inverters 2 * MPPT 50 % Total Power 80 kWac
Pnom ratio 1.28

PVsyst TRIAL
PV Array loss factors
Thermal Loss factor
Wiring Ohmic Loss
Module Quality Loss
Module Mismatch Losses
Uc (const)
Global array res.
20.0 W/m²K
76 mOhm Loss
Loss
Loss
Uv (wind)
Fraction
Fraction
Fraction
0.0 W/m²K / m/s
1.5 % at STC
-0.3 %
1.0 % at MPP
Strings Mismatch loss Loss Fraction 0.10 %
Incidence effect (IAM): User defined IAM profile
10° 20° 30° 40° 50° 60° 70° 80° 90°
0.998 0.998 0.995 0.992 0.986 0.970 0.917 0.763 0.000

User's needs : Unlimited load (grid)

PVsyst TRIAL
PVsyst Evaluation mode
PVSYST V6.70 07/01/20 Page 2/3

Grid-Connected System: Main results


Project : New Project
Simulation variant : New simulation variant
Main system parameters System type Grid-Connected
PV Field Orientation tilt 30° azimuth 0°
PV modules Model CS3U-380MS Pnom 380 Wp
PV Array Nb. of modules 270 Pnom total 103 kWp
Inverter Model Solar Inverter M80H (480 VAC) 80.0 kW ac

PVsyst TRIAL
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy 191.9 MWh/year Specific prod. 1870 kWh/kWp/year
Performance Ratio PR 83.66 %

Normalized productions (per installed kWp): Nominal power 103 kWp Performance Ratio PR

8 1.0
Lc : Collection Loss (PV-array losses) 0.93 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.837
7 Ls : System Loss (inverter, ...) 0.07 kWh/kWp/day
Yf : Produced useful energy (inverter output) 5.12 kWh/kWp/day
0.8
[kWh/kWp/day]

6
Performance Ratio PR

5
0.6

PVsyst TRIAL
Energy

0.4
Normalized

2
0.2

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

New simulation variant


Balances and main results

PVsyst TRIAL
GlobHor DiffHor T Amb GlobInc GlobEff EArray E_Grid PR
kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh
January 118.2 37.29 13.23 171.7 169.0 15.83 15.61 0.886
February 136.9 36.13 17.24 182.5 179.9 16.25 16.02 0.856
March 188.2 50.14 23.29 220.6 216.9 18.91 18.65 0.824
April 206.5 66.68 29.22 212.4 208.4 17.84 17.58 0.807
May 222.1 88.27 32.60 207.1 202.4 17.43 17.19 0.809
June 196.5 96.71 32.14 176.2 172.0 15.12 14.91 0.824
July 166.4 93.01 31.42 151.4 147.6 13.11 12.93 0.832
August 159.9 93.20 30.36 155.5 151.9 13.53 13.34 0.836
September 170.6 71.58 28.58 186.7 183.1 16.10 15.88 0.829
October 164.5 46.82 25.49 208.0 204.7 17.76 17.52 0.821
November 128.5 33.61 19.32 186.1 183.4 16.54 16.31 0.854
December 115.1 29.81 14.85 177.4 174.9 16.19 15.96 0.877

PVsyst TRIAL Year

Legends: GlobHor
DiffHor
T Amb
GlobInc
1973.4 743.23

Horizontal global irradiation


Horizontal diffuse irradiation
Ambient Temperature
Global incident in coll. plane
24.85 2235.6 2194.4

GlobEff
EArray
E_Grid
PR
194.61 191.89 0.837

Effective Global, corr. for IAM and shadings


Effective energy at the output of the array
Energy injected into grid
Performance Ratio

PVsyst Evaluation mode


PVSYST V6.70 07/01/20 Page 3/3

Grid-Connected System: Loss diagram


Project : New Project
Simulation variant : New simulation variant
Main system parameters System type Grid-Connected
PV Field Orientation tilt 30° azimuth 0°
PV modules Model CS3U-380MS Pnom 380 Wp
PV Array Nb. of modules 270 Pnom total 103 kWp
Inverter Model Solar Inverter M80H (480 VAC) 80.0 kW ac

PVsyst TRIAL
User's needs Unlimited load (grid)

Loss diagram over the whole year

1973 kWh/m² Horizontal global irradiation


+13.3% Global incident in coll. plane

-1.8% IAM factor on global

2194 kWh/m² * 536 m² coll. Effective irradiance on collectors

efficiency at STC = 19.15% PV conversion

PVsyst TRIAL
225.1 MWh Array nominal energy (at STC effic.)
-0.2% PV loss due to irradiance level

-11.2% PV loss due to temperature

+0.3% Module quality loss

-1.1% Mismatch loss, modules and strings


-1.2% Ohmic wiring loss
195.6 MWh Array virtual energy at MPP

-1.1% Inverter Loss during operation (efficiency)


0.0% Inverter Loss over nominal inv. power
-0.7% Inverter Loss due to max. input current
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to power threshold

PVsyst TRIAL
0.0% Inverter Loss due to voltage threshold
0.0% Night consumption
191.9 MWh Available Energy at Inverter Output

191.9 MWh Energy injected into grid

PVsyst TRIAL
PVsyst Evaluation mode